B09_Amendment_3_MALU_293291_Hydrant_Test_Results_Attachment_13_0003.pdf

PDF 43 KB Posted

Attached to
MALU 293291 Rehabilitate the Visitor Center and
Solicitation number
140P2024R0056
Issued by

About this file

This document contains fire hydrant and pressure test results conducted by an authorized representative of the City of Atlanta's Department of Watershed Management. The tests were requested by Calibre Engineering and performed at three different locations in Atlanta, Georgia on March 24, 2022. The test results provide details on the static pressure, residual pressure, pitot reading, and flow rate for each hydrant. This information appears to be provided as supporting documentation for a federal contract opportunity solicitation number 140P2024R0056 to rehabilitate the Visitor Center and Headquarters at the Martin Luther King Jr. National Historical Park in Atlanta, Georgia. The solicitation is being issued by the Department of the Interior, National Park Service National Office.

View the file

Other files

File Type Posted
B09_012700_DefinitionOfContractLineItems_10_28_24_amendment_0013_0013.pdf PDF
B09_SF30_Amendment_0013_Solicitation_140P2024R0056_MALU293291_0013.pdf PDF
B09_MALU_293291_Amendment0013_Vol_II_Solit_Attach_6_Price_Schedule_0013.xlsx XLSX spreadsheet
Sol_140P2024R0056_Amd_0013.pdf PDF
B09_MALU_293291_Amendment_0013_Drawings_0013.pdf PDF
B09_140P2024R0056_MALU293291_Amendment0013_Solicitation_Clauses_Pg9_0013.pdf PDF
B09_Amendment_0013_WageDecision_DBA_GA20240307_Updated_Attachment_3_0013.pdf PDF
B09_MALU_293291_Amendment_0013_Specs_0013.pdf PDF
B09_Amendment_0013_Summary_of_Changes_to_Specifications_and_Drawings_0013.pdf PDF
B09_Amendment_0013_RFI_s_MALU_293291_140P2024R0056_0013.pdf PDF
Sol_140P2024R0056_Amd_0012.pdf PDF
B09_Amendment_P0011_140P2024R0056_MALU293291_0011.pdf PDF
B09_Amendment_11_Sign_in_Sheet_0011.pdf PDF
Sol_140P2024R0056_Amd_0011.pdf PDF
B09_MALU_293291_Questions_Responses_Spreadsheet_-_Amend_10_0010.xlsx XLSX spreadsheet
B09_Amendment_P0010_140P2024R0056_MALU293291_0010.pdf PDF
Sol_140P2024R0056_Amd_0010.pdf PDF
B09_MALU_293291_DefinitionOfContractLineItems_Amend_10_0010.pdf PDF
B09_Amendment_10_140P2024R0056_MALU293291_Page_66_0010.pdf PDF
B09_MALU_293291_ContractPriceSchedule_Amend_10_0010.xlsx XLSX spreadsheet
B09_Amendment_P0009_140P2024R0056_MALU293291_0009.pdf PDF
Sol_140P2024R0056_Amd_0009.pdf PDF
B09_SF30_Amendment_P0008_MALU293291_140P2024R0056_0008.pdf PDF
Sol_140P2024R0056_Amd_0008.pdf PDF
B09_SF30_Amendment_P0007_MALU293291_140P2024R0056_0007.pdf PDF
Sol_140P2024R0056_Amd_0007.pdf PDF
B09_SF30_Amendment_P0006_MALU293291_140P2024R0056_0006.pdf PDF
Sol_140P2024R0056_Amd_0006.pdf PDF
B09_MALU_293291_Questions_Responses_Spreadsheet_-_Amend_06_0006.xlsx XLSX spreadsheet
Sol_140P2024R0056_Amd_0005.pdf PDF
B09_SF30_Amendment_P0005_MALU293291_140P2024R0056_0005.pdf PDF
B09_MALU_293291_Questions_Responses_Spreadsheet_-_Amend_05_0005.xlsx XLSX spreadsheet
B09_SF30_Amendment_P0004_MALU293291_140P2024R0056_0004.pdf PDF
B09_Amendment_4_Sign_In_Sheet_0004.pdf PDF
Sol_140P2024R0056_Amd_0004.pdf PDF
B09_Amendment_4_PreProposal_Conf_Slides_MALU_293291_0004.pptx PPTX presentation
B09_Amendment_3_MALU_293291_Combined_Div_01___Technical_specs_8_12_24__0003.pdf PDF
Sol_140P2024R0056_Amd_0003.pdf PDF
B09_Amendment_03_140P2024R0056_MALU293291_Page_48_0003.pdf PDF
B09_Amendment_3__MALU_293291_Geotechnical_Engineering_Report_MLK_Visitor_Center_FINAL_Attchment_9_0003.pdf PDF
B09_Amendment_3_MALU_293291_MLK_Mold_and_RBM_Survey_Report_Attachment_12_0003.pdf PDF
B09_Amendment_3_MALU_293291_Canopy_Roof_and_Window_Sealants_Evaluation_Attachment_10_0003.pdf PDF
B09_SF30_Amendment_P0003_MALU293291_140P2024R0056_0003.pdf PDF
B09_Amendment_3_MALU_293291_Final_Drawings_20240531_20240715_0003.pdf PDF
B09_Amendment_3_MALU_293291_Video_Pipe_Inspection_Attachment_11_0003.pdf PDF
B09_SF30_Amendment_P0002_MALU293291_140P2024R0056_0002.pdf PDF
Sol_140P2024R0056_Amd_0002.pdf PDF
B09_Amendment_02_140P2024R0056_MALU293291_Page_66_0002.pdf PDF
B09_Amendment_01_140P2024R0056_MALU293291_Page_66_0001.pdf PDF
Sol_140P2024R0056_Amd_0001.pdf PDF
Show 40 more

