140R1024R0015__Offeror_QA_final_0007.pdf
PDF 108 KB Posted
- Solicitation number
- 140R1024R0015
About this file
This document is a Q&A from a federal solicitation for the Clear Creek Dam Fish Passage Facility project in Yakima, Washington. The solicitation is being conducted by the Bureau of Reclamation under FAR Part 15 Contracting by Negotiation procedures, with an anticipated award in fiscal year 2025.
The key details include: specification requirements for concrete finishes, electrical equipment, grounding, conduits, cables, chain link fencing, turbine equipment, and excavation/backfill; responses to questions on site access, communication requirements, substitutions, and testing methods; clarifications on payment CLINs; and extensions to the proposal due date. The performance work involves constructing a fish passage facility at the Clear Creek Dam, including a fish ladder, spillway, and related civil, electrical, and mechanical systems. Offerors are required to submit past performance questionnaires for relevant projects completed within the last 10 years.
View the file
Other files
Show all 40
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
# Offeror Question Government Answer
1 There are many specification sections listed in the Table of Contents that are not included and several specification sections that are not listed in the Table of Contents. Reclamation has corrected this issue in Amendment 0002 issued 8/26/2024
2 Is there a list of bidders for this project and how would I access it? Reclamation will not be publishing an interested bidders list for this announcement
3 Can you point me to where it says what percentage the bid bond is to be made for? Read section L.23. 52.228-1 Bid Guarantee (Sep 1996) provision and associated paragraph 28.101-2 (b) in the Federal Acquisition Regulation.
4 Could you please provide the CAD files for the existing grades and final grades?
Refer to specifications Drawing 33-100-60799 through 33-100-60804 and 33-100-60870 for existing grades. Final grades and tie-in with existing grades are shown on specifications Drawings 33-D-61653 through 61657 and 33-D-61659. CAD files will be provided to the successful offeror post-award upon completion of the required waivers.
1. In Table 03 30 00F – Formed Surfaces, please clarify which concrete surfaces will require Finish F2, appearance is not critical, Item 3 in the table and which concrete surfaces will require Finish F3, appearance is important, Item 6 in the table.
Refer to updated specification Section 03 30 00, Cast-In-Place Concrete.
1. Table 03 30 00F – Formed Surfaces, requires the interior of the fish ladder to receive Finish F2. Please confirm that normal bug holes in the formed face created by air entrainment will not require patching and be allowable under the T3 tolerance listed for the fish ladder interior.
Refer to Tables 03 30 00D and 03 30 00F. Concrete surfaces inside the fish ladder shall have an F2 Finish with a T3 Surface.
Abrupt irregularities, such as a bug holes, larger than 0.25-inch shall be repaired according to the specifications.
7 Does the quantity for the CLSM shown on Sheet 17 to be paid under CLIN 33? Refer to updated specifications Section 31 23 70, Controlled Low Strength Materials (CLSM), paragraph 1.01 A for measurement and payment of CLSM.
8 Sheet 11 - Please clarify the note regarding the existing power and control conduit. Is the culvert section referenced a galvanized road pipe culvert acting as a sleeve?
The "culvert" section is referring to the portion of the fish ladder that has a CIP concrete top similar to a box culvert. Refer to "Culvert Section" callouts at approximately station 0+75 on specifications Drawing sheets 33-D-61563, -61654, and -61663.
140R1024R0015 CLEAR CREEK DAM FISH PASSAGE FACILITY
QUESTIONS AND ANSWERS
Upon review of Specification 26-42-13, section 2.07.F says to (Equip [the junction box anode circuits] with variable resistors” As potential material suppliers with no CP design liability, Farwest would need to know the required resistance and current capacity (watts) of the requested resistors. Drawing # 33-D- 61718 gives no answer to this question (reference Galvanic Anode Junction Box Detail).
The Contractor shall determine via tests during commissioning if a resister is required. If required, variable resistors are typically slide resistors and can be sized as 5 ohm - 25 Watt. Contractor shall ensure adequate space is provided in the box for mounting these resistors.
