This document is a set of technical drawings and specifications for steel beam repair details for the Hangars 3 & 4 Rehabilitation project at Floyd Bennett Field. The drawings depict three primary repair scenarios: typical lean-to beam flange and web repair, existing beam bearing repair, and typical hangar beam web repair for a 10" WF beam at the hangar clerestory.

The repair work requires removal of existing clip angles and deteriorated steel components, cleaning of all corrosion and scale, and replacement with galvanized steel plates and angles. Key materials include 3/8" galvanized web plates (minimum 6" beyond deterioration limits), new galvanized flange plates (1/2" wider on each side than existing), and galvanized bearing plates in various sizes per the provided schedules. All steel must be cleaned prior to welding per specifications and receive zinc-rich, rust-inhibiting paint before final wall rebuild. The specifications include temporary shoring requirements, non-shrink grout placement, and masonry infill work. The Beam Bearing Plate Schedule specifies eight beam types with corresponding plate dimensions (length, width, and thickness), while the Beam Reinforcing Plate Schedule provides estimates for web doubler plates and flange plates at various beam locations. The document notes that additional web plate locations beyond those indicated on the plan will likely be identified during construction, with 12 additional 36"-long locations assumed for pricing purposes, and unit costs should be provided for any additional locations discovered during work execution.

View the file

Other files

File Type Posted
Sol_140P2026R0060_Amd_0004.pdf PDF
28_20_00_Video_Surveillance_-_06_23_26_0003.pdf PDF
A3-0_-_BUILDING_SECTIONS_06_23_26_0003.pdf PDF
Sol_140P2026R0060_Amd_0003.pdf PDF
Sign-in_Sheet_for_06_16_26_Site_Visit_0003.pdf PDF
A5-0-2_-_ROOF___HANGAR_DOOR_DETAILS_06_23_26_0003.pdf PDF
FINAL_BID_QUESTIONS_AND_ANSWERS__UPDATED_06_23_26_0003.pdf PDF
GATE_308504_-_140P2026R0060_Bid_Questions_and_Answers_-_06_11_26_0002.docx DOCX document
B08_Solicitation_P2026R0060_Revisions_to_Section_L_06_11_26_0002.docx DOCX document
S2-6_-_WPA_INFILL_ROOF_FRAMING_PLAN_06_11_26_0002.pdf PDF
012700_DefinitionOfContractLineItems_Revised_06_11_26_0002.pdf PDF
G0_-_COVER_SHEET_06_11_26_0002.pdf PDF
Sol_140P2026R0060_Amd_0002.pdf PDF
B08_Fillable_Past_Performance_Questionnaire_0002.docx DOCX document
A0-4_-_EXTERIOR_ELEVATIONS_-_DEMOLITION_06_11_26_0002.pdf PDF
Solicitation_P2026R0060_GATE_308504_Contract_Price_Schedule_Revised_06_11_26_0002.xlsx XLSX spreadsheet
A0-6_-_EXISTING_CONDITIONS_PHOTOS_-_EXTERIOR_06_11_26_0002.pdf PDF
B08_Fillable_Project_Experience_Questionnaire_0002.docx DOCX document
S6-3_-_MASONRY_REPAIR_AND_LINTEL_REPLACEMENT_DETAILS_06_11_26_0002.pdf PDF
S6-5_-_TYPICAL_CONCRETE_REPAIR_DETAILS_06_11_26_0002.pdf PDF
A4-2-1_-_ENLARGED_ELEVATIONS_-_HANGAR_4_DOORS_06_11_26_0002.pdf PDF
WD_NY20260003_05_26_26_-_Issued_06_11_26_0002.pdf PDF
P4_-_PLUMBING_SCHEDULES_06_11_26_0002.pdf PDF
Sol_140P2026R0060_Amd_0001.pdf PDF
Amendment_0001_P2026R0060_0001.pdf PDF
Sol_140P2026R0060.pdf PDF
1__25-1219_GATE_308504_Final_CD_Project_Specifications.pdf PDF
3_25-1219_GATE_308504_Final_CD_Structural_Design_Calculations.pdf PDF
B08_GATE_308504_Hangars_3_and_4_Solicitation_140P2026R0060.pdf PDF
2_Final_CD_Drawings_-_Condensed.pdf PDF
Show all 30

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NEW 3/8" FLANGE PLATE,

1/2" MIN. WIDER EACH SIDE

THAN EXISTING FLANGE.

1/4

1/4

PROVIDE TEMPORARY

SHORING AS REQUIRED

NEW GALV. 3/8" WEB PLATE

6" MIN. BEYOND LIMIT

OF WEB DETERIORATION

REMOVE EXISTING CLIP ANGLES

AND CLEAN EXISTING BEAM END

OF ALL CORROSION AND SCALE.

(2) CLIP ANGLES EACH SIDE

REQUIRED PER BEAM END.

