This document is a technical specification sheet for typical concrete repair details for the Hangars 3 & 4 Rehabilitation project at Floyd Bennett Field.
The specification establishes standards for concrete repair work in compliance with ASTM C171, C309, C387, C881, and American Concrete Institute (ACI) standards including ACI 301, 305R, 306R, 308, 311.4R, 318.1, and SP-15. For patching mortar, contractors must submit manufacturer specifications and material safety data sheets for one of four approved non-sag polymer-modified products: SikaRepair SHB, STO Overhead Mortar, Euclid Chemical Verticoat, or an approved equal. For corrosion inhibitors, approved products are Sika Armatec 110 or Cortec MCI-2020, or approved equals. The repair sequence requires surface preparation including wire brushing and compressed air cleaning, removal of deteriorated concrete to sound substrate with a 90-degree edge detail and 1/2" minimum depth, mechanical cleaning of reinforcing steel to bright metal, application of anti-corrosion primer and bonding bridge, and saturation of prepared surfaces with water for up to two hours prior to placement. Patching mortar is applied in single or multiple lifts not exceeding manufacturer-specified maximum thickness, with minimum 3/4" cover over reinforcing bars. For reinforcement with section loss exceeding 20%, lap splice lengths are specified based on bar size, ranging from 12" to 45" for bottom bars and 16" to 63" for top bars. The specification includes details for infill of existing openings up to 3'-0" maximum dimension, full-depth slab repairs, concrete encasement repairs with pair of #3 bent bars at 12" on-center, and epoxy injection repairs for grade beam cracks using ASTM C881 compliant products with low-viscosity epoxy for cracks 0.010" or smaller and medium to gel viscosity for wider cracks, followed by non-destructive evaluation using impact echo, ultrasonic pulse velocity, or spectral analysis of surface waves.
View the file
Other files
Show all 30
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONCRETE REPAIR NOTES
1. STANDARDS
A. ASTM C171, C309, C387, AND C881, LATEST EDITIONS.
B. AMERICAN CONCRETE INSTITUTE (ACI) STANDARDS: ACI 301, ACI 305R, ACI 306R, ACI 308, ACI 311.4R, ACI 318.1, AND ACI SP-15.
2. PACKAGED PRODUCTS: SUBMIT MANUFACTURER'S SPECIFICATIONS, INSTALLATION PROCEDURES, AND MATERIAL SAFETY DATA SHEETS FOR ONE OF THE APPROVED PRODUCTS:
A. NON-SAG POLYMER-MODIFIED PORTLAND CEMENT PATCHING MORTAR.
1. SIKAREPAIR SHB - SIKA CONCRETE RESTORATION.
2. OVERHEAD MORTAR - STO CONCRETE RESTORATION DIVISION.
3. VERTICOAT - EUCLID CHEMICAL COMPANY.
4. APPROVED EQUAL.
B. CORROSION INHIBITORS
1. SIKA ARMATEC 110 - SIKA FERRO GUARD.
2. CORTEC MCI - 2020 BY MONEX RESOURCES, INC.
3. APPROVED EQUAL.
3. SEQUENCE & CONSTRUCTION NOTES (SEE SECTION A)
A. PREPARE SURFACES TO BE RESTORED IN COMPLIANCE WITH PRODUCT MANUFACTURER'S PRINTED INSTRUCTIONS AND AS SPECIFIED. CLEAN AREAS TO BE RESTORED WITH WIRE BRUSH AND COMPRESSED AIR OR WATER TO REMOVE ALL LOOSE MATERIALS, INCLUDING OIL, DIRT, DUST, OR OTHER FOREIGN MATERIAL FROM SURFACES TO BE REPAIRED.
B. REMOVE LOOSE AND DETERIORATED CONCRETE BY MECHANICAL MEANS DOWN TO SOUND CONCRETE SUBSTRATE.
DETAIL THE EDGE OF THE PATCH TO A 90-DEGREE ANGLE AND 1/2" MINIMUM DEPTH TO PREVENT FURTHER EDGING. CHIP CONCRETE SUBSTRATE TO OBTAIN A FRACTURED AGGREGATE SURFACE WITH A MINIMUM SURFACE PROFILE OF 1/8" DEPTH.
