This is an architectural drawing package documenting construction details for Amendment 0013 of contract 140P2023F0258 to rehabilitate the Visitor Center and Headquarters at Martin Luther King, Jr. National Historic Park in Atlanta, GA. The drawings include detailed floor plans, demolition plans, finish schedules, interior elevations, and construction notes covering architectural modifications to the facility.
The drawings specify various construction requirements including: demolition and renovation of restrooms, installation of new flooring (luxury vinyl plank, VCT, fluid-applied), wall finishes, acoustic ceiling tiles, doors and hardware, casework, accessories, and lighting fixtures. Key areas addressed include the visitor center lobby, exhibit spaces, theater, offices, corridors, mechanical/electrical rooms, and restrooms across two floors. The drawings provide specific measurements, materials, and installation details through floor plans, elevations, sections and finish schedules. Design firms involved include DHM Design (Denver, CO) as prime contractor, GWWO Inc. (Baltimore, MD) for architectural/structural, Calibre (Highlands Ranch, CO) for civil, 360 Engineering (Golden, CO) for mechanical, and AE Design (Denver, CO) for electrical work.
View the file
Other files
Show 40 more
Latest 50 of 62 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SheetMark REVISION Date Initial
Sheet 11/27/24 AM
AMENDMENT 0013:
FINISHES, SITE ACCESS
1ARCH:
DHM DESIGN - 140P2023F0258
GWWO, INC.
BALTIMORE, MD
CIVIL:
CALIBRE
HIGHLANDS RANCH,
MECHANICAL:
360 ENGINEERING
GOLDEN, CO
LANDSCAPE:
DHM DESIGN
DENVER, CO
STRUCTURAL:
GWWO, INC.
BALTIMORE, MD
ELECTRICAL:
AE DESIGN
DENVER, CO
CO
04/26/2
11/27/2024 amenendez Image
04/26/2024
293291
188079
MARTIN LUTHER KING, JR. NATIONAL HISTORIC PARK
REHABILITATE VISITOR CENTER AND HEADQUARTERS
IM
AG
ES
Im ag es
\A tl A er ial
.jp g|.
\Im ag es
\E xis tin g C on dit ion s\E
C Fa ile d P av ing
.jp g|S cu lpt ur e L igh t.jp g|.
\Im ag es \G eo rg ia
1.p ng
|P :\D en ve r\N
PS
M
AL
U-
VI
SI
TO
R
CE
NT
ER
-2
\7_
CD
\Im ag es
\E xis tin g C on dit ion s\E
C Cu rb R am p f ro m
Pa rki ng
.JP
EG
|E
C Do or at
N or th En try
.JP
EG
|E
C En
3/1
1/2 4 1
7:0 2 A
ME
NE
ND
EZ
R
P :\D
EN
VE
R\
NP
S
MA
LU
-V
IS
IT
OR
C
EN
TE
R-
7\7
_C D\
CA
DD
\LA
\00
_M
AL
U-
GE
NE
RA
L.D W
G
XR
EF
S:
BA
SE
S\
XL
-M
AL
U_
TI
TL
E-
BL
OC
K.
DW
G;
BA
SE
S\
XC
-M
AL
U-
SU
RV
EY
_2
1.D
W G;
BA
SE
S\
XL
-M
AL
U-
LA
YO
UT
.D
W G;
DATE:
DESIGNED:
TECH. REVIEW:
SUB SHEET NO. DRAWING NO.
OF
TITLE OF SHEETA/E FIRM
PRIME:
DHM DESIGN
DENVER, CO
LAND ARCH:
DHM DESIGN
DENVER, CO
PKG.
NO. SHEET
DRAWING INDEX
GENERAL NOTES
ABBREVIATIONS 2
DHM
DHM
DHM
G0.1
& AND
' FEET
" INCHES
% PERCENT
± PLUS OR MINUS
# NUMBER
ABAAS ARCH BARRIERS
ACT ACCESSIBILITY
STANDARDS
APPROX APPROXIMATELY
ARCH ARCHITECTURE
BLDG BUILDING
CONC. CONCRETE
C.O. CONTRACTING
OFFICER
DEMO DEMOLITION
Ø DIAMETER
ELEC ELECTRIC
EX. EXISTING
FFE FINISHED FLOOR
ELEVATION
HP HIGH POINT
HT HEIGHT
LOC LIMITS OF
CONSTRUCTION
LP LOW POINT
MAX MAXIMUM
MISC MISCELLANEOUS
N NORTH
N/A NOT APPLICABLE
NTS NOT TO SCALE
NPS NATIONAL PARK
SERVICE
PTD PAINTED
QTY QUANTITY
R RADIUS
RD ROAD
RE: REFERENCE
SPECS. SPECIFICATIONS
SS STAINLESS STEEL
SF SQUARE FEET
TMU TEMPORARY MOBILE
UNIT
TYP. TYPICAL
W/ WITH
GENERAL NOTES
1. THE CONTRACTOR SHALL BE RESPONSIBLE FOR FAMILIARIZING
THEMSELVES WITH THE CONTRACT DOCUMENTS, VERIFYING FIELD
CONDITIONS AND DIMENSIONS, AND CONFIRMING THAT THE WORK
MAY BE ACCOMPLISHED AS SHOWN PRIOR TO PROCEEDING WITH
CONSTRUCTION. CONTRACTOR SHALL NOTIFY THE CONTRACTING
OFFICER IN WRITING OF ANY DISCREPANCY WITHIN THE CONTRACT
DOCUMENTS AND REQUEST CLARIFICATION PRIOR TO PROCEEDING
WITH CONSTRUCTION.
2. CONTRACTOR SHALL NOT WILLFULLY PROCEED WITH CONSTRUCTION
AS DESIGNED WHEN IT IS OBVIOUS THAT UNKNOWN OBSTRUCTIONS,
AREA DISCREPANCIES AND/OR GRADE DIFFERENCES EXIST. SUCH
CONDITIONS SHALL BE IMMEDIATELY BROUGHT TO THE ATTENTION
OF THE CONTRACTING OFFICER. THE CONTRACTOR SHALL ASSUME
FULL RESPONSIBILITY FOR ALL NECESSARY REVISIONS DUE TO
FAILURE TO GIVE SUCH NOTIFICATIONS.
3. THE LOCATIONS OF EXISTING UTILITIES ARE SHOWN IN THE
APPROXIMATE LOCATION. NOT ALL UTILITIES MAY BE SHOWN. THE
CONTRACTOR SHALL DETERMINE THE EXACT LOCATION OF ALL
EXISTING UTILITIES WHETHER SHOWN OR NOT BEFORE COMMENCING
WORK. THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING
AND DETERMINING EXACT LOCATIONS, DIMENSIONS, DEPTHS, AND
MATERIALS AT TIME OF CONSTRUCTION. THE CONTRACTOR SHALL
VERIFY THE LOCATION OF ALL EXISTING UTILITIES FAR ENOUGH IN
ADVANCE OF NEW CONSTRUCTION TO ALLOW FOR POSSIBLE GRADE,
DEPTH, ALIGNMENT, OR MATERIAL CHANGES. THE CONTRACTOR
SHALL PROTECT EXISTING UTILITIES DURING ALL DEMOLITION AND
CONSTRUCTION OPERATIONS. CONTRACTOR SHALL TAKE SOLE
RESPONSIBILITY FOR COSTS INCURRED DUE TO DAMAGE AND
REPLACEMENT OF UTILITIES TO REMAIN. THE CONTRACTOR SHALL
IMMEDIATELY CONTACT OWNER UPON DISCOVERY OF A UTILITY
DISCREPANCY OR CONFLICT AT LEAST ONE WEEK PRIOR TO
CONSTRUCTION.
4. DIMENSIONS SHOWN ON THE DRAWINGS ARE APPROXIMATE. DO NOT
SCALE THE DRAWINGS; MAY RESULT IN DISCREPANCIES. THE
CONTRACTOR IS RESPONSIBLE TO VERIFY THE DIMENSIONS IN THE
FIELD BEFORE PROCEEDING. NOTIFY THE CONTRACTING OFFICER
IMMEDIATELY OF ANY INCONSISTENCY BETWEEN THE CONDITIONS
FOUND AND THOSE SHOWN ON DRAWINGS.
5. THE CONTRACTOR SHALL BE SOLELY AND COMPLETELY
RESPONSIBLE FOR CONDITIONS AT AND ADJACENT TO THE JOB SITE,
INCLUDING SECURITY AND SAFETY OF ALL PERSONS AND PROPERTY
DURING THE PERFORMANCE OF THE WORK. THE CONTRACTOR SHALL
ERECT AND MAINTAIN ALL PROTECTIVE DEVICES AS NECESSARY OR
REQUIRED TO PROTECT ALL PERSONS ON THE SITE THROUGHOUT
THE DURATION OF THE PROJECT.
6. DAMAGE TO NATURAL AREAS, EXISTING GRADES, VEGETATION,
PAVEMENTS, UNDERGROUND UTILITIES, AND OTHER IMPROVEMENTS
AND AREAS OF PROTECTION, CAUSED DURING WORK UNDER THIS
CONTRACT, SHALL BE REPAIRED TO ORIGINAL CONDITION OR BETTER
AT NO ADDITIONAL COST TO THE GOVERNMENT.
7. THE SCOPE OF THE WORK IS DEFINED IN THE CONTRACT
DOCUMENTS. THE CONTRACT DOCUMENTS INCLUDE THE
CONSTRUCTION DRAWINGS AND THE SPECIFICATIONS. REFERENCE
TO BOTH IS REQUIRED.
8. EXECUTION OF THE WORK SHALL BE THE RESPONSIBILITY OF THE
PRIME CONTRACTOR AND SHALL BE COORDINATED WITH NPS
CONTRACTING OFFICER.
9. THE WORK OF ALL TRADES SHALL CONFORM TO CURRENT
APPLICABLE FEDERAL, STATE, AND LOCAL ORDINANCES IN FORCE.
10. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL WORK,
COORDINATION AND COSTS ASSOCIATED WITH TEMPORARY UTILITY
SERVICES FOR CONSTRUCTION TRAILERS AND CONSTRUCTION
ACTIVITIES, INCLUDING BUT NOT LIMITED TO; UTILITY CONNECTIONS,
METERS AND GENERATORS.
11. PRIOR TO CONSTRUCTION, CONTRACTOR IS TO COMPLETE PRE
CONSTRUCTION MEETINGS AND PROVIDE PROTECTION, ACCESS AND
MAINTENANCE PLANS AND SCHEDULES FOR THE CONTRACTING
OFFICER'S APPROVAL OF ALL EQUIPMENT AND FOOT TRAFFIC
CONSTRUCTION ACCESS, ROUTES, METHODS, PLANS AND
SCHEDULES, INCLUDING BUT NOT LIMITED TO; SAFETY PLAN, AND
INSTALLATION PLAN. REFERENCE DIVISION 01 AND TECHNICAL
SPECIFICATIONS FOR SPECIFIC REQUIREMENTS.
12. NOISE CONTROL: PERFORM DECONSTRUCTION AND CONSTRUCTION
OPERATIONS TO MINIMIZE NOISE. PERFORM NOISE-PRODUCING
WORK IN LESS SENSITIVE HOURS OF THE DAY OR WEEK AS DIRECTED
BY THE CONTRACTING OFFICER. REFERENCE SECTION 01 57 19.12
NOISE & EXTERIOR LIGHTING MANAGEMENT
13. THE CONTRACTOR SHALL FURNISH THE CONTRACTING OFFICER WITH
A SET OF CONSTRUCTION RECORD DRAWINGS MARKED
"AS-CONSTRUCTED", IN ACCORDANCE WITH PLANS, SPECIFICATIONS
AND NPS STANDARDS, AND SHALL SHOW ALL UTILITY TYPES,
LOCATIONS AND SIZES, AND ANY VARIATIONS FROM THE BID
DOCUMENTS.
