This document is an architectural drawing sheet depicting building sections for a federal facility at Gateway National Recreation Area (Floyd Bennett Field). The drawing provides detailed cross-sectional views of multiple building components including Hangar 3, Hangar 4, Lean-To structures 3 and 4, a WPA Infill section, and a Boiler Room. The sections illustrate structural elements, floor elevations, roof heights, and architectural details at various scales, with floor levels referenced at ±0'-0" for hangar and lean-to floors, boiler room floor at ±-1'-11 1/4", and roof heights ranging from ±14'-7 11/16" for lean-to roofs to ±33'-4 1/16" for hangar roofs.
The document includes seven sheet notes outlining scope requirements for masonry repair and restoration work. Key requirements include: visual survey-based identification of repair work with notation that additional repairs may be required; matching new brick, cast stone masonry, and mortar to original specifications in color, texture, size, makeup, and profile; performing general cleaning of 100% of exterior masonry plus spot cleaning as indicated; careful removal of vegetation on and adjacent to exterior walls without damaging existing masonry; and abatement of lead paint located on the interior face of frieze wood planking. All areas not specifically called out are to remain existing and be protected from damage during construction. The drawing references typical masonry, cast stone, and concrete repair detail sheets for additional specifications. The project is associated with PMIS/PKG No. 190066 and Gate 308504, dated 10/17/2025, with revisions noted as of 6/17/2026.
View the file
Other files
Show all 30
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
HANGAR AND
LEAN-TO FLOORS
±0' - 0"
HANGAR ROOFS
±33' - 4 1/16"
LEAN-TO ROOFS
±14' - 7 11/16"
WPA10BWPA10A
ABCDEFGHIJ
A4.3.1
A4.3.1
A4.3.1
A4.2.70
A4.2.61
HANGAR AND
LEAN-TO FLOORS
±0' - 0"
WPA INFILL ROOF
±20' - 9 29/32"
HANGAR ROOFS
±33' - 4 1/16"
LEAN-TO ROOFS
±14' - 7 11/16"
BOILER ROOM
FLOOR
±-1' - 11 1/4"
1 2 3 4 5 6
A4.3.2
A4.3.2
A4.3.2
A4.2.10
A4.2.12
A4.2.15
A4.2.17
A4.2.19
A4.2.60
A4.2.52
A4.2.50
± 118'
06-05
HANGAR AND
LEAN-TO FLOORS
±0' - 0"
LEAN-TO ROOFS
±14' - 7 11/16"
ABCDEFGHIJ
A4.2.18
A4.2.50
A4.2.50
HANGAR AND
LEAN-TO FLOORS
±0' - 0"
LEAN-TO ROOFS
±14' - 7 11/16"
A B C D E F G H I J
A4.3.2
A4.3.2
A4.2.14
A4.2.16
A4.2.53
A4.2.53
WPA INFILL ROOF
±20' - 9 29/32"
BOILER ROOM
FLOOR
±-1' - 11 1/4"
3 4
A4.2.70
HANGAR AND
LEAN-TO FLOORS
±0' - 0"
WPA INFILL ROOF
±20' - 9 29/32"
HANGAR ROOFS
±33' - 4 1/16"
LEAN-TO ROOFS
±14' - 7 11/16"
WPA INFILL
MEZZANINE
±12' - 1 11/16"
WPA INFILL FLR
±-0' - 0 7/16"
123456 A4.2.11
A4.2.13
A4.2.15
A4.2.17
A4.2.19
A4.2.60
A4.2.50
A4.2.52
06-05
± 118'
1. ALL SURVEY WAS DONE VISUALLY FROM THE
GROUND AT A SINGLE POINT IN TIME. SOME
ADDITIONAL REPAIR WORK MAY BE REQUIRED IN
ADDITION TO THE WORK INDICATED ON THE
DRAWINGS.
2. MASONRY REPAIR WORK IS SHOWN BY
SHADING, HATCH, BOLD LINES, AND/OR NOTES.
3. ALL AREAS NOT CALLED OUT ARE EXISTING TO
REMAIN AND SHALL BE PROTECTED FROM
DAMAGE DURING CONSTRUCTION.
4. NEW BRICK, CAST STONE MASONRY AND
MORTAR SHALL MATCH ORIGINAL BRICK AND
CAST STONE IN COLOR, TEXTURE, SIZE, MAKEUP
AND PROFILE.
5. IN ADDITION TO SPOT CLEANING INDICATED ON
DRAWINGS, PERFORM A GENERAL CLEANING OF
100% OF THE EXTERIOR MASONRY.
6. CAREFULLY REMOVE ALL EXISTING VEGETATION
ON AND ADJACENT TO EXTERIOR WALLS. AVOID
DAMAGING EXISTING MASONRY.
7. REFER TO TYPICAL MASONRY, CAST STONE AND
CONCRETE REPAIR DETAIL SHEETS.
SHEET NOTES
DATE:
DESIGNED:
TECH. REVIEW:
SUB SHEET NO.
PMIS/PKG NO.
DRAWING NO.
SHEET
TITLE OF SHEET
OF
190066
GATE 308504
GATEWAY NATIONAL RECREATION AREA
CT
SW
AK
10/17/2025
/1
/2
:4
:5
P M
A u to d e s k D o c s /G
A T
E F lo y d B e n n e tt F ie ld
/G A
T E
F lo y d B e n n e tt F ie ld
R
.r v t
A3.0
BUILDING SECTIONS
SCALE AA3.0
1 BUILDING SECTION - NORTH/SOUTH
SCALE AA3.0
3 BUILDING SECTION - NORTH
SCALE AA3.0
6 BUILDING SECTION - HANGAR 4 LEAN-TO
SCALE AA3.0
5 BUILDING SECTION - HANGAR 3 LEAN-TO
SCALE AA3.0
2 BUILDING SECTION - BOILER ROOM
SCALE AA3.0
4 BUILDING SECTION - SOUTH
016 16 328
SCALE OF FEET
SCALE A
BOILER ROOM WPA INFILL
HANGAR 4LEAN-TO 4 WPA INFILL HANGAR 3 LEAN-TO 3
HANGAR 3LEAN-TO 3 WPA INFILL HANGAR 4 LEAN-TO 4
KEYNOTES
KEY
VALUE TEXT
06-05 ABATE LEAD PAINT LOCATED ON
THE INTERIOR FACE OF THE
FRIEZE WOOD PLANKING.
| Sheets |
| A3.0 - BUILDING SECTIONS |
File details come from the government source that posted it. Updated .