Is it possible for us to meet someone on site who will have keys to these areas (Interior of Generator Building and equipment on the dam behind gates) so we can investigate some of this equipment and determine the full scope? We would also like to visit the Yakima field office to learn more about the existing control workstation and what software is being used on it, if we are able too.
The Government will not schedule a second site visit to address this question. However, the Government has provided pictures of the site that could address offeror concerns regarding this question.
11 1. In Section 28 10 01, Part 2, 2.02, calls out for a protective cage that is SS. Can you provide acceptable examples of cages, or describe what protection functions the cage needs to provide?
Specifications Section 28 10 01, Security and Surveillance Equipment, paragraph 2.02, is the section for the PTZ Dome Cameras, so the stainless steel protective cage called out in paragraph 2.02 G.3 is to protect the dome camera. Contractor is responsible for choosing a stainless steel protective cage appropriate for the cameras proposed. The supplied manufacturer's data for the product should identify that it is a stainless steel protective cage for cameras in the supplied product literature.
12 2. What power circuit is the Power meter in Main Control Panel monitoring? Please confirm the point of desired monitoring.
The power meter in the Main Control Panel is monitoring incoming 3-Phase, 480VAC power. The existing meter is an Acuvim II multifunction power meter. Contractor is to provide a new power meter to replace the current one, as well as reconnect all current and voltage circuits to the new meter as required by specifications Section 25 00 01, System Control and Monitoring, paragraph 2.01 H, I, and J.
13 3. What is the SCADA/HMI software used on the existing workstation HMI at the Yamika Field office? There is no software used at the facility. It is a direct connection from Yakima Field Office to Clear Creek Dam (panel to panel via modems).
14 4. Is the project open to other forms of site-to-site communication to the site, like Satellite? No other forms of communication are acceptable.
15 5. If the leased phone line is the only acceptable or viable option for communications to the Yamika field office, please confirm that the VPN and firewall section of Division 25, section 2.12, are not applicable. These would only apply to any contractor provided network switches connected to the external communication circuit.
16 1. The specified encryption device, SEL SEL-3025, called out in section 27 20 01 paragraph 2.03 is no longer available, is there another acceptable model?
Refer to updated specifications Section 27 20 01, Communications System, and updated specifications Drawing 33-D-61746.
Encryption module is no longer required.
1. Spec 26 05 04 – 2. a. Drawings show existing conduit and wiring coming from the dam that is to be relocated for the fish ladder. How long can this wiring be de-energized and disconnected while it is being relocated?
Refer to updated Specification Section 01 51 00 - Temporary Utilities for requirements.
1. 33-D-61669 Detail A Note 6. a. There are approximately 6+ existing conduits in the path of the fish ladder. Are we to relocate and embed all 6+ existing conduits so they pass through the fish passage structure as the detail only shows a single 4” conduit? (The site was locked so I could not verify which conduits are being used) b. What spacing would be required between adjacent embedded conduits where they pass through the fish passage structure?
Refer to updated Specification Drawing 33-D-61669. Maintain 2-inch spacing between embedded conduits.
19 1. 33-D-61745. a. How long can power be off while ATS/DP1 is being installed/replaced? b. Will temporary power be required during replacement?
Refer to updated Specification Section 01 51 00 - Temporary Utilities for requirements. Temporary power will be required for the four gates and the communication equipment that allows remote control and monitoring from YFO.
1. 33-D-61740. a. This drawing shows explosion proof electrical equipment in the new generator room.
Please clarify what the hazardous area is classified as, CL 1-DIV 1, CL1-DIV 2, etc, as well as where the boundary is. b. This drawing shows multiple circuits in the new generator building with no means of disconnect at the building as required by NEC 225.30, 225.31, as panel LP2 is located in the existing gatehouse/control room. With this generator building classified as a hazardous location, it makes it more challenging sourcing equipment rated for the location. How should we address this code issue of the generator building requiring a disconnecting means? c. What controls the building exhaust fan?
Thermostat?
a. The boundary is according to NFPA 58, Liquified Petroleum Gas Code, in this code Section 6.29 provides requirements for Containers for Stationary Engines. Per this code the electrical equipment in the building should be class 1 Div 2.
b. Electrical distribution equipment that is not necessary to locate within Class 1 areas should not be located in these areas as they may act as ignition sources for the explosive gas, for this reason the electrical distribution equipment for this area is located in close proximity to the building but is not located in the hazardous area.
c. The fan is to run continuously.
