This document is a technical specification sheet for typical concrete repair details for the Hangars 3 & 4 Rehabilitation project at Floyd Bennett Field.

The specification establishes standards for concrete repair work in compliance with ASTM C171, C309, C387, C881, and American Concrete Institute (ACI) standards including ACI 301, 305R, 306R, 308, 311.4R, 318.1, and SP-15. For patching mortar, contractors must submit manufacturer specifications and material safety data sheets for one of four approved non-sag polymer-modified products: SikaRepair SHB, STO Overhead Mortar, Euclid Chemical Verticoat, or an approved equal. For corrosion inhibitors, approved products are Sika Armatec 110 or Cortec MCI-2020, or approved equals. The repair sequence requires surface preparation including wire brushing and compressed air cleaning, removal of deteriorated concrete to sound substrate with a 90-degree edge detail and 1/2" minimum depth, mechanical cleaning of reinforcing steel to bright metal, application of anti-corrosion primer and bonding bridge, and saturation of prepared surfaces with water for up to two hours prior to placement. Patching mortar is applied in single or multiple lifts not exceeding manufacturer-specified maximum thickness, with minimum 3/4" cover over reinforcing bars. For reinforcement with section loss exceeding 20%, lap splice lengths are specified based on bar size, ranging from 12" to 45" for bottom bars and 16" to 63" for top bars. The specification includes details for infill of existing openings up to 3'-0" maximum dimension, full-depth slab repairs, concrete encasement repairs with pair of #3 bent bars at 12" on-center, and epoxy injection repairs for grade beam cracks using ASTM C881 compliant products with low-viscosity epoxy for cracks 0.010" or smaller and medium to gel viscosity for wider cracks, followed by non-destructive evaluation using impact echo, ultrasonic pulse velocity, or spectral analysis of surface waves.

View the file

Other files

File Type Posted
Sol_140P2026R0060_Amd_0004.pdf PDF
28_20_00_Video_Surveillance_-_06_23_26_0003.pdf PDF
A3-0_-_BUILDING_SECTIONS_06_23_26_0003.pdf PDF
Sol_140P2026R0060_Amd_0003.pdf PDF
Sign-in_Sheet_for_06_16_26_Site_Visit_0003.pdf PDF
A5-0-2_-_ROOF___HANGAR_DOOR_DETAILS_06_23_26_0003.pdf PDF
FINAL_BID_QUESTIONS_AND_ANSWERS__UPDATED_06_23_26_0003.pdf PDF
GATE_308504_-_140P2026R0060_Bid_Questions_and_Answers_-_06_11_26_0002.docx DOCX document
B08_Solicitation_P2026R0060_Revisions_to_Section_L_06_11_26_0002.docx DOCX document
S2-6_-_WPA_INFILL_ROOF_FRAMING_PLAN_06_11_26_0002.pdf PDF
012700_DefinitionOfContractLineItems_Revised_06_11_26_0002.pdf PDF
G0_-_COVER_SHEET_06_11_26_0002.pdf PDF
Sol_140P2026R0060_Amd_0002.pdf PDF
B08_Fillable_Past_Performance_Questionnaire_0002.docx DOCX document
A0-4_-_EXTERIOR_ELEVATIONS_-_DEMOLITION_06_11_26_0002.pdf PDF
Solicitation_P2026R0060_GATE_308504_Contract_Price_Schedule_Revised_06_11_26_0002.xlsx XLSX spreadsheet
A0-6_-_EXISTING_CONDITIONS_PHOTOS_-_EXTERIOR_06_11_26_0002.pdf PDF
B08_Fillable_Project_Experience_Questionnaire_0002.docx DOCX document
S6-3_-_MASONRY_REPAIR_AND_LINTEL_REPLACEMENT_DETAILS_06_11_26_0002.pdf PDF
A4-2-1_-_ENLARGED_ELEVATIONS_-_HANGAR_4_DOORS_06_11_26_0002.pdf PDF
S6-2_-_STEEL_BEAM_REPAIR_DETAILS_06_11_26_0002.pdf PDF
WD_NY20260003_05_26_26_-_Issued_06_11_26_0002.pdf PDF
P4_-_PLUMBING_SCHEDULES_06_11_26_0002.pdf PDF
Sol_140P2026R0060_Amd_0001.pdf PDF
Amendment_0001_P2026R0060_0001.pdf PDF
Sol_140P2026R0060.pdf PDF
1__25-1219_GATE_308504_Final_CD_Project_Specifications.pdf PDF
3_25-1219_GATE_308504_Final_CD_Structural_Design_Calculations.pdf PDF
B08_GATE_308504_Hangars_3_and_4_Solicitation_140P2026R0060.pdf PDF
2_Final_CD_Drawings_-_Condensed.pdf PDF
Show all 30

