This is a Definition of Contract Line Items section from a federal construction contract (GATE 308504) for hangar restoration work.

The contract contains one mandatory line item and fifteen optional line items. Contract Line Item 0001 is Hangar Restoration, a lump sum item covering contractor general requirements including trailer and construction fencing. The fifteen options are evaluated during bidding and may be included or excluded at the Contracting Officer's discretion. Options 1-2 are lump sum items for Exterior Utility Improvements (water, storm, and sanitary sewer) and Exterior Site Restoration. Options 3-15 are unit price items for specialized repairs and work: graffiti removal (per square foot); partial and full depth concrete repairs to the Boiler Room roof slab (per square foot); grade beam epoxy crack repair (per linear foot); door threshold concrete apron replacement (per linear foot); lean-to beam flange and web repair (per repair); hangar clerestory hung lintel beam flange plate reinforcement (per repair); existing beam bearing repair (per repair); expose lintel bearing (per instance); clean and coat exposed lintel (per repair); replace outer lintel with section loss (per lintel); replace deteriorated hangar door aluminum connecting angle and bolts (per replacement); and repair of clerestory beam web and doubler plate (per repair). All payment is contingent upon completion and measurement criteria as specified in the contract documents and referenced drawings.

View the file

Other files

File Type Posted
Sol_140P2026R0060_Amd_0004.pdf PDF
28_20_00_Video_Surveillance_-_06_23_26_0003.pdf PDF
A3-0_-_BUILDING_SECTIONS_06_23_26_0003.pdf PDF
Sol_140P2026R0060_Amd_0003.pdf PDF
Sign-in_Sheet_for_06_16_26_Site_Visit_0003.pdf PDF
A5-0-2_-_ROOF___HANGAR_DOOR_DETAILS_06_23_26_0003.pdf PDF
FINAL_BID_QUESTIONS_AND_ANSWERS__UPDATED_06_23_26_0003.pdf PDF
GATE_308504_-_140P2026R0060_Bid_Questions_and_Answers_-_06_11_26_0002.docx DOCX document
B08_Solicitation_P2026R0060_Revisions_to_Section_L_06_11_26_0002.docx DOCX document
S2-6_-_WPA_INFILL_ROOF_FRAMING_PLAN_06_11_26_0002.pdf PDF
G0_-_COVER_SHEET_06_11_26_0002.pdf PDF
Sol_140P2026R0060_Amd_0002.pdf PDF
B08_Fillable_Past_Performance_Questionnaire_0002.docx DOCX document
A0-4_-_EXTERIOR_ELEVATIONS_-_DEMOLITION_06_11_26_0002.pdf PDF
Solicitation_P2026R0060_GATE_308504_Contract_Price_Schedule_Revised_06_11_26_0002.xlsx XLSX spreadsheet
A0-6_-_EXISTING_CONDITIONS_PHOTOS_-_EXTERIOR_06_11_26_0002.pdf PDF
B08_Fillable_Project_Experience_Questionnaire_0002.docx DOCX document
S6-3_-_MASONRY_REPAIR_AND_LINTEL_REPLACEMENT_DETAILS_06_11_26_0002.pdf PDF
S6-5_-_TYPICAL_CONCRETE_REPAIR_DETAILS_06_11_26_0002.pdf PDF
A4-2-1_-_ENLARGED_ELEVATIONS_-_HANGAR_4_DOORS_06_11_26_0002.pdf PDF
S6-2_-_STEEL_BEAM_REPAIR_DETAILS_06_11_26_0002.pdf PDF
WD_NY20260003_05_26_26_-_Issued_06_11_26_0002.pdf PDF
P4_-_PLUMBING_SCHEDULES_06_11_26_0002.pdf PDF
Sol_140P2026R0060_Amd_0001.pdf PDF
Amendment_0001_P2026R0060_0001.pdf PDF
Sol_140P2026R0060.pdf PDF
1__25-1219_GATE_308504_Final_CD_Project_Specifications.pdf PDF
3_25-1219_GATE_308504_Final_CD_Structural_Design_Calculations.pdf PDF
B08_GATE_308504_Hangars_3_and_4_Solicitation_140P2026R0060.pdf PDF
2_Final_CD_Drawings_-_Condensed.pdf PDF
Show all 30