21 1. L3 fixture(HW4G) is discontinued, please provide a replacement part #. The Crouse-Hinds EV LED explosion proof fixture with 2900 lumens, wall mount attachment and 3000K color option is similar to the discontinued HW4G explosion proof wall mount fixture listed in specification Section 26 56 60.
1. Spec 26 05 26 – 4 3.01, 40-D-4334, 40-D4335, 40-D-4753. a. Are we to provide grounding for the fish ladder chain link cover fencing and rail supports? b. If so, are we to provide grounding at every fence rail location as shown on 40-D-4753 figure 8? c. Are we to provide grounding for every hand rail support post as shown on 40-D-4335 figure 6? d. Are we to provide grounding for the new and existing re-installed site fence shown on 33-D-61652?
a. The metallic structures provided by the contractor are required to be grounded per specifications Section 26 05 26, Grounding and Bonding, paragraph 3.01 B and F. This can be done by bonding the components of the metallic structure together and then grounding it to the installed grounding system. Overall grounding installation is required to be installed in accordance with NFPA 70 per specifications Section 26 05 26, paragraph 3.01 A.
b. Contractor is responsible for grounding all metallic structures, as referenced in the response above this can be by bonding elements of the metallic structure together. Yes, bonding the components of the structure can be used to reduce the number of grounding points on pieces of the metallic structure.
c. The applies to the hand rail support posts that are acting as the ground point for the handrail and is not required for all hand rail support poses.
d. Contractor is responsible for grounding contractor installed components in accordance with specifications Section 26 05 26.
13.Spec 26 05 10 – 5 2.02 L, 26 05 10 – 6 2.03 L a.Spec indicates type TC multiconductor cable is to be used for power/control conductors smaller than
1/0. This will substantially increase conduit sizes to accommodate this type of cabling. Is standard single conductor thhn/xhhw wiring acceptable for power/control circuits when utilizing wiring smaller than 1/0?
Maintain existing cable requirements in specifications Section 26 05 10, Cables and Conductors.
24 Section 05 50 00 Page 8 – Please clarify which ladders are to receive a Ladder Safety Gate per Para. 2.06 and which are to receive a Ladder Guard per Para. 2.07.
The specification Drawings references either 40-D-6601 (no safety gate) or 40-D-6602 (safety gate). Refer to updated drawing 40-D-6602.
25 Dwg. 33-D-61723, Sheet 82 – Please provide a grade of steel for the Bulkhead Springs, Part 11. Refer to updated specifications Section 35 21 21, Bulkhead Gate, and updated specifications Drawing 33-D-61723.
26 1. What is the load rating for the Spillway Bridge? If nothing is available, what shall we assume for bidding purposes?
The spillway bridge was designed for HS-20 loading and does not have any load restrictions (load posting). All legal loads are able to use this bridge.
27 1. Are complete cross sections available? The ones on page 33-D-61657 do not extend to the catch points at several stations. If possible, please provide a cross section every 25 or 50 feet. No. Refer to specification Drawings.
1. Spec 31 23 11-7 states “ Rock Excavations will consist of mechanical means and/or other methods in accordance with Section 01 56 10 and 31 23 05.” Specification 01 56 10 does not reference rock excavation and specification 31 23 25 is not included in the documents. Please provide additional information regarding rock excavation, specifically any constraints related to proximity of the dam? Is Drilling & Blasting allowed, if so, are there any restrictions on the location, or means and methods of drilling and blasting? Is seismic monitoring required?
Refer to updated specification Section 31 23 11, Earthwork for Structures.
29 1. Please consider extending the Q&A period to 9/16/2024, two weeks prior to the offer due date. Refer to solicitation amendments posted to SAM.gov.
1. Please indicate if any F3 finishing is required and the locations. Table 03 30 00F indicates “surfaces exposed prominently to view or where appearance is important”, this is subjective and difficult to determine.