Latest 50 of 62 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CITY OF ATLANTA

ANDRE DICKENS 651 FOURTEENTH STREET DEPARTMENT OF

MAYOR ATLANTA, GEORGIA 30318 WATERSHED MANAGEMENT

OFFICE . 404-982-1487 MIKITA BROWNING

FAX . 404-982-1400 COMMISSIONER

Date: 3/24/22

The following report is on FIRE HYDRANT and PRESSURE TEST results.

Done by an Authorized Representative of The City of Atlanta.

Test location: 90 Boulevard

Plat card # 386

Test Hydrant # 404

Flow Hydrant # 3978

Static: 73

Residual: 70

Pitot: 50

Flow: 1190 gpm

Comments: Flowed 2.5 inch nozzle 6 inch main 11:00 a.m. 1 min.

Requested by: Calibre Engineering

Contact: Jessica Kordziel

Phone: 303-502-7287

City of Atlanta-Watershed Management

Representative:

Emanuel Toles 678-878-5192 etoles@atlantaga.gov

ANDRE DICKENS 651 FOURTEENTH STREET DEPARTMENT OF

MAYOR ATLANTA, GEORGIA 30318 WATERSHED MANAGEMENT

Test location: 101 Jackson Street

Plat card # 413

Test Hydrant # 776

Flow Hydrant # 809

Static: 80

Residual: 40

Pitot: 20

Flow: 750 gpm

Comments: Flowed 2.5 inch nozzle 6 inch main 11:25 a.m. 1 min.

ANDRE DICKENS 651 FOURTEENTH STREET DEPARTMENT OF

MAYOR ATLANTA, GEORGIA 30318 WATERSHED MANAGEMENT

Test location: 460 Auburn Avenue

Plat card # 386

Test Hydrant # 2489

Flow Hydrant # 3978

Static: 71

Residual: 69

Pitot: 50

Flow: 1190 gpm

Comments: Flowed 2.5 inch nozzle 6 inch main 11:35 a.m. 1 min.