STAGING AND ACCESS
1. THE CONTRACTOR SHALL USE ALL NECESSARY PHYSICAL MEANS
REQUIRED TO RESTRICT ACCESS AND PROTECT ALL PERSONS IN AND
AROUND WORK AREAS. SAFETY DEVICES SHALL BE USED IN
CONFORMANCE WITH CURRENT APPLICABLE FEDERAL, STATE, AND
LOCAL BUILDING CODES AND ORDINANCES IN FORCE.
DEMOLITION NOTES
1. THE CONTRACTOR SHALL COORDINATE THE LIMITS OF
CONSTRUCTION WITH THE CONTRACTING OFFICER PRIOR TO THE
START OF CONSTRUCTION.
2. ALL CONSTRUCTION ACTIVITIES ARE LIMITED TO WITHIN THE
CONTRACTING OFFICER APPROVED LIMITS OF CONSTRUCTION
BOUNDARIES.
3. ACCESS IS PROHIBITED BEYOND THE CONTRACTING OFFICER
APPROVED LIMITS OF CONSTRUCTION.
4. CONTRACTOR SHALL MINIMIZE SITE DISTURBANCE TO THE EXTENT
POSSIBLE.
5. ENSURE POSITIVE DRAINAGE AT ALL TIMES.
6. ALL MATERIALS TO BE REUSED OR SALVAGED SHALL BE STORED IN
AN AREA DESIGNATED BY THE CONTRACTING OFFICER FOR THAT
PURPOSE. ALL SALVAGED MATERIALS SHALL REMAIN THE PROPERTY
OF THE GOVERNMENT.
7. ALL MATERIALS SPECIFIED TO BE REMOVED SHALL BE LEGALLY
DISPOSED OF OFF-SITE BY THE CONTRACTOR PER LOCAL CODES
AND REGULATIONS.
8. THE CONTRACTOR IS REQUIRED TO PROVIDE AND MAINTAIN EROSION
AND SEDIMENT CONTROL MEASURES IN ACCORDANCE WITH THE
LOCAL JURISDICTION, THE STATE OF GEORGIA, AND FEDERAL
REQUIREMENTS. THE CONTRACTOR IS RESPONSIBLE FOR
PROHIBITING SILT AND DEBRIS LADEN RUNOFF FROM LEAVING THE
SITE, AND FOR KEEPING ALL PUBLIC AREAS FREE OF MUD AND
DEBRIS. THE CONTRACTOR IS RESPONSIBLE FOR RE-ESTABLISHING
FINAL GRADES AND FOR REMOVING ACCUMULATED SEDIMENTATION
FROM ALL AREAS INCLUDING THE STAGING AREA. CONTRACTOR
SHALL REMOVE TEMPORARY EROSION CONTROL MEASURES AND
REPAIR AREAS AS REQUIRED AFTER VEGETATION IS ESTABLISHED
AND ACCEPTED BY THE CONTRACTING OFFICER.
ABBREVIATIONS
INDEX OF DRAWINGS
GENERAL
1. - COVER SHEET
2. G0.1 DRAWING INDEX, GENERAL NOTES, ABBREVIATIONS
3. G0.2 TOPOGRAPHIC SURVEY
4. G0.3 STAGING AND ACCESS PLAN, ACCESSIBLE ROUTE
5. G0.4 EXISTING CONDITIONS
6. G0.5 EXISTING CONDITIONS
CIVIL
7. C1.0 EXISTING CONDITIONS
8. C1.1 SURFACE GRADING PLAN
9. C1.2 UTILITY PLAN
10. C1.3 LAYOUT PLAN
11. C1.4 CIVIL DETAILS
12. C1.5 CIVIL DETAILS
LANDSCAPE ARCHITECTURE
13. L1.0 DEMOLITION PLAN
14. L1.1 DEMOLITION PLAN
15. L1.2 DEMOLITION PLAN ENLARGEMENT
16. L2.0 LAYOUT PLAN
17. L2.1 LAYOUT PLAN
18. L2.2 LAYOUT PLAN ENLARGEMENT
19. L2.3 CLIN 10 - FOUNTAIN REMOVAL
20. L2.4 CLIN 11 - SIGNAGE IMPROVEMENTS
21. L2.5 CLIN 11 - SIGNAGE IMPROVEMENTS
22. L3.0 GRADING PLAN ENLARGEMENTS
23. L4.0 LANDSCAPE PLAN
24. L4.1 LANDSCAPE PLAN
25. L4.2 LANDSCAPE PLAN ENLARGEMENT
26. L5.0 SITE DETAILS
27. L5.1 SITE DETAILS
28. L5.2 SITE DETAILS
IRRIGATION
29. IR0.1 IRRIGATION NOTES
30. IR1.0 IRRIGATION PLAN
31. IR1.1 IRRIGATION PLAN
32. IR2.0 IRRIGATION DETAILS
ARCHITECTURE
33. G1.0 ABBREVIATIONS, SYMBOLS, AND MATERIALS
34. G1.1 CODE STUDY
35. G1.2 EGRESS PLAN
36. G1.3 EGRESS PLAN
37. AC.1 CONSTRUCTION NOTES
38. AC.2 CONSTRUCTION TYPES
39. AC.3 TYPICAL DETAILS
40. AD1.0 DEMOLITION NOTES
41. AD1.1 FIRST FLOOR DEMOLITION PLAN
42. AD1.2 FIRST FLOOR ENLARGED DEMOLITION PLANS
43. AD1.3 SECOND FLOOR DEMOLITION PLAN
44. AD1.4 SECOND FLOOR ENLARGED DEMOLITION PLANS
45. AD1.5 ROOF DEMOLITION PLAN
46. AD3.1 DEMO EXTERIOR ELEVATIONS
47. A1.1 FIRST FLOOR PLAN
48. A1.2 FIRST FLOOR ENLARGED PLAN
49. A1.3 SECOND FLOOR PLAN
50. A1.4 SECOND FLOOR ENLARGED PLAN
51. A1.5 ROOF PLAN
52. A2.1 FIRST FLOOR REFLECTED CEILING PLAN
53. A2.2 FIRST FLOOR ENLARGED REFLECTED CEILING PLAN
54. A2.3 SECOND FLOOR REFLECTED CEILING PLAN
55. A3.1 EXTERIOR ELEVATIONS
56. A3.2 EXTERIOR ELEVATIONS
57. A4.1 BUILDING SECTIONS
58. A4.2 BUILDING SECTIONS
59. A6.1 INTERIOR DETAILS
60. A6.2 EXTERIOR DETAILS
61. A6.3 EXTERIOR DETAILS
62. A6.4 EXTERIOR DETAILS
63. A6.5 EXTERIOR DETAILS
64. A7.1 ACCESSORIES SCHEDULE & TYPICAL DETAILS
65. A7.2 FURNISHING ENLARGED PLANS
66. A7.3 INTERIOR ELEVATIONS - FIRST FLOOR
67. A7.4 INTERIOR ELEVATIONS - SECOND FLOOR
68. A8.1 DOOR & WINDOW SCHEDULE & DETAILS
69. A8.2 DOOR SCHEDULE & DETAILS
70. A9.0 FINISH SCHEDULE
71. A9.1 FIRST FLOOR FINISH PLAN
72. A9.2 SECOND FLOOR FINISH PLAN
73. AL.1 CLIN 8 - EXHIBIT SPACE CEILINGS
74. AL.2 CLIN 9 - EXHIBIT SPACE FINISHES
75. AL.3 CLIN 12 - CASEWORK REPLACEMENT
76. AL.4 CLIN 12 - CASEWORK REPLACEMENT
MECHANICAL & PLUMBING
77. M.001 MECHANICAL COVER SHEET
78. M.002 MECHANICAL DETAILS
79. M.003 MECHANICAL DETAILS
80. M.004 MECHANICAL COMCHECK
81. M.005 MECHANICAL CONTROLS
82. M.006 MECHANICAL CONTROLS
83. M.007 MECHANICAL SEQUENCES
84. M.008 MECHANICAL SEQUENCES
85. M.009 HEATING WATER PIPING DIAGRAM
86. M.010 CHILLED WATER PIPING DIAGRAM
87. M.100 MECHANICAL FIRST FLOOR DEMO PLAN
88. M.101 MECHANICAL SECOND FLOOR DEMO PLAN
89. M.102 MECHANICAL ROOF DEMO PLAN
90. M.103 MECHANICAL FIRST FLOOR NEW PLAN
91. M.104 MECHANICAL SECOND FLOOR NEW PLAN
92. M.105 MECHANICAL ROOF NEW PLAN
93. M.106 MECHANICAL ENLARGED PLAN
94. M.107 MECHANICAL FIRST FLOOR PIPING DEMO PLAN
95. M.108 MECHANICAL SECOND FLOOR PIPING DEMO PLAN
96. M.109 MECHANICAL FIRST FLOOR PIPING NEW PLAN
97. M.110 MECHANICAL SECOND FLOOR PIPING NEW PLAN
98. M.111 MECHANICAL FIRST FLOOR ENLARGED PLAN
99. M.112 MECHANICAL SECOND FLOOR ENLARGED PLAN
100. M.600 MECHANICAL SCHEDULES
101. M.601 MECHANICAL SCHEDULES
102. P.001 PLUMBING COVER SHEET
103. P.002 PLUMBING DETAILS
104. P.003 WASTE AND VENT ISOMETRIC - FIRST FLOOR
105. P.004 WASTE AND VENT ISOMETRIC - SECOND FLOOR
106. P.100 DOMESTIC PLUMBING FIRST FLOOR DEMO PLAN
107. P.101 WASTE AND VENT FIRST FLOOR DEMO PLAN
108. P.102 DOMESTIC PLUMBING SECOND FLOOR DEMO PLAN
109. P.103 WASTE AND VENT SECOND FLOOR DEMO PLAN
110. P.104 DOMESTIC PLUMBING FIRST FLOOR NEW PLAN
111. P.105 WASTE AND VENT FIRST FLOOR NEW PLAN
112. P.106 DOMESTIC PLUMBING SECOND FLOOR NEW PLAN
113. P.107 WASTE AND VENT SECOND FLOOR NEW PLAN
114. P.600 PLUMBING SCHEDULES
115. P.601 PLUMBING SCHEDULES
FIRE PROTECTION
116. FA00 GENERAL COMMENTS
117. FA01 FIRST FLOOR DEMOLITION
118. FA02 SECOND FLOOR DEMOLITION
119. FA03 FIRST FLOOR NEW
120. FA04 SECOND FLOOR NEW
121. FX00 GENERAL COMMENTS
122. FX01 FIRST FLOOR DEMOLITION
123. FX02 SECOND FLOOR DEMOLITION
124. FX03 FIRST FLOOR NEW
125. FX04 SECOND FLOOR NEW
ELECTRICAL
126. E0.0 ELECTRICAL COVER SHEET
127. E0.1 ELECTRICAL LEGENDS
128. ED1.0 ELECTRICAL DEMOLITION POWER PLAN FIRST FLOOR
129. ED1.1 ELECTRICAL DEMOLITION POWER PLAN SECOND FLOOR
130. ED1.2 ELECTRICAL DEMOLITION POWER ROOF PLAN
131. ED2.0 ELECTRICAL DEMOLITION LIGHTING PLAN FIRST FLOOR
132. ED2.1 ELECTRICAL DEMOLITION LIGHTING PLAN SECOND FLOOR
133. E1.0 ELECTRICAL POWER PLAN FIRST FLOOR
134. E1.1 ELECTRICAL POWER PLAN SECOND FLOOR
135. E1.2 ELECTRICAL POWER PLAN ROOF
136. E2.0 ELECTRICAL LIGHTING PLAN FIRST FLOOR
137. E2.1 ELECTRICAL LIGHTING PLAN SECOND FLOOR
138. E3.0 ELECTRICAL ONE-LINE DIAGRAM
139. E3.1 ELECTRICAL PANEL SCHEDULES
140. E3.2 ELECTRICAL PANEL SCHEDULES
141. E3.3 ELECTRICAL SCHEDULES
142. E4.0 ELECTRICAL LIGHTING SCHEDULES
143. E4.1 ELECTRICAL LIGHTING CONTROLS
1 A 1 A
1 A
1 A 1 A 1 A
1 A
1 A
1 A 1 A
1 A
1 A 1 A
1 A
1 A
1 A
AutoCAD SHX Text 11/27/2024
3.