Refer to updated specification Section 03 30 00, Cast-In-Place Concrete.
31 1. Fish ladder slab elevations are not shown from Sta 0+29.75 to 3+25.19. Please provide elevations or cross sections for determining wall heights.
Refer to specification Drawings 33-D-61669 (25) through 33-D-61676 (35) for elevations and slopes of walls and slabs of the fish ladder.
1. Section 3.03 Placing requires a craftsman certified as an ACI Concrete Flatwork Finisher, the ACI website indicates there are no available trainings in the Pacific Northwest. Is there an alternate, locally attainable certification that would also be acceptable?
Refer to updated specification Section 03 30 00, Cast-In-Place Concrete.
33 What CLIN is the road guardrail to be paid under? Refer to updated specifications Section 34 71 10, W-Beam Guardrail and Section 31 23 50, Earthwork for Road
34 Please confirm that the proposals will be opened and publicly read aloud according to the Solicitation, Offer, and Award.
This solicitation is being conducted under FAR Part 15 Contracting by Negotiation procedures. Therefore, proposals will not be opened and publicly read aloud. Offerors should familiarize themselves with Sections L and M of the solicitation for details on how the Government will select an awardee.
35 Fabric is called out as Galvanizing Before Weaving. This process will make it so that the top and bottom of the fabric will be exposed. I recommend Galvanizing After Weaving. Requirements in specifications Section 32 31 10, Chain Link Fence and Chain Link Fence Cover, shall be met.
36 Fabric coating is called out as Class 1. The weight for class one is 1.2 oz. Since this is a very wet environment, I would recommend Class 2 making the coating to be 2.0 ounce. Requirements in specifications Section 32 31 10, Chain Link Fence and Chain Link Fence Cover, shall be met.
37 Would it be acceptable for the pipe to be per ASTM F1043 Group IC? It is easier to get and less expensive than Group IA in the 50 kpsi.
Refer to updated specifications Section 32 31 10, Chain Link Fence and Chain Link Fence Cover, and specifications Drawing 33-D-61698.
38 What weight of galvanization will the pipe be? I would again recommend 2.0 ounce. Requirements in specifications Section 32 31 10, Chain Link Fence and Chain Link Fence Cover, shall be met.
39 Details show the cover to be welding. Will this require a certified welder? Will it be required to galvanize after welding or will cold galv paint be acceptable?
Refer to updated specifications Section 32 31 10, Chain Link Fence and Chain Link Fence Cover, and specifications Drawing 33-D-61698.
40 Is the design intent for the cover to be removable as the details show the cover sleeving into the posts? The intent of the design is not to be removeable. The sleeve component is there to simplify transportation of fabricated parts and constructability.
In Section 35 79 30 – Debris Boom Modifications, in Para. 1.01.A it mentions debris removal during construction. Can you clarify that this is only during the period of doing the boom modifications and not for the project duration? If it is for the project duration, we should be given some idea of what to expect.
Any debris that accumulates at the location of the reservoir structure and is in the way of construction activities will be the responsibility of the Contractor to remove. This is most likely during times the debris boom is not in place.
- Because of the location of the project and proximity of testing laboratories to perform ASTM D 5080 can this requirement be removed from the project specifications and satisfied with conventional nuclear density testing? In addition, with the requirement to perform 1 of these tests per day and every 500cy it is unlikely to see the test results from this back within 48-72 hours.
Place and compact backfill in accordance with specifications Section 31 23 02, Compacting Earth Materials, and Section 31 23 11, Earthwork for Structures.
- Due to the lack of equipment availability and certification to perform ASTM D 7382 in Washington state, can this requirement be removed from the project specifications and satisfied with conventional nuclear density testing? In addition, with the requirement to perform 1 of these tests per day and every 500cy it is unlikely to see the test results from this back within 48-72 hours.
Place and compact backfill in accordance with specifications Section 31 23 02, Compacting Earth Materials, and Section 31 23 11, Earthwork for Structures.
Factor 3 requires at least three PPQs to be sent directly to the Bureau of Reclamation. Factor 3 does not mention this, but the PPQ form requests a minimum of three Federal Government clients for whom it has performed similar services in the past three years. Is it required that the PPQ’s the Offeror requests have been performed within the past three years, or may we request PPQ’s for projects that have been completed within the last 10 years, as is requested under Factor 2, Section B (page L-8, or pg. 924/933 of Solicitation).
PPQs may be submitted for projects within the last 10 years as descried in Section L and M.
Dwg 33-D-61698 Notes and section 32 31 10-2.02.B indicate that Chain Link Cover pipes are spec F1082 Gr 50. Which is a pre-galvanized Fence material. The Cover Frames require rolling the Arch which could be detrimental to the Galvanized coating. This assembly also requires welding which again will require galvanizing repairs. Will ASTM A500 Gr B pipe be acceptable with Post-Fabrication Hot Dip Galvanizing in lieu of F1082?
Refer to updated specifications Section 32 31 10, Chain Link Fence and Chain Link Fence Cover, and specifications Drawing 33-D-61698.
Hendrick Screen Company has prepared a quotation for the fish screens found on the Clear Creek Dam Fish Passage Facility. We normally send out a copy of our quotation and scope of supply to the bidders on the project. I have searched the documents and was unable to find a plan holder or bidder’s list. Can you direct me to where I can access a list?
The Government did not generate a bidders list. Offerors should review the solicitation amendments for the site visit attendance roster.
47 Please consider extending the proposal date four weeks due to unanswered questions and extensive proposal level of effort. The proposal due date has been extended. Offerors should review solicitation amendment's for revised due date.
48 Are there any restrictions for pile installation using a drilling method adjacent to the dam? There is insufficient information provided to answer. Additional coordination via RFIs and VEPs will be considered after contractor award.
According to Sheet 77 , the turbine discharge centerline will be 7’-0” above the floor of the discharge weir. The elevation of that floor is 3013.50 according to Sheet 27, and the elevation of the floor slab that the turbine soleplate is installed on is 3019.50 according to Sheet 26. That puts the elevation of the discharge centerline at 3020.5, leaving no room for an equipment pad. Is the Soleplate actually going to be embedded in the concrete floor as it appears to be called out in Spec Section 33 12 71.C.4?
Refer to updated specification Section 33 12 71, Vertical Turbine Pumping Units, and specification Drawing 33-D-61737.
According to sheet 127, the anchor embedment should be at least 10x the anchor diameter. The Soleplate anchor holes are sized for 10” anchors, and the slab is only 8” thick. Are we to drill a through-hole in the slab and grout in the anchors?
Refer to specifications Drawing 33-D-61667. Contractor to adjust anchorage to work within the dimensional constraints of the slab or provide a proposed anchor design that satisfies the loading conditions.
51 What is the load rating for the spillway bridge? The spillway bridge was designed for HS-20 loading and does not have any load postings. All legal loads are able to use this bridge.
52 Note 9 on Dwg. Sheet 17 states to backfill the Reservoir and River structures with concrete and CLSM.
Please provide a dimension from the ends of each how far this zone is to be.
Specification Drawing 33-D-61666 and 33-D-61676 delineates what is considered the "Reservoir Structure" and the "River Structure", which are 29'-8" long and 22'-6" long, respectively.
May the fish ladder sections founded in rock, other than the Reservoir and River structures, be over excavated and backfilled with compacted backfill to allow for two-sided wall forming? It is unknown how the rock will excavate in regards to overbreak adding unknown risk for concrete over run. The rock excavation payline allows for virtually no overbreak volume for additional concrete.
Two-sided wall forming is not restricted in the contract document; only required in areas above bedrock. If the Contractor prefers to excavate addition amounts to facilitate two-sided wall forming below bedrock, it will be considered at the convenience of the Contractor and the Government will not pay for the additional excavation. Paylines shown in Specification Drawings will be used for payment.
54 The height of the chain link fence (CLIN 36) is not called out. Specification Drawing 40-D-7016 indicates that chain link fences are 6 foot high fabric unless otherwise noted on specific site plans.
55 On Sht. 51, Note 2 specifies the 2” grating. However, the note states the bearing bars are to be 2 ½”.
Please clarify. Refer to updated Specifications Drawing 33-D-61693.