B08_RFP_140P2023R0031_Amendment_0002-1_18_23_0002.pdf
PDF 201 KB Posted
- Attached to
- EVER 244476, Construct MSD Visitor Center
- Solicitation number
- 140P2023R0031
About this file
This document is an amendment to a solicitation for construction services. The National Park Service is seeking to construct the Marjory Stoneman Douglas Visitors Center at Everglades National Park in Everglades City, Florida. The estimated value of the contract is over $8 million. This amendment updates the wage determinations in attachments, modifies the evaluation criteria for project experience to require experience with vertical commercial construction over 3,000 square feet in size and marine facilities work over $1.5 million in a coastal floodplain. It also adjusts page limits for technical approach narratives and extends the response deadline to February 21, 2023. A pre-bid site visit sign-in sheet is provided as an attachment.
View the file
Other files
Show all 45
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
140P2023R0031 x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
PDS
Denver CO 80225-0287 P.O. Box 25287 12795 W. Alameda Pkwy NPS, DSC Contracting Services Div
EVER 244476January 18, 20230002
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
12/16/2022
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
Anne Laporta
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Previous edition unusable
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
EVER 2444476
Construct Marjory Stoneman Douglas Visitors Center
NPS PM/COR: Harry Turtschanow
NPS PS/COR: Ben Marnell
NPS CS: Michael Smith
NPS CO: Anne LaPorta
The purpose of this Amendment is to update the Solicitation Section J Attachments 4 and 5 for the correct county Wage Determinations, update the Solicitation Evaluation Factors requirements as noted in this modification and extend the Solicitation Response date to 02/21/2023. This Amendment will also include the Pre-Bid Site Visit Sign-In Sheet. All other terms and conditions remain unchanged. Continued ...
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED
140P2023R0031/0002
PAGES OF
NAME OF OFFEROR OR CONTRACTOR
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
REVISED RFP ITEMS
Attachments:
Revision #1 – Update Section J Attachments 4 and 5 with replacements for the correct County in which work will take place.
LIST OF ADDITONAL ATTACHMENTS PROVIDED BY THIS AMENDMENT
1. Section J Attachment 4 General Decision Number FL20230201 replaces Section J Attachment 4 General Decision
Number FL20220022
2. Section J Attachment 5 General Decision Number FL20230002 replaces Section J Attachment 5 General Decision
Number FL20220096
3. Pre-Bid Site Visit Sign-In Sheet for the Pre-Bid Site Walk held on January 12, 2023, at 10:00 AM Eastern Time.
Evaluation Factor Update:
Revision #1 – Factor 1 – Project Experience:
a. Project Experience – Vertical Construction - Use the attached Project Experience Form for submission of this factor.
Provide three (3) construction projects for which you performed in the role of prime contractor. Each project should be substantially similar in scope, magnitude, and complexity as the project, having at least the following characteristics:
i. Commercial new construction (not prefabricated), more than 3,000 square feet in size with a project magnitude at least $8,000,000.00 or greater; and
ii. Project experience with commercial building construction in a coastal floodplain or flood hazard zones designated as either a VE Zone and/or AE Zone; and
iii. Projects that have been successfully completed, including all options, within the past ten years, or be at least
75% successfully complete as of the date of submission of the proposal for this solicitation.
iv. Projects used to demonstrate experience for Factor 1b may also be used for this Factor 1a; however, the projects for each of these Factors may be different.
Revision #2 – Factor 1 – Project Experience:
a. Project Experience – Marine Construction - Use the attached Project Experience Form for submission of this factor. For purposes of this Factor 1b only, “you” means offeror. Provide three (3) construction projects for which you performed in the role of prime contractor and either self-performed or managed the marine work of a subcontractor. Each project should have marine work substantially similar in scope, magnitude, and complexity required for this project, having at least the following characteristics:
i. Construction project, that is a total marine facilities construction scope, or a project that has marine facilities construction as a portion of the scope of a larger construction project; provided, that the work you performed has the following characteristics:
ii. Construction of marine facilities and/or bulkhead (“Marine Work”) with a magnitude of at least $1,500,000 or greater; and
iii. Projects that have been successfully completed, including all options, within the past ten years, or be at least
75% successfully complete as of the date of submission of the proposal for this solicitation.
iv. Project site in an ocean coastal environment; and
v. Project experience with Marine Work construction in a coastal floodplain or flood hazard zones designated as either a VE Zone and/or AE Zone.
vi. Projects used to demonstrate experience for Factor 1a may also be used for this Factor 1b; however, the projects for each of these Factors may be different.
Revision #3 – FACTOR 2 – TECHNICAL APPROACH/SCHEDULE
a. Technical Approach - Risk Mitigation – For the Risk Mitigation Narrative, the page limitation is set at a 3-page limitation.
Continued ...
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED
140P2023R0031/0002
PAGES OF
NAME OF OFFEROR OR CONTRACTOR
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
Revision #4 – FACTOR 2 – TECHNICAL APPROACH/SCHEDULE
a. Technical Approach – Schedule – For the Schedule Narrative, the page limitation is set at a 2-page limitation.
Revision #5 – FACTOR 3 – MANAGEMENT APPROACH
a. Management Approach - Logistics, Coordination, Process – For the Management Approach Logistics, Coordination, Process Narrative, the page limitation is now increased from a 3-page to a 5-page limitation.
Solicitation Response Date Update:
Revision #1 – The Solicitation Response date has moved from January 27, 2023, by 1:00 PM Eastern Time to February 21, 2023 by 1:00 PM Eastern Time. The initial set date for the Pre-Bid Question Due Date of January 20, 2023, by close of business, goes unchanged. Depending on the questions received, a second round of Pre-Bid Questions may be set by the Contracting Officer via amendment to this solicitation.