Amd_No_0007_Specification_Sections_0007.pdf
PDF 708 KB Posted
- Solicitation number
- 140R1024R0015
About this file
This document contains the specifications and submittal requirements for the Clear Creek Dam Fish Passage Facility project in the Yakima Project, Washington. The solicitation is being issued by the U.S. Bureau of Reclamation in Fiscal Year 2024 with an anticipated award in Fiscal Year 2025. The project involves the construction of a new fish passage facility at Clear Creek Dam, including work on the dam structure, debris boom modifications, temporary utilities, and other civil and electrical work. Key submittal requirements include plans and drawings for various construction activities, quality control procedures, safety programs, and commissioning testing. Material and equipment specifications are provided for items like concrete, steel piping, valves, and communications systems. No set-asides are mentioned, and the document does not contain a Performance Work Statement or Statement of Objectives. The document appears to be the specifications portion of the full solicitation package.
View the file
Other files
Show all 40
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TECHNICAL SERVICE CENTER
WRITTEN SPECIFICATIONS SIGNATURE SHEET
Specifications Title: Clear Creek Dam Fish Passage Facility
Project Title: Yakima Project, Washington
Region: CPN
Prepared:
Technical Approval:
Certified:
AMD/MOD No. Technical Approval Signature:
Prepared By Signature: Revised Specifications
GERALD HORTON HORTON
Date: 2023.08.07 11:02:16 -06'00' P.E.
2023.08.07 11:42:38 -06'00' P.E.
NANCY ARTHUR ARTHUR
P.E.
AMD No. 0007 Revised Specifications, Revised Drawings, and Replacement Standard Drawings
2024.09.20 10:51:33 -06'00'
GERALD
HORTON
Digitally signed by
GERALD HORTON
Date: 2024.09.20 12:26:15 -06'00'
Clear Creek Dam Fish Passage Facility Yakima Project, Washington Amendment No. P0007
Work Restrictions and Limitations – (Revised)
01 14 12 - 2
D. Material deliveries and removal of materials:
1. Restricted to Monday through Friday, 7:00 am to 7:00 pm.
2. Approved by the COR 72 hours in advance if outside of allowable hours.
3. Not permitted on Federal holidays.
4. Inspected by Government before allowed onsite. Coordinate deliveries with COR
24 hours in advance to avoid unanticipated delays.
1.04 DEBRIS BOOM
A. Government shall clear debris prior to Contractor beginning on-site work.
B. Contractor shall perform debris removal after mobilizing to the site and secure debris boom in a location that does not interfere with other work prior to reservoir drawdown.
C. See Section 35 79 30 – Debris Boom Modifications for additional requirements.
1.05 LAND DISTURBANCE
A. Except where shown on drawings, Contractor shall not:
1. Excavate below ground level.
2. Cut or prune trees.
3. Disturb campground areas and infrastructure.
B. Contractor shall not drive or vibrate piles on the project.
1.06 RESERVOIR CONSTRUCTION
A. Contractor shall provide continuous flood protection, or maintain existing protection, up to Elevation 3016.5 once excavation activities begin.
B. The Reservoir will be unwatered to facilitate the construction of the Reservoir Structure in the dry. See Section 01 14 20 – Dam Operations and Unwatering for key details and dates for this unwatering.
1. The Contractor shall inform the COR 30 days in writing prior to the start of the desired unwatering period.
1.07 OTHER CONTRACTS
A. During work under this contract, other work will be performed in vicinity of work area by Reclamation and other contractors.
B. Cooperate and coordinate with other contractors on access to and use of work areas and contractor use areas. Comply with the clause at FAR 52.236-8, Other Contracts.
C. Do not interfere with work of other contractors or Government in vicinity of work.
D. Cooperate and coordinate with other contractors on use of temporary utilities.
Submittals – (Revised)
01 33 00 - 8
* Submittal Types: A - Approval, I - Information ** CP -Y indicates Yes, the submittal is required to be shown on the Construction Schedule - see Section 01 32 10 - Construction Program *** CO indicates Contracting Officer, COR indicates Contracting Officer Representative, and TSC indicates
Technical Service Center
RSN
Clause or
Section Title
Submittals required
Due date or Delivery time
Type
CP
Respon-sible code
No. of sets to be sent to: ***
CO COR TSC
1 Bonds (52.228-15)
Performance and payment bonds
Within 10 calendar days after award
A COR 1 0 0
2 Release of claims (1452.204-70)
Release of claims (DI-137) against United States
After completion of work and prior to final payment
A CO 1 0 0
3 Payroll and Basic Records (52.222-8)
Certified payrolls Weekly for each week any contract work is performed on site
I COR CDMS
4 Subcontracts (52.222-11)
(1) List of subcontractors
(2) Statement and Acknowledgment Form (SF-1413) for each subcontract
Within 14 days after award of contract, and within 14 days after award of any subcontract
I COR CDMS
5 Equal opportunity (52.222-26)
Information required by Executive Order
11246 (SF-100)
Within 30 days following award
I COR CDMS
6 Performance and Payment Bonds (52.228-15)
Performance and payment bonds
Within 10 calendar days after award
A CO 1 0 0
7 Liability Insurance
(WBR
1452.228-70)
Acceptable Certificate of Liability Insurance
Prior to commencement of work under the contract
A CO 1 0 0
8 Estimate of Percentage of Recovered Material Content of
EPA-
Designated Items (52.223-9)
Estimate the percentage of the total recovered material content for EPA designated item(s) delivered and/or used in contract performance
On completion of the contract (no later than with submittal of final voucher)
I COR CDMS
9 Safety and Health (WBR 1452.223-81)
Safety Program Submitted and accepted before starting onsite work.
See Section 1.03 of
RSHS.
A Y COR CDMS
10 Safety and Health (WBR 1452.223-81)
Monthly Accident Summary Report
First day of month.
See Section 1.03 of
RSHS.
I COR CDMS
01 33 00 - 9
* Submittal Types: A - Approval, I - Information ** CP -Y indicates Yes, the submittal is required to be shown on the Construction Schedule - see Section 01 32 10 - Construction Program *** CO indicates Contracting Officer, COR indicates Contracting Officer Representative, and TSC indicates
Technical Service Center
RSN
Clause or
Section Title
Submittals required
Due date or Delivery time
Respon-sible code
No. of sets to be sent to: ***
CO COR TSC
11 Security Requirements
(WBR
1452.237-80)
Security Program Submitted and approved before mobilization
A COR CDMS
01 14 10-1 Use of Site Land Use and Landscape Rehabilitation Plan
At least 28 days before use of Government land
A COR CDMS
01 14 20-1 Dam Operations and Unwatering
Emergency Operations Plan
At least 28 days before use of Government land
A COR CDMS
01 31 19-1 Project Management and Coordination
Weekly Coordination Meeting Documentation
Weekly I COR CDMS
01 31 30-1 Contract Document Management System
Approval Data At least 28 days before starting work.