C. ALL OXIDIZED AND CORRODED BARS SHALL BE UNDERCUT A MINIMUM OF 3/4" OR 1/4" LARGER THAN THE LARGEST SIZE AGGREGATE IN THE PATCHING CONCRETE, WHICHEVER IS GREATER. EXPOSED BARS WHICH ARE NOT OXIDIZED OR CORRODED DO NOT HAVE TO BE UNDERCUT IF LESS THAN 50% OF THE BAR'S CIRCUMFERENCE IS EXPOSED AND THE BOND BETWEEN THE BAR AND CONCRETE IS INTACT. IF THE BOND IS BROKEN OR MORE THAN 50% OF THE BAR'S CIRCUMFERENCE IS EXPOSED, THEN THE BAR SHALL BE UNDERCUT AS DESCRIBED IN SECTION C.
D. CLEAN REINFORCING STEEL OF OXIDATION USING A WIRE BRUSH. THE REINFORCING BARS SHALL BE CLEANED TO BRIGHT METAL. APPLY ANTI-CORROSION PRIMER AND BONDING BRIDGE. COAT THE REINFORCEMENT OR OTHER
STEEL TO REMAIN WITH CORROSION INHIBITOR.
E. IF REDUCED SECTION OF REINFORCEMENT IS LESS THAN 80% OF ORIGINAL AREA, PROVIDE ADDITIONAL REINFORCING STEEL OF 1.5 x AREA LOST OR GREATER OR REPLACE WITH NEW.
F. REINFORCING SHALL BE ADDED ACCORDING TO NOTES BELOW AND SECTIONS B AND C.
1. SPLICE LENGTH SHOWN SHALL EXTEND ON BOTH ENDS OF HEAVILY OXIDIZED SECTION FROM THE POINT WHERE
THE EXISTING BAR IS BEING SPLICED.
2. IF LAP SPLICE OF ADDITIONAL STEEL EXTENDS BEYOND THE REPAIR AREA PERIMETER, CUT A NOTCH IN THE EXISTING CONCRETE TO PROVIDE A 3/4" CLEAR SPACE BEHIND AND ON EACH SIDE OF THE ADDED STEEL.
3. BOTTOM BAR SPLICE NEED NOT EXTEND BEYOND THE FACE OF SUPPORT OF THE BEAM OR GIRDER.
4. IF ADDED STEEL ENCOUNTERS END OF MEMBER, PROVIDE HOOK OR MECHANICAL ANCHOR TO DEVELOP THE
STEEL TENSION CAPACITY. DRILL & GROUT AS REQ'D.
5. IF OBSTRUCTION PREVENTS FULL SPLICE LENGTH, USE MECHANICAL TENSION SPLICE COUPLER. CUT AND
CONNECT TO EXIST REINF.
6. SEE SECTIONS B & C FOR ADDITIONAL INFO.
G. SATURATE THE SURFACE OF THE PREPARED CONCRETE WITH WATER FOR A MAXIMUM OF TWO HOURS PRIOR TO THE PLACEMENT OF THE NEW CONCRETE. NO STANDING WATER AT THE TIME OF PATCH INSTALLATION.
H. JUST PRIOR TO NEW CONCRETE PLACEMENT, APPLY A SCRUB COAT OF A THIN CEMENT SLURRY WITH A STIFF BRUSH.
SLURRY MUST BE SCRUBBED INTO SUBSTRATE, FILLING ALL PORES AND VOIDS.
I. APPLY REPAIR MORTAR PER MANUFACTURER'S REQUIREMENTS. AT AREAS WHERE THE DEPTH OF REPAIR TO SOUND CONCRETE EXCEEDS THE MAXIMUM THICKNESS OF A SINGLE LIFT AS INDICATED BY THE MORTAR MANUFACTURER, APPLY THE PATCHING MORTAR IN MULTIPLE LIFTS WITH THICKNESS NOT EXCEEDING THE MAXIMUM. ALLOW SUFFICIENT
CURING TIME AND SCORE MORTAR SURFACE BETWEEN LIFTS.
