WA614890_-_PRELIM_DESIGN_0004.pdf
PDF 429 KB Posted
- Attached to
- GRCA - 229035 Phantom Ranch Wastewater Treatment P Federal contract opportunity
- Solicitation number
- 140P2021R0127
About this file
This document contains preliminary design plans for utility relocation work related to a wastewater treatment plant project. The plans show proposed routing for underground electric lines to be installed by APS, including trench locations and specifications. The related federal contract opportunity is to provide short term improvements to the Phantom Ranch Wastewater Treatment Plant operated by the National Park Service within Grand Canyon National Park. The solicitation number is 140P2021R0127 with an estimated value over $250,000. The incumbent contractor was not identified.
View the file
Other files for this federal contract opportunity
Show all 33
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N3422
50 C
J
NSC2321
A
Ø
W
/2
V
U
C
Z
C
1-UC002Z-C
T
R
E
A
T
M
E
N
T
P
L
A
N
T
CUSTOMER TO
LOCATE DIRECT BURY
LINE, HAND DIG,
PROVIDE SPLICE PIT
3'X3'X2'
U
A
B
T
O
E
A
A
N
D
O
N
D
T
W
E
N
W
C
N
D
U
I T
-U
A B
36.09931, -112.09381
S
-U
A B
1-UA4/0B (4")
+C4" (PER
CUSTOMER
DRAWINGS)
±95'
TO N3423
INSTALL1
LU3092
(2 LOCATIONS)
INSTALLWI
6220.UA4/0B(120)
LU8162(120)
DATA MODIFIED PER FIELD CONDITIONS
VICINITY MAP
MOBILE:
INSPECTOR:
PHONE: MOBILE:
CONTACT:
PHONE:
BRADY HORN
480-296-9505
KEVIN HARTIGAN
602-663-7194
FILE:
BY:
SCALE: SHEET
DATE:
OF
06/15/2021
BRADY H
1:30
APSCAD.DWT
1 1
NPS - GC
PHANTOM RANCH SVC RE-ROUTE
WA614890
T T
FO FO
CATV CATV
TS TS
SD
IRR
W
S
G
EXISTING PROPOSED
UTILITIES KEY
G
S
W
IRR
SD
WATER
SPARE CONDUIT
OH SECONDARY/SERVICE (120/240V)*
OH PRIMARY (12,470/7,200V)*
OH TRANSMISSION (69KV)*
UG SECONDARY/SERVICE (120/240V)*
UG TRANSMISSION (69KV)*
UG PRIMARY (12,470/7,200V)*
* UNLESS OTHERWISE NOTED
TRENCH RUNNING LINE
SEWER
GAS
STORM DRAIN
IRRIGATION
TRAFFIC SIGNAL
TELCO
CABLE TV
FIBER
OH TRANSFORMER
OH SWITCH (KPF)
OH/UG CAPACITOR BANK
APS OWNED JOINT USE POLE
STREET LIGHT
J-BOX / PULL BOX
MANHOLES
APS OWNED POLE
APS OWNED STEEL POLE
APS SYMBOL LEGEND
PADMOUNT TRANSFORMER
SWITCHING CABINETS
EXISITING PROPOSED
S S
DUSK TO DAWN LIGHT
1Ø SWITCHING CABINETJ J
DIP (TRANSITION) POLE
DATE DESCRIPTION BY
REVISION
QUARTER SECTION GRID DATA
1/4SecT R MAP#31.0N 03.0E 05 SW aps
Call 811 or click Arizona811.com
Contact Arizona 811 at least two full working days before you begin excavation
COORDINATE WITH WO#
Curbs and Sidewalks
SIDEWALKS AND CURBS INSTALLED PRIOR TO THE
COMPLETION OF APS CONSTRUCTION, WHICH MAY
INTERFERE WITH APS CONSTRUCTION, WILL BE
REPAIRED AT CUSTOMER'S EXPENSE.
Revisions
THERE WILL BE A CHARGE TO THE CUSTOMER FOR
CHANGES MADE AT THE REQUEST OF THE CUSTOMER TO
THE FINAL DESIGN.
Easements
TRENCH, CONDUIT, AND ANY OTHER FACILITIES
INSTALLED PRIOR TO OBTAINING EASEMENTS IS AT THE
RISK OF THE CUSTOMER. IF THE FINAL DESIGN MUST
CHANGE BECAUSE EASEMENTS CANNOT BE GRANTED,
THE CUSTOMER IS RESPONSIBLE FOR ALL COST AND
INSTALLATION ASSOCIATED WITH THE CHANGE.