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

GATE 308504 01 27 00 - 1

012721 DEFINITION OF CONTRACT LINE ITEMS

GATE 308504

SECTION 01 27 00 – DEFINITION OF CONTRACT LINE ITEMS

PART 1 - GENERAL

1.1 SUMMARY

A. Section explains in general, what is and is not included in a contract line item, and limits or cut-off points where one item ends and another begins.

B. If no contract line item exists for a portion of work, include costs in a related item.

C. OPTIONS are contract line items that will be evaluated during the bidding process and either included or not included in the contract award at the discretion of the Contracting Officer.

PART 2 - PRODUCTS (Not Used)

PART 3 - EXECUTION

3.1 LIST OF CONTRACT LINE ITEMS and OPTIONS

A. Contract Line Item Number 0001: Hangar Restoration.

1. This item consists of contractor general requirements including but not limited to, contractor trailer, construction fencing, etc.

2. Measurement for payment will be lump sum.

3. Payment will be made at the contract lump sum price.

B. OPTION 1 - Exterior Utility Improvements.

1. This item consists of the work associated with exterior utility improvements for water, storm, and sanitary sewer.

2. Measurement for payment will be lump sum.

3. Payment will be made at the contract lump sum price.

C. OPTION 2 - Exterior Site Restoration.

1. This item consists of all exterior site work associated with restoring the site back to final finished condition per contract documents.

2. Measurement for payment will be lump sum.

3. Payment will be made at the contract lump sum price.

D. OPTION 3 - Unit Price for Graffiti Removal.

GATE 308504 01 27 00 - 2

1. This item consists of the work associated with removing the graffiti per square foot.

graffiti removal section of the masonry restoration specification.

2. Measurement for payment will be per square foot of graffiti removal.

3. Payment will be made at unit price.

E. OPTION 4 - Unit Price for Partial Depth Concrete Repairs in Existing Boiler Room Roof Slab.

1. This item consists of the work associated with making partial depth concrete repairs in the existing Boiler Room roof slab or where indicated as shown in keynote 03-03 on detail 1 & 2 on drawing S6.5 and on drawings S2.5 and S2.6.

2. Measurement for payment will be per square foot of concrete repair.

3. Payment will be made at unit price.

F. OPTION 5 - Unit Price for Full Depth Concrete Repairs in Existing Boiler Room Roof Slab.

1. This item consists of the work associated with making full depth concrete repairs in the existing Boiler Room roof slab as shown in keynote 03-03 on detail 1 & 2 on drawing S6.5 and on drawings S2.5 and S2.6.

2. Measurement for payment will be per square foot of concrete repair.

3. Payment will be made at unit price.

G. OPTION 6 - Unit Price for Grade Beam Epoxy Crack Repair.

1. This item consists of the work associated with the grade beam epoxy crack repair as shown in keynote 03-04 on detail 4 on drawing S6.5.

2. Measurement for payment will be per linear foot of crack repair.

3. Payment will be made at unit price.

H. OPTION 7 - Unit Price for Existing Door Threshold Concrete Apron Replacement.

1. This item consists of the work associated with the existing door threshold concrete apron replacement as shown in detail 3 on drawing S5.2.

2. Measurement for payment will be per linear foot of apron replacement.

3. Payment will be made at unit price.

I. OPTION 8 - Unit Price for Lean-To Beam Flange and Web Repair.

1. This item consists of the work associated with the lean-to beam flange and web repair as shown in keynote 05-01 on detail 1 on drawing S6.2.

2. Measurement for payment will be per repair.

3. Payment will be made at unit price.

J. OPTION 9 - Unit Price for Hangar Clerestory Hung Lintel Beam Flange Plate Reinforcement.

1. This item consists of the work associated with the hangar clerestory hung lintel beam flange plate reinforcement where section loss is observed as shown in keynote 05-01 on details 1 and 2 on drawing S6.3.