J. PLACE CONCRETE TO MINIMUM 3/4" COVER OVER REINFORCING BARS.
K. STRIKE OFF SURFACES AS NECESSARY AND ALLOW CONCRETE TO SET. COORDINATE WITH ARCHITECT FOR FINAL FINISH
APPEARANCE, CURE BY COVERING EXPOSED SURFACES WITH WET BURLAP.
4. REFER TO ARCHITECTURAL DRAWINGS FOR ADDITIONAL REPAIR DETAILS.
LAP
REQUIRED
MORE, SPLICE
SECTION LOSS
OF 20% OR
LAP
REQUIRED
OXIDIZED
LT/MED
OXIDIZED
HEAVILY
OXIDIZED
LT/MED
CLEANING & COATING REQUIRED
NO CLEANING
CONDITION
TO POINT WHERE
REPAIR AS REQ'D
SECTION
UNOXIDIZED
SECTION
OXIDIZED
3/4"
SEE SCHEDULE
LAP SPLICE LENGTH
/4
/4
/4
SECTION A
SECTION B
SECTION C
G, H
E, F A
C, DKI, J
B
SLAB BAR REPAIR SPLICE SCHEDULE
EXISTING
BAR SIZE
BOT BARS TOP BARS REMARKS
#3 12" 16"
#4 16" 22"
#5 20" 27"
#6 25" 35"
#7 34" 48"
#8 45" 63"
W/ NEW REINF.
ORIGINAL MILL
REQUIRED
EXIST.
REINF.
STEEL
INCREASE SIZE OF
CORROSION OF
REINF. ENDS
ADD'L REINF.
STEEL IF
REQ'D (SEE
NOTE 3.F.4)
SEE SECTION B
PERIMETER OF REPAIR AREA
PROVIDE PAIRS OF #3 BENT
BARS @ 12" O.C. IN HILTI HIT-
HY 200 V3 W/ 3" EMBEDMENT
INTO (E) CONC.
REMOVE CONCRETE
ENCASEMENT TO EXPOSE
BOTTOM FLANGE. CLEAN
FLANGE OF ALL CORROSION
AND COAT WITH RUST-
INHIBITING PAINT. PATCH
CONCRETE ENCASEMENT.
(E) WF BEAM
(E) SLAB
OR AREA OF DETERIORATION
EXIST. OPENING
t/ t/
#4@12 E.W. (MIN. 2 BARS
E.W.) FOR INFILL OF
OPENINGS GREATER THAN 8"
t
SAWCUT 1/2 DEPTH
SHEAR KEY ON TWO
SIDES OF EXIST OPENING
TYP.
2"
INFILL OF EXISTING OPENINGS < 3'-0" MAX DIMENSION
NOTES FOR INFILL OF EXISTING OPENINGS:
1. THIS DETAIL APPLIES FOR INFILL OF EXISTING OPENINGS UP TO 3'-0" MAX. IN DIMENSION.
2. CREATE SHEAR KEY ON SIDES OF OPENING.
3. PROVIDE REINFORCING PER DETAIL FOR INFILL OF OPENINGS GREATER THAN 8".
4. FORM BOTTOM OF INFILL AND CAST CONCRETE.
NOTES FOR FULL-DEPTH CONCRETE SLAB REPAIR
1. REMOVE LOOSE CONCRETE PER 1/S6.5 TO SOUNDS MATERIAL. THIS DETAIL APPLIES WHERE LOOSE /
DETERIORATED CONCRETE EXTENDS TO FULL DEPTH OF SLAB.
2. CLEAN AND COAT REINFORCING STEEL PER 1/S6.5. PROVIDE ADDITIONAL REINFORCING AS NEEDED PER
1/S6.5 (MID-DEPTH REINFORCING AS SHOWN ABOVE NOT REQUIRED).
3. CREATE SHEAR KEY ON SIDES OF OPENING.
4. SATURATE THE SURFACE OF THE PREPARED CONCRETE WITH WATER FOR A MAXIMUM OF TWO HOURS
PRIOR TO THE PLACEMENT OF THE NEW CONCRETE. NO STANDING WATER AT THE TIME OF PATCH
INSTALLATION.