I COR 1 1 1
01 31 30-2 Contract Document Management System
Final Data Within 14 days after Project Closeout
I COR CDMS
01 32 10-1 Construction Program
Representative Information
At least 21 days before starting onsite work
A COR CDMS
01 32 10-2 Construction Program
Baseline Schedule
At least 21 days before starting onsite work
A Y COR CDMS
01 32 10-3 Construction Program
Updated Schedule
Monthly
When invoice for progress payments will be submitted, submit at least 7 days before invoice.
A Y COR CDMS
01 33 00 - 10
* Submittal Types: A - Approval, I - Information ** CP -Y indicates Yes, the submittal is required to be shown on the Construction Schedule - see Section 01 32 10 - Construction Program *** CO indicates Contracting Officer, COR indicates Contracting Officer Representative, and TSC indicates
Technical Service Center
RSN
Clause or
Section Title
Submittals required
Due date or Delivery time
Respon-sible code
No. of sets to be sent to: ***
CO COR TSC
01 32 10-4 Construction Program
Time Impact Analysis
If the contractor believes it is owed time only, Within 28 days after the CO directs a contract change, requests proposal for a future modification, value engineering proposal, or request for equitable adjustment
A COR CDMS
01 35 10-1 Safety Data Sheets
Complete LHM and
SDS
At least 14-days before hazardous materials are delivered to jobsite
I COR CDMS
01 35 10-2 Safety Data Sheets
Updated LHM and
SDS
At least 14-days before hazardous materials are delivered to jobsite
I COR CDMS
01 35 20-1 Safety and Health
Emergency Action Plans, Written Program, and Training Records
At least 28 days before beginning onsite work
A COR CDMS
01 35 20-2 Safety and Health
Job Hazard Analysis (JHA)
At least 28 days before beginning onsite work
A COR CDMS
01 35 30-1 Contractor’s Onsite Safety and Health Personnel
Qualifications Submitted and approved before starting onsite work.
See Section 1.03 of
RSHS
A COR CDMS
01 35 30-2 Contractor’s Onsite Safety and Health Personnel
Safety Inspection Reports
At least once each week
A COR CDMS
01 35 37-1 Underwater Work
Diving Plan At least 28 days before beginning onsite work
A COR CDMS
01 35 37-2 Underwater Work
Daily Diving Plan At least 28 days before beginning onsite work
A COR CDMS
01 33 00 - 11
* Submittal Types: A - Approval, I - Information ** CP -Y indicates Yes, the submittal is required to be shown on the Construction Schedule - see Section 01 32 10 - Construction Program *** CO indicates Contracting Officer, COR indicates Contracting Officer Representative, and TSC indicates
Technical Service Center
RSN
Clause or
Section Title
Submittals required
Due date or Delivery time
Respon-sible code
No. of sets to be sent to: ***
CO COR TSC
01 46 00-1 Quality Procedures
Contractor Quality Control Plan (QC)
At least 28 days before beginning onsite work
A COR CDMS
01 46 00-2 Quality Procedures
Contractor’s Daily Report
No later than the end of the following work day
I COR CDMS
01 46 00-3 Quality Procedures
Quality Control Supervisor (QCS) Resume
At least 28 days before beginning onsite work
A COR CDMS
01 46 00-4 Quality Procedures
Contractor’s Quality Testing Plan
At least 28 days before beginning onsite work
A COR CDMS
01 46 00-5 Quality Procedures
Summary of Monthly Test Results
Monthly I COR CDMS
01 51 00-1 Temporary Utilities
Temporary Power Plan
At least 28 days before beginning onsite work
A COR CDMS
01 51 00-2 Temporary Utilities
Interruption of Service Request
At least 28 days before beginning onsite work
A COR CDMS
01 52 10-1 Field Office Delivery Schedule and Site Layout
At least 28 days before beginning onsite work
I COR CDMS
01 55 00-1 Vehicular Access and Parking
Initial Digital Recording
At least 28 days before beginning onsite work
I COR CDMS
01 55 00-2 Vehicular Access and Parking
Post Construction Digital Recording.
Within 7 days of completing construction
A COR CDMS
01 55 00-3 Vehicular Access and Parking
Post Repair Digital Recording
Within 7 days of completing repair
A COR CDMS
01 55 20-1 Traffic Control Traffic Control Plan At least 28 days before start of construction activities
A COR CDMS
01 56 10-1 Protection of Existing Installations
Plan for Protecting Existing Installations
At least 28 days before start of construction activities
A COR CDMS
01 56 15-1 Protection of Existing Utilities
Utility Owner Acknowledgment
At least 28 days before beginning onsite work
01 33 00 - 12
* Submittal Types: A - Approval, I - Information ** CP -Y indicates Yes, the submittal is required to be shown on the Construction Schedule - see Section 01 32 10 - Construction Program *** CO indicates Contracting Officer, COR indicates Contracting Officer Representative, and TSC indicates
Technical Service Center
RSN
Clause or
Section Title
Submittals required
Due date or Delivery time
Respon-sible code
No. of sets to be sent to: ***
CO COR TSC
01 57 20-1 Environmental Controls
Copy of Applicable Air Quality Permit
At least 28 days before beginning onsite work
I COR CDMS
01 57 20-2 Environmental Controls
Dust Abatement Plan
At least 28 days before beginning onsite work
I COR CDMS
01 57 30-1 Water Pollution Control
Water Quality Management Plan
At least 35 days before start of construction activities
A COR CDMS
01 57 30-2 Water Pollution Control
Spill Prevention, Control, and Countermeasure (SPCC) Plan
At least 28 days before start of construction activities
A COR CDMS
01 57 30-3 Water Pollution Control
Water Pollution Control Product Data
At least 28 days before start of construction activities
01 57 30-4 Water Pollution Control
Water Quality Monitoring Results
At least 28 days before start of construction activities
01 57 50-1 Tree and Plant Protection
Protection Plan At least 28 days before start of construction activities
A COR CDMS
01 57 50-2 Tree and Plant Protection
Qualifications At least 56 days before start of construction activities
A COR CDMS
01 57 70-1 Fire Protection and Prevention
Fire Protection and Prevention Plan
At least 28 days before start of construction activities
A COR CDMS
01 57 90-1 Preservation of Historical and Archeological Data
Proposed Use, Barrow, and Spoil/Waste Ares
At least 84 days before start of construction activities
A COR CDMS
01 71 20-1 Surveying Surveying Plan At least 28 days before start of construction activities
A COR CDMS
01 71 20-2 Surveying Resumes At least 28 days before start of construction activities; At least 28 days before personnel change
01 33 00 - 13
* Submittal Types: A - Approval, I - Information ** CP -Y indicates Yes, the submittal is required to be shown on the Construction Schedule - see Section 01 32 10 - Construction Program *** CO indicates Contracting Officer, COR indicates Contracting Officer Representative, and TSC indicates
Technical Service Center
RSN
Clause or
Section Title
Submittals required
Due date or Delivery time
Respon-sible code
No. of sets to be sent to: ***
CO COR TSC
01 71 20-3 Surveying Accuracy Check Results
At least 28 days before start of construction activities
A COR CDMS
01 71 20-4 Surveying Completed and Reduced Survey Notes
Within 7 days of completing and reducing notes
01 71 20-5 Surveying Quantity Survey Notes and Computations
Submitted for monthly progress payments
A COR CDMS
01 71 20-6 Surveying Workday’s Survey Notes
Submitted for monthly progress payments
A COR CDMS
01 74 00-1 Cleaning and Waste Management
Waste Production and Disposal Plan
At least 14 days before start of construction activities. All updates submitted monthly.
