A4-2-1_-_ENLARGED_ELEVATIONS_-_HANGAR_4_DOORS_06_11_26_0002.pdf
PDF 2 MB Posted
- Solicitation number
- 140P2026R0060
About this file
This is an architectural drawing for hangar door and glazing repair work at Floyd Bennett Field, a National Park Service facility within Gateway National Recreation Area.
The drawing specifies enlarged elevations and repair details for Hangar 4's north and south friezes, identifying multiple restoration tasks including: removal and reinstallation of existing aluminum panels with shop priming and painting to match Hangars 1 and 2; careful removal and cleaning of existing wireglass with replacement of damaged glazing using replica etched chickenwire single-pane glazing; removal of existing gasketing; dismantle and restoration of existing wheel hardware to operational condition with salvaged wheel replacement as needed; abatement of lead paint on existing metal trim; in-kind replacement of historic aluminum doors and hardware; and replication of two sliding hangar doors utilizing salvaged wheel hardware and replica glazing. Additional work includes priming and painting corrugated copper sheeting and painting text and symbols to match existing hangar specifications. Light fixture installation at original junction box locations is also specified with reference to electrical drawings. All contractors are required to verify existing field dimensions, remove hangar doors completely from tracks for restoration, refer to structural drawings for member replacement, and ensure all doors are reinstalled to full operability. The work emphasizes historic preservation and matching existing conditions across all hangar friezes.
View the file
Other files
Show all 30
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
4 4 N A T I O N A L P A R K S E R V I C E
F L O Y D B E N N E T T F I E L D
05-06
09-03
09-03 09-0409-04 09-0409-04 05-13
08-01.GL
08-02.GL
08-01 08-03
08-02.DR
TYP
TYP
TYP TYP08-01.RW TYP
A4.3.3
Sim
A5.0.2
A5.1
Sim
A5.1
Sim
A5.0.2
Sim
A5.0.2
Sim
26-08
26-08
26-0826-08
7' - 11" ±10' - 3 1/2" ±
18' - 2 1/2" ± 08-09
4 4 N A T I O N A L P A R K S E R V I C E
F L O Y D B E N N E T T F I E L D 09-03
09-0409-04
2 3
08-01.GL
08-02.GL
08-0108-03
08-02.DR 08-02.DR
TYP
TYP
TYP
TYP08-01.RW
TYP
A4.3.3
Sim1
A5.0.2
A5.1
Sim
A5.1
Sim
A5.0.2
Sim
A5.0.2
Sim
26-08
26-0826-08
26-08
GLAZING ROLLING DOOR HARDWARE
08-01.GL
08-02.GL
ALUMINUM PANEL
08-01.AL
08-02.AL
08-02.DR
08-01.RW
08-02.RW
GLAZING AND HANGAR DOOR REPAIR LEGEND
1. CONTRACTOR TO VERIFY ALL EXISTING DIMENSIONS IN
FIELD.
2. ALL HANGAR DOORS SHOULD BE REMOVED COMPLETELY
FROM THEIR TRACKS FOR RESTORATION.
3. REFER TO STRUCTURAL DRAWINGS FOR
REPLACEMENT/REPAIR OF HANGAR DOOR STRUCTURAL
MEMBERS.
4. HANGAR DOORS ARE TO BE REINSTALLED TO BE FULLY
OPERABLE.
5. FOR HANGAR DOOR STRUTURAL MEMBER REPAIRS, SEE
DETAILS ON STRUCTURAL DRAWINGS.
SHEET NOTES
LEAN-TO 4 HANGAR 4 WPA INFILL HANGAR 3
BOILER
ROOM
LEAN-TO 3
KEY PLAN
DATE:
DESIGNED:
TECH. REVIEW:
SUB SHEET NO.
PMIS/PKG NO.
DRAWING NO.
SHEET
TITLE OF SHEET
OF
190066
GATE 308504
GATEWAY NATIONAL RECREATION AREA
CT
SW
AK
10/17/2025
/9
/2
:5
:5
P
M A u to d e s k D o c s /G
A T
E F lo y d B e n n e tt F ie ld
/G A
T E
F lo y d B e n n e tt F ie ld
R
.r v t
A4.2.1
ENLARGED ELEVATIONS -
HANGAR 4 DOORS
SCALE OF FEET
2'4' 0 8'4'
SCALE A
SCALE AA4.2.1
1 ELEVATION - HANGAR 4 NORTH FRIEZE
SCALE AA4.2.1
2 ELEVATION - HANGAR 4 SOUTH FRIEZE
KEYNOTES
KEY
VALUE TEXT
05-06 IN-KIND REPLACEMENT SHEET METAL TRIM
PANEL. PRIME AND PAINT. COLOR TO MATCH
HANGARS 1&2 TRIM.
05-13 ABATE LEAD PAINT ON EXISTING METAL
TRIM. CLEAN, PRIME AND PAINT TO MATCH
HANGARS 1&2.
08-01 REMOVE EXISTING ALUMINUM PANEL. STRIP
EXISTING PAINT. SHOP PRIME AND PAINT.
REINSTALL WITH ALUMINUM RIVETS TO
MATCH EXISTING HISTORIC FASTENERS.
PRIME AND PAINT RIVETS TO MATCH.
08-01.GL CAREFULLY REMOVE EXISTING WIREGLASS
FROM STEEL FRAME. CLEAN AND
REINSTALL. IF GLAZING APPEARS TO BE
DAMAGED ONCE CONTRACTOR HAS
REMOVED IT, THE EXISTING GLAZING
SHOULD BE REPLACED WITH REPLICA
GLAZING.
08-01.RW DISMANTLE EXISTING WHEEL. BLAST TO
BARE METAL. SHOP PRIME AND PAINT.
REINSTALL TO BE OPERATIONAL. REPLACE
WITH ON SITE SALVAGED WHEEL
AS-NEEDED.
08-02.DR REPLACE EXISTING DOOR WITH IN-KIND
REPLACEMENT HISTORIC ALUMINUM DOOR
AND HARDWARE.
08-02.GL REMOVE EXISTING GLAZING. REPLACE WITH
REPLICA ETCHED CHICKENWIRE SINGLE
PANE GLAZING.
08-03 CAREFULLY REMOVE EXISTING GASKETING.
08-09 REPLICATE TWO (2) SLIDING HANGAR
DOORS TO MATCH EXISTING ALUMINUM
FRAME AND SHEET METAL DOORS. UTILIZE
SALVAGED WHEEL HARDWARE. GLAZING
SHALL BE REPLICA GLAZING, GL-1.
09-03 PRIME AND PAINT CORRUGATED COPPER
SHEETING. COLOR TO MATCH HANGARS 1&2.
09-04 PAINT TEXT AND SYMBOLS TO MATCH
HANGARS 1&2 IN SIZE AND TEXT TYPE.
26-08 INSTALL LIGHT FIXTURE AT EXISTING
ORIGINAL JBOX LOCATIONS. SEE
ELECTRICAL.
HANGAR 3&4 FRIEZES MATCH EXISTING HANGAR 1&2 FRIEZES.
| Sheets |
| A4.2.1 - ENLARGED ELEVATIONS - HANGAR 4 DOORS |