S2-6_-_WPA_INFILL_ROOF_FRAMING_PLAN_06_11_26_0002.pdf
PDF 188 KB Posted
- Solicitation number
- 140P2026R0060
About this file
This is a structural drawing for the WPA Infill Roof Framing Plan as part of the Hangars 3 & 4 Rehabilitation project at Floyd Bennett Field. The drawing details the top chord and roof framing configuration for an existing building infill structure, showing the layout of existing steel trusses (Types T3 and T4), purlins, concrete-encased steel beams, and related structural elements that require rehabilitation work.
The project requires comprehensive structural repair and replacement services including: wire brushing and rust removal of all superstructure steel elements with zinc-rich paint coating; reinforcement of steel members experiencing more than 5% section loss through field welding of new steel sections; replacement of corroded lintels with hot-dipped galvanized angles; removal and patching of masonry encasements around beams and columns; concrete repairs to roof slabs and curbs (assuming 20 SF partial depth repairs per location with eight additional locations); complete replacement of roof decking with 2x (1.5" thick) tongue and groove decking overlaid with 15/32" plywood sheathing; replacement of nailers and bolts (assuming 100% replacement of both); coverage of existing roof openings; and installation of nine new skylights. The drawing references related detail sheets (S6.1 through S6.5) for typical repair specifications and coordinates with architectural, civil, and MEP contract requirements. The drawing is dated December 19, 2025, with a technical review date of June 10, 2026.
View the file
Other files
Show all 30
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
C
A
D
E
F
G
H
J
I
B
3 4
(E) TRUSS - TYPE T3
(E) TRUSS - TYPE T3
(E) TRUSS - TYPE T3
S3.1
S3.1
F-B
(E) CONCRETE-ENCASED
STEEL BEAM
SUPPORTING ONE-WAY
REINF. CONC. SLAB,
TYP. BETWEEN COLUMN
LINES G & J.
(E) SKYLIGHT
OPENING
(E) TRUSS - TYPE T4
06-01
03-03
03-03 03-03
(E) MAS. PARAPET
(E) C10 PURLIN, TYP.
TYP. @
WOOD ROOF
05-04
05-04
05-0105-01
REMOVE (E) STEEL CAGING
AND RE-BUILD TOP OF
MASONRY CHIMNEY IN
KIND DOWN TO BOTTOM OF
HANGER 4 ROOF EAVE
06-02 TYP. AT ALL PURLINS
(E
C
B (E
C
B (E
C
B (E
C
B (E
C
B (E
C
B (E
C
B
(E
C
B
(E
C
B (E
C
B (E
C
B (E
C
B (E
C
B
(E
C
B
05-01
TYP. ALL
STEEL
FRAMING AND
BRACING
05-12
FOR HEIGHT
OF TRUSS
05-11
03-03
05-11 05-03 05-0305-03
05-03 05-03
COVER (E) ROOF
OPENINGS PER ARCH
DWGS, TYP. 4 LOC.
PERFORM CONCRETE
REPAIRS AT CURB AS
REQUIRED TO PROVIDE
ADEQUATE SUBSTRATE
FOR ANCHORAGE OF
COVER.
EXISTING INFILLED
SKYLIGHT OPENING TO
RECEIVE NEW
SKYLIGHTS PER ARCH.
DWGS, TYP. (9) LOC.
05-13
05-13
05-13
PLAN NOTES
1. SEE DRAWINGS S0.1, S0.2 AND S0.3 FOR GENERAL NOTES AND SCHEDULES.
2. DATUM ELEVATION 0'-0" REFERENCES TOP OF GROUND FLOOR (LEVEL 0) ELEVATION
13.73'. ALL ELEVATIONS INDICATED ARE RELATIVE TO THE DATUM ELEVATION.
3. EXISTING FRAMING AND LAYOUT INDICATED ON PLAN IS PER THE 1929 DRAWINGS AND
SHALL BE VERIFIED IN THE FIELD IN AREAS OF WORK.
4. SEE DRAWINGS S6.1 AND S6.2 FOR TYPICAL STEEL REPAIR DETAILS.
5. SEE DRAWING S6.3 FOR TYPICAL LINTEL DETAILS, DRAWING S6.4 FOR TYPICAL MASONRY
REPAIR DETAILS, AND S6.5 FOR TYPICAL CONCRETE REPAIR DETAILS.
6. COORDINATE ALL DIMENSIONS WITH ARCHITECT, CIVIL, MEP AND OTHER PRIME
CONTRACTORS.
7. FOR BOILER ROOM ROOF SLAB CONCRETE REPAIRS, ASSUME 20 SF PARTIAL DEPTH
REPAIR PER LOCATION INDICATED. ASSUME (8) ADDITIONAL LOCATIONS.
DATE:
DESIGNED:
TECH. REVIEW:
SUB SHEET NO.