A COR CDMS
01 74 00-2 Cleaning and Waste Management
Waste Production and Disposal Records
Within 7 days of waste disposal
A COR CDMS
01 74 00-3 Cleaning and Waste Management
Environmental Consultant Resume
At least 28 days before beginning environmental assessment
A COR CDMS
01 74 00-4 Cleaning and Waste Management
Environmental Site Assessment
At least 28 days before beginning environmental assessment
A COR CDMS
01 78 30-1 Project Record Documents
Electronic Media Release Form
Within 28 days of completing crane upgrades and modernization
I COR CDMS
01 78 30-2 Project Record Documents
Progress As-Built Drawings
Submitted for monthly progress payments
A COR CDMS
01 78 30-3 Project Record Documents
Draft As-built Drawings
Within 14 days of completion of work
A Y COR CDMS
01 78 30-4 Project Record Documents
Final Drawings Within 21 days of RSN 01 78 30-2 Final As-Built Drawings approval
A Y COR CDMS
01 78 30-5 Project Record Documents
Final O&M Manuals
Within 14 days of completion of work
01 33 00 - 14
* Submittal Types: A - Approval, I - Information ** CP -Y indicates Yes, the submittal is required to be shown on the Construction Schedule - see Section 01 32 10 - Construction Program *** CO indicates Contracting Officer, COR indicates Contracting Officer Representative, and TSC indicates
Technical Service Center
RSN
Clause or
Section Title
Submittals required
Due date or Delivery time
Respon-sible code
No. of sets to be sent to: ***
CO COR TSC
01 78 30-6 Project Record Documents
As-built Record of Materials
Within 14 days of completion of work
A COR CDMS
01 78 30-7 Project Record Documents
Extra Materials Within 14 days of completion of work
I COR CDMS
01 78 30-8 Project Record Documents
Warranties Within 14 days of completion of work
I COR CDMS
01 91 13-1 Commissioning Test Plan At least 28 days before start of construction activities
A COR CDMS
01 91 13-2 Commissioning Test Procedures At least 28 days before start of construction activities
A COR CDMS
01 91 13-3 Commissioning Test Reports Within 14 days of completion of testing
A COR CDMS
01 91 13-4 Commissioning Post Testing and Commissioning Documentation
Within 14 days of completion of testing
02 41 10-1 Selective Site Demolition
Demolition and Removal Plan
At least 28 days before starting onsite work
A COR CDMS
03 11 10-1 Concrete Forming
Formwork Design and Drawings
At least 28 days before starting onsite work
A COR CDMS
03 15 12-1 PVC
Waterstop
Purchase Orders At least 28 days before starting onsite work
A COR CDMS
03 15 12-2 PVC
Waterstop
Samples At least 28 days before starting onsite work
A COR CDMS
03 15 12-3 PVC
Waterstop
Certification At least 28 days before starting onsite work
A COR CDMS
03 15 12-4 PVC
Waterstop
Drawings At least 28 days before starting onsite work
A COR CDMS
03 15 12-5 PVC
Waterstop
Instructions At least 28 days before starting onsite work
A COR CDMS
03 20 00-1 Concrete Reinforcing
Reinforcement Diagrams and Lists
At least 28 days before starting onsite work
01 33 00 - 15
* Submittal Types: A - Approval, I - Information ** CP -Y indicates Yes, the submittal is required to be shown on the Construction Schedule - see Section 01 32 10 - Construction Program *** CO indicates Contracting Officer, COR indicates Contracting Officer Representative, and TSC indicates
Technical Service Center
RSN
Clause or
Section Title
Submittals required
Due date or Delivery time
Respon-sible code
No. of sets to be sent to: ***
CO COR TSC
03 30 00-1 Cast-in Place Concrete
Approval Data At least 28 days before starting onsite work
A COR CDMS
03 30 00-2 Cast-in Place Concrete
Concrete Placement Drawings
At least 28 days before starting onsite work
A COR CDMS
03 30 00-3 Cast-in Place Concrete
Concrete Placement Schedule
At least 28 days before starting onsite work
A COR CDMS
03 30 00-4 Cast-in Place Concrete
RSMC Temperature Control Plan
At least 28 days before starting onsite work
A COR CDMS
03 30 00-5 Cast-in Place Concrete
RSMC Temperature Readings
At least 28 days before starting onsite work
A COR CDMS
03 30 00-6 Cast-in Place Concrete
Certifications At least 28 days before starting onsite work
A COR CDMS
03 30 00-7 Cast-in Place Concrete
Test Reports At least 28 days before starting onsite work
A COR CDMS
03 62 20-1 Nonshrink Grout for Equipment and Metalwork
Packed Nonshrink Grout Data
At least 28 days before starting onsite work
A COR CDMS
07 72 30-1 Roof Hatch Product Data and Shop Drawings
At least 28 days before starting onsite work
A COR CDMS
07 92 00-1 Joint Sealants Approval Data At least 28 days before starting onsite work
A COR CDMS
07 92 00-2 Joint Sealants Certifications At least 28 days before starting onsite work
A COR CDMS
07 92 00-3 Joint Sealants Instructions At least 28 days before starting onsite work
A COR CDMS
08 11 10-1 Steel Doors and Frames
Approval Drawings and Data
At least 28 days before starting onsite work
A COR CDMS
08 11 10-2 Steel Doors and Frames
Instructions At least 28 days before starting onsite
01 33 00 - 16
* Submittal Types: A - Approval, I - Information ** CP -Y indicates Yes, the submittal is required to be shown on the Construction Schedule - see Section 01 32 10 - Construction Program *** CO indicates Contracting Officer, COR indicates Contracting Officer Representative, and TSC indicates
Technical Service Center
RSN
Clause or
Section Title
Submittals required
Due date or Delivery time
Respon-sible code
No. of sets to be sent to: ***
CO COR TSC
08 31 20-1 Floor Access Hatches
Product Data and Shop Drawings
At least 28 days before starting onsite work
A COR CDMS
08 71 00-1 Door Hardware Hardware Schedule and Approval Data
At least 28 days before starting onsite work
A COR CDMS
08 71 00-2 Door Hardware Instructions At least 28 days before starting onsite work
A COR CDMS
08 95 16-1 Wall Vents Approval Data At least 28 days before starting onsite work
A COR CDMS
09 96 20-1 Coatings Approval Data At least 28 days before starting onsite work
A COR CDMS
09 96 20-2 Coatings Final Approval Data
At least 28 days before starting onsite work
A COR CDMS