2. Measurement for payment will be per repair.

3. Payment will be made at unit price.

K. OPTION 10 - Unit Price for Existing Beam Bearing Repair.

GATE 308504 01 27 00 - 3

1. This item consists of the work associated with the existing beam bearing repair as shown in keynote 05-01 and 05-04 on detail 2 on drawing S6.2.

2. Measurement for payment will be per repair.

3. Payment will be made at unit price.

L. OPTION 11 - Unit Price for Expose Lintel Bearing.

1. This item consists of the work associated with exposing the lintel bearing by removing surrounding brick masonry as shown in keynote 05-02 on drawing S4.1 and S4.2.

2. Measurement for payment will be per each instance of exposure.

3. Payment will be made at unit price.

M. OPTION 12 - Unit Price for Clean and Coat Exposed Lintel.

1. This item consists of the work associated with cleaning and coating the exposed lintel and if there is little deterioration as shown in keynote 05-02 on drawing S4.1 and S4.2.

2. Measurement for payment will be per each cleaning and coating repair.

3. Payment will be made at unit price.

N. OPTION 13 - Unit Price for Replace Outer Lintel Where Section Loss is Observed.

1. This item consists of the work associated with replacing the outer lintel where section loss is observed at the exposed lintel as shown in keynote 05-02 on drawing S4.1 and S4.2.

2. Measurement for payment will be per lintel replacement.

3. Payment will be made at unit price.

O. OPTION 14 - Unit Price for Replace Deteriorated Hangar Door Aluminum Connecting Angle and Bolts.

1. This item consists of the work associated with replacing the deteriorated hangar door aluminum connecting angle and bolts as shown in keynote 05-06 on drawing S7.2 Sheet Note 3.

2. Measurement for payment will be per replacement.

3. Payment will be made at unit price.

P. OPTION 15 - Unit Price for Repair of Clerestory Beam Web and Beam Web Doubler Plate.

1. This item consists of the work associated with providing repairs at extreme section loss at the clerestory beam webs and beam web doubler plate as shown in keynote 05-13 on detail 3 drawing S6.2.