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONCRETE REPAIR NOTES

1. STANDARDS

A. ASTM C171, C309, C387, AND C881, LATEST EDITIONS.

B. AMERICAN CONCRETE INSTITUTE (ACI) STANDARDS: ACI 301, ACI 305R, ACI 306R, ACI 308, ACI 311.4R, ACI 318.1, AND ACI SP-15.

2. PACKAGED PRODUCTS: SUBMIT MANUFACTURER'S SPECIFICATIONS, INSTALLATION PROCEDURES, AND MATERIAL SAFETY DATA SHEETS FOR ONE OF THE APPROVED PRODUCTS:

A. NON-SAG POLYMER-MODIFIED PORTLAND CEMENT PATCHING MORTAR.

1. SIKAREPAIR SHB - SIKA CONCRETE RESTORATION.

2. OVERHEAD MORTAR - STO CONCRETE RESTORATION DIVISION.

3. VERTICOAT - EUCLID CHEMICAL COMPANY.

4. APPROVED EQUAL.

B. CORROSION INHIBITORS

1. SIKA ARMATEC 110 - SIKA FERRO GUARD.

2. CORTEC MCI - 2020 BY MONEX RESOURCES, INC.

3. APPROVED EQUAL.

3. SEQUENCE & CONSTRUCTION NOTES (SEE SECTION A)

A. PREPARE SURFACES TO BE RESTORED IN COMPLIANCE WITH PRODUCT MANUFACTURER'S PRINTED INSTRUCTIONS AND AS SPECIFIED. CLEAN AREAS TO BE RESTORED WITH WIRE BRUSH AND COMPRESSED AIR OR WATER TO REMOVE ALL LOOSE MATERIALS, INCLUDING OIL, DIRT, DUST, OR OTHER FOREIGN MATERIAL FROM SURFACES TO BE REPAIRED.

B. REMOVE LOOSE AND DETERIORATED CONCRETE BY MECHANICAL MEANS DOWN TO SOUND CONCRETE SUBSTRATE.

DETAIL THE EDGE OF THE PATCH TO A 90-DEGREE ANGLE AND 1/2" MINIMUM DEPTH TO PREVENT FURTHER EDGING. CHIP CONCRETE SUBSTRATE TO OBTAIN A FRACTURED AGGREGATE SURFACE WITH A MINIMUM SURFACE PROFILE OF 1/8" DEPTH.

C. ALL OXIDIZED AND CORRODED BARS SHALL BE UNDERCUT A MINIMUM OF 3/4" OR 1/4" LARGER THAN THE LARGEST SIZE AGGREGATE IN THE PATCHING CONCRETE, WHICHEVER IS GREATER. EXPOSED BARS WHICH ARE NOT OXIDIZED OR CORRODED DO NOT HAVE TO BE UNDERCUT IF LESS THAN 50% OF THE BAR'S CIRCUMFERENCE IS EXPOSED AND THE BOND BETWEEN THE BAR AND CONCRETE IS INTACT. IF THE BOND IS BROKEN OR MORE THAN 50% OF THE BAR'S CIRCUMFERENCE IS EXPOSED, THEN THE BAR SHALL BE UNDERCUT AS DESCRIBED IN SECTION C.