4%
2.5%
2.6%
0.8%2.8%
XXXXX
X X
X X
X X X X X
X X
X
JOHN LEWIS FREEDOM PARKWAY
JOHN WESLEY DOBBS AVENUE
CAIN STREET
BO
U
LEVAR
D
IRWIN STREET
JAC
KSO
N
STR
EET
AUBURN AVENUE
V.C.
H.Q.CHURCH
MAINT.
ROSE PEACE
GARDEN
X
X
X X
X
XXX
PARKING
FIRE
HOUSE
FOUNTAIN
PR
O
M
EN
AD
E
04/26/2024
293291
188079
MARTIN LUTHER KING, JR. NATIONAL HISTORIC PARK
REHABILITATE VISITOR CENTER AND HEADQUARTERS
IM
AG
ES
Im ag es
\A tl A er ial
.jp g|.
\Im ag es
\E xis tin g C on dit ion s\E
C Fa ile d P av ing
.jp g|S cu lpt ur e L igh t.jp g|.
\Im ag es \G eo rg ia
1.p ng
|P :\D en ve r\N
PS
M
AL
U-
VI
SI
TO
R
CE
NT
ER
-2
\7_
CD
\Im ag es
\E xis tin g C on dit ion s\E
C Cu rb R am p f ro m
Pa rki ng
.JP
EG
|E
C Do or at
N or th En try
.JP
EG
|E
C En
3/1
1/2 4 1
7:0 2 A
ME
NE
ND
EZ
R
P :\D
EN
VE
R\
NP
S
MA
LU
-V
IS
IT
OR
C
EN
TE
R-
7\7
_C D\
CA
DD
\LA
\00
_M
AL
U-
GE
NE
RA
L.D W
G
XR
EF
S:
BA
SE
S\
XL
-M
AL
U_
TI
TL
E-
BL
OC
K.
DW
G;
BA
SE
S\
XC
-M
AL
U-
SU
RV
EY
_2
1.D
W G;
BA
SE
S\
XL
-M
AL
U-
LA
YO
UT
.D
W G;
DATE:
DESIGNED:
TECH. REVIEW:
SUB SHEET NO. DRAWING NO.
OF
TITLE OF SHEETA/E FIRM
PRIME:
DHM DESIGN
DENVER, CO
LAND ARCH:
DHM DESIGN
DENVER, CO
PKG.
NO. SHEET
STAGING & ACCESS PLAN
ACCESSIBILITY ROUTE
DHM
DHM
DHM
G0.3
ACCESSIBLE ROUTE DIAGRAMCONTRACTOR ACCESS, STORAGE AND STAGING AREA
CONTRACTOR TRAILER
PROPOSED
CONTRACTOR
STORAGE AREA
CONTRACTING
OFFICER'S TRAILER
8' HIGH SECURE
CONSTRUCTION FENCING
140'
0'
SECURE STAGING AREA
W/ TRACK OUT MAT
RE: CIVIL
PROVIDE PEDESTRIAN PATH
FROM IRWIN STREET TO
AUBURN AVENUE AT ALL TIMES
DURING CONSTRUCTION
ACCESS TO
STORAGE AREA
VEHICULAR ACCESS TO
CONSTRUCTION ENTRY
CONTRACTOR ENTRY
CONTRACTOR
PARKING
ACCESSIBLE ROUTE
FROM PARKING AREA
TO PRIMARY ENTRY
VISITOR CENTER
TEMPORARY VISITOR TOILET
ROOMS AT FIREHOUSE
PARKING LOT
VEHICLE TRAFFIC NOT
PERMITTED AT PROMENADE
PROVIDE PEDESTRIAN PATH
FROM IRWIN STREET TO
AUBURN AVENUE AT ALL TIMES
DURING CONSTRUCTION
AutoCAD SHX Text
SCALE OF FEET
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 1" = 30'
AutoCAD SHX Text NOTES: 1. SITE ACCESSIBILITY IMPROVEMENTS ARE LIMITED IN SCOPE FROM THE ACCESSIBLE SITE ACCESSIBILITY IMPROVEMENTS ARE LIMITED IN SCOPE FROM THE ACCESSIBLE PARKING TO THE BUILDING ENTRANCE ONLY. 2. ALL NEWLY CONSTRUCTED OR ALTERNATIONS AT ACCESSIBLE ROUTES SHALL ALL NEWLY CONSTRUCTED OR ALTERNATIONS AT ACCESSIBLE ROUTES SHALL COMPLY WITH RULES OF REGULATIONS SET FORTH BY NPS AND THE ARCHITECTURAL BARRIERS ACT ACCESSIBILITY STANDARDS.
AutoCAD SHX Text
SCALE OF FEET
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 11/27/2024
9.1 PROVIDE ACOUSTIC CEILING TILE
ASSEMBLY.
9.2 PROVIDE GYPSUM BOARD CEILING
ASSEMBLY.
9.4 PROVIDE FLUID APPLIED
FLOORING AND BASE.
9.5 PROVIDE CERAMIC TILE AND
CEMENTITIOUS BACKER BOARD
ON WALL.
9.6 PROVIDE LUXURY VINYL PLANK
FLOORING.
9.7 PROVIDE VCT FLOORING.
9.3 REPAIR, REFINISH, AND REPAINT
WALLS, METAL FRAMES AND
METAL DOORS.
CONSTRUCTION NOTES KEYED TO DRAWINGS
8. OPENINGS
9. FINISHES
26. ELECTRICAL
10.9 PROVIDE TOILET SEAT COVER
DESPENSER.
26.1 PROVIDE LIGHT FIXTURES. REFER
TO ELECTRICAL.
7.1 REPLACE DAMAGED CEMENTITOUS
WOOD FIBER ROOF DECK.
7.2 PROVIDE SINGLE MEMBRANE
ROOF, CRICKETS AND FLASHING.
7.4 PROVIDE NEW OVERFLOW
DRAINAGE BASKETS. REUSE
EXISTING LOCATION.
7.5 PROVIDE NEW JOINT SEALANT
AND BACKER ROD AT ALL ROOF
COPING JOINTS.
7.6 PROVIDE THROUGH-WALL
FLASHING AT BRICK TRANSITION
TO ROOF.
7. THERMAL AND MOISTURE PROTECTION
7.8 PROVIDE NEW SEALANTS AT ALL
CONTROL AND CONSTRUCTION
JOINTS.
14. CONVEYING EQUIPMENT
14.1 PROVIDE NEW ELEVATOR FINISHES
INCLUDING FLOORING, WALLS,
CEILING, LIGHTING AND CALL
SYSTEM.
10.13 PROVIDE NEW PUBLIC INTERIOR
SIGNAGE.
7.9 PROVIDE NEW PERIMETER
SEALANT OF ALL WINDOWS.
4.1 CLEAN WEEP HOLES AT BRICK
EXTERIORS.
4. MASONRY
8.1 PROVIDE DOOR AND HARDWARE.
10. SPECIALTIES
7.10 PROVIDE NEW PERIMETER
SEALANT OF ALL DOORS.
7.11 PROVIDE ROOF DRAIN. REUSE
EXISTING LOCATION.
7.12 EXISTING ROOF HATCH TO
REMAIN.
7.13 EXISTING ROOF RIDGE IS
LOCATED ALONG COLUMN LINE 4.
7.14 PROVIDE NEW GASKETS AND
SEALANT AT GLASS SKYLIGHT.
7.15 PROVIDE NEW CRICKETS.
1/2"/FT. SLOPE TYP.
8.2 INSTALL SALVAGED DOOR AND
HARDWARE.
8.3 INSTALL SLAVAGED TRANSOM
WINDOW.
7.16 PROVIDE ROOF HATCH GUARDRAIL
TO EXISTING ROOF HATCH.
10.14 INSTALL SALVAGED EXHIBIT AT
GROUND.
9.11 PROVIDE WALL BASE. SEE FINISH
SCHEDULE.
12. FURNISHINGS
12.5 INSTALL SALVAGED MAILBOX
CUBBY.
8.4 INSTALL NEW EXTERIOR DOOR
THRESHOLD.
10.15 INSTALL SALVAGED EXHIBIT
SUSPENDED SOUND STRUCTURE.
9.12 PROVIDE ENTRANCE MAT.
7.17 PROVIDE NEW JOINT SEALANT AT
METAL RADIUS ROOF.
10.16 INSTALL SALVAGED ROOM
SIGNAGE.
10.17 PROVIDE NEW ROOM SIGNAGE.
MATCH EXISTING SALAVAGED
ROOM SIGNAGE..
26.2 PROVIDE GENERATOR. REFER TO
ELECTRICAL.
2.1 CLEAN MICROBIAL GROWTH FROM
FABRIC WALL PANELS ON NORTH,
EAST AND SOUTH WALLS WITH
BIOCIDE AGENT AND VACUUM
UTILIZING A VACCUM SYSEM WITH
HEPA FILTERS. REFER TO
MOLD/IAQ AND REGULAED
BUILDING MATERIALS SURVEY
REPORT, SPECIFICATIONS
APPENDIX C.
2. EXISTING CONDITIONS
GENERAL NOTES
1. CONTRACTOR SHALL MEET THE REQUIREMENTS OF ALL CODES, RULES, AND
REGULATIONS GOVERNING THIS PROJECT AS SET BY FEDERAL, STATE, AND
LOCAL CODES, BUILDING DEPARTMENT AGENCIES, AND THE OWNER.
2. CONTRACTOR SHALL MEET THE REQUIREMENTS OF THE APPLICABLE
ACCESSIBILITY GUIDELINES FOR ALL ASPECTS OF THIS PROJECT. (IDENTIFY
THE APPLICABLE GUIDELINES ON THE CODE SUMMARY SHEET)
3. THE INFORMATION INCLUDED IN THESE DRAWINGS WITH REGARDS TO THE
EXISTING BUILDING IS BASED ON PREVIOUS DOCUMENTATION PROVIDED TO
THE ARCHITECT AS WELL AS WHAT IS READILY OBSERVABLE AT THE
PROJECT SITE. DESTRUCTIVE INVESTIGATION TECHNIQUES HAVE NOT BEEN
USED TO VERIFY INFORMATION THAT IS NOT READILY OBSERVABLE.
4. PROVIDE BLOCKING AS INDICATED ON THE DRAWINGS OR AT ALL WALL OR
CEILING MOUNTED ACCESSORIES AS NECESSARY TO SUPPORT THE WORK.
VERIFY MOUNTING HEIGHTS WITH ARCHITECTURAL DRAWINGS AND
MANUFACTURERS RECOMMENDATIONS FOR EACH ITEM.
5. THE 0’-0” REFERENCE ELEVATION SHALL BE THE ACTUAL TOP OF SLAB
ELEVATION INDICATED ON THE CIVIL DRAWINGS.
6. "EXTENT OF WORK" SYMBOLS ARE DEFINED AS FOLLOWS:
SCOPE OF WORK APPLIES TO THE
ENTIRE ROOM FOR THE ITEM OF WORK
IDENTIFIED EITHER IN THE NOTE OR AT
THE SYMBOL.
X.X
X.X
X.X
X.X
SCOPE OF WORK APPLIES TO THE
ENTIRE OPENING FOR THE ITEM OF
WORK IDENTIFIED.
SCOPE OF WORK APPLIES TO
THE AREA ENCLOSED BY THE
DASHED LINE.
SCOPE OF WORK APPLIES TO THE
ITEM SHOWN WITH DASHED LINES.
SEE DEMOLITION DWGS AND NOTES
FOR EXTENT.
EXISTING
WALL
NEW WORK
WALL
ROOF GENERAL NOTES
1. EXISTING ROOFING AND SUBSTRATE TO BE REMOVED TO EXISTING ROOF
DECK. REMOVE ALL EXISTING CANTS, CRICKETS, ROOF DRAINS AND
ASSOCIATED ACCESSORIES.