09 96 20-3 Coatings Paint Chip Samples At least 28 days before starting onsite work
A COR CDMS
09 96 20-4 Coatings Qualifications At least 28 days before starting onsite work
A COR CDMS
09 96 20-5 Coatings Quality Control Plan
At least 28 days before starting onsite work
A COR CDMS
09 96 20-6 Coatings Contractor Quality Testing Final Report
Within 14 days of completion of testing
23 05 29-1 Supports -
HVAC
Approval Data At least 28 days before manufacture
A COR CDMS
23 31 00-1 Ducts - HVAC Approval Data At least 28 days before manufacture
A COR CDMS
23 34 00-1 Fans - HVAC Approval Data and Drawings
At least 28 days before manufacture
A COR CDMS
23 37 00-1 Air Inlets and Outlets
Approval Data At least 28 days before starting onsite work
A COR CDMS
25 00 01-1 System Control and Monitoring
Approval Data At least 28 days before manufacture
01 33 00 - 17
* Submittal Types: A - Approval, I - Information ** CP -Y indicates Yes, the submittal is required to be shown on the Construction Schedule - see Section 01 32 10 - Construction Program *** CO indicates Contracting Officer, COR indicates Contracting Officer Representative, and TSC indicates
Technical Service Center
RSN
Clause or
Section Title
Submittals required
Due date or Delivery time
Respon-sible code
No. of sets to be sent to: ***
CO COR TSC
25 00 01-2 System Control and Monitoring
Design Coordination Meeting and Conference Call Records
At least 7 days before coordination meeting
A COR CDMS
25 00 01-3 System Control and Monitoring
Component Data At least 28 days before manufacture
A COR CDMS
25 00 01-4 System Control and Monitoring
System Architecture
At least 28 days before manufacture
A COR CDMS
25 00 01-5 System Control and Monitoring
System Description Documentation
At least 28 days before manufacture
A COR CDMS
25 00 01-6 System Control and Monitoring
Approval Drawings and Data
At least 28 days before manufacture
A COR CDMS
25 00 01-7 System Control and Monitoring
Approval Data - Software Development Documentation
At least 28 days before manufacture
A COR CDMS
25 00 01-8 System Control and Monitoring
Layout Drawings At least 28 days before manufacture
A COR CDMS
25 00 01-9 System Control and Monitoring
Approval Data - Final Drawings and Documentation
Within 28 days upon completion of installation
A COR CDMS
25 00 01-10 System Control and Monitoring
Component and Network Documentation
Within 28 days upon completion of installation
A COR CDMS
25 00 01-11 System Control and Monitoring
Information System Inventory
Within 28 days upon completion of installation
A COR CDMS
25 00 01-12 System Control and Monitoring
Information Security Documentation
Within 28 days upon completion of installation
A COR CDMS
25 00 01-13 System Control and Monitoring
Training Staff Qualifications
Within 28 days upon completion of installation
A COR CDMS
25 00 01-14 System Control and Monitoring
Training Plan Within 28 days upon completion of installation
A COR CDMS
25 00 01-15 System Control and Monitoring
Class Materials Within 28 days upon completion of installation
A COR CDMS
25 00 01-16 System Control and Monitoring
Operation and Maintenance Instruction Books
Within 28 days upon completion of installation
01 33 00 - 18
* Submittal Types: A - Approval, I - Information ** CP -Y indicates Yes, the submittal is required to be shown on the Construction Schedule - see Section 01 32 10 - Construction Program *** CO indicates Contracting Officer, COR indicates Contracting Officer Representative, and TSC indicates
Technical Service Center
RSN
Clause or
Section Title
Submittals required
Due date or Delivery time
Respon-sible code
No. of sets to be sent to: ***
CO COR TSC
25 00 01-17 System Control and Monitoring
Software and Software Licenses
Within 28 days upon completion of installation
A COR CDMS
26 05 04-1 Removal of Existing Electrical Equipment
Approval Data At least 28 days before starting onsite work
A COR CDMS
26 05 10-1 Conductors and Cables
Approval Data At least 28 days before procurement
A COR CDMS
26 05 10-2 Conductors and Cables
Construction Documentation
Within 14 days after tests are completed
I COR CDMS
26 05 26-1 Grounding and Bonding
Approval Data At least 28 days before starting onsite work
A COR CDMS
26 05 26-2 Grounding and Bonding
Inspection and Test Reports
Within 14 days after completing work
A COR CDMS
26 05 33-1 Raceways and Boxes
Approval Drawings and Data
At least 28 days before procurement
A COR CDMS
a26 05 33-2 Raceways and Boxes
As Built Drawings and Data
Within 14 days after completing work
A COR CDMS
26 05 80-1 Wiring Checkout and Tests
Qualifications At least 28 days before starting onsite work
A COR CDMS
26 05 80-2 Wiring Checkout and Tests
Test Plan At least 28 days before starting onsite work
A COR CDMS
26 05 80-3 Wiring Checkout and Tests
Test Reports Within 14 days after tests are completed
I COR CDMS
26 24 16-1 Distribution Panelboards
Approval Data At least 28 days before manufacture
A COR CDMS
26 24 16-2 Distribution Panelboards
Approval Drawings At least 28 days before manufacture
A COR CDMS
26 24 16-3 Distribution Panelboards
Draft Operation and Maintenance Instruction Books
Within 14 days after completing work
A COR CDMS
26 24 16-4 Distribution Panelboards
Finalized Operation and Maintenance Instruction Books
Within 14 days after completing work
A COR CDMS
26 24 30-1 Control Panels Manufacturer’s Technical Data
At least 28 days before manufacture
01 33 00 - 19
* Submittal Types: A - Approval, I - Information ** CP -Y indicates Yes, the submittal is required to be shown on the Construction Schedule - see Section 01 32 10 - Construction Program *** CO indicates Contracting Officer, COR indicates Contracting Officer Representative, and TSC indicates
Technical Service Center
RSN
Clause or
Section Title
Submittals required
Due date or Delivery time
Respon-sible code
No. of sets to be sent to: ***
CO COR TSC
26 24 30-2 Control Panels Shop Drawings and Manufacturer’s Data
At least 28 days before manufacture
A COR CDMS
26 24 30-3 Control Panels Schematic and Wiring Diagrams
At least 28 days before manufacture