D. CLEAN REINFORCING STEEL OF OXIDATION USING A WIRE BRUSH. THE REINFORCING BARS SHALL BE CLEANED TO BRIGHT METAL. APPLY ANTI-CORROSION PRIMER AND BONDING BRIDGE. COAT THE REINFORCEMENT OR OTHER

STEEL TO REMAIN WITH CORROSION INHIBITOR.

E. IF REDUCED SECTION OF REINFORCEMENT IS LESS THAN 80% OF ORIGINAL AREA, PROVIDE ADDITIONAL REINFORCING STEEL OF 1.5 x AREA LOST OR GREATER OR REPLACE WITH NEW.

F. REINFORCING SHALL BE ADDED ACCORDING TO NOTES BELOW AND SECTIONS B AND C.

1. SPLICE LENGTH SHOWN SHALL EXTEND ON BOTH ENDS OF HEAVILY OXIDIZED SECTION FROM THE POINT WHERE

THE EXISTING BAR IS BEING SPLICED.

2. IF LAP SPLICE OF ADDITIONAL STEEL EXTENDS BEYOND THE REPAIR AREA PERIMETER, CUT A NOTCH IN THE EXISTING CONCRETE TO PROVIDE A 3/4" CLEAR SPACE BEHIND AND ON EACH SIDE OF THE ADDED STEEL.

3. BOTTOM BAR SPLICE NEED NOT EXTEND BEYOND THE FACE OF SUPPORT OF THE BEAM OR GIRDER.

4. IF ADDED STEEL ENCOUNTERS END OF MEMBER, PROVIDE HOOK OR MECHANICAL ANCHOR TO DEVELOP THE

STEEL TENSION CAPACITY. DRILL & GROUT AS REQ'D.

5. IF OBSTRUCTION PREVENTS FULL SPLICE LENGTH, USE MECHANICAL TENSION SPLICE COUPLER. CUT AND

CONNECT TO EXIST REINF.

6. SEE SECTIONS B & C FOR ADDITIONAL INFO.

G. SATURATE THE SURFACE OF THE PREPARED CONCRETE WITH WATER FOR A MAXIMUM OF TWO HOURS PRIOR TO THE PLACEMENT OF THE NEW CONCRETE. NO STANDING WATER AT THE TIME OF PATCH INSTALLATION.

H. JUST PRIOR TO NEW CONCRETE PLACEMENT, APPLY A SCRUB COAT OF A THIN CEMENT SLURRY WITH A STIFF BRUSH.

SLURRY MUST BE SCRUBBED INTO SUBSTRATE, FILLING ALL PORES AND VOIDS.

I. APPLY REPAIR MORTAR PER MANUFACTURER'S REQUIREMENTS. AT AREAS WHERE THE DEPTH OF REPAIR TO SOUND CONCRETE EXCEEDS THE MAXIMUM THICKNESS OF A SINGLE LIFT AS INDICATED BY THE MORTAR MANUFACTURER, APPLY THE PATCHING MORTAR IN MULTIPLE LIFTS WITH THICKNESS NOT EXCEEDING THE MAXIMUM. ALLOW SUFFICIENT

CURING TIME AND SCORE MORTAR SURFACE BETWEEN LIFTS.

J. PLACE CONCRETE TO MINIMUM 3/4" COVER OVER REINFORCING BARS.

K. STRIKE OFF SURFACES AS NECESSARY AND ALLOW CONCRETE TO SET. COORDINATE WITH ARCHITECT FOR FINAL FINISH

APPEARANCE, CURE BY COVERING EXPOSED SURFACES WITH WET BURLAP.

4. REFER TO ARCHITECTURAL DRAWINGS FOR ADDITIONAL REPAIR DETAILS.

LAP

REQUIRED

MORE, SPLICE

SECTION LOSS

OF 20% OR

LAP

REQUIRED

OXIDIZED

LT/MED

OXIDIZED

HEAVILY

OXIDIZED

LT/MED

CLEANING & COATING REQUIRED

NO CLEANING

CONDITION

TO POINT WHERE

REPAIR AS REQ'D

SECTION

UNOXIDIZED

SECTION

OXIDIZED

3/4"

SEE SCHEDULE

LAP SPLICE LENGTH

/4

/4

/4

SECTION A

SECTION B

SECTION C

G, H

E, F A

C, DKI, J

B

SLAB BAR REPAIR SPLICE SCHEDULE

EXISTING

BAR SIZE

BOT BARS TOP BARS REMARKS

#3 12" 16"

#4 16" 22"

#5 20" 27"

#6 25" 35"

#7 34" 48"

#8 45" 63"

W/ NEW REINF.

ORIGINAL MILL

REQUIRED

EXIST.

REINF.

STEEL

INCREASE SIZE OF

CORROSION OF

REINF. ENDS

ADD'L REINF.

STEEL IF

REQ'D (SEE

NOTE 3.F.4)

SEE SECTION B

PERIMETER OF REPAIR AREA

PROVIDE PAIRS OF #3 BENT

BARS @ 12" O.C. IN HILTI HIT-

HY 200 V3 W/ 3" EMBEDMENT

INTO (E) CONC.

REMOVE CONCRETE

ENCASEMENT TO EXPOSE

BOTTOM FLANGE. CLEAN

FLANGE OF ALL CORROSION

AND COAT WITH RUST-

INHIBITING PAINT. PATCH

CONCRETE ENCASEMENT.

(E) WF BEAM

(E) SLAB

OR AREA OF DETERIORATION

EXIST. OPENING

t/ t/

#4@12 E.W. (MIN. 2 BARS

E.W.) FOR INFILL OF

OPENINGS GREATER THAN 8"

t

SAWCUT 1/2 DEPTH

SHEAR KEY ON TWO

SIDES OF EXIST OPENING

TYP.

2"

INFILL OF EXISTING OPENINGS < 3'-0" MAX DIMENSION

NOTES FOR INFILL OF EXISTING OPENINGS:

1. THIS DETAIL APPLIES FOR INFILL OF EXISTING OPENINGS UP TO 3'-0" MAX. IN DIMENSION.

2. CREATE SHEAR KEY ON SIDES OF OPENING.

3. PROVIDE REINFORCING PER DETAIL FOR INFILL OF OPENINGS GREATER THAN 8".

4. FORM BOTTOM OF INFILL AND CAST CONCRETE.

NOTES FOR FULL-DEPTH CONCRETE SLAB REPAIR

1. REMOVE LOOSE CONCRETE PER 1/S6.5 TO SOUNDS MATERIAL. THIS DETAIL APPLIES WHERE LOOSE /

DETERIORATED CONCRETE EXTENDS TO FULL DEPTH OF SLAB.

2. CLEAN AND COAT REINFORCING STEEL PER 1/S6.5. PROVIDE ADDITIONAL REINFORCING AS NEEDED PER

1/S6.5 (MID-DEPTH REINFORCING AS SHOWN ABOVE NOT REQUIRED).

3. CREATE SHEAR KEY ON SIDES OF OPENING.

4. SATURATE THE SURFACE OF THE PREPARED CONCRETE WITH WATER FOR A MAXIMUM OF TWO HOURS

PRIOR TO THE PLACEMENT OF THE NEW CONCRETE. NO STANDING WATER AT THE TIME OF PATCH

INSTALLATION.

5. JUST PRIOR TO NEW CONCRETE PLACEMENT, APPLY A SCRUB COAT OF A THIN CEMENT SLURRY WITH A STIFF BRUSH. SLURRY MUST BE SCRUBBED INTO SUBSTRATE, FILLING ALL PORES AND VOIDS.

6. FORM BOTTOM OF REPAIR AREA AND CAST CONCRETE.

EXISTING SLAB REINFORCEMENT

WHERE PRESENT

(E) CONC. PILE BOTT. OF (E)

GRADE BEAM

EXT. FOOTING

BUMPOUT WHERE

PRESENT

(E) SLAB

(E) CRACK IN GRADE BEAM /

FOUNDATION WALL

GROUT INJECTION PORT.

LAYOUT AND PROCEDURE TO BE

SUBMITTED BY CONTRACTOR

FOR C.O.R. / E.O.R. REVIEW .

T.O. (E) CURB WHERE PRESENT

CONCRETE EPOXY INJECTION REPAIR NOTES

1. STANDARDS

A. ASTM C881, STANDARD SPECIFICATION FOR EPOXY-RESIN-BASE BONDING SYSTEMS

FOR CONCRETE, LATEST EDITION.

B. AMERICAN CONCRETE INSTITUTE (ACI) STANDARDS: ACI 224.1R, ACI 364.1R, ACI 503R, AND ACI 546.

2. EPOXY PRODUCTS: SUBMIT MANUFACTURER'S SPECIFICATIONS, INSTALLATION

PROCEDURES, AND MATERIAL SAFETY DATA SHEETS.

3. RECOMMENDED SEQUENCE & CONSTRUCTION NOTES

A. CLEAN THE SURFACE AREA ABOUT 1/2" WIDE ON EACH SIDE OF THE CRACK BY WIRE

BRUSHING. WHERE CONCRETE SURFACES ADJACENT TO THE CRACK ARE

DETERIORATED, V-GROOVE THE CRACK UNTIL SOUND CONCRETE IS REACHED.

B. INSTALL INJECTION PORTS AT 8 INCHES ON CENTER OR AS REQUIRED BASED ON

MATERIAL THICKNESS AND WIDTH OF CRACK. INSTALL THE CAP SEAL.

C. BATCH AND MIX THE EPOXY IN STRICT ACCORDANCE WITH THE MANUFACTURER'S

REQUIREMENTS. FOR CRACK WIDTHS 0.010 INCHES OR SMALLER, USE A LOW-

VISCOSITY EPOXY (500 CPS OR LESS). FOR WIDER CRACKS, OR WHERE INJECTION

ACCESS IS LIMITED TO ONE SIDE, USE A MEDIUM TO GEL VISCOSITY MATERIAL.

D. INJECT THE EPOXY, STARTING AT THE WIDEST SECTION OF THE CRACK AT

HORIZONTAL CRACKS OR AT THE BASE OF THE CRACK FOR VERTICAL CRACKS.

CONTINUE THE INJECTION UNTIL REFUSAL AND CAP PORT. MANAGE PRESSURE WITH

CARE TO PREVENT BLOWOUT OF THE CAP SEAL OR PORTS.

E. REMOVE THE PORTS AND CAP SEAL BY HEAT, CHIPPING OR GRINDING.

F. TO ENSURE THAT THE INJECTIONS HAS BEEN SUCCESSFUL, PERFORM NON-

DESTRUCTIVE EVALUATION (NDE) USING ONE OF THE FOLLOWING METHODS:

1. IMPACT ECHO (IE).

2. ULTRASONIC PULSE VELOCITY (UPV)

3. SPECTRAL ANALYSIS OF SURVACE WAVES (SASW)

4. PROVIDE ADD UNIT COST FOR ADDITIONAL LOCATIONS THAT MAY BE DISCOVERED

DURING CONSTRUCTION.

SCALE: NTSS6.5

1 TYPICAL CONCRETE REPAIR DETAIL

DATE:

DESIGNED:

TECH. REVIEW:

SUB SHEET NO.

PMIS/PKG NO.

DRAWING NO.

SHEET

TITLE OF SHEET

OF

190066

GATE 308504

HANGARS 3 & 4 REHABILITATION 150

/1

/2

:4

:1

P M

C U s e rs

\j th ib a u \D o c u m e n ts

\S T

R U

C T

G

A T

E F lo y d B e n n e t F ie ld r2 jt h ib a u V

G D

.r v t

JCT / EB / PA

MAS

NF

12/19/2025

S6.5

TYPICAL CONCRETE

REPAIR DETAILS

N.T.S.S6.5

4 GRADE BEAM CRACK EPOXY REPAIR (ELEVATION)

SCALE: NTSS6.5

3 TYPICAL CONCRETE ENCASEMENT REPAIR

SCALE: NTSS6.5

2 TYPICAL FULL-DEPTH CONCRETE REPAIR DETAIL / INFILL OF EXISTING OPENINGS

Sheets
S0.1 - STRUCTURAL GENERAL NOTES
S0.2 - STRUCTURAL GENERAL NOTES
S0.3 - SCHEDULES AND LEGENDS
S1.0 - FOUNDATION - GROUND FLOOR OVERALL PLAN
S1.1 - LEAN-TO ROOF AND WPA INFILL MEZZANINE OVERALL FRAMING PLAN
S1.2 - HANGAR ROOF TRUSS BOTTOM CHORD LEVEL OVERALL FRAMING PLAN
S1.3 - HANGAR ROOF TRUSS TOP CHORD LEVEL OVERALL FRAMING PLAN
S2.1 - HANGAR 4 LEAN-TO FRAMING PLANS
S2.2 - HANGAR 4 FOUNDATION / GROUND FLOOR PLAN
S2.3 - HANGAR 4 ROOF TRUSS BOTTOM CHORD LEVEL FRAMING PLAN
S2.4 - HANGAR 4 ROOF TRUSS TOP CHORD LEVEL FRAMING PLAN
S2.5 - WPA INFILL FRAMING PLANS
S2.6 - WPA INFILL ROOF FRAMING PLAN
S2.7 - HANGAR 3 FOUNDATION / GROUND FLOOR PLAN
S2.8 - HANGAR 3 ROOF TRUSS BOTTOM CHORD LEVEL FRAMING PLAN
S2.9 - HANGAR 3 ROOF TRUSS TOP CHORD LEVEL FRAMING PLAN
S2.10 - HANGER 3 LEAN-TO FRAMING PLANS
S3.1 - EXISTING TRUSS ELEVATIONS
S3.2 - HANGAR 4 INTERIOR ELEVATIONS
S3.3 - HANGAR 3 INTERIOR ELEVATIONS
S4.1 - EXTERIOR ELEVATIONS - WPA INFILL
S4.2 - EXTERIOR ELEVATIONS - HANGAR 4 LEAN-TO
S5.1 - TYPICAL FOUNDATION DETAILS
S6.2 - STEEL BEAM REPAIR DETAILS
S6.3 - MASONRY REPAIR AND LINTEL REPLACEMENT DETAILS
S5.2 - FOUNDATION DETAILS
S5.3 - FOUNDATION DETAILS
S6.1 - STEEL COLUMN REPAIR DETAILS
S6.5 - TYPICAL CONCRETE REPAIR DETAILS
S6.4 - TYPICAL BRICK REPAIR DETAILS
S6.6 - SUPERSTRUCTURE DETAILS
S6.7 - HANGAR DOOR POCKET WALL DETAILS
S6.8 - HANGAR DOOR POCKET WALL DETAILS
S6.9 - HANGAR DOOR POCKET WALL DETAILS
S6.10 - HANGAR DOOR POCKET WALL DETAILS
S6.11 - SECTIONS AND DETAILS
S7.1 - HANGAR DOOR REPAIR DETAILS
S7.2 - HANGAR DOOR REPAIR DETAILS

File details come from the government source that posted it. Updated .