5. JUST PRIOR TO NEW CONCRETE PLACEMENT, APPLY A SCRUB COAT OF A THIN CEMENT SLURRY WITH A STIFF BRUSH. SLURRY MUST BE SCRUBBED INTO SUBSTRATE, FILLING ALL PORES AND VOIDS.
6. FORM BOTTOM OF REPAIR AREA AND CAST CONCRETE.
EXISTING SLAB REINFORCEMENT
WHERE PRESENT
(E) CONC. PILE BOTT. OF (E)
GRADE BEAM
EXT. FOOTING
BUMPOUT WHERE
PRESENT
(E) SLAB
(E) CRACK IN GRADE BEAM /
FOUNDATION WALL
GROUT INJECTION PORT.
LAYOUT AND PROCEDURE TO BE
SUBMITTED BY CONTRACTOR
FOR C.O.R. / E.O.R. REVIEW .
T.O. (E) CURB WHERE PRESENT
CONCRETE EPOXY INJECTION REPAIR NOTES
1. STANDARDS
A. ASTM C881, STANDARD SPECIFICATION FOR EPOXY-RESIN-BASE BONDING SYSTEMS
FOR CONCRETE, LATEST EDITION.
B. AMERICAN CONCRETE INSTITUTE (ACI) STANDARDS: ACI 224.1R, ACI 364.1R, ACI 503R, AND ACI 546.
2. EPOXY PRODUCTS: SUBMIT MANUFACTURER'S SPECIFICATIONS, INSTALLATION
PROCEDURES, AND MATERIAL SAFETY DATA SHEETS.
3. RECOMMENDED SEQUENCE & CONSTRUCTION NOTES
A. CLEAN THE SURFACE AREA ABOUT 1/2" WIDE ON EACH SIDE OF THE CRACK BY WIRE
BRUSHING. WHERE CONCRETE SURFACES ADJACENT TO THE CRACK ARE
DETERIORATED, V-GROOVE THE CRACK UNTIL SOUND CONCRETE IS REACHED.
B. INSTALL INJECTION PORTS AT 8 INCHES ON CENTER OR AS REQUIRED BASED ON
MATERIAL THICKNESS AND WIDTH OF CRACK. INSTALL THE CAP SEAL.
C. BATCH AND MIX THE EPOXY IN STRICT ACCORDANCE WITH THE MANUFACTURER'S
REQUIREMENTS. FOR CRACK WIDTHS 0.010 INCHES OR SMALLER, USE A LOW-
VISCOSITY EPOXY (500 CPS OR LESS). FOR WIDER CRACKS, OR WHERE INJECTION
ACCESS IS LIMITED TO ONE SIDE, USE A MEDIUM TO GEL VISCOSITY MATERIAL.
D. INJECT THE EPOXY, STARTING AT THE WIDEST SECTION OF THE CRACK AT
HORIZONTAL CRACKS OR AT THE BASE OF THE CRACK FOR VERTICAL CRACKS.
CONTINUE THE INJECTION UNTIL REFUSAL AND CAP PORT. MANAGE PRESSURE WITH
CARE TO PREVENT BLOWOUT OF THE CAP SEAL OR PORTS.
E. REMOVE THE PORTS AND CAP SEAL BY HEAT, CHIPPING OR GRINDING.
F. TO ENSURE THAT THE INJECTIONS HAS BEEN SUCCESSFUL, PERFORM NON-
DESTRUCTIVE EVALUATION (NDE) USING ONE OF THE FOLLOWING METHODS:
1. IMPACT ECHO (IE).
2. ULTRASONIC PULSE VELOCITY (UPV)
3. SPECTRAL ANALYSIS OF SURVACE WAVES (SASW)
4. PROVIDE ADD UNIT COST FOR ADDITIONAL LOCATIONS THAT MAY BE DISCOVERED
DURING CONSTRUCTION.
SCALE: NTSS6.5
1 TYPICAL CONCRETE REPAIR DETAIL
DATE:
DESIGNED:
TECH. REVIEW:
SUB SHEET NO.
PMIS/PKG NO.