Permits
APS WILL SUBMIT PERMITS. CONTRACTOR MUST SHOW
PROOF OF BOND AND SIGN PERMITS PRIOR TO STARTING
WORK.
Existing Underground Electric Lines
THE LOCATION OF LINES IS APPROXIMATE AND THE
AS-BUILT LOCATIONS IN THE FIELD MAY BE DIFFERENT.
CUSTOMER TO PROVIDE & INSTALL:
GENERAL CONSTRUCTION NOTES
STAKING PROPERTY CORNERS WITH OFFICIAL SURVEY
CAPS, ELEVATIONS AND GRADES. THERE IS A RESTAKING
FEE IF RESURVEYING IS REQUIRED DUE TO APS SURVEY
STAKES BEING DESTROYED IN THE FIELD.
ALL APPROVED TRENCH & CONDUIT MATERIALS
IN COMPLIANCE WITH THE A.P.S. TRENCH AGREEMENT &
THE TRANSMISSION & DISTRIBUTION CONSTRUCTION
STANDARDS, UNLESS OTHERWISE NOTED.
EQUIPMENT PADS (EXCEPT 3-PHASE TRANSFORMER
PADS), J-BOXES, PULL BOXES, FLAT STRAP AND
MANHOLES UNLESS NOTED OTHERWISE. PLEASE
CONTACT CSR TO ARRANGE TO PICK UP YOUR MATERIAL.
2.
1.
1.
APS TO PROVIDE, CUSTOMER TO INSTALL
APPROVED AS
DESIGNED
APPROVED AS
RED LINED
REVISION
REQUIRED
ANY DESIGN CHANGES TO FINAL DRAWINGS ARE
SUBJECT TO A HOURLY REDESIGN FEE.
(ie: REPLAT OR CUSTOMER CHANGES)
NOTE:
DATEDEVELOPER
SIGNATURE
PRELIMINARY
NOT APPROVED FOR CONSTRUCTION
07/07/21 BRADY H
ALL DATA CONTAINED IN THIS DRAWING WAS BASED
ON INFORMATION AVAILABLE AT THE TIME OF IT'S
PREPARATION. APS NEITHER ENCOURAGES
RELIANCE ON, NOR WARRANTS, THE ACCURACY OF
THE DRAWING. PLEASE CALL BLUE STAKE BEFORE
DIGGING OR TRENCHING. FAILURE TO CONTACT
BLUE STAKE MAY RESULT IN VIOLATIONS OF A.R.S.
SS 40-360.21 AND 40-360.22A
WARNING!!!
0'
SCALE: 1" = 30'
15' 30'
TOTAL TRENCH IN R/W(ft):
TOTAL TRENCH (ft): 95'
0'
SECONDARY
CODE TYPE REMINST
WIRE DATA
ABAND
6220.UA4/0B 120' 0' 0'
JOINT USE TRENCH DETAILS
MAINTAIN 2FT VERTICAL SEPARATION BETWEEN TOP OF CONDUIT AND BOTTOM OF UTILITY CROSSING APS CONDUITS, FOR
FUTURE UTILITY INSTALLATIONS OF STORM DRAINS, WATER LINES, ETC. MAINTAIN 1FT VERTICAL SEPARATION BETWEEN
APS CONDUITS AND UTILITIES BEING CROSSED. ALSO MAINTAIN A MINIMUM COVER OF AT LEAST 36" FROM FINAL GRADE
FOR APS CONDUITS. TRENCH DEPTH MAY BE DEEPER WHEN APPROACHING APS EQUIPMENT. SEE APS TRANSMISSION AND
DISTRIBUTION CONSTRUCTION STANDARDS SPECIFICATION 8601 AND 8648 FOR MORE DETAIL.
TRENCH DEPTH MAY BE REDUCED UTILIZING APS RANDOM LAY REQUIREMENTS (REFER TO SPECS 8601& 8610) CHECK
WITH OTHER UTILITIES FOR HORIZONTAL & VERTICAL SEPARATION REQUIREMENTS.
* ALL SERVICE CROSSINGS IN CITY & COUNTY R/W TO MAINTAIN 36" MINIMUM COVER.
**CHECK WITH OTHER UTILITIES FOR HORIZONTAL SEPARATION REQUIREMENTS & VERTICAL SEPARATION
REQUIREMENTS.
12"
REQUIRED
BEDDING
*APPROVED
STREET
FINAL
SIDE
GRADE
M
I N
ES-4"(2)
S
CONSTRUCTION NOTES:
B
R
I
G
H
T
A
N
G
L
R
A
I
L
N KAIBAB TRAIL
JOB
SITE
AutoCAD SHX Text
1-UC002Z-ABAND-A
File details come from the government source that posted it. Updated .