Amendment_0004_Pictures_0004.pdf

PDF 7 MB Posted

Attached to
Clear Creek Dam Fish Passage Facility, Yakima Rive
Solicitation number
140R1024R0015
Issued by

About this file

This document appears to be a series of images related to the Clear Creek Dam Fish Passage Facility project, which is the subject of a federal contract opportunity.

The key details of the federal contract opportunity are:

  • Solicitation Number: 140R1024R0015
  • Name: Clear Creek Dam Fish Passage Facility, Yakima River
  • Opportunity Type: Solicitation
  • Description: Reclamation is soliciting bids in Fiscal Year 2024 with an anticipated award occurring in Fiscal Year 2025. There are active fires in the vicinity of the project site, and interested offerors are advised to monitor SAM.gov for any amendments to the pre-proposal site visit. All correspondence should be directed to the Contract Specialist Drew McGuire and the Contracting Officer Lance Fleming.

View the file

Other files

File Type Posted
Revised_Section_M_for_Amendment_0008_0008.pdf PDF
Sol_140R1024R0015_Amd_0008.pdf PDF
Amd_No_0007_Drawing_Binder_11x17_092024_0007.pdf PDF
Amd_No_0007_Drawing_Binder_22x34_092024_0007.pdf PDF
Sol_140R1024R0015_Amd_0007.pdf PDF
140R1024R0015__Offeror_QA_final_0007.pdf PDF
Amd_No_0007_Specification_Sections_0007.pdf PDF
Sol_140R1024R0015_Amd_0006.pdf PDF
Sol_140R1024R0015_Amd_0005.pdf PDF
Sol_140R1024R0015_Amd_0004.pdf PDF
Sol_140R1024R0015_Amd_0003.pdf PDF
Site_Visit_Attendee_Roster_0003.pdf PDF
Sol_140R1024R0015_Amd_0002.pdf PDF
Clear_Creek_Dam_Fish_Passage_Solicitation_-_Revised_for_Amendment_0002_0002.pdf PDF
J_2__Specification_Drawings_Size_11x17_0001.pdf PDF
J_3_E_a__Environmental_Assessment_0001.pdf PDF
J_3_F__State_Environmental_Protection_Act_0001.pdf PDF
J_4__Geology_Drawings_Size_11x17_0001.pdf PDF
J_3_C__Hydraulic_Project_Approval_0001.pdf PDF
J_3_E_b__Finding_of_no_Significant_Impact_(FONSI)_0001.pdf PDF
J_3_A__401_Water_Quality_Certification_0001.pdf PDF
J_2__Specification_Drawings_22x34_0001.pdf PDF
Sol_140R1024R0015_Amd_0001.pdf PDF
J_3_D_Inadvertent_Discovery_Plan_0001.pdf PDF
Clear_Creek_Dam_Fish_Passage_Solicitation_-_Revised_for_Amendment_0001_0001.pdf PDF
J_3_B__404_USACE_Nationwide_Permit_0001.pdf PDF
J_4__Geology_Drawings_Size_22x34_0001.pdf PDF
J_2__05_00_00_02_Dwgs-B3_ClearCreekDam_22x34_08-02-2024.pdf PDF
20240715_email_MMaldonado_ECY_401WQCunder404.pdf PDF
GOV_HPA_Permit_Std.pdf PDF
Solicitation_R0015_Clear_Creek_Fish_Passage_Final.pdf PDF
404_Combined.pdf PDF
Sol_140R1024R0015.pdf PDF
ClearCreekDamFishPassageSEPADNS-Final.pdf PDF
J_4__00_00_02A_GeologyDwgs-B_G1-G26_ClearCreekDam_11x17_08-02-2024.pdf PDF
J_2__04_00_00_02_Dwgs-B3_ClearCreekDam_11x17_08-02-2024.pdf PDF
CCDFP_FONSI_4-23-2024_508.pdf PDF
CCDFP_EA_4-16-2024_508.pdf PDF
20240730-CR-IDP.pdf PDF
J_4__00_00_02A_GeologyDwgs-B_G1-G26_ClearCreekDam_22x34_08-02-2024.pdf PDF
Show all 40

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Flammable liquid storage cabinet

Electrical Panels and Control Panels

Generator Transfer Switch

General Layout

Work Desk and SCADA

Vent and Doorway

Interior General

Main Doorway

Interior Showing Building Structure

Interior Vent Louver

Lockout Tagout and First Aid Station

CMU Construction

Generator and Exhaust System

Vent and Doorway

Generator and its Main Electrical Connection

Generator

General Interior

Locked 277 480 Volt Electrical Panel

Locked Electrical Panel 2

File details come from the government source that posted it. Updated .