This document contains responses to contractor questions (RFIs) regarding a federal construction solicitation to build the Marjory Stoneman Douglas Visitor Center at Everglades National Park in Florida. The responses clarify that MSHP-1 should be labeled as MSCU-1 in the unit schedule. Galvanized sheet metal must be used for all supply and return ductwork within the building, with stainless steel required for outside air intake ducts and high-humidity intake areas like showers. Florida state license information and examples of two past projects of similar size and scope are required installer qualifications for all seismic-rated systems.

View the file

Other files

File Type Posted
B08_RFP_140P2023R0031_Amendment_0010_4_4_23_0010.pdf PDF
B08_Sol_140P2023R0031_Amendment_10_Attachment_1_Responses_to_Pre-Bid_RFIs_3_28_23_0010.pdf PDF
Sol_140P2023R0031_Amd_0010.pdf PDF
B08_Sol_140P2023R0031_Amendment_9_Attachment_1_Additionl_Responses_Clarifications_Pre-Bid_RFIs_3_23_23_0009.pdf PDF
Sol_140P2023R0031_Amd_0009.pdf PDF
B08_RFP_140P2023R0031_Amendment_0009_3_23_23_0009.pdf PDF
Sol_140P2023R0031_Amd_0008.pdf PDF
B08_RFP_140P2023R0031_Amendment_0008_3_16_23_0008.pdf PDF
Sol_140P2023R0031_Amd_0007.pdf PDF
B08_RFP_140P2023R0031_Amendment_0007_3_8_23_0007.pdf PDF
B08_Sol_140P2023R0031_Amendment_6_Attachment_2_Contract_Price_Schedule_2_21_23_0006.xlsx XLSX spreadsheet
B08_RFP_140P2023R0031_Amendment_0006_2_22_23_0006.pdf PDF
Sol_140P2023R0031_Amd_0006.pdf PDF
B08_SO_1_0006.PDF PDF
B08_Sol_140P2023R0031_Amendment_5_Attachment_1_Additionl_Responses_Clarifications_Pre-Bid_RFIs_Round_2_0005.pdf PDF
B08_Sol_140P2023R0031_Amendment_5_Attachment_3__SF_1442_Conformed_Copy_0005.pdf PDF
B08_RFP_140P2023R0031_Amendment_0005-2_16_23_0005.pdf PDF
Sol_140P2023R0031_Amd_0005.pdf PDF
B08_Sol_140P2023R0031_Amendment_4_Attachment_1_Pre-Bid_RFI_and_NPS_Response_Round_2_0004.pdf PDF
Sol_140P2023R0031_Amd_0004.pdf PDF
B08_RFP_140P2023R0031_Amendment_0004-2_10_23_0004.pdf PDF
B08_Sol_140P2023R0031_Amendment_3_Attachment_4_Picture_2_of_the_Canopy-Picnic_Area_foundation_0003.JPG JPG image
B08_Sol_140P2023R0031_Amendment_3_Attachment_1__Pre-Bid_RFIs_Question_and_Responses_Round_1_0003.pdf PDF
B08_Sol_140P2023R0031_Amendment_3_Attachment_4_Picture_1_of_the_Canopy-Picnic_Area_foundation_0003.JPG JPG image
B08_Sol_140P2023R0031_Amendment_3_Attachment_3_Demolished_Maintenance_Building_Floor_Plan_0003.pdf PDF
B08_RFP_140P2023R0031_Amendment_0003-1_27_23_0003.pdf PDF
Sol_140P2023R0031_Amd_0003.pdf PDF
B08_Solicitation_140P2023R0031_Amendment_2_Conformed_Copy_0002.pdf PDF
B08_RFP_140P2023R0031_Amendment_0002-1_18_23_0002.pdf PDF
Sol_140P2023R0031_Amd_0002.pdf PDF
B08_Section_J_Attachment_5_General_Decision_Number_FL20230002_0002.pdf PDF
B09_Pre-Bid_Site_Visit_Sign-In_Sheet_EVER_244476_0002.pdf PDF
B08_Section_J_Attachment_4_General_Decision_Number_FL20230201_0002.pdf PDF
B08_Section_J_Attachment_1_Specifications_6_22_22-UPDATED_12_5_22_0001.pdf PDF
B08_Solicitation_140P2023R0031_Amendment_1_Conformed_Copy_0001.pdf PDF
B09_PreBid_Site_Visit_Powerpoint_Presentation-1_12_23_0001.pptx PPTX presentation
B08_RFP_140P2023R0031_Amendment_0001-1_4_23_0001.pdf PDF
Sol_140P2023R0031_Amd_0001.pdf PDF
B08_Section_J_Attachment_5_General_Decision_Number_FL20220096.pdf PDF
Sol_140P2023R0031.pdf PDF
B08_Section_J_Attachment_3_Contract_Price_Schedule_12_14_22.xlsx XLSX spreadsheet
B08_Section_J_Attachment_4_General_Decision_Number_FL20220022.pdf PDF
B08_Solicitation_140P2023R0031_EVER_244476.pdf PDF
B08_Section_J_Attachment_6_Proposal_Submission_Package_Forms_Portfolio.pdf PDF
B08_Section_J_Attachment_1_Specifications_6_22_22-UPDATED_9_8_22.pdf PDF
Show all 45

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFI 29.1:

23 05 29 1.4 D

D. Installer's Qualifications: Include evidence of compliance with specified requirements for all seismic-rated systems, including Georgia State license information and examples of at least

(2) successful projects of similar size and scope.

NPS RESPONSE: The correct statement is “D. Installer's Qualifications: Include evidence of compliance with specified requirements for all seismic-rated systems, including Florida State license information and examples of at least”

RFI 29.2:

Please confirm that MSHP-1 is a mislabeling of MSCU-1.

NPS RESPONSE: CONFIRMED. PER UNIT SCHEDULE MSHP-1 IS ACTUALLY MSCU-1.

RFI 29.3:

Please confirm supply duct shown on the plans is galvanized sheetmetal. Below snaps are the source of confusion:

Per Spec 23 31 00

Attachment 2: Pre-Bid RFIs Round 2 Word Attachment for RFI # 29

Attachment 2 Page 1 of 2

NPS RESPONSE: GALVANIZED FOR ALL SUPPLY / RETURN DUCTWORK WITHIN BUILDING. STAINLESS

STEEL FOR ALL OUTSIDE AIR INTAKE DUCTWORK AND HIGH-HUMIDITY INTAKE (SHOWERS). REFER TO

ERV SCHEDULE ON M601, AND DETAIL 1/M502.