PMIS/PKG NO.
DRAWING NO.
SHEET
TITLE OF SHEET
OF
190066
GATE 308504
HANGARS 3 & 4 REHABILITATION 150
/1
/2
:4
:4
P M
C U s e rs
\j th ib a u \D o c u m e n ts
\S T
R U
C T
G
A T
E F lo y d B e n n e t F ie ld r2 jt h ib a u V
G D
.r v t
JCT / EB / PA
MAS
NF
12/19/2025
S2.6
WPA INFILL ROOF
FRAMING PLAN
SCALE BS2.6
1 WPA INFILL TOP CHORD AND ROOF FRAMING PLAN
KEYNOTE LEGEND
03-03 PEFORM CONCRETE REPAIRS IN EXISTING ROOF SLAB OR WHERE INDICATED PER
TYPICAL DETAILS 1/S6.5 AND 2/S6.5. SEE ARCHITECTURAL DRAWINGS FOR ADDITIONAL
REPAIRS.
05-01 WIRE BRUSH CLEAN TO BARE METAL ALL STRUCTURAL STEEL (COLUMNS, BEAMS,
TRUSS ELEMENTS AND CONNECTIONS) TO REMOVE SURFACE CORROSION AND RUST
SCALING DEPOSITS. FOR CLERESTORY BEAMS AT THE INTERSECTION OF THE
HANGARS AND THE WPA INFILL BUILDING, SEQUENTIAL REMOVAL OF THE TOP
COURSE OF BRICK BELOW MAY BE REQUIRED TO CLEAN THE BEAM BOTTOM FLANGE;
RESET BRICK AFTER CLEANING AND COATING STEEL. AFTER CLEANING, DETERMINE
SECTION LOSS BY COMPARING RESULTING ELEMENT THICKNESS (MEASURED USING
DIGITAL CALIPERS) TO THE ORIGINAL THICKNESSES SHOWN ON THE DRAWINGS.
REINFORCE STRUCTURAL MEMBERS WHERE FRAMING ELEMENTS HAVE EXPERIENCED
MORE THAN 5% SECTION LOSS (REFERENCE COLUMN REPAIR DETAILS ON S6.1 AND
BEAM REPAIR DETAILS ON S6.2). REINFORCEMENT SHALL CONSIST OF FIELD WELDING
NEW STEEL REINFORCEMENT SECTIONS TO THE EXISTING COMPROMISED MEMBERS.
FOR PRICING, ASSUME THAT 100% OF ALL SUPERSTRUCTURE ELEMENT SURFACES
WILL REQUIRE RUST CLEANING AND COATING WITH ZINC-RICH, RUST-INHIBITING
PAINT. SEE DETAILS FOR ASSUMED QUANTITIES OF REINFORCEMENT.
05-03 TEMPORARILY SHORE BRICK MASONRY ABOVE LINTEL WHERE REQUIRED. REMOVE
BRICK MASONRY AROUND CORRODED LINTEL AND REPLACE LINTEL WITH HOT-DIPPED
GALVANIZED ANGLES TO MATCH EXISTING IN SIZE (SEE ASSUMED LINTEL PROFILES
ON S6.3, V.I.F.). REBUILD MASONRY WITH APPROPRIATE MORTAR AND BRICK PER
ARCHITECTURAL SPECIFICATIONS. SEE ARCHITECTURAL ELEVATIONS FOR EXTENTS
OF MASONRY REBUILDING.
05-04 REMOVE MASONRY ENCASEMENT AT BEAM POCKET TO FULLY EXPOSE BEAM END AND
BEARING PLATE. CLEAN ALL STEEL PER 05-01 AND REINFORCE DETERIORATED BEAM
END WITH WELDED STEEL PLATES PER DETAILS ON S6.2. REPLACE BEARING PLATE
WHERE REQUIRED. COAT BEAM END AND BEARING PLATE WITH ZINC-RICH,
RUST-INHIBITING PAINT PRIOR TO PATCHING MASONRY.
05-11 REMOVE LOOSE CONCRETE ENCASEMENT ON STEEL BEAM. CLEAN EXPOSED
SURFACES OF BEAM OF ALL RUST AND COAT WITH ZINC-RICH, RUST-INHIBITING PAINT.
REPAIR CONCRETE ENCASEMENT PER TYPICAL DETAIL 3/S6.5.
05-12 REMOVE MASONRY ENCASEMENT AT COLUMN TO FULLY EXPOSE COLUMN FLANGES
AND WEB. CLEAN ALL STEEL PER 05-01. COAT COLUMN WITH INTUMESCENT PAINT UP
TO TRUSS BOTTOM CHORD LEVEL PER ARCHITECTURAL SPECIFICATIONS PRIOR TO
PATCHING MASONRY.