REPLACE WITH GALV. CLIP

ANGLES TO MATCH EXISTING IF

MISSING OR IF INTERFERES WITH

WEB REPAIR. WELD TO WEB

PLATE IF NEEDED.

1/4

NOTES:

1. ALL STEEL TO BE CLEANED PRIOR

TO WELDING PER SPECIFICATIONS.

STEEL TO RECEIVE ZINC-RICH,

RUST-INHIBITING PAINT PRIOR TO

FINAL WALL REBUILD.

2. BEAM REPAIR DEPICTED IN THIS

DETAIL REPRESENTS THE TYPICAL

21"-DEEP LEAN-TO GIRDER. REFER

TO BEAM REINFORCING SCHEDULE

FOR PLATE SIZES AT ALL BEAM

LOCATIONS.

3. NOTE ROOF AND BEAM SLOPE NOT

SHOWN, SEE PLANS AND SECTIONS.

4. ASSUME WEB PLATES AND NEW

CLIP ANGLES WILL BE REQUIRED

WHERE INDICATED ON PLAN.

PROVIDE UNIT COST FOR ADD.

4"

REBUILD TOP OF WALL

PER ARCHITECTURAL

ELEVATIONS. INFILL BEAM

POCKET WITH MASONRY

AFTER BEAM REPAIRS

ARE COMPLETE.

3@12"

NEW GALV. BEAM

BEARING PLATE WHERE

REQUIRED, SEE 2/S6.2.

SEE 4/S6.6 FOR

DIAPHRAGM AND

SILL ATTACHMENT.

LINE OF WALL BEYOND

EXTERIOR FACE OF PIER

LIMIT OF

DETERIORATION

BEAM, SEE PLAN.

REINFORCE AS

REQ'D PER 1/S6.2

POCKET

BEARING PLATE

LENGTH "L"

MATCH EXISTING ANGLES

IN SIZE AND NUMBER,

ASSUME L3x3x5/16 x 0'-3"

FOR PRICING

EXISTING MASONRY

WALL; SEE ARCH

DWGS FOR EXTENTS

OF REBUILD / REPAIR

GALV. BEARING

PLATE BP-#

PER PLAN AND

SCHEDULE

NOTES:

1. PROVIDE TEMPORARY SHORING TO UNDERSIDE OF BEAM NEAR

BEARING END PRIOR TO REPLACING BEARING PLATE.

2. CUT POCKET IN WALL AS SHOWN.

3. FILL HOLLOWS IN WALL UNDER BEARING PLATE SOLID WITH

MORTARED BRICK BEFORE PLACING PLATE. (MINIMUM 2

COURSES)

4. AFTER BEAM IS REPAIRED / REINFORCED AND BEARING PLATE

IS REPLACED, BRICK UP POCKET SOLID. FULL MORTAR BEDDING

IN ALL H & V BRICK JOINTS, TO POCKET FACES AND TO BEAM.

(ALTERNATE: GROUT SOLID)

5. ASSUME ALL BEARING PLATES WILL NEED TO BE REPLACED

WHERE INDICATED ON PLAN. PROVIDE UNIT COST FOR ADD.

SECTION ELEVATION

EXISTING

MASONRY

WALL

BEARING PLATE

WIDTH "B"

2" CLR. 2" CLR.

1/4

B E

A M

D E

P T

H

S E

E P

L A

N

0' - 1"

N O

N -S

H R

IN

K

G R

O U

T

1" CL. 1" CL.

N O

N -S

H R

IN

K

G R

O U

T B

P T

H

IC

K N

E S

S t"

NEW 3/8"

WEB PLATE

1/4

TYP. EA. BENT

PLATE

NOTES:

1. ALL STEEL TO BE CLEANED PRIOR TO

WELDING PER SPECIFICATIONS.

STEEL TO RECEIVE ZINC-RICH, RUST-

INHIBITING PAINT PRIOR TO FINAL

WALL REBUILD.

2. LOCATIONS NOTED ON PLAN

INDICATE THOSE TO HAVE RUSTED

THROUGH THE BEAM WEB AS

OBSERVED FROM THE GROUND.

ONCE THE STEEL HAS BEEN CLEANED

AND OBSERVED FROM BOTH SIDES

UP CLOSE, ADDITIONAL LOCATIONS

WILL LIKELY BE IDENTIFIED. ASSUME

(12) ADDITIONAL LOCATIONS IN

ADDITION TO THOSE INDICATED ON

PLAN. ASSUME A 36"-LONG WEB

PLATE AT EACH LOCATION FOR

PRICING AND PROVIDE A UNIT COST

FOR ADDITIONAL LOCATIONS THAT

MAY BE IDENTIFIED DURING

CONSTRUCTION.

AREA OF WEB DETERIORATION.

CLEAN OF ALL RUST AND SCALE TO

ALLOW MEASUREMENT OF

REMAINING WEB THICKNESS.

2" MIN.