2. EXISTING ROOF STRUCTURE SLOPE VARIES. THE CONTRACTOR IS
RESPONSIBLE FOR FIELD VARIFICATION OF ALL SLOPES.
3. NEW ROOFING TO BE INSTALLED OVER NEW INSULATION. SEE DRAWINGS FOR
MINIMUM INSULATION AT ROOF THROUGHOUT EXCEPT AT CRICKETS.
4. THE CONTRACTOR IS RESPONSIBLE TO MAINTAIN 1/2"/FT. SLOPE ON ALL
CRICKETS AND VERIFY SPOT ELEVATIONS.
5. ROOF DRAINS ARE AT +4" ABOVE EXISTING ROOF DECK, TYPICAL.
6. AT MECHANICAL ROOF ONLY INSTALL TAPERED INSTULATION. MAINTAIN
1/4"/FT. SLOPE TYPICAL. SEE DRAWINGS FOR MINIMUM INSULATION AT ROOF
THROUGHOUT.
GENERAL STRUCTURE NOTES
1. DESIGN LOADS:
LIVE LOADS:
A. ROOF - 20 P.S.F.
B. FIRST FLOOR SLAB-ON-GRADE - 100 P.S.F.
C. RAMPS, WALKWAYS AND LANDINGS - 100 P.S.F.
D. MECHANICAL ACCESS PLATFORM - 125 P.S.F.
E. WIND LOAD DESIGN PARAMETERS:
Vult=113 M.P.H.,Vasd=87.5 M.P.H., EXPOSURE B, Iw=1.00, RISK CATEGORY III, GCPI =± 0.18
COMPONENTS & CLADDING (ASD)
F. SNOW LOAD DESIGN PARAMETERS:
Pg=5 P.S.F., Ce=1.0, CATEGORY III, Is=1.10 CT=1.00, Pf=8.9 P.S.F., Pd=12.6 P.S.F., W=21'-0"
G. SEISMIC LOAD DESIGN PARAMETERS:
Ss= 0.183, S1= 0.085, SITE CLASS D, SDS= 0.195, SD1= 0.136, RISK CATEGORY III, Ie= 1.25, DESIGN CATEGORY C R= 3.0, Wo= 3.0, Cd= 2.5
BASIC STRUCTURAL/SEISMIC SYSTEMS: ORDINARY MASONRY SHEAR
WALLS
ANALYSIS PROCEDURE: EQUIVALENT LATERAL FORCE PROCEDURE.
H. DEAD LOADS (MECHANICAL BLDG.): ROOF= 60 P.S.F.
2. CONCRETE:
A. UNLESS NOTED, ALL SPLICES IN REINFORCEMENT TO LAP MINIMUM 48x BAR
DIAMETERS.
B. PROVIDE BOLSTERS OR CHAIRS FOR SLAB REINFORCEMENT SUPPORT.
3. SHOP DRAWINGS:
A. SHOP DRAWINGS OF STRUCTURAL STEEL AND CONCRETE REINFORCING
STEEL SHALL BE SUBMITTED TO THE CONTRACTING OFFICER FOR REVIEW,
AND SUCH REVIEW SHALL BE SECURED BEFORE FABRICATION IS BEGUN.
ALL SHOP DRAWINGS SHALL BE REVIEWED AND STAMPED BY THE GENERAL
CONTRACTOR BEFORE FORWARDING TO THE CONTRACTING OFFICER. ALL
REVISIONS TO SHOP DRAWINGS SHALL BE CLEARLY IDENTIFIED BY
CLOUDS AND REVISION MARKS.
4. INSPECTION AND NOTIFICATION:
A. ALL MASONRY, CONCRETE AND EARTH WORK SHALL BE
INSPECTED AND TESTED BY AN INDEPENDENT THIRD PARTY INSPECTION
AGENCY, ENGAGED BY THE CONTRACTOR, IN ACCORDANCE WITH THE
INTERNATIONAL BUILDING CODE, CHAPTER 17 AND THE STATEMENT OF
STRUCTURAL TESTS AND SPECIAL INSPECTIONS. REFER TO PROJECT
SPECIFICATIONS FOR ADDITIONAL INFORMATION.
B. AT NEW OPENING LOCATIONS, REINFORCEMENT BAR LOCATION VERIFICATION
AT EXISTING CONCRETE FLOORS AND WALLS SHALL BE PERFORMED WITH
THE USE OF EITHER GROUND PENETRATION RADAR (GPR), A PACHOMETER
OR WITH OTHER MAGNETIC NON-DESTRUCTIVE TESTING DEVICE.
5. EXISTING STRUCTURE:
A. DIMENSIONS AND MEMBER SIZES SHOWN ARE BASED ON INFORMATION
FROM AVAILABLE DRAWINGS OF EXISTING STRUCTURE. CONTRACTOR
SHALL FIELD VERIFY AND COORDINATE EXISTING AND NEW DIMENSIONS
PRIOR TO PROCEEDINGS WITH THE WORK. SHOULD SIGNIFICANT
DIFFERENCES BE FOUND BETWEEN THE NEW AND ACTUAL FIELD
DIMENSIONS, THE CONTRACTING OFFICER SHALL BE NOTIFIED BEFORE
PROCEEDING WITH THE WORK.
B. THE CONTRACTOR SHALL FIELD VERIFY ALL EXISTING STRUCTURAL
CONDITIONS AND PROVIDE COORDINATION BETWEEN NEW AND EXISTING
WORK.
C. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ANY DAMAGE TO AND
REPAIR OF EXISTING ADJACENT WORK.
D. ALL SHORING, NEEDLING AND UNDERPINNING SHALL BE AS REQUIRED TO
SUPPORT THE EXISTING STRUCTURE. THE CONTRACTOR SHALL HIRE A
GEORGIA REGISTERED PROFESSIONAL ENGINEER, ACCEPTABLE TO THE
CONTRACTING OFFICER, TO SELECT, DESIGN AND SUPERVISE ALL
NECESSARY SHORING, NEEDLING AND UNDERPINNING.
E. REMOVE EXISTING ELECTRICAL, MECHANICAL AND PLUMBING UTILITIES,
PIPES, DUCTS, FIXTURES, ETC. AS REQUIRED TO INSTALL NEW FRAMING.
REPLACE THEM TO MATCH EXISTING OR NEW CONDITIONS.
F. WHERE EXISTING CONCRETE WALLS AND FLOORS ARE TO BE CORE
DRILLED FOR NEW PIPE PENETRATIONS, LOCATE EXISTING REINFORCING
BARS USING A NON-DESTRUCTIVE METHOD PRIOR TO DRILLING. DO NOT
CUT THROUGH EXISTING REINFORCING BARS WITHOUT PRIOR APPROVAL
OF THE CONTRACTING OFFICER.
WIND SURFACE PRESSURE (PSF)
AREA
10SF
50SF
100SF
-21.2/+10.0
1 2 3 4 5
WALL ZONEROOF ZONE
-28.0/+10.0 -38.2/+10.9 -13.2/+12.2 -16.3/+12.2
-18.0/+10.0 -23.8/+10.0 -29.8/+10.0 -12.0/+10.9 -13.8/+10.9
-16.6/+10.0 -22.0/+10.0 -26.2/+10.0 -11.4/+10.4 -12.7/+10.4
11/27/20241
A/E FIRM
SUBCONTRACTOR:
NAME: GWWO, INC.
BALTIMORE, MD
TITLE OF SHEET DRAWING NO.
PKG.
NO.
SHEET
OF
SUB SHEET NO.DESIGNED:
CADD:
TECH. REVIEW:
DATE:
REHABILITATE VISITOR CENTER AND HEADQUARTERS
MARTIN LUTHER KING, JR. NATIONAL HISTORIC PARK
188079
SEAL:
:0 :2
P M
A u to d e s k
D o c s
M a rt in
L u th e r K in g
J r.
N a ti o n a l H is to ri c a l P a rk
V is it o r C e n te r a n d
H e a d q u a rt e rs
M A L U
N P S
R e n o v a ti o n
C A .r v t
CONSTRUCTION NOTES 489
293291 37
AC.1
GWWO
GWWO
GWWO
04/26/2024
04/26/
11/27/2024
SCOPE OF WORK APPLIES
TO THE ENTIRE ROOM FOR
THE ITEM OF WORK
IDENTIFIED EITHER IN THE
NOTE OR AT THE SYMBOL.
DEMOLITION NOTES: THE FOLLOWING NOTES APPLY TO ALL DEMOLITION
WORK WHETHER INDICATED ON THE DEMOLITION DRAWINGS OR
REQUIRED ELSEWHERE IN THE CONTRACT DOCUMENTS.
1.1 GENERAL REQUIREMENTS: THE FOLLOWING GENERAL
REQUIREMENTS NOTES APPLY TO ALL DEMOLITION WORK.
THESE NOTES ARE NOT SYMBOLICALLY REFERENCED
ELSEWHERE IN THE DRAWINGS.
X.X
X.X
X.X
X.X
SCOPE OF WORK APPLIES
TO THE ENTIRE OPENING
FOR THE ITEM OF WORK
IDENTIFIED.
GENERAL DEMOLITION NOTES
(ARCHITECTURAL DRAWINGS ONLY)
1.2 DEMO CONTRACTOR SHALL COORDINATE WITH NEW WORK
SECTIONS FOR ADDITIONAL INFO RELATED TO EXTENT OF DEMO.
1.3 "EXTENT OF WORK" SYMBOLS ARE DEFINED AS FOLLOWS:
SCOPE OF WORK APPLIES
TO THE AREA ENCLOSED BY
THE DASHED LINE.
SCOPE OF WORK APPLIES
TO THE ITEM SHOWN
WITH DASHED LINES. SEE
DEMOLITION DWGS AND
NOTES FOR EXTENT.
1.4 THE TERM "REMOVE" IS DEFINED IN THE SPECIFICATION
SECTION - "SELECTIVE DEMOLITION".
1.5 DURING DEMOLITION, PROVIDE TEMPORARY SUPPORT TO
ADJACENT EXISTING CONSTRUCTION AND STRUCTURE TO
HOLD IN PLACE WITHOUT ANY MOVEMENT UNTIL NEW
SUPPORTING WORK IS IN PLACE.
1.6 SALVAGE SHALL CONSIST OF TWO TYPES AS FOLLOWS:
TYPE 1 - SALVAGED ITEMS SHALL BE REMOVED, TAGGED,
PROTECTED, AND STORED BY THE CONTRACTOR TO BE
REUSED IN THE WORK.
TYPE 2 - SALVAGED ITEM SHALL BE REMOVED AND
DELIVERED TO THE CONTRACTING OFFICER AFTER BEING
TAGGED AND PROTECTED. THE LOCATION FOR DELIVERY WILL
BE DETERMINED BY THE CONTRACTING OFFICER.
1.7 THE TERM "REMOVED" WHEN USED WITH "SALVAGE" IS
DEFINED AS ABOVE, WITH THE ADDITIONAL REQUIREMENTS
THAT THE ITEM OR MATERIAL SHALL BE REMOVED INTACT IN
COMPLETE PIECES. THE INDICATED ITEM SHALL BE
PROTECTED DURING REMOVAL TO MINIMIZE DAMAGE. THE
SALVAGED MATERIAL OR ITEM IS TO BE CLEANED, TAGGED,
PROTECTED, AND STORED AS SPECIFIED BY THE CONTRACTING
OFFICER.
1.8 SALVAGE ALL MATERIAL IDENTIFIED FOR "SALVAGE" IN
ACCORDANCE WITH THE SPECIFICATIONS INCLUDING TAGGING,
PROTECTION, AND STORAGE, AS SPECIFIED. DISPOSE OF ALL
MATERIALS NOT IDENTIFIED FOR SALVAGE.
1.9 THE CONTRACTING OFFICER TO BE CONTACTED PRIOR TO
ANYTHING NOT IDENTIFIED AS "TO BE REMOVED" OR "TO
BE SALVAGED" IS DEMOLISHED.