05-13 EXTREME SECTION LOSS AT EXISTING CLERESTORY BEAM WEB. CLEAN ALL STEEL
PER 05-01. REINFORCE DETERIORATED BEAM WEB WITH WELDED STEEL PLATES PER
TYPICAL DETAIL 3/S6.2. COAT BEAM WITH ZINC-RICH, RUST-INHIBITING PAINT PER
ARCHITECTURAL SPECIFICATIONS. PROVIDE UNIT COST FOR REPAIRS.
06-01 REPLACE EXISTING ROOF DECKING WITH NEW 2x (1-1/2" THICK) TONGUE AND GROOVE
ROOF DECKING. OVERLAY WITH 15/32" PLYWOOD SHEATHING. SHEATHING PANELS
SHALL BE INSTALLED WITH LONG DIMENSION PERPENDICULAR TO DECKING. SEE
GENERAL NOTES FOR MATERIAL INFORMATION AND FASTENERS. ASSUME 100%
REPLACEMENT OF ROOF DECKING FOR PRICING.
06-02 REPLACE EXISTING NAILERS WITH NEW (2)2x4 NAILERS BOLTED TO PURLINS. RE-USE
EXISTING 1/2" DIAMETER BOLTS WHERE IN GOOD CONDITION. REPLACE
DETERIORATED BOLTS IN KIND. SEE TYP. DETAIL 3/S6.6. ASSUME 100% REPLACEMENT
OF NAILERS AND 100% REPLACEMENT OF BOLTS FOR PRICING.
SCALE OF FEET
0'8' 8' 16'
SCALE B BUILDING
NORTH
| Sheets |
| S0.1 - STRUCTURAL GENERAL NOTES |
| S0.2 - STRUCTURAL GENERAL NOTES |
| S0.3 - SCHEDULES AND LEGENDS |
| S1.0 - FOUNDATION - GROUND FLOOR OVERALL PLAN |
| S1.1 - LEAN-TO ROOF AND WPA INFILL MEZZANINE OVERALL FRAMING PLAN |
| S1.2 - HANGAR ROOF TRUSS BOTTOM CHORD LEVEL OVERALL FRAMING PLAN |
| S1.3 - HANGAR ROOF TRUSS TOP CHORD LEVEL OVERALL FRAMING PLAN |
| S2.1 - HANGAR 4 LEAN-TO FRAMING PLANS |
| S2.2 - HANGAR 4 FOUNDATION / GROUND FLOOR PLAN |
| S2.3 - HANGAR 4 ROOF TRUSS BOTTOM CHORD LEVEL FRAMING PLAN |
| S2.4 - HANGAR 4 ROOF TRUSS TOP CHORD LEVEL FRAMING PLAN |
| S2.5 - WPA INFILL FRAMING PLANS |
| S2.6 - WPA INFILL ROOF FRAMING PLAN |
| S2.7 - HANGAR 3 FOUNDATION / GROUND FLOOR PLAN |
| S2.8 - HANGAR 3 ROOF TRUSS BOTTOM CHORD LEVEL FRAMING PLAN |
| S2.9 - HANGAR 3 ROOF TRUSS TOP CHORD LEVEL FRAMING PLAN |
| S2.10 - HANGER 3 LEAN-TO FRAMING PLANS |
| S3.1 - EXISTING TRUSS ELEVATIONS |
| S3.2 - HANGAR 4 INTERIOR ELEVATIONS |
| S3.3 - HANGAR 3 INTERIOR ELEVATIONS |
| S4.1 - EXTERIOR ELEVATIONS - WPA INFILL |
| S4.2 - EXTERIOR ELEVATIONS - HANGAR 4 LEAN-TO |
| S5.1 - TYPICAL FOUNDATION DETAILS |
| S6.2 - STEEL BEAM REPAIR DETAILS |
| S6.3 - MASONRY REPAIR AND LINTEL REPLACEMENT DETAILS |
| S5.2 - FOUNDATION DETAILS |
| S5.3 - FOUNDATION DETAILS |
| S6.1 - STEEL COLUMN REPAIR DETAILS |
| S6.5 - TYPICAL CONCRETE REPAIR DETAILS |
| S6.4 - TYPICAL BRICK REPAIR DETAILS |
| S6.6 - SUPERSTRUCTURE DETAILS |
| S6.7 - HANGAR DOOR POCKET WALL DETAILS |
| S6.8 - HANGAR DOOR POCKET WALL DETAILS |
| S6.9 - HANGAR DOOR POCKET WALL DETAILS |
| S6.10 - HANGAR DOOR POCKET WALL DETAILS |
| S6.11 - SECTIONS AND DETAILS |
| S7.1 - HANGAR DOOR REPAIR DETAILS |
| S7.2 - HANGAR DOOR REPAIR DETAILS |
File details come from the government source that posted it. Updated .