A COR CDMS
26 24 30-4 Control Panels Check Prints At least 28 days before starting onsite work
A COR CDMS
26 24 30-5 Control Panels Test Plan At least 28 days before test
A COR CDMS
26 24 30-6 Control Panels Field Test Reports Within 14 days of completion of testing
A COR CDMS
26 24 30-7 Control Panels Draft Manual(s) Monthly A COR CDMS 26 24 30-8 Control Panels Finalized Manual(s) Within 14 days after completion of installation
A COR CDMS
26 27 40-1 Wiring Devices Approval Data At least 28 days before procurement
A COR CDMS
26 30 10-1 Automatic Transfer Switch
Approval Drawings and Data
At least 28 days before procurement
A COR CDMS
26 30 10-2 Automatic Transfer Switch
Approval Data Within 14 days after completing work
A COR CDMS
26 32 10-1 Engine- Generator Set
Approval Drawings and Data
At least 28 days before procurement
A COR CDMS
26 32 10-2 Engine- Generator Set
Final Drawings and Data
At least 28 days before procurement
A COR CDMS
26 32 10-3 Engine- Generator Set
Site Test Report Within 14 days after tests are completed
I COR CDMS
26 42 13-1 Submerged Galvanic Anode Cathodic Protection and Corrosion Monitoring Systems
Certification and Data
At least 28 days before starting onsite work
A COR CDMS
26 42 13-2 Submerged Galvanic Anode Cathodic Protection and Corrosion Monitoring Systems
Final Data At least 28 days before starting onsite
01 33 00 - 20
* Submittal Types: A - Approval, I - Information ** CP -Y indicates Yes, the submittal is required to be shown on the Construction Schedule - see Section 01 32 10 - Construction Program *** CO indicates Contracting Officer, COR indicates Contracting Officer Representative, and TSC indicates
Technical Service Center
RSN
Clause or
Section Title
Submittals required
Due date or Delivery time
Respon-sible code
No. of sets to be sent to: ***
CO COR TSC
26 56 60-1 Exterior Lighting
Approval Data At least 28 days before procurement
A COR CDMS
26 56 60-2 Exterior Lighting
As-built Drawings Within 14 days after completing work
A COR CDMS
27 20 01-1 Communication s System
Communications System Design
At least 28 days before procurement
A COR CDMS
27 20 01-2 Communication s System
Approval Drawings and Data
At least 28 days before procurement
A COR CDMS
27 20 01-3 Communication s System
Test Reports Within 14 days after tests are completed
A COR CDMS
27 20 01-4 Communication s System
Draft Operations and Maintenance Manuals
Within 14 days after completing work
A COR CDMS
27 20 01-5 Communication s System
Final Operations and Maintenance Manuals
Within 14 days after completing work
A COR CDMS
28 10 01-1 Security and Surveillance Equipment
Approval Drawings and Data
At least 28 days before procurement
A COR CDMS
28 10 01-2 Security and Surveillance Equipment
Test Procedure and Start Date
At least 28 days before test
A COR CDMS
28 10 01-3 Security and Surveillance Equipment
Test Report Within 14 days after tests are completed
A COR CDMS
28 10 01-4 Security and Surveillance Equipment
Check Prints At least 28 days before starting onsite work
A COR CDMS
28 10 01-5 Security and Surveillance Equipment
Final Drawings and Operations and Maintenance Manuals
Within 14 days after completing work
A COR CDMS
31 03 10-1 Diversion and Care of Stream During Construction
Dredging Plan At least 28 days before starting onsite work
A COR CDMS
31 03 10-2 Diversion and Care of Stream During Construction
Water Control Plan At least 28 days before starting onsite
01 33 00 - 21
* Submittal Types: A - Approval, I - Information ** CP -Y indicates Yes, the submittal is required to be shown on the Construction Schedule - see Section 01 32 10 - Construction Program *** CO indicates Contracting Officer, COR indicates Contracting Officer Representative, and TSC indicates
Technical Service Center
RSN
Clause or
Section Title
Submittals required
Due date or Delivery time
Respon-sible code
No. of sets to be sent to: ***
CO COR TSC
31 03 10-3 Diversion and Care of Stream During Construction
Cofferdam Design At least 28 days before starting onsite work
A COR CDMS
31 03 10-4 Diversion and Care of Stream During Construction
Cofferdam Construction and Removal Plan
At least 28 days before starting onsite work
A COR CDMS
31 03 10-5 Diversion and Care of Stream During Construction
Notification Prior to In Water Work
At least 28 days before starting onsite work
A COR CDMS
31 03 33-1 Removal of Water from Excavation
Removal of Water Plan
At least 28 days before starting onsite work
A COR CDMS
31 23 02-1 Compacting Earth Materials
Test Results At least 28 days before starting onsite work
A COR CDMS
31 23 11-1 Earthwork for Structures
Earthwork Plan for Structures
At least 28 days before starting onsite work
A COR CDMS
31 23 39-1 Disposal of Excavated Materials
Disposal Plan At least 28 days before starting onsite work
A COR CDMS
31 23 70-1 CLSM Approval Data for
CLSM
At least 28 days before starting onsite work
A COR CDMS
31 23 70-2 CLSM Quality Control Test Results
Within 1 days after completing Tests
A COR CDMS
31 25 10-1 Erosion Control Silt Fence Certification
At least 28 days before starting onsite work
A COR CDMS
31 25 10-2 Erosion Control Straw Certification At least 28 days before starting onsite work
A COR CDMS
31 32 32-1 Geotextile Geotextile Installation
At least 28 days before starting onsite work
A COR CDMS
31 32 32-2 Geotextile Manufacturer’s Certification
At least 28 days before starting onsite work
A COR CDMS
31 32 32-3 Geotextile Samples At least 28 days before starting onsite
01 33 00 - 22
* Submittal Types: A - Approval, I - Information ** CP -Y indicates Yes, the submittal is required to be shown on the Construction Schedule - see Section 01 32 10 - Construction Program *** CO indicates Contracting Officer, COR indicates Contracting Officer Representative, and TSC indicates
Technical Service Center
RSN
Clause or
Section Title
Submittals required
Due date or Delivery time
Respon-sible code
No. of sets to be sent to: ***
CO COR TSC
31 32 32-4 Geotextile Protection Method At least 28 days before starting onsite work
A COR CDMS