1.10 ALL WORK SHOWN IS EXISTING TO REMAIN UNLESS NOTED OR
OTHERWISE INDICATED AS DASHED LINES TO BE REMOVED.
THE EXTENT OF DEMO WORK SHALL INCLUDE ALL
INCIDENTAL DEMO WORK NECESSARY TO PROPERLY
PROVIDE ALL NEW WORK SHOWN AND SPECIFIED, TO
INCLUDE MECHANICAL, ELECTRICAL AND PLUMBING ITEMS.
1.11 DEMO WORK IS SHOWN BASED ON EXISTING DRAWINGS AND
INSPECTIONS. THE CONTRACTOR SHALL VISUALLY INSPECT
ALL EXISTING CONDITIONS AND IS RESPONSIBLE FOR
PERFORMING THE INDICATED DEMO WORK EVEN IF ACTUAL
CONDITIONS DIFFER FROM THOSE SHOWN ON THE DRAWINGS.
1.12 DEMO CONTRACT SHALL COORDINATE WITH NEW WORK
SECTION FOR ADDITIONAL INFO RELATED TO EXTENT OF
DEMO.
1.13 REFER TO OTHER DRAWINGS IN THIS SET FOR INCIDENTAL
DEMOLITION WORK NOT NOTED ON THE ARCHITECTURAL
PLANS.
1.14 ITEMS TO BE DEMOLISHED SHALL BE REMOVED COMPLETELY
INCLUDING ALL ANCHORS, HANGERS, FASTENERS, PIPES,
CONDUITS, DUCTS, ETC UNLESS OTHERWISE INDICATED TO
BE ABANDONED IN PLACE, REPAIR/PATCH HOLES AND
PAINT.
1.15 CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTAINING THE
INTEGRITY OF EXISTING BUILDING ELEMENTS TO REMAIN
THROUGHOUT SEQUENCE OF WORK. ANY DAMAGE TO
EXISTING BUILDING CONDITIONS SHOWN TO REMAIN SHALL
BE RESTORED TO NEW WORK CONDITION AT NO ADDITIONAL
COST TO THE NPS.
1.16 ALL EXISTING SURFACES TO REMAIN SHALL BE PROTECTED,
REPAIRED IF DAMAGED AND CLEANED PRIOR TO APPLICATION
OF FINISHES.
1.17 REMOVE MECH, ELEC, PLUMBING, FIRE PROTECTION,
STRUCTURAL, AND SECURITY AS NOTED ON THOSE
DISCIPLINES DRAWINGS. COORDINATE WITH STRUCTURAL,
MECH, ELECTRICAL AND PLUMBING FOR ADDITIONAL DEMO
NOTES. CONTRACTOR SHALL REFER TO ALL STRUCTURAL,
MECH, ELECTRICAL, PLUMBING, FIRE PROTECTION AND
SECURITY DRAWINGS AND SPECS FOR PROCEDURES
CONCERNING RELATED TRADES IN AREAS WHICH REQUIRE
DEMO.
1.18 REMOVE WALL PARTITIONS FOR PROPOSED MECHANICAL DUCT
OR PIPING PENETRATIONS ON MECH OR PLUMBING
DRAWINGS EVEN IF NOT SHOWN ON DEMO DRAWINGS.
PROVIDE STEEL LINTEL.
GENERAL DEMOLITION NOTES CONT. DEMOLITION NOTES KEYED TO DRAWINGS
5. METALS
5.1 REMOVE STUD WALL TO THE
EXTENT SHOWN.
8. OPENINGS
8.1 REMOVE DOOR(S), INCLUDING
FRAMES, BLOCKING, AND
HARDWARE.
9. FINISHES
9.1 REMOVE ACOUSTIC CEILING TILE
ASSEMBLY.
9.4 REMOVE CERAMIC TILE FLOORING.
9.5 REMOVE CERAMIC TILE AND
SUBSTRATE ON WALLS.
10. SPECIALTIES
10.1 REMOVE TOILET PARTITION, DOOR,
HARDWARE, AND ACCESSORIES.
10.2 REMOVE ELECTRIC HAND DRYER.
10.3 REMOVE PAPER TOWEL
DESPENSER.
10.5 REMOVE GRAB BARS.
10.6 REMOVE TOILET PAPER
DISPENSER.
10.7 REMOVE RECESSED PAPER TOWEL
DESPENSER.
12. FURNISHINGS
12.1 REMOVE CASEWORK.
12.2 REMOVE PLAM COUNTER.
22. PLUMBING
22.1 REMOVE WATER CLOSET FIXTURE
AND ASSOCIATED VALVE. REFER
TO PLUMBING.
22.2 REMOVE URINAL AND ASSOCIATED
VALVE. REFER TO PLUMBING.
22.3 REMOVE LAVATORY AND
ASSOCIATED VALVE. REFER TO
PLUMBING.
22.4 REMOVE WATER FOUNTAIN. REFER
TO PLUMBING.
26. ELECTRICAL
26.1 REMOVE LIGHT FIXTURES. REFER
TO ELECTRICAL.
3. CONCRETE
22.5 REMOVE OVER MOUNT SINK AND
ASSOCIATED VALVE. REFER TO
PLUMBING.
11. EQUIPMENT
11.1 REMOVE REFRIGERATOR.
10.8 REMOVE SOAP DESPENSER.
10.9 REMOVE TOILET SEAT COVER
DESPENSER.
10.10 REMOVE MIRROR. REFER TO
SPEC SECTION 028200
ASBESTOS ABATEMENT.
22.6 REMOVE JANITOR SINK AND
ASSOCIATED VALVE. REFER TO
PLUMBING.
10.11 REMOVE SANITARY NAPKIN
DESPENSER.
9.6 REMOVE CARPET FLOORING.
REMOVE BASES EXCEPT WHERE
SPCIFICED TO REMAIN.
9.7 REMOVE VCT FLOORING AND
BASES.
3.2 REMOVE PORTION OF CMU WALL
TO UNDERSIDE OF STRUCTURE.
7. THERMAL AND MOISTURE PROTECTION
7.3 REMOVE BUILT UP ROOF AND
INSULATION DOWN TO ROOF
DECK.
14. CONVEYING EQUIPMENT
14.1 REMOVE ELEVATOR FINISHES
INCLUDING FLOORING, WALLS,
CEILING, LIGHTING AND CALL
SYSTEM.
10.12 REMOVE ALL PUBLIC INTERIOR
SIGNAGE ON FIRST FLOOR.
9.8 RETAIN AND PROTECT WOOD
PANELING.
9.9 RETAIN AND PROTECT GRANITE
TILE FLOOR AND BASES.
8.2 SALVAGE (TYPE 1) DOOR(S),
INCLUDING FRAMES, BLOCKING,
AND HARDWARE.
9.10 REMOVE 1/2" METAL REVEALS IN
WALLS.
7.1 DECK TO REMAIN. REMOVE
DAMAGED OR DETERIORATED
CEMENTITIOUS WOOD FIBER
DECK. ASSUME 25% WILL
REQUIRE REPLACEMENT.
9.11 SALVAGE (TYPE 1) GRANITE TILE
FLOOR AND BASES TO THE
EXTENT SHOWN FOR
REINSTALLATION.
7.2 METAL DECK TO REMAIN.
7.4 REMOVE OVERFLOW DRAIN.
7.5 REMOVE DRAIN.
7.6 REMOVE CRICKETS.
7.7 REMOVE ROOF FLASHING.
7.8 RETAIN EXISTING RIDGE LINE
ALONG COLUMN LINE 4
7.9 REMOVE EXISTING PERIMETER
SEALANT AND PREPARE OPENING
FOR NEW SEALANT.
7.10 EXISTING ROOF HATCH TO
REMAIN.
7.11 REMOVE EXISTING GASKETS AND
PREPARE OPENING FOR NEW
GASKETS.
7.12 REMOVE EXISTING PERIMETER
SEALANT OF ALL DOORS AND
PREPARE OPENING FOR NEW
SEALANT.
7.13 REMOVE ALL EXISTING SEALANTS
AT CONTROL AND CONSTRUCTION
JOINTS AND PREPARE JOINT FOR
NEW SEALANT.
7.14 REMOVE EXISTING PERIMETER
SEALANT OF ALL WINDOWS AND
PREPARE OPENING FOR NEW
SEALANT.
12.3 SALVAGE (TYPE 1) MAILBOX
CUBBY.
8.3 SALVAGE (TYPE 1) TRANSOM
WINDOW, INCLUDING FRAMES,
BLOCKING, AND HARDWARE.
6. WOOD, PLASTICS, AND COMPOSITES
6.1 REMOVE WOOD PLATFORM
STRUCTURE.
10.13 REMOVE LADDER.
10.14 SALVAGE (TYPE 1) EXHIBIT AT
GROUND.
9.12 DEMO MARBLE THRESHOLD
9.13 REMOVE GYPSUM BOARD AND
BACKER BOARD DOWN TO THE
STUDS.
7.15 REMOVE EXISTING CHILLER
STRUCTURE BEAMS.
7.16 EXISTING STEEL CHILLER
TUBEPOSTS WITH CAP PLATE TO
REMAIN. TYP. OF (4).
9.2 REMOVE GYPSUM BOARD CEILING
ASSEMBLY.
3.3 REMOVE PORTION OF CMU WALL
FOR DOOR OPENING. SEE DOOR
SCHEDULE FOR SIZE.
8.4 REMOVE EXTERIOR DOOR
THRESHOLD.
7.17 REMOVE EXISTING SEALANT AND
PREPARE OPENING FOR NEW
SEALANT AT ALL ROOF COPING
JOINTS SEE DETAIL 4/A6.3.
10.15 COVER AND PROTECT EXHIBIT
INSTALLED AT GROUND,
SUSPENDED LIGHTING AND
SOUND STRUCTURES.
9.14 REMOVE ACOUSTIC CEILING TILES
TO ACCESS MEP WORK. ASSUME
REPLACEMENT OF 105 OF
ACOUSTIC CEILING TILES.
10.16 SALVAGE (TYPE 1) EXHIBIT
SUSPENDED SOUND STRUCTURE.
9.15 REMOVE ENTRANCE MAT.
DEMOLITION NOTES KEYED TO DRAWINGS
7. THERMAL AND MOISTURE PROTECTION 10. SPECIALTIES
10.17 SALVAGE (TYPE 1) ROOM
SIGNAGE.
9. FINISHES
7.18 REMOVE EXISTING JOINT SEALANT
AT METAL RADIUS ROOF.
8.5 REMOVE DOOR(S), INCLUDING
HARDWARE. FRAME TO REMAIN.
11/27/20241
A/E FIRM
SUBCONTRACTOR:
NAME: GWWO, INC.
BALTIMORE, MD
TITLE OF SHEET DRAWING NO.
PKG.
NO.
SHEET
OF
SUB SHEET NO.DESIGNED:
CADD:
TECH. REVIEW:
DATE:
REHABILITATE VISITOR CENTER AND HEADQUARTERS
MARTIN LUTHER KING, JR. NATIONAL HISTORIC PARK
188079
SEAL:
:0 :2
P M
A u to d e s k
D o c s
M a rt in
L u th e r K in g
J r.
N a ti o n a l H is to ri c a l P a rk
V is it o r C e n te r a n d
H e a d q u a rt e rs
M A L U
N P S
R e n o v a ti o n
C A .r v t
DEMOLITION NOTES 489
293291 40
AD1.0
GWWO
GWWO
GWWO
04/26/2024
H
4.6 5.2 5.5 6 6.3 6.5 6.9 7.3 7.8 84.7 76.86.15.4
H'
J
J'
K
5 5.6
9.11
5.1
22.4
3.2
12.2
12.2
12.2 9.11
10.9
22.6
22.3
10.10
10.8 10.2
TYP.
OF 2
TYP.
OF 3
TYP.
OF 2
TYP.
OF 4
10.1
TYP.
OF 10
10.5
TYP.
OF 2
10.6
TYP.
OF 10
10.3
TYP.
OF 2
10.11
TYP.