DRAWING NO.
SHEET
TITLE OF SHEET
OF
190066
GATE 308504
HANGARS 3 & 4 REHABILITATION 150
/1
/2
:4
:1
P M
C U s e rs
\j th ib a u \D o c u m e n ts
\S T
R U
C T
G
A T
E F lo y d B e n n e t F ie ld r2 jt h ib a u V
G D
.r v t
JCT / EB / PA
MAS
NF
12/19/2025
S6.5
TYPICAL CONCRETE
REPAIR DETAILS
N.T.S.S6.5
4 GRADE BEAM CRACK EPOXY REPAIR (ELEVATION)
SCALE: NTSS6.5
3 TYPICAL CONCRETE ENCASEMENT REPAIR
SCALE: NTSS6.5
2 TYPICAL FULL-DEPTH CONCRETE REPAIR DETAIL / INFILL OF EXISTING OPENINGS
| Sheets |
| S0.1 - STRUCTURAL GENERAL NOTES |
| S0.2 - STRUCTURAL GENERAL NOTES |
| S0.3 - SCHEDULES AND LEGENDS |
| S1.0 - FOUNDATION - GROUND FLOOR OVERALL PLAN |
| S1.1 - LEAN-TO ROOF AND WPA INFILL MEZZANINE OVERALL FRAMING PLAN |
| S1.2 - HANGAR ROOF TRUSS BOTTOM CHORD LEVEL OVERALL FRAMING PLAN |
| S1.3 - HANGAR ROOF TRUSS TOP CHORD LEVEL OVERALL FRAMING PLAN |
| S2.1 - HANGAR 4 LEAN-TO FRAMING PLANS |
| S2.2 - HANGAR 4 FOUNDATION / GROUND FLOOR PLAN |
| S2.3 - HANGAR 4 ROOF TRUSS BOTTOM CHORD LEVEL FRAMING PLAN |
| S2.4 - HANGAR 4 ROOF TRUSS TOP CHORD LEVEL FRAMING PLAN |
| S2.5 - WPA INFILL FRAMING PLANS |
| S2.6 - WPA INFILL ROOF FRAMING PLAN |
| S2.7 - HANGAR 3 FOUNDATION / GROUND FLOOR PLAN |
| S2.8 - HANGAR 3 ROOF TRUSS BOTTOM CHORD LEVEL FRAMING PLAN |
| S2.9 - HANGAR 3 ROOF TRUSS TOP CHORD LEVEL FRAMING PLAN |
| S2.10 - HANGER 3 LEAN-TO FRAMING PLANS |
| S3.1 - EXISTING TRUSS ELEVATIONS |
| S3.2 - HANGAR 4 INTERIOR ELEVATIONS |
| S3.3 - HANGAR 3 INTERIOR ELEVATIONS |
| S4.1 - EXTERIOR ELEVATIONS - WPA INFILL |
| S4.2 - EXTERIOR ELEVATIONS - HANGAR 4 LEAN-TO |
| S5.1 - TYPICAL FOUNDATION DETAILS |
| S6.2 - STEEL BEAM REPAIR DETAILS |
| S6.3 - MASONRY REPAIR AND LINTEL REPLACEMENT DETAILS |
| S5.2 - FOUNDATION DETAILS |
| S5.3 - FOUNDATION DETAILS |
| S6.1 - STEEL COLUMN REPAIR DETAILS |
| S6.5 - TYPICAL CONCRETE REPAIR DETAILS |
| S6.4 - TYPICAL BRICK REPAIR DETAILS |
| S6.6 - SUPERSTRUCTURE DETAILS |
| S6.7 - HANGAR DOOR POCKET WALL DETAILS |
| S6.8 - HANGAR DOOR POCKET WALL DETAILS |
| S6.9 - HANGAR DOOR POCKET WALL DETAILS |
| S6.10 - HANGAR DOOR POCKET WALL DETAILS |
| S6.11 - SECTIONS AND DETAILS |
| S7.1 - HANGAR DOOR REPAIR DETAILS |
| S7.2 - HANGAR DOOR REPAIR DETAILS |
File details come from the government source that posted it. Updated .