B09_MALU_293291_Questions_Responses_Spreadsheet_-_Amend_10_0010.xlsx

XLSX spreadsheet 20 KB Posted

Attached to
MALU 293291 Rehabilitate the Visitor Center and
Solicitation number
140P2024R0056
Issued by

About this file

This document appears to be a Questions and Answers spreadsheet related to a federal contract opportunity for the Rehabilitation of the Visitor Center and Headquarters at Martin Luther King Jr. National Historical Park in Atlanta, GA.

The key details include:

  • The contract requires the rehabilitation of the visitor center and headquarters buildings, including work on the roof deck, HVAC systems, lighting, and ceiling tiles.
  • There are questions and answers regarding the handling of asbestos and mold, replacement of ceiling tiles and lighting, access to the roof, and the scope of cleaning required for the HVAC system.
  • The solicitation number is 140P2024R0056 and the procuring agency is the National Park Service.
  • The contract requires the replacement of approximately 25% of the roof deck panels and the full replacement of the canopy as per a separate evaluation report.
  • Specific installation and performance requirements are outlined in the contract's drawings, specifications, and other documents.

View the file

Other files

File Type Posted
B09_012700_DefinitionOfContractLineItems_10_28_24_amendment_0013_0013.pdf PDF
B09_SF30_Amendment_0013_Solicitation_140P2024R0056_MALU293291_0013.pdf PDF
B09_MALU_293291_Amendment0013_Vol_II_Solit_Attach_6_Price_Schedule_0013.xlsx XLSX spreadsheet
Sol_140P2024R0056_Amd_0013.pdf PDF
B09_MALU_293291_Amendment_0013_Drawings_0013.pdf PDF
B09_140P2024R0056_MALU293291_Amendment0013_Solicitation_Clauses_Pg9_0013.pdf PDF
B09_Amendment_0013_WageDecision_DBA_GA20240307_Updated_Attachment_3_0013.pdf PDF
B09_MALU_293291_Amendment_0013_Specs_0013.pdf PDF
B09_Amendment_0013_Summary_of_Changes_to_Specifications_and_Drawings_0013.pdf PDF
B09_Amendment_0013_RFI_s_MALU_293291_140P2024R0056_0013.pdf PDF
Sol_140P2024R0056_Amd_0012.pdf PDF
B09_Amendment_P0011_140P2024R0056_MALU293291_0011.pdf PDF
B09_Amendment_11_Sign_in_Sheet_0011.pdf PDF
Sol_140P2024R0056_Amd_0011.pdf PDF
B09_Amendment_P0010_140P2024R0056_MALU293291_0010.pdf PDF
Sol_140P2024R0056_Amd_0010.pdf PDF
B09_MALU_293291_DefinitionOfContractLineItems_Amend_10_0010.pdf PDF
B09_Amendment_10_140P2024R0056_MALU293291_Page_66_0010.pdf PDF
B09_MALU_293291_ContractPriceSchedule_Amend_10_0010.xlsx XLSX spreadsheet
B09_Amendment_P0009_140P2024R0056_MALU293291_0009.pdf PDF
Sol_140P2024R0056_Amd_0009.pdf PDF
B09_SF30_Amendment_P0008_MALU293291_140P2024R0056_0008.pdf PDF
Sol_140P2024R0056_Amd_0008.pdf PDF
B09_SF30_Amendment_P0007_MALU293291_140P2024R0056_0007.pdf PDF
Sol_140P2024R0056_Amd_0007.pdf PDF
B09_SF30_Amendment_P0006_MALU293291_140P2024R0056_0006.pdf PDF
Sol_140P2024R0056_Amd_0006.pdf PDF
B09_MALU_293291_Questions_Responses_Spreadsheet_-_Amend_06_0006.xlsx XLSX spreadsheet
Sol_140P2024R0056_Amd_0005.pdf PDF
B09_SF30_Amendment_P0005_MALU293291_140P2024R0056_0005.pdf PDF
B09_MALU_293291_Questions_Responses_Spreadsheet_-_Amend_05_0005.xlsx XLSX spreadsheet
B09_SF30_Amendment_P0004_MALU293291_140P2024R0056_0004.pdf PDF
B09_Amendment_4_Sign_In_Sheet_0004.pdf PDF
Sol_140P2024R0056_Amd_0004.pdf PDF
B09_Amendment_4_PreProposal_Conf_Slides_MALU_293291_0004.pptx PPTX presentation
B09_Amendment_3_MALU_293291_Combined_Div_01___Technical_specs_8_12_24__0003.pdf PDF
Sol_140P2024R0056_Amd_0003.pdf PDF
B09_Amendment_03_140P2024R0056_MALU293291_Page_48_0003.pdf PDF
B09_Amendment_3__MALU_293291_Geotechnical_Engineering_Report_MLK_Visitor_Center_FINAL_Attchment_9_0003.pdf PDF
B09_Amendment_3_MALU_293291_MLK_Mold_and_RBM_Survey_Report_Attachment_12_0003.pdf PDF
B09_Amendment_3_MALU_293291_Canopy_Roof_and_Window_Sealants_Evaluation_Attachment_10_0003.pdf PDF
B09_SF30_Amendment_P0003_MALU293291_140P2024R0056_0003.pdf PDF
B09_Amendment_3_MALU_293291_Final_Drawings_20240531_20240715_0003.pdf PDF
B09_Amendment_3_MALU_293291_Video_Pipe_Inspection_Attachment_11_0003.pdf PDF
B09_Amendment_3_MALU_293291_Hydrant_Test_Results_Attachment_13_0003.pdf PDF
B09_SF30_Amendment_P0002_MALU293291_140P2024R0056_0002.pdf PDF
Sol_140P2024R0056_Amd_0002.pdf PDF
B09_Amendment_02_140P2024R0056_MALU293291_Page_66_0002.pdf PDF
B09_Amendment_01_140P2024R0056_MALU293291_Page_66_0001.pdf PDF
Sol_140P2024R0056_Amd_0001.pdf PDF
Show 40 more

Latest 50 of 62 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

Park:MALU
PMIS:293291
Project Name:Rehabilitate the Visitor Center and Headquarters
Question#Question:Answer:
1Will there be any protocol for the mold and asbestos noted in bid?See specification section 02 82 00 and other contract language for asbestos abatement requirements. Mold abatement is not part of this contract, mold report is provided for reference only. See Hazardous materials language in the contract.
2If no protocol what specifically do we bid on? The mold report shows elevated levels in the store and possibly the theater.See above
3Testing will need to be done to the stucco of the entrance to see if asbestos. If area is not hot is all stucco removed and replaced?Asbestos scope is outlined in 02 82 00. Exterior stucco is not a part of this contract. If contractor sees otherwise please provide specific citations from contract documents.
4How do we know which ceiling tiles to replace, it states only about 20% replacement. Who will determine suitability or replacement?20% replacement will be identified during construction in consultation with the successful contractor and the Government.
5It looks like we need to dismantle and remove lighting grid in Exhibit 17 to remove and replace ceiling tiles. Are we allowed to do this?Exhibit 17 dismantle and reconstruction approval is contingent on upon submission of means and methods during construction.
6Also how about the bridge in the Exhibit area? Is it to be removed for ceiling access?Bridge to remain in place during construction.
7HVAC cleaning. It stated that units and plenums will be replaced and then states in HVAC that the plenums are to be cleaned. Can we get a clear picture of when what and where the ducts shall be cleaned?Specific drawing and/or specification section indications are required to answer this question, please provide more detail. The Government does not see any conflicting requirements with respect to the plenums.
8Throughout the RFQ it states remove ceiling tile assembly does that include the grid and hangers?Assembly includes grid and wire hangers.
9ROOF DECK PANEL COMPONENTS

A. Cementitious deck form board products, including the following:

1. Roof Deck Panels:

a. Physical:

1) Material 1-1/2” Aspen wood fibers bonded with inorganic hydraulic cement, bonded to Dow Styrofoam brand extruded foam insulation, bonded to top surface of 19/32 inch (11.1 mm) plywood C-D Exposure class 1 min 4 ply.

b. Nominal Panel Thickness to match existing.Tectum thickness is the 1-1/2” as indicated in specs and mentioned above. 25% replacement should be assumed as indicated in the drawings. Actual thickness must be verified in field by contractor prior to ordering material and prior to roof demo.
10Detail 5/AC.2 shows 5" min. thickness, is this what we are to use?the 5” shown in the detail is insulation
11I don’t see any rooftop access at the museum in the drawings . RFI references scaffold tower for access, G0.3 doesn't reference. Is there a roof hatch to the high roof ?
Drawings show the mechanical room has the only hatch and is to receive some safety add ons.Both roof levels have access from inside the building. See note 7.12 on sheet A1.5 for both hatch locations.
12Addenda 3 contains the WJE canopy evaluation where they recommend full replacement of the canopy’s, yet I can’t locate any type of NPS response reflecting the same. Then there is the aspect of the WJE referenced EPDM gutter liner and structural which is clearly an issue and still no reference outside that report with a correcting directive in plans or specs.The canopy evaluation is FIO “For Information Only”, all contract requirements from the report were evaluated by the design team to be part of this project were included in the contract drawings and specifications.

File details come from the government source that posted it. Updated .