OF 2
22.1
TYP.
OF 10
10.7
9.2
9.4
9.5
26.1
9.1
8.1
3.2
8.1
3.2
3.2
22.3
10.10
10.8 TYP.
OF 2
TYP.
OF 3
10.2
TYP.
OF 2
10.3
TYP.
OF 2
3.3
10.7 10.9
10.2
TYP.
OF 2
22.3
10.10
10.8 TYP.
OF 2
TYP.
OF 3
10.5
TYP.
OF 6
22.1
22.2
TYP.
OF 6
10.1
TYP.
OF 5
3.2
5.1
9.2
9.4
9.5
26.1
9.1
9.4
9.5
26.1
9.1
10.1
TYP.
OF 6
10.11
10.6
TYP.
OF 6
10.9
TYP.
OF 2
TYP.
OF 5
22.1
10.6
TYP.
OF 5
10.5
10.1
TYP.
OF 5
WOMEN'S RESTROOM MEN'S RESTROOM
CORRIDOR
JANITOR
CLOSET
SWING
RESTROOM
TYP.
OF 3
TYP.
OF 3
SPOT ASPOT B
SPOT B AT
CORNER OF WALL
SPOT A AT
CORNER OF WALL
EQ 8'-11" EQ
9.13
9.13
9.13
3.3
HATCH KEY LEGEND
SALVAGE GRANITE TILE FLOOR AND
BASES TO THE EXTENT SHOWN.
11/27/20241
A/E FIRM
SUBCONTRACTOR:
NAME: GWWO, INC.
BALTIMORE, MD
TITLE OF SHEET DRAWING NO.
PKG.
NO.
SHEET
OF
SUB SHEET NO.DESIGNED:
CADD:
TECH. REVIEW:
DATE:
REHABILITATE VISITOR CENTER AND HEADQUARTERS
MARTIN LUTHER KING, JR. NATIONAL HISTORIC PARK
188079
SEAL:
:0 :2
P M
A u to d e s k
D o c s
M a rt in
L u th e r K in g
J r.
N a ti o n a l H is to ri c a l P a rk
V is it o r C e n te r a n d
H e a d q u a rt e rs
M A L U
N P S
R e n o v a ti o n
C A .r v t
FIRST FLOOR ENLARGED
DEMOLITION PLANS
293291 42
AD1.2
GWWO
GWWO
GWWO
04/26/2024
SCALE AAD1.2
1 FIRST FLOOR ENLARGED DEMOLITION PLAN
DEMOLITION NOTES ON SHEET
3.2 REMOVE PORTION OF CMU WALL TO UNDERSIDE OF
STRUCTURE.
3.3 REMOVE PORTION OF CMU WALL FOR DOOR
OPENING. SEE DOOR SCHEDULE FOR SIZE.
5.1 REMOVE STUD WALL TO THE EXTENT SHOWN.
8.1 REMOVE DOOR(S), INCLUDING FRAMES, BLOCKING,
AND HARDWARE.
9.1 REMOVE ACOUSTIC CEILING TILE ASSEMBLY.
9.2 REMOVE GYPSUM BOARD CEILING ASSEMBLY.
9.4 REMOVE CERAMIC TILE FLOORING.
9.5 REMOVE CERAMIC TILE AND SUBSTRATE ON WALLS.
9.11 SALVAGE (TYPE 1) GRANITE TILE FLOOR AND BASES
TO THE EXTENT SHOWN FOR REINSTALLATION.
9.13 REMOVE GYPSUM BOARD AND BACKER BOARD
DOWN TO THE STUDS.
10.1 REMOVE TOILET PARTITION, DOOR, HARDWARE, AND
ACCESSORIES.
10.2 REMOVE ELECTRIC HAND DRYER.
10.3 REMOVE PAPER TOWEL DESPENSER.
10.5 REMOVE GRAB BARS.
10.6 REMOVE TOILET PAPER DISPENSER.
10.7 REMOVE RECESSED PAPER TOWEL DESPENSER.
10.8 REMOVE SOAP DESPENSER.
10.9 REMOVE TOILET SEAT COVER DESPENSER.
10.10 REMOVE MIRROR. REFER TO SPEC SECTION 028200
ASBESTOS ABATEMENT.
10.11 REMOVE SANITARY NAPKIN DESPENSER.
12.2 REMOVE PLAM COUNTER.
22.1 REMOVE WATER CLOSET FIXTURE AND ASSOCIATED
VALVE. REFER TO PLUMBING.
22.2 REMOVE URINAL AND ASSOCIATED VALVE. REFER TO
PLUMBING.
22.3 REMOVE LAVATORY AND ASSOCIATED VALVE. REFER
TO PLUMBING.
22.4 REMOVE WATER FOUNTAIN. REFER TO PLUMBING.
22.6 REMOVE JANITOR SINK AND ASSOCIATED VALVE.
REFER TO PLUMBING.
26.1 REMOVE LIGHT FIXTURES. REFER TO ELECTRICAL.
SCALE OF FEET
4 0 4 8
SCALE A
A .2 2
A3.2
A .12
A3.1
1 2 3
H
2.8 4 4.6 5.2 5.5 6 6.3 6.5 6.9 7.3 7.8 8 94.7 76.86.15.4
H'
J
J'
K
K'
L
M
N
P
Q
M.6
M.3
5 5.6
WOMEN'S RESTROOM
RESTROOM 1
CORRIDOR
RESTROOM 2
JAN.
CLOS.
MEN'S RESTROOM
OFFICE
ELECTRICAL
ROOM
MECHANICAL
SALES
THEATER
EXHIBIT
MULTI-PURPOSE ROOM
CORRIDOR
ELEV.
ELEV
MECH ROOM
STAIR 1
VESTIBULE
VESTIBULE
PROJECTION
ROOM
STORAGE
LOBBY
CORRIDOR
A1.2STORAGE
9.1 9.6 26.1
9.1 9.6 26.1
9.6
9.1
9.7
26.1 26.1
9.1 9.6 26.1
9.1 9.6 26.1
26.1
9.6 26.19.6 26.1
9.1 26.19.7
26.1
9.1 9.6 26.1
9.1 26.1
9.1
26.1
26.1 9.3
9.3
9.3
9.3
9.3
9.3
9.3 9.3
9.3
9.3
9.3
9.3
9.3
9.3
9.3 26.1
14.1
8.4
8.4
A7.2
VESTIBULE
110A
VENDING ALCOVE
A4.1
A4.1
A4.2
A4.2
A4.2
STORAGE
8.1
106C
110A
107B
106B
122C
122D
122A
110D
110F
106A
107A
102A 102B
122B
114A118A
114B
118B
108B
10.13
A4.2
110E
A4.1
8.4
8.4 8.4
8.4 8.4
108A
110B 110C
10.14
9.12
9.12 9.12
26.2
2.1
8.1
11/27/20241
A/E FIRM
SUBCONTRACTOR:
NAME: GWWO, INC.
BALTIMORE, MD
TITLE OF SHEET DRAWING NO.
PKG.
NO.
SHEET
OF
SUB SHEET NO.DESIGNED:
CADD:
TECH. REVIEW:
DATE:
REHABILITATE VISITOR CENTER AND HEADQUARTERS
MARTIN LUTHER KING, JR. NATIONAL HISTORIC PARK
188079
SEAL:
:0 :2
P M
A u to d e s k
D o c s
M a rt in
L u th e r K in g
J r.
N a ti o n a l H is to ri c a l P a rk
V is it o r C e n te r a n d
H e a d q u a rt e rs
M A L U
N P S
R e n o v a ti o n
C A .r v t
FIRST FLOOR PLAN 489
293291 47
A1.1
GWWO
GWWO
GWWO
04/26/2024
SCALE AA1.1
1 FIRST FLOOR NEW WORK PLAN
CONSTRUCTION NOTES ON SHEET
2.1 CLEAN MICROBIAL GROWTH FROM FABRIC WALL
PANELS ON NORTH, EAST AND SOUTH WALLS WITH
BIOCIDE AGENT AND VACUUM UTILIZING A VACCUM
SYSEM WITH HEPA FILTERS. REFER TO MOLD/IAQ AND
REGULAED BUILDING MATERIALS SURVEY REPORT,
SPECIFICATIONS APPENDIX C.
8.1 PROVIDE DOOR AND HARDWARE.
8.4 INSTALL NEW EXTERIOR DOOR THRESHOLD.
9.1 PROVIDE ACOUSTIC CEILING TILE ASSEMBLY.
9.3 REPAIR, REFINISH, AND REPAINT WALLS, METAL
FRAMES AND METAL DOORS.
9.6 PROVIDE LUXURY VINYL PLANK FLOORING.
9.7 PROVIDE VCT FLOORING.
9.12 PROVIDE 1 HR RATED WALL ASSEMBLY. INFILL HOLES
IN WALLS.
10.13 INSTALL NEW PUBLIC INTERIOR SIGNAGE ON THE
FIRST FLOOR.
10.14 INSTALL SALVAGED EXHIBIT AT GROUND.
14.1 PROVIDE NEW ELEVATOR FINISHES INCLUDING
FLOORING, WALLS, CEILING, LIGHTING AND CALL
SYSTEM.
26.1 PROVIDE LIGHT FIXTURES. REFER TO ELECTRICAL.
26.2 PROVIDE GENERATOR. REFER TO ELECTRICAL.
SCALE OF FEET
8 0 8 16
SCALE A
REFER TO SHEETS AL.1 & AL.2
4.6 5.2 5.5 6 6.3 6.5 6.9 7.3 7.8 84.7 76.86.15.4
H'
J
J'
K
5 5.6
RESTROOM 2
RESTROOM 1
JAN.
CLOS.
WOMEN'S RESTROOM
118 MEN'S RESTROOM
CORRIDOR
SALES
117 116
118B 114B
2.03
2.03
2.43
2.53
2.13
2.63
2.132.63
2.63
2.632.63
2.132.13
2.62 2.63
1'-4 5/8" 4'-7 3/8"
2.63
8'-0"
1'-8 5/8"
ALIGN
ALIGN
A6.1
EQ EQ
A4.1
A4.2
VESTIBULE
110A
26.19.11 9.2
9.2
9.1 9.4 9.5 26.1
9.1 9.4 9.5 26.1
9.11
VENDING ALCOVE
26.1 9.10
STORAGE
ALIGN NEW WALL
TO SPOT A
EQ 8'-11" EQ
R A D
IU
S
ALIGN NEW WALL
TO SPOT B
2.032.03
2.03
2.03
2.13
2.13
2.03
108B
SPOT ASPOT B
2.03
ALIGN
ALIGN
108A
ALIGN
EQ EQ
8' - 0" 110C
10.9
10.9
2.31
2.31
2.31
2.312.31
2.312.31
2.312.31
2.31
2.312.31
2.31
2.31 2.312.31
2.312.31
2.31
2.312.31
2.312.31
2.31
2.31
2.31
2.312.31
2.312.31
2.31
2.312.31
2.31
11/27/20241
A/E FIRM
SUBCONTRACTOR:
NAME: GWWO, INC.
BALTIMORE, MD
TITLE OF SHEET DRAWING NO.
PKG.
NO.
SHEET
OF
SUB SHEET NO.DESIGNED:
CADD:
TECH. REVIEW:
DATE:
REHABILITATE VISITOR CENTER AND HEADQUARTERS
MARTIN LUTHER KING, JR. NATIONAL HISTORIC PARK
188079
SEAL:
:0 :3
P M
A u to d e s k
D o c s
M a rt in
L u th e r K in g
J r.
N a ti o n a l H is to ri c a l P a rk
V is it o r C e n te r a n d
H e a d q u a rt e rs
M A L U
N P S
R e n o v a ti o n
C A .r v t
FIRST FLOOR ENLARGED
PLAN
293291 48
A1.2
GWWO
GWWO
GWWO
04/26/2024
SCALE AA1.2
1 FIRST FLOOR ENLARGED PLAN
CONSTRUCTION NOTES ON SHEET
9.1 PROVIDE ACOUSTIC CEILING TILE ASSEMBLY.
9.2 PROVIDE GYPSUM BOARD CEILING ASSEMBLY.
9.4 PROVIDE FLUID APPLIED FLOORING AND BASE.
9.5 PROVIDE CERAMIC TILE AND CEMENTITIOUS BACKER
BOARD ON WALL.
