B09_MALU_293291_Questions_Responses_Spreadsheet_-_Amend_06_0006.xlsx
XLSX spreadsheet 18 KB Posted
- Attached to
- MALU 293291 Rehabilitate the Visitor Center and
- Solicitation number
- 140P2024R0056
About this file
This document appears to be a Questions and Answers spreadsheet related to the federal contract opportunity to Rehabilitate the Visitor Center and Headquarters at Martin Luther King Jr. National Historical Park in Atlanta, GA (Solicitation Number 140P2024R0056).
The key details are:
- The contract involves asbestos abatement per the specifications, but mold abatement is not part of the contract.
- The exterior stucco is not part of the contract, and 20% replacement of ceiling tiles will be identified during construction.
- The contractor will need to coordinate with the government on dismantling and reconstruction of the lighting grid and bridge in the exhibit area.
- There are no conflicting requirements related to cleaning the HVAC plenums.
- The ceiling tile assembly includes removal of the grid and wire hangers.
View the file
Other files
Show 40 more
Latest 50 of 62 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Park: | MALU | |
| PMIS: | 293291 | |
| Project Name: | Rehabilitate the Visitor Center and Headquarters | |
| Question# | Question: | Answer: |
| 1 | Will there be any protocol for the mold and asbestos noted in bid? | See specification section 02 82 00 and other contract language for asbestos abatement requirements. Mold abatement is not part of this contract, mold report is provided for reference only. See Hazardous materials language in the contract. |
| 2 | If no protocol what specifically do we bid on? The mold report shows elevated levels in the store and possibly the theater. | See above |
| 3 | Testing will need to be done to the stucco of the entrance to see if asbestos. If area is not hot is all stucco removed and replaced? | Asbestos scope is outlined in 02 82 00. Exterior stucco is not a part of this contract. If contractor sees otherwise please provide specific citations from contract documents. |
| 4 | How do we know which ceiling tiles to replace, it states only about 20% replacement. Who will determine suitability or replacement? | 20% replacement will be identified during construction in consultation with the successful contractor and the Government. |
| 5 | It looks like we need to dismantle and remove lighting grid in Exhibit 17 to remove and replace ceiling tiles. Are we allowed to do this? | Exhibit 17 dismantle and reconstruction approval is contingent on upon submission of means and methods during construction. |
| 6 | Also how about the bridge in the Exhibit area? Is it to be removed for ceiling access? | Bridge to remain in place during construction. |
| 7 | HVAC cleaning. It stated that units and plenums will be replaced and then states in HVAC that the plenums are to be cleaned. Can we get a clear picture of when what and where the ducts shall be cleaned? | Specific drawing and/or specification section indications are required to answer this question, please provide more detail. The Government does not see any conflicting requirements with respect to the plenums. |
| 8 | Throughout the RFQ it states remove ceiling tile assembly does that include the grid and hangers? | Assembly includes grid and wire hangers. |
File details come from the government source that posted it. Updated .