This document is an amendment to a solicitation for the Phantom Ranch Wastewater Treatment Plant Short Term Improvements project located at Grand Canyon National Park. The amendment provides responses to questions from prospective offerors. It clarifies that the "biomass" that must be kept alive refers to the mixture of water and solids known as activated sludge in the aeration tank. It also explains that not all material in the tank will have been screened previously, so it must all pass through the new screen as specified. The amendment includes a subcontracting percentage worksheet as an attachment. It confirms that CPAR evaluations are an acceptable alternative to past performance questionnaires for proposal submission. No key trades are required to be specified for this project.

View the file

Other files for this federal contract opportunity

Other files attached to GRCA - 229035 Phantom Ranch Wastewater Treatment P, newest first.
File Type Posted
Sol_140P2021R0127_Amd_0006.pdf PDF
Amendment_6_Sched_of_Changes_0006.pdf PDF
E15_Deliverables_LmtOnSubconRpt_REQD_0005.pdf PDF
Sol_140P2021R0127_Amd_0005.pdf PDF
Amendment_4_Sched_of_Changes_0004.docx DOCX document
140P2021R0127_0004.pdf PDF
PR_WWTP_229035_Photo_Graphic_Part_3_0004.pptx PPTX presentation
PR_WWTP_229035_Photo_Graphic_Part_2_0004.pptx PPTX presentation
PR_WWTP_229035_Photo_Graphic_Part_1_0004.pptx PPTX presentation
Headworks_As-builts_C7_showing_DEMO_0004.pdf PDF
TCWL_Geotechnical_Baseline_0004.pdf PDF
PR_WWTP_ACD_GRCA_113_41073_D_0004.pdf PDF
GCNPS_Phantom_Ranch_WWTP_test_report_0004.pdf PDF
Asbestos_Survey_-_Phantom_Ranch_WWTP_0004.pdf PDF
WA614890_-_PRELIM_DESIGN_0004.pdf PDF
Sol_140P2021R0127_Amd_0004.pdf PDF
Sol_140P2021R0127_Amd_0003.pdf PDF
Amendment_3_SF30_with_changes_to_L_M_0003.pdf PDF
GRCA_PreProposal_Presentation_Final8_3_0003.pdf PDF
Amendment_3_Sched_of_Changes_0003.pdf PDF
Vol1_Specifications_Final_Construction_Documents_May_2021_0002.pdf PDF
Vol2_Drawings_Final_Construction_Documents_June_2021_0002.pdf PDF
Sol_140P2021R0127_Amd_0002.pdf PDF
Question_and_Answers_0001.pdf PDF
Sol_140P2021R0127_Amd_0001.pdf PDF
A06_NPS_Phantom_Ranch_Vol3_Details_Final_Construction_Documents_0001.pdf PDF
B08_Solit_ConstructionClauseTemplate_REQD.pdf PDF
Proposal_Submission_Package.pdf PDF
A04_NPS_Phantom_Ranch_Vol1_Specifications_100__Complete_CD.pdf PDF
WDOL.pdf PDF
Sol_140P2021R0127.pdf PDF
A04_NPS_Phantom_Ranch_Vol2_Drawings_100__Complete_CD.pdf PDF
SF2416d.pdf PDF
Show all 33

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

GRAND CANYON NATIONAL PARK

Solicitation No. 140P2021R0127 Phantom Ranch Wastewater Treatment Plant Short Term Improvements

GRCA 229035

SCHEDULE OF CHANGES

AMENDMENT NO. 5

SUPPLEMENTAL FORMS AND DOCUMENTS

1. ADD attached file E15_Deliverables_LmtOnSubconRpt_REQD_0005.xlsx

RESPONSES TO QUESTIONS FROM PROSPECTIVE OFFERORS

2. The specifications require the following during retrofit of the Integrated Fixed Film Activated Sludge Equipment –

Section 01 31 00-1.11.E.2.h.3) requires the Contractor to feed process air to the temporary storage tank to keep the biomass alive at a minimum dissolved oxygen concentration of 1 mg/L.

Section 01 31 00-1.11.E.2.h.5) states the Contractor shall screen biomass from existing aeration tank through the new influent screen prior to returning to the retrofit aeration tank.

o Please clarify the Engineers definition of “biomass” to be kept alive.

o Please clarify the Engineers definition and intent of “Screen Biomass” from the existing aeration tank through the new screen prior to returning the contents to the aeration tank. It is unclear why the material needs to be processed back through the new screen a second time.

Response: The material in the aeration tank is a mixture of water and solids known as activated sludge. This mixture is the “biomass”. The biomass requires continuous aeration to keep the organisms contained in the biomass alive and active. Not all the material in the tank will have gone through the new screen a first time. The material shall be screened as specified in 01 31 00- 1.11.E.2.h.5).

The questions below were included in Amendment 4 but did not include the responses. Question numbers have been retained from Amendment 4 and responses are now included.

36. Please provide Subcontracting percentage worksheet if a specific form is required to be submitted.

Response: Included with this Amendment.

37. Please provide Subcontracting percentage worksheet if a specific form is required to be submitted.

Response: See No. 36.

38. Please confirm CPAR evaluations are an acceptable alternative to the Past performance questionnaire as mentioned in the pre-proposal conference.

a. Further, do these CPAR evaluations need to be submitted to the Contracting Officer prior to submitting our proposal?

Response: Yes. CPARs evaluations are acceptable with proposal submission.

39. Section H – Special Contract Requirements of the Construction clauses has a clause for Key Trades but doesn’t outline any specific requirements for key trades to be listed. What Key Trades, if any, are we required to submit?

Response: There are no key trades specified.