B09_Amendment_0013_Summary_of_Changes_to_Specifications_and_Drawings_0013.pdf
PDF 474 KB Posted
- Attached to
- MALU 293291 Rehabilitate the Visitor Center and
- Solicitation number
- 140P2024R0056
About this file
This is Amendment 13, which outlines specification and drawing changes for contract MALU 293291 related to rehabilitating the Visitor Center and Headquarters at Martin Luther King Jr. National Historical Park in Atlanta, GA.
The amendment adds two new specifications (Finish Carpentry and Fluid-Applied Flooring) while deleting Tile Carpeting. Seven specifications are completely replaced, including the Contract Priced Schedule, Definition of Contract Line Items, Architectural Wood Casework, Tiling, Resilient Flooring, Interior Painting, and Plastic Toilet Compartments. Additionally, sixteen drawing sheets are revised, covering various aspects of construction including floor plans, demolition plans, finish schedules, interior elevations, and accessibility routing for both first and second floors of the facility.
View the file
Other files
Show 40 more
Latest 50 of 62 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MALU 293291
Amendment 13 - Summary of Changes
Specifica ons:
New:
- 06 20 00 Finish Carpentry
- 09 67 00 Fluid-Applied Flooring
Deleted:
- 09 68 13 Tile Carpe ng
Following are replaced in en rety:
- Contract Priced Schedule
- 01 27 00 Defini on of Contract Line Items
- 06 41 00 Architectural Wood Casework
- 09 30 00 Tiling
- 09 65 00 Resilient Flooring
- 09 21 23 Interior Pain ng
- 10 21 13.19 Plas c Toilet Compartments
Revised Drawing Sheets:
- Cover Sheet
- G0.1 Drawing Index, General Notes, Abbrevia ons
- G0.3 Staging and Access Plan, Accessibility Rou ng
- AC.1 Construc on Notes
- AD1.0 Demoli on Notes
- AD1.2 First Floor Enlarged Demoli on Plan
- A1.1 First Floor Plan
- A1.2 First Floor Enlarged Plan
- A1.3 Second Floor Plan
- A7.1 Accessories Schedule and Typical Details
- A7.3 Interior Eleva ons – First Floor
- A7.4 Interior Eleva ons – Second Floor
- A9.0 Finish Schedule
- A9.1 First Floor Finish Plan
- A9.2 Second Floor Finish Plan
- AL.2 - CLIN 9 Exhibit Space Finishes