9.11 INSTALL SALVAGED GRANITE TILE FLOORING.
10.9 PROVIDE TOILET SEAT COVER DESPENSER.
26.1 PROVIDE LIGHT FIXTURES. REFER TO ELECTRICAL.
SCALE OF FEET
4 0 4 8
SCALE A
A .2 2
A3.2
A .12
A3.1
1 2 3
H
2.8 4 4.6 5.2 5.5 6 6.3 6.5 6.9 7.3 7.8 8 94.7 76.86.15.4
H'
J
J'
K
K'
L
M
N
P
Q
M.6
M.3
5 5.6
EXHIBIT HALL
BELOW
LOBBY
BELOW
THEATER
BELOW
CURATORIAL STORAGE
OFFICE
OFFICE
OFFICE
201 STAIR 1
OFFICE
OFFICE
OFFICE
REFERENCE ROOM
OFFICE
OFFICE
ADMIN
STORAGE
ROOM
CLOS.
COPY
ROOM
RESTROOM 3
JAN.
CLOS.
RESTROOM 4
BREAK ROOM
OFFICE
221CORRIDOR
ELEV.
MECHANICAL
ROOM
AV ROOM
CURATOR
WORK SPACE
9.1 9.6 26.1
9.1 9.6 26.1 9.1 9.3 26.1
9.1 9.326.1
9.1 9.6 26.1
9.1 9.6 26.1
9.1 9.6 26.1
26.1
9.3 9.6
9.3
9.3
9.3
9.6
9.6
9.3
9.3
9.1 9.6 26.19.3
9.1 9.6 26.19.3
26.1
9.1 9.3 26.19.6
9.1 9.3 26.19.6
9.1 9.3 26.19.6
9.1
9.1
9.3
9.39.6
9.6 26.1
26.1
A7.2
A4.1
A4.1
A4.21
A4.2
A4.2
9.39.1 26.1
9.6 26.1
9.3 26.1
9.3
9.69.69.1 26.1
9.69.1 26.19.5
9.526.19.3
A1.4
217A
200B
216B
203A 202A 201A
205B
201C202B
222B
221B
220B
221C 220A 219A222A
219B
219C 218B
218A
217B
216A
217C
214211
200A
201B
221A
205A
203B
A7.2
A4.2
A4.1
9.12
10.1610.17
AL.4
SIM
NOTE: ALL ITEMS WITHIN CURATORIAL STORAGE
TO REMAIN IN PLACE AND PROTECTED
THROUGHOUT DURATION OF THE WORK.
COORDINATE WITH THE PARK BEFORE ANY
WORK IN CURATORIAL STORAGE BEGINS.
9.6
11/27/20241
A/E FIRM
SUBCONTRACTOR:
NAME: GWWO, INC.
BALTIMORE, MD
TITLE OF SHEET DRAWING NO.
PKG.
NO.
SHEET
OF
SUB SHEET NO.DESIGNED:
CADD:
TECH. REVIEW:
DATE:
REHABILITATE VISITOR CENTER AND HEADQUARTERS
MARTIN LUTHER KING, JR. NATIONAL HISTORIC PARK
188079
SEAL:
:0 :3
P M
A u to d e s k
D o c s
M a rt in
L u th e r K in g
J r.
N a ti o n a l H is to ri c a l P a rk
V is it o r C e n te r a n d
H e a d q u a rt e rs
M A L U
N P S
R e n o v a ti o n
C A .r v t
SECOND FLOOR PLAN 489
293291 49
A1.3
GWWO
GWWO
GWWO
04/26/2024
SCALE AA1.3
1 SECOND FLOOR NEW WORK PLAN
CONSTRUCTION NOTES ON SHEET
9.1 PROVIDE ACOUSTIC CEILING TILE ASSEMBLY.
9.3 REPAIR, REFINISH, AND REPAINT WALLS, METAL
FRAMES AND METAL DOORS.
9.5 PROVIDE CERAMIC TILE AND CEMENTITIOUS BACKER
BOARD ON WALL.
9.6 PROVIDE LUXURY VINYL PLANK FLOORING.
9.12 PROVIDE 1 HR RATED WALL ASSEMBLY. INFILL HOLES
IN WALLS.
10.16 INSTALL SALVAGED ROOM SIGNAGE.
10.17 PROVIDE NEW ROOM SIGNAGE. MATCH EXISTING
SALAVAGED ROOM SIGNAGE..
26.1 PROVIDE LIGHT FIXTURES. REFER TO ELECTRICAL.
SCALE OF FEET
8 0 8 16
SCALE A
6" 6" 11 1/4"
M A X
2'-1"
M
IN
S
IN
K
D E P T H
M A X
REQ. TOE
CLEARANCE
1 3/4"
A7.1
TYP.
PLAM CASEWORK
REMOVEABLE PANEL
CONTINUOUS PLAM
COUNTERTOP WITH
BACKSPLASH
PLUMBING
(REFER TO PLUMBING
FOR MORE INFORMATION)
PLAM SKIRT
MOISTURE RESISTANT,
MEDIUM DENSITY
FIBERBOARD (MDF)
3/4"
MOISTURE RESISTANT,
MEDIUM DENSITY
FIBERBOARD (MDF)
3/4"
2 LAYERS
CONTINUOUS PLAM
COUNTERTOP WITH
BACKSPLASH
BLOCKING
RADIUSED PLAM EDGE
M
IN
2'-1"CONTINUOUS PLAM
COUNTERTOP WITH
BACKSPLASH
METAL COUNTERTOP
SUPPORT BRACKET
3'-0" O.C. MAX
1 3/4"
A7.1
TYP.
A AUTOMATIC SOAP
DISPENSER
B SURFACE MOUNTED
AUTOMATIC HAND
DRYER
D ABA
COMPLIANT
MIRROR
E DOUBLE ROLL
TOILET TISSUE
DISPENSER
F SANITARY NAPKIN
DISPOSAL
G ABA COMPLIANT
GRAB BAR
G.1 = 3'-0" LENGTH
G.2 = 4'-0" LENGTH
M A X
18"
ABA
COMPLIANT
SINK
I ABA
COMPLIANT
FLOOR MOUNTED
TOILET
M A X
J ABA
COMPLIANT
WALL MOUNTED
TOILET
HC SEMI-RECESSED
PAPER TOWEL
DISPENSER AND
WASTE RECEPTACLE
K WALL MOUNTED
URINAL
K.1 = TYPICAL URINAL
K.2 = ABA
COMPLIANT URINAL
M A X
K .2
L ABA
COMPLIANT
CHANGING STATION
M FRAMED MIRROR
24"
S S.1 = SEMI-
RECESSED
AUTOMATIC LARGE
PAPER TOWEL
DISPENSER
S.2 = SMALL PAPER
TOWEL DISPENSER
O BI-LEVEL WATER
FOUNTAIN WITH
BOTTLE FILLER
P SINGLE WATER
FOUNTAIN WITH
BOTTLE FILLER
Q CEILING HUNG
TOILET PARTITION
Q.1 = TYPICAL STALL
Q.2 = AMBULATORY STALL
Q.3 = ABA COMPLIANT STALL
K .1
R URINAL PARTITION
M A X
M
IN
S.1
S.2
T SURFACE-MOUNTED
SEAT-COVER
DISPENSER
T.1 = TYPICAL
T.2 - ABA COMPLIANT
T Y P
T.1
T.2
M A X . 4
M A X
M
IN
M A X
M A X
2'-1"
ADJ
TYP
ADJ
TYP
3"
1'-0"
A7.1
TYP.
BLOCKING
TYP
PLAM CABINETS
CONTINUOUS PLAM
COUNTERTOP
PLAM CABINETS
REFER TO ELEVATIONS
FOR EXTENT OF
UPPER CABINETS
BACKSPLASH AND
SIDESPLASH.
SAME AS COUNTERTOP
REFER TO ELEVATIONS.
SOLID SURFACE
COUNTERTOP AT
BREAKROOM ONLY
A7.1
TYP.
6" 6" 11 1/4"
M A X
2'-1"
M
IN
S
IN
K
D E P T H
M A X
REQ. TOE
CLEARANCE
1 3/4"
A7.1
TYP.
PLAM CASEWORK
REMOVEABLE PANEL
CONTINUOUS PLAM
COUNTERTOP WITH
BACKSPLASH
PLUMBING
(REFER TO PLUMBING
FOR MORE INFORMATION)
1'-0"
A7.1
TYP.
BACKSPLASH AND
SIDESPLASH.
SAME AS COUNTERTOP
REFER TO ELEVATIONS.
SOLID SURFACE
COUNTERTOP AT
BREAKROOM ONLY
12" G.1
J 15"18"
T.2
12" 7" TO 9"
G.2
F
E J
12"
12" 7" TO 9"
G.2
F
E J
12"
GRAB BARS (G.2) AND ABA COMPLIANT
TOILET REQ. FOR RA2 ASSEMBLY
BOTH SIDES
NOTE: THESE ITEMS ARE LISTED AS A CONVENIENCE AND ARE NOT A
COMPREHENSIVE LIST OF NIC ITEMS WITHIN THE PROJECT.
SPECIALTY EQUIPMENT N.I.C SCHEDULE
ACC NO.
DIMENSION LIMIT
(WxDxH)
N1 REFRIGERATOR
N2 ELECTRIC STOVE
N3 DISHWASHER
N4 MICROWAVE
NOTES
ITEM
36 1/2" x N/A" x 66"
36" x 24" x 34"
30" x 24" x 32 1/2"
30" x 17" x 18"
WATER & ICE
DISPENSER
N5 VENDING MACHINE 44" x 34" x 90"
PLAM CABINET
MOISTURE RESISTANT,
MEDIUM DENSITY
FIBERBOARD (MDF)
3/4"
2 LAYERS
CONTINUOUS PLAM
COUNTERTOP WITH
BACKSPLASH
RADIUSED PLAM EDGE
PLAM CABINET
1/2" THICK NOMINAL SOLID
SURFACE COUNTER
3/4" THICK
PLYWOOD
JOINT SEALANT AND
BACKER ROD
PLAM SKIRT
1/2" THICK NOMINAL SOLID
SURFACE COUNTER
3/4" THICK
PLYWOOD
JOINT SEALANT AND
BACKER ROD
BLOCKING
11/27/20241
A/E FIRM
SUBCONTRACTOR:
NAME: GWWO, INC.
BALTIMORE, MD
TITLE OF SHEET DRAWING NO.
PKG.
NO.
SHEET
OF
SUB SHEET NO.DESIGNED:
CADD:
TECH. REVIEW:
DATE:
REHABILITATE VISITOR CENTER AND HEADQUARTERS
MARTIN LUTHER KING, JR. NATIONAL HISTORIC PARK
188079
SEAL:
:0 :3
P M
A u to d e s k
D o c s
M a rt in
L u th e r K in g
J r.