32 15 10-1 Gravel Surfacing
Gravel Certification At least 28 days before starting onsite work
A COR CDMS
32 31 10-1 Chain Link Fence and Chain Link Fence Cover
Certifications
At least 28 days before starting onsite work
A COR CDMS
32 92 20-1 Seeding and Site Improvements
Seeding Plan At least 28 days before starting onsite work
A COR CDMS
32 92 20-2 Seeding and Site Improvements
Certifications At least 28 days before starting onsite work
A COR CDMS
33 09 12-1 Water Level Measuring Devices
Approval Drawings and Data
At least 28 days before starting onsite work
A COR CDMS
33 09 12-2 Water Level Measuring Devices
Final Data At least 28 days before starting onsite work
A COR CDMS
33 12 71-1 Vertical Turbine Pumping Units
Pumping Manufacture’s Qualifications
At least 28 days before starting onsite work
A COR CDMS
33 12 71-2 Vertical Turbine Pumping Units
Pump Preliminary Data
At least 28 days before starting onsite work
A COR CDMS
33 12 71-3 Vertical Turbine Pumping Units
Mechanical Analyses
At least 28 days before starting onsite work
A COR CDMS
33 12 71-4 Vertical Turbine Pumping Units
Approval Data and Drawings
At least 28 days before starting onsite work
A COR CDMS
33 12 71-5 Vertical Turbine Pumping Units
Motor Approval Data and Drawings
At least 28 days before starting onsite work
A COR CDMS
33 12 71-6 Vertical Turbine Pumping Units
Pumping Unit Certified Performance Test Data and Reports
At least 28 days before starting onsite
01 33 00 - 23
* Submittal Types: A - Approval, I - Information ** CP -Y indicates Yes, the submittal is required to be shown on the Construction Schedule - see Section 01 32 10 - Construction Program *** CO indicates Contracting Officer, COR indicates Contracting Officer Representative, and TSC indicates
Technical Service Center
RSN
Clause or
Section Title
Submittals required
Due date or Delivery time
Respon-sible code
No. of sets to be sent to: ***
CO COR TSC
33 12 71-7 Vertical Turbine Pumping Units
Pump Final Data and Drawings
Within 14 days after completing the work
A COR CDMS
33 12 71-8 Vertical Turbine Pumping Units
Field Test Plans At least 28 days before starting onsite work
A Y COR CDMS
33 12 71-9 Vertical Turbine Pumping Units
Field Test Reports Within 14 days of completion of testing
A COR CDMS
33 12 71-10 Vertical Turbine Pumping Units
Welding Approval Documentation
At least 28 days before starting onsite work
A COR CDMS
33 12 71-11 Vertical Turbine Pumping Units
Operations and Maintenance Training
Within 28 days upon completion of installation
A COR CDMS
34 71 10-1 W-Beam Guardrail
Certifications At least 28 days before starting onsite work
A COR CDMS
35 10 10-1 Fish Screens Approval Data At least 28 days before starting onsite work
A COR CDMS
35 21 13-1 Cylindrical Screens
Approval Drawings and Data
At least 28 days before starting onsite work
A COR CDMS
35 21 13-2 Cylindrical Screens
Final Drawings and Data
At least 28 days before starting onsite work
A COR CDMS
35 21 95-1 Steel Piping Shop Drawings At least 28 days before starting onsite work
A COR CDMS
35 21 95-2 Steel Piping Commercial Products and Data
At least 28 days before starting onsite work
A COR CDMS
35 21 95-3 Steel Piping Steel Pipe Installation Procedures
At least 28 days before starting onsite work
A COR CDMS
35 21 95-4 Steel Piping Final Data Within 14 days after completing the work
A COR CDMS
35 22 10-1 Slide Gates Design Calculations At least 28 days before starting onsite work
A COR CDMS
35 22 10-2 Slide Gates Product Data and Drawings
At least 28 days before starting onsite
01 33 00 - 24
* Submittal Types: A - Approval, I - Information ** CP -Y indicates Yes, the submittal is required to be shown on the Construction Schedule - see Section 01 32 10 - Construction Program *** CO indicates Contracting Officer, COR indicates Contracting Officer Representative, and TSC indicates
Technical Service Center
RSN
Clause or
Section Title
Submittals required
Due date or Delivery time
Respon-sible code
No. of sets to be sent to: ***
CO COR TSC
35 22 10-3 Slide Gates Shop Assembly and Test Results
At least 28 days before starting onsite work
A COR CDMS
35 22 10-4 Slide Gates Field Test Results At least 28 days before starting onsite work
A COR CDMS
35 22 10-5 Slide Gates Draft Manuals Within 14 days after completing the work
A COR CDMS
35 22 10-6 Slide Gates Final Manuals Within 14 days after completing the work
A COR CDMS
35 22 14-1 Valves and Equipment
Commercial Products Data
At least 28 days before starting onsite work
A COR CDMS
35 22 14-2 Valves and Equipment
Shop Testing Certifications and Reports
At least 28 days before starting onsite work
A COR CDMS
35 22 14-3 Valves and Equipment
Approval Service Manuals
Within 14 days after completing the work
A COR CDMS
35 79 30-1 Debris Boom Modifications
Product Data and Instructions
At least 28 days before starting onsite work
A COR CDMS
35 79 30-2 Debris Boom Modifications
Debris Boom System Removal, Modification, and Installation Plan
At least 28 days before starting onsite work
A COR CDMS
41 22 14-1 Jib Crane Approval Data At least 28 days before starting onsite work
A COR CDMS
41 22 14-2 Jib Crane Final Data Within 14 days after completing the work
END OF SECTION
Temporary Utilities – (Revised)
01 51 00 - 1
SECTION 01 51 00
TEMPORARY UTILITIES
PART 1 GENERAL
1.01 MEASUREMENT AND PAYMENT
A. Cost:
1. Include in prices offered in the price schedule for other items of work.
1.02 REFERENCE STANDARDS
A. Institute of Electrical and Electronics Engineers (IEEE)
1. IEEE C2-23 National Electrical Safety Code (NESC)
1.03 SUBMITTALS
A. Submit the following in accordance with Section 01 33 00 – Submittals.
B. RSN 01 51 00-1, Temporary Power Plan
1. Provide a power distribution diagram to indicate the connections between the distribution components utilized in the temporary power system. End devices, receptacles, etc., are not required to be included on the power distribution diagram.
a. Diagrams shall indicate all connections between the four existing dam gates actuators and starters, and the temporary power distribution system.