(E) 10" WF AT

HANGAR CLERESTORY

k -F

IL

L E

T T

Y P

3@12"

LIMIT OF WEB

DETERIORATION

DATE:

DESIGNED:

TECH. REVIEW:

SUB SHEET NO.

PMIS/PKG NO.

DRAWING NO.

SHEET

TITLE OF SHEET

OF

190066

GATE 308504

HANGARS 3 & 4 REHABILITATION 150

/1

/2

:4

:1

P M

C U s e rs

\j th ib a u \D o c u m e n ts

\S T

R U

C T

G

A T

E F lo y d B e n n e t F ie ld r2 jt h ib a u V

G D

.r v t

JCT / EB / PA

MAS

NF

12/19/2025

S6.2

STEEL BEAM REPAIR

DETAILS

SCALE: NTSS6.2

1 TYPICAL LEAN-TO BEAM FLANGE AND WEB REPAIR

SCALE: NTSS6.2

2 EXISTING BEAM BEARING REPAIR

SCALE: NTSS6.2

3 TYPICAL HANGAR BEAM WEB REPAIR

BEAM BEARING PLATE SCHEDULE

BEAM

SIZE

MARK L (IN) B (IN) t (IN) NOTES

21" CB 55# BP-1 12 12 0.75

16" B 45#

4" I 7.7# BP-3 6 6 0.50

C10 x 15.3# BP-4 8 6 0.50

C8 x 11.5# BP-5 8 6 0.50

NO BP

BEARS DIRECTLY

ON 2C LINTEL

BEAM REINFORCING PLATE SCHEDULE

(ESTIMATES - FOR PRICING PURPOSES)

BEAM

SIZE

L (IN) H (IN) L (IN)

21" CB 55# 24 19 24

16" B 45#

4" I 7.7# 3

C10 x 15.3# 8

C8 x 11.5# 6

B (IN)

WEB DOUBLER PLATE FLANGE PLATE

12 14

8.5

3.5

Sheets
S0.1 - STRUCTURAL GENERAL NOTES
S0.2 - STRUCTURAL GENERAL NOTES
S0.3 - SCHEDULES AND LEGENDS
S1.0 - FOUNDATION - GROUND FLOOR OVERALL PLAN
S1.1 - LEAN-TO ROOF AND WPA INFILL MEZZANINE OVERALL FRAMING PLAN
S1.2 - HANGAR ROOF TRUSS BOTTOM CHORD LEVEL OVERALL FRAMING PLAN
S1.3 - HANGAR ROOF TRUSS TOP CHORD LEVEL OVERALL FRAMING PLAN
S2.1 - HANGAR 4 LEAN-TO FRAMING PLANS
S2.2 - HANGAR 4 FOUNDATION / GROUND FLOOR PLAN
S2.3 - HANGAR 4 ROOF TRUSS BOTTOM CHORD LEVEL FRAMING PLAN
S2.4 - HANGAR 4 ROOF TRUSS TOP CHORD LEVEL FRAMING PLAN
S2.5 - WPA INFILL FRAMING PLANS
S2.6 - WPA INFILL ROOF FRAMING PLAN
S2.7 - HANGAR 3 FOUNDATION / GROUND FLOOR PLAN
S2.8 - HANGAR 3 ROOF TRUSS BOTTOM CHORD LEVEL FRAMING PLAN
S2.9 - HANGAR 3 ROOF TRUSS TOP CHORD LEVEL FRAMING PLAN
S2.10 - HANGER 3 LEAN-TO FRAMING PLANS
S3.1 - EXISTING TRUSS ELEVATIONS
S3.2 - HANGAR 4 INTERIOR ELEVATIONS
S3.3 - HANGAR 3 INTERIOR ELEVATIONS
S4.1 - EXTERIOR ELEVATIONS - WPA INFILL
S4.2 - EXTERIOR ELEVATIONS - HANGAR 4 LEAN-TO
S5.1 - TYPICAL FOUNDATION DETAILS
S6.2 - STEEL BEAM REPAIR DETAILS
S6.3 - MASONRY REPAIR AND LINTEL REPLACEMENT DETAILS
S5.2 - FOUNDATION DETAILS
S5.3 - FOUNDATION DETAILS
S6.1 - STEEL COLUMN REPAIR DETAILS
S6.5 - TYPICAL CONCRETE REPAIR DETAILS
S6.4 - TYPICAL BRICK REPAIR DETAILS
S6.6 - SUPERSTRUCTURE DETAILS
S6.7 - HANGAR DOOR POCKET WALL DETAILS
S6.8 - HANGAR DOOR POCKET WALL DETAILS
S6.9 - HANGAR DOOR POCKET WALL DETAILS
S6.10 - HANGAR DOOR POCKET WALL DETAILS
S6.11 - SECTIONS AND DETAILS
S7.1 - HANGAR DOOR REPAIR DETAILS
S7.2 - HANGAR DOOR REPAIR DETAILS

File details come from the government source that posted it. Updated .