2. Measurement for payment will be per repair.

3. Payment will be made at unit price.

END OF SECTION 01 27 00

PART 1 - GENERAL
1.1 SUMMARY
A. Section explains in general, what is and is not included in a contract line item, and limits or cut-off points where one item ends and another begins.
B. If no contract line item exists for a portion of work, include costs in a related item.
C. OPTIONS are contract line items that will be evaluated during the bidding process and either included or not included in the contract award at the discretion of the Contracting Officer.
PART 2 - PRODUCTS (Not Used)
PART 3 - EXECUTION
3.1 LIST OF CONTRACT LINE ITEMS and OPTIONS
A. Contract Line Item Number 0001: Hangar Restoration.
1. This item consists of contractor general requirements including but not limited to, contractor trailer, construction fencing, etc.
2. Measurement for payment will be lump sum.
3. Payment will be made at the contract lump sum price.
B. OPTION 1 - Exterior Utility Improvements.
1. This item consists of the work associated with exterior utility improvements for water, storm, and sanitary sewer.
2. Measurement for payment will be lump sum.
3. Payment will be made at the contract lump sum price.
C. OPTION 2 - Exterior Site Restoration.
1. This item consists of all exterior site work associated with restoring the site back to final finished condition per contract documents.
2. Measurement for payment will be lump sum.
3. Payment will be made at the contract lump sum price.
D. OPTION 3 - Unit Price for Graffiti Removal.
1. This item consists of the work associated with removing the graffiti per square foot. graffiti removal section of the masonry restoration specification.
2. Measurement for payment will be per square foot of graffiti removal.
3. Payment will be made at unit price.
E. OPTION 4 - Unit Price for Partial Depth Concrete Repairs in Existing Boiler Room Roof Slab.
1. This item consists of the work associated with making partial depth concrete repairs in the existing Boiler Room roof slab or where indicated as shown in keynote 03-03 on detail 1 & 2 on drawing S6.5 and on drawings S2.5 and S2.6.
2. Measurement for payment will be per square foot of concrete repair.
3. Payment will be made at unit price.
F. OPTION 5 - Unit Price for Full Depth Concrete Repairs in Existing Boiler Room Roof Slab.
1. This item consists of the work associated with making full depth concrete repairs in the existing Boiler Room roof slab as shown in keynote 03-03 on detail 1 & 2 on drawing S6.5 and on drawings S2.5 and S2.6.
2. Measurement for payment will be per square foot of concrete repair.
3. Payment will be made at unit price.
G. OPTION 6 - Unit Price for Grade Beam Epoxy Crack Repair.
1. This item consists of the work associated with the grade beam epoxy crack repair as shown in keynote 03-04 on detail 4 on drawing S6.5.
2. Measurement for payment will be per linear foot of crack repair.
3. Payment will be made at unit price.
H. OPTION 7 - Unit Price for Existing Door Threshold Concrete Apron Replacement.
1. This item consists of the work associated with the existing door threshold concrete apron replacement as shown in detail 3 on drawing S5.2.
2. Measurement for payment will be per linear foot of apron replacement.
3. Payment will be made at unit price.
I. OPTION 8 - Unit Price for Lean-To Beam Flange and Web Repair.
1. This item consists of the work associated with the lean-to beam flange and web repair as shown in keynote 05-01 on detail 1 on drawing S6.2.
2. Measurement for payment will be per repair.
3. Payment will be made at unit price.
J. OPTION 9 - Unit Price for Hangar Clerestory Hung Lintel Beam Flange Plate Reinforcement.
1. This item consists of the work associated with the hangar clerestory hung lintel beam flange plate reinforcement where section loss is observed as shown in keynote 05-01 on details 1 and 2 on drawing S6.3.
2. Measurement for payment will be per repair.
3. Payment will be made at unit price.
K. OPTION 10 - Unit Price for Existing Beam Bearing Repair.
1. This item consists of the work associated with the existing beam bearing repair as shown in keynote 05-01 and 05-04 on detail 2 on drawing S6.2.
2. Measurement for payment will be per repair.
3. Payment will be made at unit price.
L. OPTION 11 - Unit Price for Expose Lintel Bearing.
1. This item consists of the work associated with exposing the lintel bearing by removing surrounding brick masonry as shown in keynote 05-02 on drawing S4.1 and S4.2.
2. Measurement for payment will be per each instance of exposure.
3. Payment will be made at unit price.
M. OPTION 12 - Unit Price for Clean and Coat Exposed Lintel.
1. This item consists of the work associated with cleaning and coating the exposed lintel and if there is little deterioration as shown in keynote 05-02 on drawing S4.1 and S4.2.
2. Measurement for payment will be per each cleaning and coating repair.
3. Payment will be made at unit price.
N. OPTION 13 - Unit Price for Replace Outer Lintel Where Section Loss is Observed.
1. This item consists of the work associated with replacing the outer lintel where section loss is observed at the exposed lintel as shown in keynote 05-02 on drawing S4.1 and S4.2.
2. Measurement for payment will be per lintel replacement.
3. Payment will be made at unit price.
O. OPTION 14 - Unit Price for Replace Deteriorated Hangar Door Aluminum Connecting Angle and Bolts.
1. This item consists of the work associated with replacing the deteriorated hangar door aluminum connecting angle and bolts as shown in keynote 05-06 on drawing S7.2 Sheet Note 3.
2. Measurement for payment will be per replacement.
3. Payment will be made at unit price.
P. OPTION 15 - Unit Price for Repair of Clerestory Beam Web and Beam Web Doubler Plate.
1. This item consists of the work associated with providing repairs at extreme section loss at the clerestory beam webs and beam web doubler plate as shown in keynote 05-13 on detail 3 drawing S6.2.
2. Measurement for payment will be per repair.
3. Payment will be made at unit price.