N a ti o n a l H is to ri c a l P a rk
V is it o r C e n te r a n d
H e a d q u a rt e rs
M A L U
N P S
R e n o v a ti o n
C A .r v t
ACCESSORIES
SCHEDULE & TYPICAL
DETAILS
293291 64
A7.1
GWWO
GWWO
GWWO
04/26/2024
NO SCALEA7.1
5 ABA COMPLIANT SINK - TYP SECTION DETAIL
NO SCALEA7.1
TYP COUNTERTOP EDGE
WITH SKIRT
NO SCALEA7.1
6 COUNTER DETAIL TYP
NO SCALE
ACCESSORIES SCHEDULE
NO SCALEA7.1
3 CASEWORK DETAIL TYP
NO SCALEA7.1
ABA COMPLIANT SINK W/ UPPER CABINET -
TYP SECTION DETAIL
NO SCALEA7.1
8 RA3 ELEVATIONS
NO SCALEA7.1
7 RA1 & RA2 ELEVATION
NO SCALEA7.1
TYP COUNTERTOP EDGE
WITH CABINET
NO SCALEA7.1
SOLID SURFACE COUNTERTOP WITH CABINET
AT BREAKROOM
NO SCALEA7.1
SOLID SURFACE COUNTERTOP EDGE WITH
SKIRT
1 1
M
36"
OPEN TO
BEYOND
OPEN TO
BEYOND
118A OPEN TO
BEYOND
24"
C
118B
D D D
AA
B B
EQ
EQ
EQ
EQ
51"48"
OPEN TO
BEYOND
RA3 RA1 RA1 RA1 RA1
Q.3 Q.1 Q.1 Q.1Q.1
T.1 T.1 T.1 T.1
OPEN TO
BEYOND
RA1 RA1 RA1 RA2 RA3
Q.3Q.2Q.1Q.1Q.1
T.1 T.1 T.1 T.1
OPEN TO
BEYOND
K.2 K.1 K.1 K.1 K.1 K.1
R
TYP
D
HRA3
T.2
17" 14" 18"
A
RA3
CLR
60" L
OPEN TO
BEYOND
OPEN TO
BEYOND
N5 N5
110B
FILL-IN MISSING
BASE WITH B-3
FILL-IN MISSING
BASE WITH B-3
OPEN TO
BEYOND
OPEN TO
BEYOND
B-3 BASE EXISTING BASEEXISTING BASE
CORRIDOR
LOBBY
VESTIBULE
110A
B-3 BASE
108A
CORRIDOR
LOBBY
108B
B-3 BASE
OPEN TO
BEYOND
OPEN TO
BEYOND
OPEN TO
BEYOND
OPEN TO
BEYOND
ALIGN BASE CHANGE
WITH THRESHOLD
B-2 B-3 B-3 B-2
OPEN TO
BEYOND
11/27/20241
A/E FIRM
SUBCONTRACTOR:
NAME: GWWO, INC.
BALTIMORE, MD
TITLE OF SHEET DRAWING NO.
PKG.
NO.
SHEET
OF
SUB SHEET NO.DESIGNED:
CADD:
TECH. REVIEW:
DATE:
REHABILITATE VISITOR CENTER AND HEADQUARTERS
MARTIN LUTHER KING, JR. NATIONAL HISTORIC PARK
188079
SEAL:
:0 :3
P M
A u to d e s k
D o c s
M a rt in
L u th e r K in g
J r.
N a ti o n a l H is to ri c a l P a rk
V is it o r C e n te r a n d
H e a d q u a rt e rs
M A L U
N P S
R e n o v a ti o n
C A .r v t
INTERIOR ELEVATIONS -
FIRST FLOOR
293291 66
A7.3
GWWO
GWWO
GWWO
04/26/2024
SCALE AA7.3
2 GROUP RESTROOM ELEVATION 2
SCALE AA7.3
3 GROUP RESTROOM ELEVATION 3
SCALE AA7.3
4 GROUP RESTROOM ELEVATION 4
SCALE AA7.3
1 GROUP RESTROOM ELEVATION 1
SCALE AA7.3
6 WOMAN'S RESTROOM ELEVATION 6
SCALE AA7.3
5 GROUP RESTROOM ELEVATION 5
SCALE AA7.3
7 MEN'S RESTROOM ELEVATION 7
SCALE AA7.3
RESTROOM 2
ELEVATION 1
SCALE AA7.3
RESTROOM 2
ELEVATION 2
SCALE AA7.3
RESTROOM 2
ELEVATION 3
SCALE AA7.3
RESTROOM 2
ELEVATION 4
SCALE AA7.3
15 CORRIDOR 110 ELEVATION 4
SCALE AA7.3
12 CORRIDOR 110 ELEVATION 1
SCALE AA7.3
13 CORRIDOR 110 ELEVATION 2
SCALE AA7.3
14 CORRIDOR 110 ELEVATION 3
SCALE OF FEET
4 0 4 8
SCALE A
SCALE AA7.3
19 VESTIBULE 110A ELEVATION 4
SCALE AA7.3
VESTIBULE 110A
ELEVATION 1
SCALE AA7.3
17 VESTIBULE 110A ELEVATION 2
SCALE AA7.3
VESTIBULE 110A
ELEVATION 3
D
12"
I
12"
T.2 G.1
18"
15"
7" TO 9" 12"
12"
G.2
I
E F 36"
M
14" 6"
A
S.1
FILLER
30"
36" 30" 30" 30"
8" 9"
A S.2
N3N1
FILLER
N2
FILLER
36"36"30"
36" 36" FILLERFILLER 18" 36" 36" 30"
N4
36"36"
203B204
12" 14" A S.1
11/27/20241
A/E FIRM
SUBCONTRACTOR:
NAME: GWWO, INC.
BALTIMORE, MD
TITLE OF SHEET DRAWING NO.
PKG.
NO.
SHEET
OF
SUB SHEET NO.DESIGNED:
CADD:
TECH. REVIEW:
DATE:
REHABILITATE VISITOR CENTER AND HEADQUARTERS
MARTIN LUTHER KING, JR. NATIONAL HISTORIC PARK
188079
SEAL:
:0 :3
P M
A u to d e s k
D o c s
M a rt in
L u th e r K in g
J r.
N a ti o n a l H is to ri c a l P a rk
V is it o r C e n te r a n d
H e a d q u a rt e rs
M A L U
N P S
R e n o v a ti o n
C A .r v t
INTERIOR ELEVATIONS -
SECOND FLOOR
293291 67
A7.4
GWWO
GWWO
GWWO
04/26/2024
SCALE AA7.4
1 RESTROOM 4 ELEVATION 1
SCALE AA7.4
2 RESTROOM 4 ELEVATION 2
SCALE AA7.4
3 RESTROOM 4 ELEVATION 3
SCALE AA7.4
4 RESTROOM 4 ELEVATION 4
SCALE AA7.4
6 BREAK ROOM ELEVATION 1
SCALE AA7.4
7 BREAK ROOM ELEVATION 2
SCALE AA7.4
8 CORRIDOR 200 ELEVATION 1
SCALE OF FEET
4 0 4 8
SCALE A
SCALE AA7.4
5 RESTROOM 3 ELEVATION 4
NOTE 1: FOR PATTERNS, SEE FINISH PLANS AND INTERIOR ELEVATIONS
NOTE 2: MANUFACTURER LISTED AS BASIS OF DESIGN OR APPROVED EQUAL PER SALIENT CHARACTERISTICS
OUTLINE IN SPEC SECTIONS LISTED AND FINISH SCHEDULE ABOVE.
INTERIOR FINISH SCHEDULE
ITEM MATERIAL DESCRIPTION MFR/STYLE/COLOR (BASIS OF DESIGN OR EQUAL)
FINISH TYPES
WALL FINISH
W-1
W-2
PAINTED WALLS
PORCELAIN TILE
BASE FINISH
PPG - PPG1006-1 GYPSUM
DALTILE/VOLUME 1.0/TRUFFLE VL64/12"X24"
B-1
B-2
RUBBER
FLUID APPLIED
JOHNSONITE/BASEWORKS 4" TOE/BURNT UMBER
5 1/2"
FLOOR FINISH
ROOM NAME ###
WALL
ROOM NUMBER
* = ALTERNATE, IF APPLICABLE
BASE FLOOR
ALT*
F-1 LUXURY VINYL PLANK
F-2
FLUID APPLIEDF-3
SEALED CONCRETE
VCT ARMSTRONG FLOORING/IMPERIAL TEXTURE/SILK 59234/12"X12"
F-4
EXISTING GRANITE TILEF-5
EXISTING EXPOSED CONCRETEF-6
DOOR & FRAME FINISH
PAINTED DOOR/FRAME
PAINTED DOOR/FRAME
PPG - PPG1007-3 GHOST WRITER
SEE DOOR SCHEDULE FOR DOOR/FRAME FINISH.
MATCH EXISTING COLOR AT EXTERIOR HM DOORS/FRAMES.
SEE DOOR SCHEDULE FOR DOOR/FRAME FINISH.
PNT1
PNT3
SECTION
099123
096700
096700
096700
099123
096500
096500
096500
033511
B-3 GRANITE BASE 5 1/2" MATCH EXISTING
F-7 SALVAGED GRANITE TILE
F-8 WALK-OFF MAT ULTRA ENTRY: EXTRUDED PVC GRID / BLACK BASE / NY
CHARCOAL SPLASH INSERT.
124813
W-3 PAINTED WALLS PPG - PPG1001-7 BLACK MAGIC
B-4 WOOD BASE 3" PAINTED WOOD - PPG - PPG1006-1 GYPSUM
099123
PAINTED DOOR/FRAME PPG - PPG1006-1 GYPSUM
SEE DOOR SCHEDULE FOR DOOR/FRAME FINISH.
PNT2
099113
099123
F-7A LUXURY VINYL PLANK
OVERLAID F-5
096500
062000
FLOOR FINISH COLOR KEY
TYPE SYMBOL SPEC SECTION
LVP
VCT
FLOOR FINISHES
FLUID APPLIED
EXISTING FLOOR TO REMAIN
SEALED CONCRETE
096700
096500
096500
033511
WALK-OFF MAT 124813
SALVAGED GRANITE TILE
NOTE: FOR PATTERNS, SEE FINISH PLANS AND INTERIOR ELEVATIONS
FLOOR TRANSISTION & TRESHOLD SCHEDULE
FLOOR FINISH TO FLOOR FINISH MFR/STYLE/COLOR
F-1 F-1
F-1 F-2
F-1 F-5
F-1 F-6
F-2 F-2
F-2 F-5
F-3 F-3
F-3 F-4
F-5 F-5
NO THRESHOLDF-6 F-6
SECTION
F-3 F-5
F-5 F-6
096500
096500
096700
096700
096700
096700
096700
F-7A F-5
NO THRESHOLD
T-1 RUBBER REDUCER
NO THRESHOLD
NO THRESHOLD
NO THRESHOLD
NO THRESHOLD
T-4/T-5 METAL TRANSITION
T-3 RUBBER TRANSITION
T-1 RUBBER REDUCER
T-4/T-5 METAL TRANSITION
T-2 METAL REDUCER
T-2 METAL REDUCER
T-4/T-5 METAL TRANSITION
096500
F-3 F-7 096700T-4/T-5 METAL TRANSITION
WALL TYPE
VARIES
METAL TILE EDGE TRIM
FLUID APPLIED FLOOR
SEE SCHEDULE
PORCELAIN WALL TILE,
SEE ELEVATIONS FOR
LOCATIONS
FLUID APPLIED BASE
SEE SCHEDULE
1/2"
WALL TILE
SEE SCHEDULE
WALL TYPE
VARIES
METAL TILE EDGE TRIM 1/2"
WALL TILE
SEE SCHEDULE
WALL TYPE VARIES
WALL TILE
SEE SCHEDULE
METAL SQUARE
EDGE-TILE TRIM CORNER 1/2"
W-2
B-2 / B-4 SEE FINISH
PLANS AND ELEVATIONS
BETWEEN OPENINGS
CENTER TILE
O F
C E
IL
IN
G
U .N .O
E X T E N D
T O
U N D E R S
ID
E
RUBBER
REDUCER STRIP
DOOR, SEE
PLANS FOR
LOCATIONS
FLOOR FINISH
SEE FINISH
PLANS
FLOOR FINISH
SEE FINISH PLANS
T1
THRESHOLD
RUBBER REDUCER STRIP
METAL REDUCER
STRIPFLOOR FINISH
SEE FINISH
PLANS
FLOOR FINISH
SEE FINISH PLANS
T2
THRESHOLD
METAL REDUCER STRIP
DOOR, SEE
PLANS FOR
LOCATIONS
FLOOR FINISH
SEE FINISH
PLANS
FLOOR FINISH
SEE FINISH
PLANS
RUBBER
TRANSITION STRIP
T3
THRESHOLD
RUBB…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .