This document is a revised solicitation for the Clear Creek Dam Fish Passage Facility project in the Yakima River, Washington. The U.S. Bureau of Reclamation is seeking proposals for this project, with an anticipated award in Fiscal Year 2025. The solicitation includes a Statement of Work detailing the requirements for the fish passage facility construction. Key details include an active fire situation near the project site, with potential amendments to the pre-proposal site visit, and instructions for interested offerors to direct all correspondence to the specified Contract Specialist and Contracting Officer. This is a civilian federal contract opportunity, and the solicitation attachments provide additional details on the project requirements and proposal submission.
View the file
Other files
Show all 40
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
U.S. Department of the Interior SPECIFICATIONS Bureau of Reclamation Technical Service Center Denver, Colorado August, 2024
Clear Creek Dam Fish Passage Facility
Yakima Project, Washington
Columbia-Pacific Northwest Region Solicitation No. 140R1024R0015
This solicitation issued by Contracting Officer
Pacific Northwest Region Bureau of Reclamation
1150 North Curtis Road, Suite 100 Boise ID 83706-1234
CLEAR CREEK DAM
Fish Passage Facility
Yakima Project, Washington
FOREWORD
Work is located at Clear Creek Dam, approximately 45 miles west of Yakima, Washington in Yakima County. Work is for construction of a fish passage. Principal components include intake structure, pump, concrete fish ladder, dam gate automation, site lighting, generator building, electrical upgrades, and access road.
SEE SECTION L FOR SITE VISIT INFORMATION. ATTENDEES WILL PROVIDE
THEIR OWN PERSONAL PROTECTION EQUIPMENT (PPE) TO INCLUDE: SAFETY
GLASSES, SAFETY BOOTS, HARD HATS, AND SAFETY VESTS.
FOR DATE AND PLACE OF BID OPENING, SEE “SOLICITATION, OFFER, AND
AWARD” STANDARD FORM 1442.
FOR INFORMATION REGARDING BUREAU OF RECLAMATION'S PUBLICATION
"RECLAMATION SAFETY AND HEALTH STANDARDS" (LATEST EDITION AS
REVISED, WITH REVISIONS AT ( https://www.usbr.gov/safety/rshs/index.html ).
WHICH IS APPLICABLE TO WORK UNDER THIS CONTRACT, SEE CLAUSE AT
"WBR 1452.223-81 SAFETY AND HEALTH."
This page intentionally left blank.
Clear Creek Dam Fish Passage Facility Solicitation No. 140R1024R0015 i
PART I THE SCHEDULE..................................................................................................... A-1
SECTION A SOLICITATION/CONTRACT FORM ........................................................ A-2
SECTION B SUPPLIES OR SERVICES AND PRICES/COSTS ..................................... B-1
SECTION C DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK ................ C-1
DIVISION 01 - GENERAL REQUIREMENTS
01 11 00 Summary of Work 01 14 10 Use of Site 01 14 12 Work Restrictions and Limitations 01 14 15 Forest Service Requirements 01 14 20 Dam Operations and Unwatering 01 31 19 Project Management and Coordination Meetings 01 31 30 Contract Document Management System 01 32 10 Construction Program 01 33 00 Submittals 01 33 26 Electrical Drawings and Data 01 35 10 Safety Data Sheets 01 35 20 Safety and Health 01 35 30 Contractor’s Onsite Safety Personnel 01 35 37 Underwater Work 01 42 10 Reference Standards 01 46 00 Quality Procedures 01 51 00 Temporary Utilities 01 52 10 Field Office 01 55 00 Vehicular Access and Parking 01 55 20 Traffic Control 01 56 10 Protection of Existing Installations 01 56 15 Protection of Existing Utilities 01 56 20 Existing Fences 01 56 32 Temporary Safety Fence 01 57 20 Environmental Controls 01 57 30 Water Pollution Control 01 57 50 Tree and Plant Protection 01 57 60 Protected Species 01 57 70 Fire Protection and Prevention 01 57 90 Preservation of Historical and Archeological Data 01 60 00 Product Requirements 01 71 20 Surveying 01 74 00 Cleaning and Waste Management 01 78 30 Project Record Documents 01 91 13 Commissioning
DIVISION 02 - EXISTING CONDITIONS
ii
02 41 10 Selective Site Demolition
DIVISION 03 - CONCRETE
03 11 10 Concrete Forming 03 15 12 PVC Waterstop 03 20 00 Concrete Reinforcing 03 30 00 Cast-In-Place Concrete 03 62 20 Nonshrink Grout for Equipment and Metalwork
DIVISION 05 - METALS
05 50 00 Metal Fabrications
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 72 30 Roof Hatches 07 92 00 Joint Sealants
DIVISION 08 - OPENINGS
08 11 10 Steel Doors and Frames 08 31 20 Floor Access Hatches 08 71 00 Door Hardware 08 95 16 Wall Vents
DIVISION 09 - FINISHES
09 96 20 Coatings
DIVISION 13 – SPECIAL CONSTRUCTION
13 34 40 Engine-Generator Building
DIVISION 23 - HEATING, VENTILATING, AND AIR-CONDITIONING (HVAC)
23 05 29 Supports - HVAC 23 31 00 Ducts - HVAC 23 34 00 Fans - HVAC 23 37 00 Air Inlets and Outlets
0F1FDIVISION 25 - INTEGRATED AUTOMATION
25 00 01 System Control and Monitoring iii
DIVISION 26 - ELECTRICAL
26 05 02 Basic Electrical Materials and Methods 26 05 04 Removal of Existing Electrical Equipment 26 05 10 Conductors and Cables 26 05 26 Grounding and Bonding 26 05 33 Raceway and Boxes 26 05 80 Wiring Checkout and Tests 26 24 16 Distribution Panelboards 26 24 30 Control Panel 26 27 40 Wiring Devices 26 30 10 Automatic Transfer Switch 26 32 10 Engine Generator Set 26 42 13 Submerged Galvanic Anode Cathodic Protection and Corrosion Monitoring
Systems 26 56 60 Lighting
DIVISION 27 – COMMUNICATIONS
27 20 01 Communications Systems
DIVISION 28 – SECURITY
28 10 01 Security and Surveillance Equipment
DIVISION 31 - EARTHWORK
31 02 10 Water for Dust Abatement 31 03 10 Diversion and Care of Stream During Construction 31 03 33 Removal of Water from Excavation 31 11 00 Clearing and Grubbing 31 14 10 Topsoil Stripping, Stockpiling, and Placement 31 23 02 Compacting Earth Materials 31 23 11 Earthwork for Structures 31 23 39 Disposal of Excavated Materials 31 23 50 Earthwork for Roads 31 23 70 Controlled Low Strength Material (CLSM) 31 25 10 Erosion Control 31 32 32 Geotextile
DIVISION 32 - EXTERIOR IMPROVEMENTS
32 15 10 Gravel Surfacing 32 31 10 Chain Link Fence and Chain Link Cover iv
32 92 20 Seeding and Site Improvements
DIVISION 33 - UTILITIES
33 09 12 Water Level Measuring Devices 33 12 71 Vertical Turbine Pumping Units
DIVISION 34 - TRANSPORTATION
34 71 10 W-Beam Guardrail
DIVISION 35 - WATERWAY AND MARINE CONSTRUCTION
35 10 10 Fish Screen 35 21 13 Cylindrical Screen 35 21 16 False Weir and Steep Pass 35 21 21 Bulkhead Gate 35 21 23 Bar Rack 35 21 95 Steel Piping 35 22 10 Slide Gates 35 22 14 Valves and Equipment 35 79 30 Debris Boom Modifications
DIVISION 41 - MATERIAL PROCESSING AND HANDLING EQUIPMENT
41 22 14 Jib Crane
FDIVISION 51 - INFORMATION AVAILABLE TO OFFERORS
51 00 00 Information Available to Offerors 51 00 20 I-O Points List 51 00 30 Photographs 51 00 80 Bridge Overload Permit 51 00 90 Road Use Permit
DIVISION 52 - DRAWINGS
52 00 00 Drawings
DIVISION 53 - GEOLOGIC INVESTIGATIONS AND RECORDS
53 10 00 Geologic Investigations 53 20 00 Records of Geologic and Subsurface Investigations
SECTION D PACKAGING AND MARKING .................................................................. D-1 v
SECTION E INPSECTION AND ACCEPTANCE ............................................................ E-1
E.1. 52.246-12 Inspection of Construction (Aug 1996) .................................................... E-1
SECTION F Section F Deliveries and Performance ........................................................... F-1
F.1. 52.211-10 Commencement, Prosecution, and Completion of Work (Apr 1984) ...... F-1
F.2. 52.211-12 Liquidated Damages — Construction (Sep 2000) ................................... F-1
F.3. 52.211-18 Variation in Estimated Quantity (Apr 1984) ............................................ F-1
F.4. 52.242-14 Suspension of Work (Apr 1984) .............................................................. F-1
SECTION G CONTRACT ADMINISTRATION .............................................................. G-1
G.1. Government Point of Contact ................................................................................... G-1
G.2. 1452.201-70 Authorities and Delegations (Sep 2011) ............................................. G-1
G.3. DOI-AAAP-0028 Electronic Invoicing and Payment Requirements – Invoice Processing Platform (IPP) (Feb 2021) ................................................................................. G-2
G.4. WBR 1452.201-80 Contracting Officer’s Representative’s Authorities and Limitations – Bureau of Reclamation (May 2018) .............................................................. G-3
SECTION H SPECIAL CONTRACT REQUIREMENTS................................................. H-1
H.1. DOI-AAAP-0050 Contractor Performance Assessment Reporting System (Dec 2015) H-1
PART II CONTRACT CLAUSES .......................................................................................... H-1
SECTION I CONTRACT CLAUSES ................................................................................. I-1
I.1. 52.252-2 Clauses Incorporated by Reference (Feb 1998) .......................................... I-1
I.2. 52.202-1 Definitions (Jun 2020) ................................................................................. I-1
I.3. 52.203-3 Gratuities (Apr 1984) .................................................................................. I-1
I.4. 52.203-5 Covenant Against Contingent Fees (May 2014) ......................................... I-1
I.5. 52.203-6 Restrictions on Subcontractor Sales to the Government (Jun 2020) ........... I-1
I.6. 52.203-7 Anti-Kickback Procedures (Jun 2020) ........................................................ I-1
I.7. 52.203-8 Cancellation, Rescission, and Recovery of Funds for Illegal or Improper Activity (May 2014) .............................................................................................................. I-1
I.8. 52.203-10 Price or Fee Adjustment for Illegal or Improper Activity (May 2014) ..... I-1
I.9. 52.203-12 Limitations on Payments to Influence Certain Federal Actions (Jun 2020)I-
I.10. 52.203-13 Contractor Code of Business Ethics and Conduct (Nov 2021) ............. I-1
I.11. 52.203-14 Display of Hotline Poster(s) (Nov 2021) ............................................... I-1
I.12. 52.203-17 Contractor Employee Whistleblower Rights (Nov 2023) ..................... I-1 vi
I.13. 52.203-19 Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements (Jan 2017) ............................................................................................................ I-1
I.14. 1452.203-70 Restrictions on Endorsements – Department of the Interior (Jul 1996) I-1
I.15. DOI-AAAP-0081 Security Requirements: Facility Access Information Technology (Aug 2016) ............................................................................................................................. I-1
I.16. 52.204-9 Personal Identity Verification of Contractor Personnel (Jan 2011) ........ I-6
I.17. 52.204-10 Reporting Executive Compensation and First-Tier Subcontract Awards (Jun 2020) .............................................................................................................................. I-6
I.18. 52.204-13 System for Award Management (Oct 2018).......................................... I-6
I.19. Service Contract Reporting Requirements (Oct 2016) ........................................... I-6
I.20. 52.204-18 Commercial and Government Entity Code Maintenance (Aug 2020) .. I-6
I.21. 52.204-19 Incorporation by Reference of Representations and Certifications (Dec 2014) I-6
I.22. 52.204-21 Basic Safeguarding of Covered Contractor Information Systems (Nov 2021) I-6
I.23. 52.204-23 Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by Kaspersky Lab Covered Entities (Dec 2023) ............................. I-9
I.24. 52.204-25 Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment (Nov 2021) .................................................................. I-9
I.25. 52.204-27 Prohibition on a ByteDance Covered Application (Jun 2023) .............. I-9
I.26. 1452.204-70 Release of Claims – Department of the Interior (Jul 1996) ............... I-9
I.27. 52.209-6 Protecting the Government’s Interest When Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment (Nov 2021) ........................ I-9
I.28. 52.209-9 Updates of Publicly Available Information Regarding Responsibility Matters (Oct 2018)................................................................................................................. I-9
I.29. 52.209-10 Prohibition on Contracting with Inverted Domestic Corporations (Nov 2015) I-9
I.30. 52.210-1 Market Research (Nov 2021) .................................................................. I-9
I.31. 52.215-2 Audit and Records – Negotiation (Jun 2020) .......................................... I-9
I.32. 52.215-8 Order of Precedence – Uniform Contract Format (Oct 1997) ................. I-9
I.33. 52.215-10 Price Reduction for Defective Certified Cost or Pricing Data (Aug 2011) I-9
I.34. 52.215-12 Subcontractor Certified Cost or Pricing Data (Jun 2020) ...................... I-9
I.35. 52.215-15 Pension Adjustments and Asset Reversions (Oct 2010) ....................... I-9 vii
I.36. 52.215-17 Waiver of Facilities Capital Cost of Money (Oct 1997) ....................... I-9
I.37. 1452.215-70 Examination of Records by the Department of the Interior (Apr 1984) I-9
I.38. 52.215-21 Requirements for Cost or Pricing Data and Data Other Than Certified Cost or Pricing Data – Modifications (Jun 2021) ................................................................ I-10
I.39. 52.215-23 Limitations on Pass-Through Charges ................................................ I-10
I.40. WBR 1452.215-87 Incorporation of Technical Proposal (MAR 2021) ............... I-10
I.41. Contractor’s Technical Proposal Incorporated Into Contract – Bureau of Reclamation – PN Region (Mar 2001) ................................................................................ I-11
I.42. 52.219-6 Notice of Total Small Business Set-Aside (Nov 2020) ......................... I-11
I.43. 52.219-8 Utilization of Small Business Concerns (Feb 2024) ............................. I-11
I.44. 52.219-14 Limitations on Subcontracting (Oct 2022) .......................................... I-11
I.45. 52.219-28 Post Award Small Business Program Rerepresentation (Feb 2024) ... I-11
I.46. 52.222-3 Convict Labor (Jun 2003) ...................................................................... I-11
I.47. 52.222-4 Contract Work Hours and Safety Standards – Overtime Compensation (May 2018) .......................................................................................................................... I-11
I.48. 52.222-6 Construction Wage Rate Requirements (Aug 2018) ............................. I-11
I.49. 52.222-7 Withholding of Funds (May 2014) ........................................................ I-11
I.50. 52.222-8 Payrolls and Basic Records (Jul 2021) .................................................. I-11
I.51. 52.222-9 Apprentices and Trainees (Jul 2005) ..................................................... I-11
I.52. 52.222-10 Compliance with Copeland Act Requirements (Feb 1988) ................. I-11
I.53. 52.222-11 Subcontracts (Labor Standards) (May 2014) ....................................... I-11
I.54. 52.222-12 Contract Termination – Debarment (May 2014) ................................. I-11
I.55. 52.222-13 Compliance with Construction Wage Rate Requirements and Related Regulations (May 2014) ...................................................................................................... I-11
I.56. 52.222-14 Disputes Concerning Labor Standards (Feb 1988) .............................. I-11
I.57. 52.222-15 Certification of Eligibility (May 2014) ............................................... I-11
I.58. 52.222-21 Prohibition of Segregated Facilities (Apr 2015).................................. I-11
I.59. 52.222-26 Equal Opportunity (Sep 2016) ............................................................. I-11
I.60. 52.222-27 Affirmative Action Compliance Requirements for Construction (Apr 2015) I-11
I.61. 52.222-35 Equal Opportunity for Veterans (Jun 2020) ........................................ I-11
I.62. 52.222-36 Equal Opportunity for Workers with Disabilities (Jun 2020) ............. I-11 viii
I.63. 52.222-37 Employment Reports on Veterans (Jun 2020) ..................................... I-12
I.64. 52.222-40 Notification of Employee Rights Under the National Labor Relations Act (Dec 2010) .................................................................................................................... I-12
I.65. 52.222-50 Combating Trafficking of Persons (Nov 2021) ................................... I-12
I.66. 52.222-54 Employment Eligibility Verification (May 2022) ............................... I-12
I.67. 52.222-55 Minimum Wages for Contractor Workers Under Executive Order 14026 (Jan 2022) ............................................................................................................................ I-12
I.68. 52.222-62 Paid Sick Leave Under Executive Order 13706 (Jan 2022) ................ I-12
I.69. 52.223-3 Hazardous Material Identification and Material Safety Data (Feb 2021), Alternate I (Jul 1995) ........................................................................................................... I-12
I.70. 52.223-5 Pollution Prevention and Right-to-Know Information (May 2024) ...... I-12
I.71. 52.223-23 Sustainable Products and Services (May 2024) .................................. I-12
I.72. WBR 1452.223-80 Asbestos Free Warranty – Bureau of Reclamation (Aug 2021) I-
I.73. WBR 1452.223-81 Safety and Health – Bureau of Reclamation (Oct 2022) ....... I-12
I.74. WBR 1452.223-82 Ensuring Adequate Covid-19 Safety Protocols in Federal Buildings and Federally Controlled Facilities – Bureau of Reclamation (Nov 2022) ........ I-13
I.75. 52.225-11 Buy American – Construction Materials Under Trade Agreements (Nov 2023) I-13
I.76. 52.225-13 Restrictions on Certain Foreign Purchases (Feb 2021) ....................... I-13
I.77. 52.226-1 Utilization of Indian Owned Economic Enterprises (Jun 2000) ............ I-13
I.78. 52.226-7 Drug-Free Workplace (May 2024) ........................................................ I-13
I.79. 52.226-8 Encouraging Contractor Policies to Ban Text Messaging While Driving (May 2024) .......................................................................................................................... I-13
I.80. 52.227-1 Authorization and Consent (Jun 2020) .................................................. I-14
I.81. 52.227-2 Notice and Assistance Regarding Patent and Copyright Infringement (Jun 2020) I-14
I.82. 52.227-4 Patent Indemnity – Construction Contracts (Dec 2007) ........................ I-14
I.83. 52.227-17 Rights in Data – Special Works (Dec 2007) ........................................ I-14
I.84. 52.228-2 Additional Bond Security (Oct 1997) .................................................... I-14
I.85. 52.228-5 Insurance – Work on a Government Installation (Jan 1997) ................. I-14
I.86. 52.228-11 Individual Surety—Pledge of Assets (Feb 2021) ................................ I-14
I.87. 52.228-12 Prospective Subcontract Requests for Bonds (Dec 2022) ................... I-14
I.88. 52.228-14 Irrevocable Letter of Credit (Nov 2014) .............................................. I-14 ix
I.89. 52.228-15 Performance and Payment Bonds – Construction (Jun 2020) ............. I-14
I.90. 1452.228-70 Liability Insurance – Department of the Interior (Jul 1996) ........... I-14
I.91. 52.229-3 Federal, State, and Local Taxes (Feb 2013) .......................................... I-15
I.92. 52.229-11 Tax on Certain Foreign Procurements-Notice and Representation (Jun 2020) I-15
I.93. 52.229-12 Tax on Certain Foreign Procurements (Feb 2021) .............................. I-15
I.94. WBR 1452.229-90 Notice of Washington State Sales and Use Tax – Bureau of Reclamation – C-PN Region (Feb 1995) ............................................................................. I-15
I.95. 52.232-5 Payment under Fixed-Price Construction Contracts (May 2014) ......... I-15
I.96. 52.232-17 Interest (May 2014) ............................................................................. I-15
I.97. 52.232-23 Assignment of Claims (May 2014) ..................................................... I-15
I.98. 52.232-27 Prompt Payment for Construction Contracts (Jan 2017) ..................... I-15
I.99. 52.232-33 Payment by Electronic Funds Transfer – System for Award Management (Oct 2018) ...................................................................................................... I-15
I.100. 52.232-39 Unenforceability of Unauthorized Obligations (Jun 2013) ................. I-15
I.101. 52.232-40 Providing Accelerated Payments to Small Business Subcontractors (Mar 2023) I-15
I.102. WBR 1452.232-80 Limitation of Funds – Bureau of Reclamation (Mar 2022) ... I-15
I.103. WBR 1452.232-81 Payment for Mobilization and Preparatory Work – Bureau of Reclamation (Mar 2022), Alternate I (Mar 2022) ............................................................... I-17
I.104. 52.233-1 Disputes (May 2014), Alternate I (Dec 1991) ....................................... I-20
I.105. 52.233-3 Protest After Award (Aug 1996) ........................................................... I-20
I.106. 52.233-4 Applicable Law for Breach of Contract Claim (Oct 2004) ................... I-20
I.107. 52.236-1 Performance of Work by the Contractor (Apr 1984) ............................ I-20
I.108. 52.236-2 Differing Site Conditions (Apr 1984) .................................................... I-20
I.109. 52.236-3 Site Investigation and Conditions Affecting Work (Apr 1984) ............ I-20
I.110. 52.236-4 Physical Data (Apr 1984) ...................................................................... I-20
I.111. 52.236-5 Material and Workmanship (Apr 1984) ................................................ I-21
I.112. 52.236-6 Superintendence by the Contractor (Apr 1984) ..................................... I-21
I.113. 52.236-7 Permits and Responsibilities (Nov 1991) .............................................. I-21
I.114. 52.236-8 Other Contracts (Apr 1984) ................................................................... I-21
I.115. 52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements (Apr 1984) ................................................................................................... I-21 x
I.116. 52.236-10 Operation and Storage Areas (Apr 1984) ............................................ I-21
I.117. 52.236-11 Use and Possession Prior to Completion (Apr 1984) .......................... I-21
I.118. 52.236-12 Cleaning Up (Apr 1984) ...................................................................... I-21
I.119. 52.236-13 Accident Prevention (Nov 1991), Alternate I (Nov 1991) .................. I-21
I.120. 52.236-14 Availability and Use of Utility Services (Apr 1984) ........................... I-21
I.121. 52.236-16 Quantity Surveys (Apr 1984), Alternate I (Apr 1984) ........................ I-21
I.122. 52.236-17 Layout of Work (Apr 1984) ................................................................. I-21
I.123. 52.236-21 Specifications and Drawings for Construction (Feb 1997), Alternate II (Apr 1984) ........................................................................................................................... I-21
I.124. 52.236-26 Preconstruction Conference (Feb 1995) .............................................. I-21
I.125. WBR 1452.236-84 Preservation of Cultural Resources – Bureau of Reclamation (Mar 2022) ........................................................................................................................... I-21
I.126. WBR 1452.237-80 Security Requirements – Bureau of Reclamation (Mar 2022) .. I-
I.127. WBR 1452.237-90 Implementation of Security Requirements – Construction Contract – Bureau of Reclamation – C-PN Region (Aug 2010) ......................................... I-28
I.128. 52.242-13 Bankruptcy (Jul 1995) ......................................................................... I-29
I.129. 52.243-4 Changes (Jun 2007) ............................................................................... I-29
I.130. 52.243-6 Change Order Accounting (Apr 1984) .................................................. I-29
I.131. WBR 1452.243-80, Modification Proposals – Bureau of Reclamation (Mar 2022) – Alternate II (Mar 2022) ....................................................................................................... I-29
I.132. 52.244-2 Subcontracts (Jun 2020) ........................................................................ I-31
I.133. 52.244-5 Competition in Subcontracting (Dec 1996) ........................................... I-31
I.134. 52.244-6 Subcontracts for Commercial Products and Commercial Services (Feb 2024) I-31
I.135. 52.245-1 Government Property (Sep 2021) .......................................................... I-31
I.136. 52.245-9 Use and Charges (Apr 2012) ................................................................. I-31
I.137. 52.246-21 Warranty of Construction Alternate I (Apr 1984) ............................... I-31
I.138. 52.248-3 Value Engineering – Construction (Oct 2020) ...................................... I-31
I.139. 52.249-2 Termination for Convenience of the Government (Fixed Price) (Apr 2012), Alternate I (Sep 1996) .............................................................................................. I-31
I.140. 52.249-10 Default (Fixed-Price Construction) (Apr 1984) .................................. I-31
I.141. 52.252-6 Authorized Deviation in Clauses (Nov 2020) ....................................... I-31 xi
I.142. 52.253-1 Computer Generated Forms (Jan 1991) ................................................. I-31
I.143. WBR 1452.227-90 Contract Document Management System (CDMS)-CPN Region (Apr 2021) ............................................................................................................... I-31
I.144. 1452.280-3 Indian Economic Enterprise Subcontracting Limitations (Feb 2021) ... I-
PART III LIST OF DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS ............ I-1
SECTION J LIST OF ATTACHMENTS ........................................................................... J-1
J.1. Wage Determination (7 pages) .................................................................................. J-1
J.2. 140R1024R0015 Drawings (146 pages) .................................................................... J-1
J.3. Permits (625 pages) ................................................................................................... J-1
J.4. Geology Drawings (26 pages) ................................................................................... J-1
J.5. Bid Bond, Standard Form 24, OMB Control Number 9000-0045, Exp Date 8/31/2025 (2 pages) https://www.gsa.gov/forms-library/bid-bond ....................................................... J-1
J.6. Past Performance Questionnaire (6 pages) ................................................................ J-1
PART IV REPRESENTATIONS AND INSTRUCTIONS ................................................... J-1
SECTION K REPRESENTATIONS, CERTIFICATIONS, AND OTHER STATEMENTS
OF OFFERORS OR RESPONDENTS ................................................................................... K-1
K.1. Acquisition 360: Voluntary Survey (Sep 2023) ....................................................... K-1
K.2. 52.204-8 Annual Representations and Certifications (Feb 2024) ............................ K-1
K.3. 52.204-24 Representation Regarding Certain Telecommunications and Video Surveillance Services or Equipment (Nov 2021) ................................................................ K-6
K.4. 52.204-29 Federal Acquisition Supply Chain Security Act Orders-Representation and Disclosures (Dec 2023) ..................................................................................................... K-10
K.5. 52.209-7 Information Regarding Responsibility Matters (Oct 2018) .................... K-11
K.6. 52.209-13 Violation of Arms Control Treaties or Agreements-Certification (Nov 2021) K-13
K.7. 1452.280-4 Indian Economic Enterprise Representation (Feb 2021) .................... K-15
SECTION L INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS OR
RESPONDENTS ...................................................................................................................... L-1
L.1. 52.252-1 Solicitation Provisions Incorporated by Reference (Feb 1998) ................. L-1
L.2. 52.203-18 Prohibition on Contracting with Entities that Require Certain Internal Confidentiality Agreements or Statements-Representation (Jan 2017) ............................... L-1
L.3. 52.204-7 System for Award Management (Oct 2018) .............................................. L-1
L.4. 52.204-16 Commercial and Government Entity Code Reporting (Aug 2020) .......... L-1 xii
L.5. 52.204-22 Alternative Line Item Proposal (Jan 2017) .............................................. L-1
L.6. 52.211-1 Availability of Specifications Listed in the GSA Index of Federal Specifications, Standards and Commercial Item Descriptions, FPMR Part 101-29 (Sep 2023) L-1
L.7. 52.211-3 Availability of Specifications Not Listed in the GSA Index of Federal Specifications, Standards and Commercial Item (Jun 1988) ................................................ L-1
L.8. 52.211-4 Availability for Examination of Specifications Not Listed in the GSA Index of Federal Specifications, Standards and Commercial Item Descriptions (Jun 1988) ......... L-1
L.9. 52.211-6 Brand Name or Equal (Aug 1999) ............................................................. L-2
L.10. 52.215-1 Instructions to Offerors – Competitive Acquisitions (Nov 2021) .......... L-2
L.11. 52.215-16 Facilities Capital Cost of Money (Jun 2003) ........................................ L-2
L.12. 52.215-20 Requirement for Cost or Pricing Data Information Other than Cost or Pricing Data (Nov 2021)....................................................................................................... L-2
L.13. 1452.215-71 Use and Disclosure of Proposal Information – Department of Interior (Apr 1984) ............................................................................................................................ L-2
L.14. WBR 1452.215-80 Source Evaluation and Selection Procedures – Bureau of Reclamation (Mar 2021) ....................................................................................................... L-2
L.15. WBR 1452.215-81 General Proposal Instructions – Bureau of Reclamation (Mar 2021) L-3
L.16. WBR 1452.215-86 Intent to Incorporate Technical Proposal – Bureau of Reclamation (Mar 2021) ..................................................................................................... L-10
L.17. WBR 1452.215-91 Email Acknowledgement of Amendments, Modifications to Offers, and Withdrawals of Offers (Apr 2022) .................................................................. L-10
L.18. 52.216-1 Type of Contract (Apr 1984) ................................................................ L-11
L.19. 52.222-5 Construction Wage Requirements – Secondary Site of Work (May 2014) L-11
L.20. 52.222-23 Notice of Requirement for Affirmative Action to Ensure Equal Employment Opportunity for Construction (Feb 1999) ..................................................... L-11
L.21. WBR 1452.222-90 Non-Discrimination Notice to U.S. DOI Contractors, Subcontractors, and Lessors – Bureau of Reclamation - C-PN Region (Jan 2000) ........... L-13
L.22. 52.225-12 Notice of Buy American Requirement – Construction Materials Under Trade Agreements (May 2014) ........................................................................................... L-13
L.23. 52.228-1 Bid Guarantee (Sep 1996) .................................................................... L-13
L.24. 52.232-13 Notice of Progress Payments (Apr 1984) ........................................... L-13 xiii
L.25. 1452.233-2 Service of Protest – Department of the Interior (Deviation) (Jul 1996) L-13
L.26. 52.236-27 Site Visit (Construction) (Feb 1995), Alternate I (Feb 1995) ............ L-13
L.27. 52.236-28 Preparation of Proposals – Construction (Oct 1997) .......................... L-14
L.28. WBR 1452.236-85 Instruction for Mobilization and Preparatory Work Schedule Line Item – Bureau of Reclamation (Mar 2022) ................................................................ L-14
L.29. WBR 1452.236-92 Site Visit Attendance Restriction – Bureau of Reclamation – C- PN Northwest Region (May 2004) ..................................................................................... L-15
L.30. 52.252-3 Alterations in Solicitation (Apr 1984) .................................................. L-15
L.31. 52.252-5 Authorized Deviation in Provisions (Nov 2020) .................................. L-15
SECTION M EVALUATION FACTORS FOR AWARD .............................................. M-15
M.1. WBR 1452.215-82 Evaluation Factors for Award – Quality Predominance – Bureau of Reclamation (Mar 2021) .................................................................................. M-15
SOLICITATION, OFFER,
AND AWARD
2. TYPE OF SOLICITATION
6. PROJECT NO. 4. CONTRACT NO. 5. REQUISITION/PURCHASE REQUEST NO.
PAGE OF PAGES
7. ISSUED BY CODE 8. ADDRESS OFFER TO
SOLICITATION
(Construction, Alteration, or Repair)
1. SOLICITATION NO. 3. DATE ISSUED
IMPORTANT -- The "offer" section on the reverse must be fully completed by offeror.
9.
INFORMATION CALL
a. NAME b. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder."
FOR
SEALED BID (IFB)
NEGOTIATED (RFP)
Bureau of Reclamation
Pacific Northwest Region
Regional Office Acquisition Management Division
R10
1150 N. Curtis Road, Ste. 100
Boise ID 83706-1234
Drew McGuire 2083785080
1x
140R1024R0015
INVITATION FOR BID
REQUEST FOR PROPOSAL
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date)
Project Title: Clear Creek Dam Fish Passage Facility
This solicitation is being solicited as a total small business set-aside.
The construction cost magnitude for this work is between $15,000,000.00 and
$20,000,000.00.
The contractor shall complete the work in accordance with F.1 52.211-10.
Commencement, Prosecution, and Completion of Work (Apr 1984)
Establish contractor Question and Answer (Q&A) cut-off date. The final date for contractor Q&A is 1400 Mountain Standard Time, on September 6th, 2024. No contractor questions will be accepted after this date and time. Please direct all questions to the Contracting Officer Lance Fleming at LFleming@usbr.gov and the Contract Specialist Drew McGuire at DMcGuire@usbr.gov.
A site visit has been scheduled for August 28th, 2024 at 1:00 PM PST. Participants need to register with Drew McGuire at DMcGuire@usbr.gov and Matt Maling MMaling@usbr.gov. Participants will meet at Clear Creek Dam Spillway, Naches, Yakima Continued ...
11. The Contractor shall begin performance within
12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
award, notice to proceed. The performance period is mandatory negotiable. (See ________________________________________________.)
13. ADDITIONAL SOLICITATION REQUIREMENTS:
a. Sealed offers in original and is not required.is, b. An offer guarantee
c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
d. Offers providing less than
12b. CALENDAR DAYSYES NO
(If "YES", indicate within how many calendar days after award in Item 12b.)
10 1042 calendar days and complete it within ________________ ________________ calendar days after receiving
52.211-10
09/30/2024
NSN 7540-01-155-3212
x x x x copies to perform the work required are due at the place specified in Item 8 by _____________ ___________________ (hour) local time calendar days for Government acceptance after the date offers are due will not be considered and will be rejected . _________________
STANDARD FORM 1442 (Rev. 12/2022)
Prescribed by GSA
FAR(48 CFR) 53.236-1(d)
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within ____________________ calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in item 13d. Failure to insert any number means the offeror accepts the minimum in item 13d.)
14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NO. (Include area code)
16. REMITTANCE ADDRESS (Include only if different than item 14.)
CODE FACILITY CODE
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGEMENT OF AMENDMENTS
OFFER (Must be fully completed by offeror)
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE.
20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print) 20b. SIGNATURE 20c. OFFER DATE
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO THE UNITED STATES CODE AT
26. ADMINISTERED BY CODE 27. PAYMENT WILL BE MADE BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this document solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.
30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print) 31a. NAME OF CONTRACTING OFFICER (Type or print)
30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. DATE
BY
2PAGE OF
Lance Fleming
28. NEGOTIATED AGREEMENT 29. AWARD
and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations,certifications, and specifications incorporated by reference in or attached to this contract.
copies to issuing office.) Contractor agrees to furnish
10 U.S.C. 3204(a) 41 U.S.C. 3304(a)
STANDARD FORM 1442 (REV. 12/2022) BACK
Continued...
and return
(Contractor is not required to sign this document.) Your offer on this
ITEM NO.
(A)
SUPPLIES/SERVICES
(B)
QUANTITY
(C)
UNIT
(D)
UNIT PRICE
(E)
AMOUNT
(F)
NAME OF OFFEROR OR CONTRACTOR
3 3
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
140R1024R0015
County, Washington 98937
To attend the site visit interested offers must adhere the provision requirements located in L.26 52.236-27 Site Visit (Construction) (Feb 1995), Alternate I (Feb 1995). Preregistration will close August 26th at 1200 MT.
1. Attendees should monitor weather conditions for the day of the site visit. Please plan and dress accordingly. Attendees should plan on walking 1-2 miles to tour the site
2. Attendees are required to bring Personal Protective Equipment (PPE). Appropriate PPE shall be worn throughout the duration of the site visit
(i.e. hard hats, safety shoes, safety vests, and safety glasses).
Please ensure Company UEI number is reflected on the proposal cover sheet.
Due to PRISM Limitation, the Period of
Performance in block 10. may be inaccurate. For accurate Period of Performance offerors are advised to review block 11. of this SF-1442 or the clause at F.1. 52.211-10. Commencement, Prosecution, and Completion of Work (Apr 1984)".
Delivery: 10/31/2027
Delivery Location Code: 0009906765
Bureau of Reclamation-PN-CCAO
Columbia Cascades Area Office
1917 Marsh Road
Yakima WA 98901-2058 US
Period of Performance: 12/23/2024 to 10/31/2027
00010 Clear Creek Dam Fish Passage Facility
(Price Schedule A CLINS 1 through 49)
Product/Service Code: Y1PZ
Product/Service Description: CONSTRUCTION OF
OTHER NON-BUILDING FACILITIES
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
Clear Creek Dam Fish Passage Facility Yakima Project, Washington Solicitation No. 140R1024R0015
Price Schedule B - 1
CONTINUATION OF
SECTION B – SUPPLIES OR SERVICES AND PRICES
CLEAR CREEK DAM
FISH PASSAGE FACILITY
YAKIMA PROJECT, WASHINGTON
B.1 PRICE SCHEDULE
(a) Offers will be considered for award on the following Price Schedule, but no offer will be considered for award on only a part of the Price Schedule.
(b) Offers are subject to the terms and conditions of this solicitation.
(c) Quantities in the Price Schedule are estimated quantities for comparison of offers only.
Except as provided in the contract clause at FAR 52.211-18, Variation in Estimated Quantity, no claim shall be made against the Government for overruns or underruns. The contract clause at FAR 52.211-18, Variation in Estimated Quantity does not apply to lump sum items.
(d) See the contract clause at WBR 1452.232-81, Payment for Mobilization and Preparatory Work, for CLIN 1.
(e) Definitions:
(1) CLIN – Contract Line Item Number
PRICE SCHEDULE
CLIN Section Supplies or Services Quantity and Unit
Unit Price
Amount
1 WBR
1452.232 -81
Mobilization and Preparatory Work
For the lump sum of $
2 01 14 15 National Forest Roads For the lump sum of $
3 01 31 30 Contract Document Management System
For the lump sum of $
4 01 33 26 Electrical Drawings and Data For the lump sum of $
Price Schedule
B - 2
PRICE SCHEDULE
CLIN Section Supplies or Services Quantity and Unit
Unit Price
Amount
5 01 91 13 Commissioning For the lump sum of $
6 02 41 10 Selective Site Demolition For the lump sum of $
7 03 15 12 6-inch PVC Waterstop 2,600 lin ft $ $
8 03 30 30 Reinforced Cast-In-Concrete 1,160 yd3 $ $
9 03 30 30 Underwater Reinforced Concrete
For the lump sum of $
10 05 50 00 Miscellaneous Metalwork For the lump sum of $
11 13 34 40 Engine-Generator Building For the lump sum of $
12 25 00 01 System Control and Monitoring
For the lump sum of $
13 26 05 10 Conductors and Cables For the lump sum of $
14 26 05 26 Grounding and Bonding For the lump sum of $
15 26 05 33 Raceways and Boxes For the lump sum of $
16 26 24 16 Distribution Panelboards For the lump sum of $
17 26 24 30 Auxiliary Power and Control Equipment
For the lump sum of $
18 26 27 40 Wiring Devices For the lump sum of $
19 26 30 10 Automatic Transfer Switch For the lump sum of $
20 26 32 10 Standby Engine Generator Set For the lump sum of $
21 26 42 13 Submerged Galvanic Anode Cathodic Protection and Corrosion Monitoring Systems
For the lump sum of $
22 26 56 60 Luminaires For the lump sum of $
23 27 20 01 Communication System For the lump sum of $
24 28 10 01 Security and Surveillance System
B - 3
PRICE SCHEDULE
CLIN Section Supplies or Services Quantity and Unit
Unit Price
Amount
25 31 02 10 Water for Dust Abatement For the lump sum of
26 31 03 10 Diversion of Stream During Construction
For the lump sum of $
27 31 11 00 Clearing and Grubbing For the lump sum of $
28 31 23 11 Common Excavation 3,450 yd3 $ $
29 31 23 11 Rock Excavation 1,300 yd3 $
30 31 23 11 Compacted Backfill about Structures
1,230 yd3 $ $
31 31 23 39 Disposal of Excavated Material
For the lump sum of $
32 31 23 50 Earthwork for Roads For the lump sum of $
33 31 23 70 Controlled Low Strength Material (CLSM)
25 yd3 $ $
34 31 32 32 Geotextile 2,300 yd2 $ $
35 32 15 10 Gravel Surfacing 420 tons $ $
36 32 31 10 Chain Link Fence 550 lin ft $ $
37 32 31 10 Chain Link Fence Cover For the lump sum of $
38 32 92 20 Seeding and Restoration For the lump sum of $
39 33 09 12 Water Level Measuring Devices For the lump sum of $
40 33 12 71 Vertical Turbine Pumping Units
For the lump sum of $
41 35 10 10 Fish Screen For the lump sum of $
42 35 21 13 Cylindrical Screen For the lump sum of $
43 35 21 16 False Weir and Steep Pass For the lump sum of $
44 35 21 21 Coated Bulkhead Gate and Guides
For the lump sum of $
45 35 21 23 Bar Rack, Barrier Curtain Frame, and Guides
46 35 21 95 Steel Piping For the lump sum of $
B - 4
PRICE SCHEDULE
CLIN Section Supplies or Services Quantity and Unit
Unit Price
Amount
47 35 22 10 Slide Gates and Actuators For the lump sum of $
48 35 22 14 Valves and Equipment For the lump sum of $
49 35 79 30 Debris Boom Modifications For the lump sum of $
50 41 22 14 Jib Crane For the lump sum of $
TOTAL FOR PRICE SCHEDULE $_________________
END OF SUPPLIES OR SERVICES AND PRICES
TECHNICAL SERVICE CENTER
WRITTEN SPECIFICATIONS SIGNATURE SHEET
Specifications Title: Clear Creek Dam Fish Passage Facility
Project Title: Yakima Project, Washington
Region: CPN
Prepared:
Technical Approval:
Certified:
AMD/MOD
No.
Technical Approval Signature:
Prepared By Signature:
Revised Sections:
GERALD HORTON HORTON
Date: 2023.08.07 11:02:16 -06'00' P.E.
2023.08.07 11:42:38 -06'00' P.E.
NANCY ARTHUR ARTHUR
P.E.
DIVISION 01 - GENERAL REQUIREMENTS
Summary of Work
01 11 00 - 1
SECTION 01 11 00
SUMMARY OF WORK
PART 1 GENERAL
1.01 LOCATION
A. Work is located approximately 45 miles west of Yakima, Washington in Yakima County.
1.02 PRINCIPAL COMPONENTS OF WORK
A. Intake structure.
B. Piping and pump.
C. Fish ladder.
D. Dam gate automation with remote operation tie-in.
E. Site lighting and electrical system upgrade.
F. Electrical upgrades.
G. Construct access road.
1.03 SPECIFICATIONS REQUIREMENTS
A. Requirements in Division 1, General Requirements, apply to Divisions 2 through 53.
B. Imperative statements in these specifications are Contractor requirements, unless otherwise stated.
C. Where specifications are written in streamlined form, words “shall be” are included by inference where a colon (:) is used within sentence or phrase.
1.04 DEFINITIONS
A. When specifications use a word or term defined in Federal Acquisition Regulations (FAR), definition of the word or term shall be in accordance with FAR sections in effect at the time solicitation was issued.
1.05 ACRONYMS
A. The following acronyms apply to specifications Divisions 1 through 53:
1. CO: Contracting Officer.
2. COR: Contracting Officer’s Representative.
Summary of Work
01 11 00 - 2
PART 2 PRODUCTS
Not Used
PART 3 EXECUTION
Not Used
END OF SECTION
Use of Site 01 14 10 - 1
SECTION 01 14 10
USE OF SITE
PART 1 GENERAL
1.01 MEASUREMENT AND PAYMENT
A. Cost:
1. Include in prices offered in the Price Schedule for other items of work.
1.02 REFERENCE STANDARDS
A. Bureau of Reclamation (Reclamation)
1. Cleaning Manual-2012 Inspection and Cleaning Manual for
Equipment and Vehicles to Prevent the Spread of Invasive Species (Technical memorandum No. 86-68220-07-05) 2012 Edition Available online at:
http://www.usbr.gov/mussels/prevention
1.03 SUBMITTALS
A. Submit in accordance with Section 01 33 00 - Submittals.
B. RSN 01 14 10-1, Land Use and Landscape Rehabilitation Plan:
1. For each Contractor use site on Government land.
a. Show use location and extent of impact. Uses include but are not limited to the following:
1) Buildings and service areas including offices, shops, warehouses, storage areas, fuel and oil storage areas, and fabrication yards.
2) Parking areas, temporary roads, and haul routes.
3) Utilities including air, power, and water lines; fire hydrants; and compressor station.
4) First-aid and medical facilities.
5) Aggregate processing. Show sizes, rated capacities, and general features of aggregate processing plant including transporting, storing, screening, and washing facilities; and concrete conveying, placing, and cooling plants.
6) Areas for processing, storing, and disposing of waste materials from construction operations.
http://www.usbr.gov/mussels/prevention
01 14 10 - 2
7) Temporary fences.
b. Describe methods to preserve, protect, and repair, vegetation (such as trees, shrubs, and grass) and other landscape features on or adjacent to jobsite and contractor use areas, which are not to be removed and which do not interfere with work required under this contract. Include methods to mark work area limits, protect disturbed areas, and prevent erosion.
c. Describe methods to preserve and protect infrastructure within the contractor use areas that cannot be removed or altered.
d. Describe methods to protect, and repair if damaged, existing improvements and utilities at or near jobsite.
e. Describe methods for removing temporary structures and facilities, cleanup, and rehabilitating site after completion of construction activities.
2. Submit revised drawings of changes in use of Government land made during design and erection stages or after use of Government land is in operation.
1.04 PROJECT CONDITIONS
A. All Contractor Use Areas are on Government land as shown on drawings and may be used for required construction facilities except where noted otherwise.
B. No additional trees cutting or clearing and grubbing shall occur outside of the disturbed area as shown in drawings.
C. When private land is used for construction facilities, or other construction purposes, make necessary arrangements associated with use of private land.
D. Location, construction, operation, maintenance, and removal of construction facilities on Government land will be subject to approval of COR.
E. Do not interfere with work of other contractors or the Government in vicinity, or with reservations made by the Government for use of such land.
F. Areas on Government land that will be obliterated by permanent construction or inundated by reservoir may be used where use of such land will be discontinued and construction facilities, materials, equipment, and rubbish and waste materials will be removed to avoid interference with work in such areas or with filling of reservoir.
G. Housing for construction personnel will not be permitted on Government land, except housing for guards or watchmen as may be approved by COR.
PART 2 PRODUCTS
01 14 10 - 3
PART 3 EXECUTION
3.01 CLEANING
A. Construction equipment:
1. Before entering National Forest System Lands, clean construction equipment to remove dirt, vegetation, and other organic material to prevent introduction of noxious weeds, and invasive plant and animal species.
a. Cleaning procedures apply to all equipment, including service vehicles that stay on the roadway, traveling frequently in and out of the project area.
b. Care must be taken to ensure that all areas of equipment that may harbor invasive aquatic organisms (such as zebra mussels, quagga mussels, etc) are thoroughly cleaned prior to arriving onsite.
2. When equipment is moving from one portion of the project area that is weed infested to another portion that is weed free, it would be…