B09_MALU_293291_Amendment0013_Vol_II_Solit_Attach_6_Price_Schedule_0013.xlsx
XLSX spreadsheet 19 KB Posted
- Attached to
- MALU 293291 Rehabilitate the Visitor Center and
- Solicitation number
- 140P2024R0056
About this file
This is a pricing schedule template for the rehabilitation of the Visitor Center and Headquarters at Martin Luther King, Jr. National Historical Park in Atlanta, GA (Solicitation #140P2024R0056). The template requires vendors to submit pricing for both base work and optional items, with all prices to be rounded to whole dollars.
The base work consists of three main components: interior building rehabilitation, exterior building rehabilitation (including roof, canopy, and generator infrastructure), and site improvements (drainage, re-striping, and fountain sidewalk). There are eight bid options including exhibit space rehabilitation (ceiling scope and floor/wall finishes), fountain removal, site signage improvements, 2nd floor casework replacement, temporary visitor restrooms (4-stall and 8-stall options), and a generator. The template is structured as a mix of lump sum (LS) line items, with detailed measurement and payment information referenced in Division 01 Specifications Section 01 27 00.
View the file
Other files
Show 40 more
Latest 50 of 62 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Price Schedule 100% CD
| AMENDMENT 0013 | ||||||
| Contract Price Schedule Template | ||||||
| National Park Service (NPS) - Denver Service Center (DSC) | 3-13-18 | ||||||
| Solicitation Number: | ||||||
| PARK - PMIS: | Martin Luther King, Jr. National Historical Park (MALU 293291) | |||||
| (Project Management Information System) | ||||||
| Developed Area: | Visitor Center & Headquarters | |||||
| Project Title: | Rehabilitate Visitor Center and Headquarters | |||||
| Notice: Offerors are required to submit, a minimum, an offer that conforms to the solicitation documents with pricing for Base line items and all | ||||||
| option line items. Failure to do so may render the proposal unacceptable. On lump-sum line items, provide the total price only. For all unit-priced | ||||||
| line items, provide the unit price and the extended total price. If no specific line item exists for a portion of the work, include the costs in a related | ||||||
| item. In case of error in calculation of extended prices, the unit price governs. In case of error in summation, the total of the corrected amounts | ||||||
| govern. Round totals and extended prices to whole dollars. | ||||||
| Contract Line Item Number (CLIN) | Contract Line Item (CLI) Title | Quantity | Unit of Measure | Unit Price | Total Price | |
| 1 | Building Rehabilitation- Interior | 1 | LS | |||
| 2 | Building Rehabilition- Exterior (Roof, Canopy, Generator infrastructure) | 1 | LS | |||
| 3 | Site Improvements | |||||
| (Drainage, Re-striping, Fountain Sidewalk) | 1 | LS | ||||
| 4 | NOT USED | |||||
| 5 | NOT USED | |||||
| 6 | NOT USED | |||||
| 7 | NOT USED | |||||
| TOTAL BASE PRICE (Contract Line Items Number 1 through 7) --------------------------------------------------------------------------------- | ||||||
| 8 | Bid Option: Exhibit Space Rehabilition | |||||
| (Full Ceiling Scope) | 1 | LS | ||||
| 9 | Bid Option: Exhibit Space Rehabilition | |||||
| (Floor and Wall Finishes) | 1 | LS | ||||
| 10 | Bid Option: Fountain Removal | 1 | LS | |||
| 11 | Bid Option: Site Signage Improvements | 1 | LS | |||
| 12 | Bid Option: 2nd Floor Casework Replacement | 1 | LS | |||
| 13 | Bid Option: Temporary 4-Stall Visitor Restroom | 1 | LS | |||
| 14 | Bid Option: Temporary 8-Stall Visitor Restroom | 1 | LS | |||
| 15 | Bid Option: Generator | 1 | LS | |||
| TOTAL PRICE FOR ALL OPTIONS (Contract Line Items Number 8 through 15) ----------------------------------------------------------- | ||||||
| TOTAL PROPOSED PRICE - BASE PLUS ALL OPTIONS (Contract Line Item Number 1 through 15) -------------------------- | ||||||
| All measurement and payment information is included in Division 01 Specifications Section 01 27 00 Definition of Contract Line Items. |
File details come from the government source that posted it. Updated .