2. Provide sequencing plan including methods to connect to existing facilities.
3. Plan view of temporary conduit/cable routing and equipment locations. Include height above finished floor for overhead conduit and cables.
4. Ratings and physical sizes of equipment and cables.
C. RSN 01 51 00-2, Interruption of Service Request:
1. Area where work will be done (by number or other description).
2. Step by step procedures for accomplishing work including:
a. Specific safety precautions to be taken.
b. Type and location of barricades.
c. Warning signs.
d. Protective grounds and devices to be used.
e. Coordination with Government.
f. Government tasks.
Temporary Utilities – (Revised) 01 51 00 - 1A
3. Commencement time and date of work.
4. Duration of work.
5. Number of personnel and their classification.
6. Description of equipment to be used.
7. Information indicating that required materials are on site or data indicating shipping dates of materials not on site.
1.04 TEMPORARY ELECTRICITY
A. Provide electric power required for construction.
B. Provide generators, transmission lines, distribution circuits, transformers, and other electrical equipment and facilities required for obtaining power and distributing power to points of use.
C. Comply with IEEE C2 clearances and spacing for temporary communications and supply lines.
D. Contractor shall provide electric power to support the following items. Contractor shall provide electric power for these items from the time they initially mobilize for this contract until Final Acceptance of the installation or by written agreement with the COR that the Contractor may stop supplying electric power.
1. Construction and performance of these activities specified in this contract.
2. Maintaining communication between Yuma Field Office (YFO) and Clear Creek
Dam. Allow YFO the ability to control all four gates during construction.
3. Maintaining power to all four dam gate actuators.
E. Obtain outage, where required, in accordance with Section 01 14 30 – Interruption of Service.
1. Maximum allowable electric power outage for the four dam gates and communication system shall be determined by COR.
1.05 TEMPORARY WATER
A. Water from reservoir will be available for construction purposes.
1. Make arrangements with COR for use of water.
a. Use of water will be in compliance with the temporary water right that Reclamation hassecured for project purposes.
b. Contractor to provide flowmeter to and track amount of water used.
c. Provide water accounting to CO upon request.
Temporary Utilities – (Revised) 01 51 00 - 1B
2. Government will designate locations from which water may be obtained. See drawing 33-D-61652 for designated locations. Pumps shall be screened per the following criteria:
a. Circular Screen Openings: Circular screen face openings must not exceed
3/32 inch in diameter. Perforated plate must be smooth to the touch with openings punched through in the direction of approaching flow.
b. Slotted or Rectangular Screen Openings: Slotted or rectangular screen face openings must not exceed 1.75 mm (approximately 1/16 inch) in the narrow direction.
c. Square Screen Openings: Square screen face openings must not exceed 3/32 inch on a side.
d. Material: The screen material must be corrosion resistant and sufficiently durable to maintain a smooth uniform surface with long term use.
e. Other Components: Other components of the screen facility (such as seals) must not include gaps greater than the maximum screen opening defined above.
f. Open area for screen material to be at least 27 percent.
3. No charge will be made for water obtained from this source.
4. If Location #2 is used for acquiring water, the vehicle must stay on boat ramp and cannot drive on the reservoir/lakebed.
B. Use water which meets specified requirements for specific use.
C. Provide means of conveying water to points of use.
D. Contractor shall provide potable water.
1.06 COMMUNICATION
A. On site cell phone reception not available. Radios shall be used for on-site communication.
1. Contractor to provide onsite communication equipment for Reclamation use.
B. Maintain the existing communication system between Clear Creek Dam and YFO.
1.07 SANITARY FACILITIES
A. Restroom facilities will not be available to Contractor personnel.
B. Contractor shall provide sanitary facilities.
1.08 INTERRUPTION OF SERVICE
A. Coordinate and schedule interruption of services with COR:
Temporary Utilities – (Revised) 01 51 00 - 1C
1. Coordinate work with Government operations. Schedule at least 15-days in advance of requested interruption of service.
2. No specific interruption of service request will be considered unless:
a. COR has reasonable assurance that materials and equipment required for work will be onsite.
b. Contractor will be prepared to perform work on date and during period of time requested for specific interruption of service.
3. Allowable time and available interruption of service periods will govern interruption of service requests, work scheduling, onsite delivery of materials, and required drawings and data submittals:
a. Equipment shall be fully commissioned and ready for operation as determined by Government by end of interruption of service window.
Notify COR immediately if this requirement cannot be met.
4. Government reserves right to schedule interruption of services for any period during 24-hour day, any day of week.
B. When work cannot be performed during an approved interruption of service period, notify COR that interruption of service is not required.
C. Show construction interruption of services in construction schedule.
Temporary Utilities – (Revised) 01 51 00 - 2
PART 2 PRODUCTS
Not Used
PART 3 EXECUTION
3.01 REMOVAL
A. Remove temporary equipment and facilities upon completion of work under this contract.
Cast-In-Place Concrete – (Revised)
03 30 00 - 7
1. NRMCA Certification of Production Facilities. NRMCA certification shall be current and include automatic digital recording of cementitious materials, aggregate, water, and chemical admixtures. NRMCA certification shall be maintained throughout duration of project.
2. ACI Aggregate Testing Technician certification(s).
3. Deleted.
3.4. Resume for flatwork foreman with at least 5 years of experience with similar type placements.
4.5. ACI Concrete Field Testing Technician certification(s).
5.6. ACI Concrete Strength Testing Technician certification(s).
H. RSN 03 30 00-7, Test Reports
1. Aggregate test results as required by Table 03 30 00B – Contractor Batch Plant
Quality Testing.
