This document is an amendment to a solicitation for the construction of the Marjory Stoneman Douglas Visitor Center at Everglades National Park in Everglades City, Florida.
The amendment provides National Park Service responses to pre-bid questions, extends the solicitation response date to February 27, 2023, opens a second round of pre-bid questions due by February 6, 2023, and includes solicitation reminders. Additional attachments include drawings, a demolished maintenance building floor plan, and pictures of an existing canopy and picnic area foundation. The amendment modifies specification requirements for contractor quality control staffing. Interested vendors are directed to the solicitation on SAM.gov and advised to follow the notice for automatic updates. Drawings and CAD files are available by request from the contracting officer.
View the file
Other files
Show all 45
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
140P2023R0031 x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
PDS
Denver CO 80225-0287 P.O. Box 25287 12795 W. Alameda Pkwy NPS, DSC Contracting Services Div
EVER 244476
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE
January 27, 2023
2. AMENDMENT/MODIFICATION NO.
5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
12/16/2022
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
Anne Laporta
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Previous edition unusable
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
EVER 2444476
Construct Marjory Stoneman Douglas Visitors Center
NPS PM/COR: Harry Turtschanow
NPS PS/COR: Ben Marnell
NPS CS: Michael Smith
NPS CO: Anne LaPorta
The purpose of this Amendment is to provide NPS Responses and Revisions based on the Pre-Bid Questions received by 1/20/23, extend the Solicitation Response date to 02/27/2023 and open a Second Round of Pre-Bid Questions due by 2/6/23. This Amendment will also include Solicitation reminders. All other terms and conditions remain unchanged. Continued ...
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED
140P2023R0031/0003
PAGES OF
2 2
NAME OF OFFEROR OR CONTRACTOR
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
REVISED RFP ITEMS
Attachments:
Revision #1 – Provide as additional attachments to this Solicitation:
LIST OF ADDITONAL ATTACHMENTS PROVIDED BY THIS AMENDMENT
1. NPS Responses for Pre-Bid Questions received by no later than January 20, 2023.
2. Section J Attachment 2 Drawings dated 12/05/2022, now also offered in CADD format by request. See details for requests below.
3. Demolished Maintenance Building Floor Plan.
4. Pictures 1 and 2 of the Canopy-Picnic Area foundation.
Solicitation Response Date Update:
Revision #1 – The Solicitation Response date has moved from February 21, 2023, by 1:00 PM Eastern Time to February 27, 2023, by 1:00 PM Eastern Time.
Opening of Pre-Bid Questions Round 2:
Revision #1 – The Contracting Officer is now opening a second round of Pre-Bid Questions due February 6, 2023 by 1 PM
Eastern Time. Submit your questions to the Contracting Officer at Anne_laporta@nps.gov and the Contract Specialist at
Michael_smith@contractor.nps.gov. Please ensure your Questions are submitted in one(1) question set and include in your subject line the Solicitation #. Any improperly addressed or late questions may result in a lack of response.
Update Specification Section 01 40 00 - 3, 1.5.B.1:
Revision #1 – Change section to read:
B. Contractors Quality Control Staff:
1. Contractor's Quality Control Supervisor may be assigned dual duties in accordance with the Solicitation Clause: SPECIAL
REQUIREMENT 2: KEY PERSONNEL.
Solicitation Reminders:
Prospective Offerors and interested vendors are responsible for ensuring that they have the complete and the most current
Solicitation information through the Government Point of Entry (GPE) at SAM.gov under Solicitation No. 140P2023R0039 for
EVER 244476. Once you open the Solicitation Notice for 140P2023R0039, you may click on the “Follow” button in the upper right-hand corner to receive automatic notifications through the SAM.gov system, with respect to this notice. No other notifications will be provided. The only individual correspondence that may be issued by the Contracting Officer for this procurement are for the items listed below. See the “Contact Information” Section in the Solicitation Notice for the Primary Point of Contact to request the following:
1. Drawings. Due to file size, requestors will be provided a link to access the Drawings.
2. CADD Files. Due to file size, requestors will be provided a link to access the CADD Files.
mailto:Anne_laporta@nps.gov mailto:Michael_smith@contractor.nps.gov
| 140P2023R0031 |
| 140P2023R0031 |
F01_SF30_Continuation _CM-4_REQD
File details come from the government source that posted it. Updated .