2. Concrete test reports as required by Table 03 30 00E – Contractor Field Quality
Testing.
1.06 QUALIFICATIONS
A. Ready mix plant:
1. Currently certified by NRMCA. NRMCA certification shall include automatic digital recording of cementitious materials, aggregate, water, and chemical admixtures, and shall remain current throughout project.
B. ACI Aggregate Testing Technician: Currently certified ACI Aggregate Testing Technician - Level 1.
C. Deleted
C.D. Flatwork foreman with at least 5 years of experience with similar type placements.
D.E. ACI Concrete Field Testing Technician: Currently certified ACI Concrete Field Testing Technician - Grade I.
E.F. ACI Strength Testing Technician: Currently certified ACI Strength Testing Technician.
1.07 DELIVERY, STORAGE, AND HANDLING
A. Furnish legible and digitized batch ticket with each batch of concrete in accordance with ASTM C94. Deliver ticket to COR at jobsite during batch delivery.
B. Sponge rubber joint filler storage:
1. Store in protected area at temperature of 70 degrees F (21 degrees C) or less.
2. Do not expose to direct sun.
03 30 00 - 19 within 35 degrees F of daily low temperature. Temperature information in digital format shall be available to COR daily.
D. Maintain specified temperature differential between temperature monitoring devices at the center of the thickest section and the outside face.
1. Insulate concrete with new blankets free of tears and holes, or other insulation as necessary as approved COR.
2. Do not discontinue temperature monitoring or remove insulation until temperature at the outside face is within 35 degrees F of the lowest ambient temperature in a 24-hour period.
3. Internally cool concrete as necessary in accordance with approved temperature control plan.
4. Evaluate temperature records daily and adjust temperature control methods as necessary.
E. If internal concrete temperatures or concrete temperature differentials exceed specified limits, revise RSMC Temperature Control Plan and resubmit for approval prior to further placements.
3.03 PLACING
A. Notify COR at least 24 hours before placing concrete.
B. Do not place concrete without approval of the COR.
C. Place concrete in presence of COR.
D. Place concrete under the direct supervision of a qualified flatwork foreman.
D.E. Allow at least 7 days between adjacent placements, or as approved by COR.
1. For RSMC, COR may require more than 7 days between adjacent placements based on temperature control plan or actual temperature data of RSMC.
E.F. Do not use aluminum pipes and chutes for placing or pumping concrete.
F.G. Adding water to concrete batch at site will be allowed only once and only when approved by the COR.
1. Additional water shall be added before concrete is discharged.
2. Do not exceed specified water to cement ratio.
3. After water is added, concrete shall be mixed for at least 30 revolutions of mixer drum at mixing speed.
03 30 00 - 20
4. Record added water on the batch ticket to nearest gallon.
G.H. Adding air entraining admixtures to concrete batch at site will be allowed only once when approved by the COR.
1. After air entraining admixture is added, concrete shall be mixed for minimum of
30 revolutions of mixer drum at mixing speed.
2. Take slump and air content after air-entraining admixture addition and additional revolutions.
3. Record added air entraining admixture on batch ticket to nearest ounce.
H.I. Do not use concrete which has become so stiff that concrete cannot be properly placed.
I.J. Place formed concrete in continuous, approximately horizontal layers. Do not exceed 20 inches in depth of layers.
J.K. Vibrate concrete until concrete has been consolidated to maximum practical density, is free from pockets of coarse aggregate, and closes snugly against surfaces of forms and embedded materials.
K.L. Hot Weather:
1. Place concrete in accordance with ACI 305.1.
2. Protect reinforcing steel so that steel temperature does not exceed ambient air temperature immediately before placing concrete.
3. Fog spray forms, reinforcing steel, and subgrade just before placing concrete.
Keep subgrade moisture uniform without puddles or dry areas.
L.M. Cold weather:
1. Place concrete in accordance with ACI 306.1.
2. Do not place concrete on frozen subgrade or subgrade containing frozen materials.
3.04 PLACING CONCRETE UNDERWATER
A. As concrete is placed underwater, do not allow turbid water to discharge into Waterways.
1. For discharge of turbid water, refer to Section 01 57 30 – Water Pollution Control.
2. Placement operations shall not increase pH, turbidity, or temperature of water.
B. Equipment:
1. Not fabricated of aluminum.
2. Provide suitable tremie delivery system or pump:
a. Tremie system:
03 30 00 - 22
8. Once established, maintain embedment of tremie pipe or slickline in fresh concrete at least 5 feet. Exact embedment depths shall depend upon placement rates and setting time of concrete.
a. Control vertical movement of tremie pipe or slickline to prevent loss of seal.
b. If loss of seal occurs, placement shall be halted immediately.
c. Remove pipe, replace end closure device, and restart flow in presence of the COR.
1) To prevent washout of already placed concrete, a plug shall not be allowed to restart after loss of seal.
9. Clear blockages in discharge lines to prevent loss of seal.
10. As temporary casing is withdrawn, maintain minimum head of 5 feet of concrete above bottom of casing
3.05 FINISHING
A. Notify COR before finishing concrete.
B. Finish concrete in presence of Government inspector unless inspection is waived in each specific case.
C. Finishing for the placements shall be performed under the direct supervision of a qualified flatwork foreman.
C.D. Finish surfaces as specified in Table 03 30 00F – Formed Surfaces and Table 03 30 00G
– Unformed Surfaces.
D.E. Where finishes are not specified or shown on drawings for a particular surface, finish concrete as specified for similar work.
E.F. Formed surfaces:
1. Finish class is designated by symbols F1, and F2.
2. Finish F1:
a. Applies to formed surfaces to be covered by fill material, grout, or concrete, and construction joint surfaces as specified in Table 03 30 00F – Formed Surfaces.
b. Protect form tie rod ends on surfaces in contact with fill material from moisture where they will be below water table or waterline.
1) Recess tie rod ends and fill recess with dry pack or other material approved by COR.
03 30 00 - 23
c. Cut off flush with formed surface form tie rod ends on surfaces in contact with concrete or fill material and above maximum water table or waterline elevation.
3. Finish F2:
a. Applies to exposed formed surfaces not permanently concealed by fill material, grout, or concrete, deleted, and to contraction joint surfaces and expansion joint surfaces as specified in Table 03 30 00F – Formed Surfaces.
1) Recess tie rod ends and fill recess with dry pack or other material
4. Deleted
F.G. Unformed surfaces:
1. Do not use dry portland cement or additional water during finishing.
2. Do not use “jitterbugs” or other tools to…