Vol2_Drawings_Final_Construction_Documents_June_2021_0002.pdf

PDF 14 MB Posted

Attached to
GRCA - 229035 Phantom Ranch Wastewater Treatment P Federal contract opportunity
Solicitation number
140P2021R0127
Issued by
Department of the Interior National Park Service National Office

About this file

This document provides details on a federal contract opportunity for wastewater treatment plant improvements. The solicitation is number 140P2021R0127 for GRCA - 229035 Phantom Ranch Wastewater Treatment Plant Short Term Improvements through the Department of the Interior National Park Service National Office. Offerors are invited to bid on providing construction services to upgrade the existing wastewater treatment plant at Phantom Ranch in Grand Canyon National Park, as outlined in the construction drawings file Vol2_Drawings_Final_Construction_Documents_June_2021_0002.pdf. The improvements aim to address capacity issues and bring the facility into compliance with environmental regulations. The response deadline has not been specified, nor has the planned award date. No other terms or conditions are included in this document.

View the file

Other files for this federal contract opportunity

Other files attached to GRCA - 229035 Phantom Ranch Wastewater Treatment P, newest first.
File Type Posted
Sol_140P2021R0127_Amd_0006.pdf PDF
Amendment_6_Sched_of_Changes_0006.pdf PDF
Amendment_5_Sched_of_Changes_0005.pdf PDF
E15_Deliverables_LmtOnSubconRpt_REQD_0005.pdf PDF
Sol_140P2021R0127_Amd_0005.pdf PDF
Amendment_4_Sched_of_Changes_0004.docx DOCX document
140P2021R0127_0004.pdf PDF
PR_WWTP_229035_Photo_Graphic_Part_3_0004.pptx PPTX presentation
PR_WWTP_229035_Photo_Graphic_Part_2_0004.pptx PPTX presentation
PR_WWTP_229035_Photo_Graphic_Part_1_0004.pptx PPTX presentation
Headworks_As-builts_C7_showing_DEMO_0004.pdf PDF
WA614890_-_PRELIM_DESIGN_0004.pdf PDF
Sol_140P2021R0127_Amd_0004.pdf PDF
TCWL_Geotechnical_Baseline_0004.pdf PDF
PR_WWTP_ACD_GRCA_113_41073_D_0004.pdf PDF
GCNPS_Phantom_Ranch_WWTP_test_report_0004.pdf PDF
Asbestos_Survey_-_Phantom_Ranch_WWTP_0004.pdf PDF
Sol_140P2021R0127_Amd_0003.pdf PDF
Amendment_3_SF30_with_changes_to_L_M_0003.pdf PDF
GRCA_PreProposal_Presentation_Final8_3_0003.pdf PDF
Amendment_3_Sched_of_Changes_0003.pdf PDF
Vol1_Specifications_Final_Construction_Documents_May_2021_0002.pdf PDF
Sol_140P2021R0127_Amd_0002.pdf PDF
Question_and_Answers_0001.pdf PDF
Sol_140P2021R0127_Amd_0001.pdf PDF
A06_NPS_Phantom_Ranch_Vol3_Details_Final_Construction_Documents_0001.pdf PDF
B08_Solit_ConstructionClauseTemplate_REQD.pdf PDF
Proposal_Submission_Package.pdf PDF
A04_NPS_Phantom_Ranch_Vol1_Specifications_100__Complete_CD.pdf PDF
WDOL.pdf PDF
Sol_140P2021R0127.pdf PDF
A04_NPS_Phantom_Ranch_Vol2_Drawings_100__Complete_CD.pdf PDF
SF2416d.pdf PDF
Show all 33

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

K

M

44PRV

12200

NOTES:

NOTES:

S

44FV

12400

5/1 9/2

1 1 6:5

5 N H0

R2

1 C :\P

W _W

OR

KD

IR

\D

EN

3\C H2

MH

ILL

_N H0

8\D

3\1 0D

0_

D3

.D W

G

XR

EF

S:

D0

\X

G-

BO

RD

ER

.D W

G;

D0

\X D-

NE

W

-H

DW

RK

S_

PL

N.

DW

G;

D0

\X

S-

HD

W

RK

S_

PL

N-

.D W

G;

D0

\X S-

HD

W

RK

S_

PL

N-

.D

W G;

PI

LSH

PRV

PI

3.0000

BLOWER AIR

(2" G.S.P.)

INV. EL. 56.10

HWL 56.00

EQUALIZATION

TANK

AERATION

TANK

2"PVC

SLUDGE RETURN (OR

WASTE) PUMPS

2"PVC

EQUALIZATION PUMPS

BLOWER AIR

(2" G.S.P.)

HWL 56.00

4'-9" TOTAL LENGTH

OF SWING ARM

HWL 56.00

4"x3" REDUCING

ELBOWS

AEROBIC

DIGESTER

4" FLARED

LONG-RADIUS

90° BEND

AEROBIC

DIGESTER

2"G.S.P.

PLUG TOP LEG

OF TEE

S.S.U-BOLT

SLUDGE TRANSFER

PUMP SWING JOINT

2"PVC

SIGHT

GLASS

BRACKET EQ. TO

UNISTRUT P1775

8"Øx31

2" S.S.

EXPANSION

ANCHORS

TO SUMP

3.0000

5/1 9/2

1 1 6:5

4 N H0

R2

1 C :\P

W _W

OR

KD

IR

\D

EN

3\C H2

MH

ILL

_N H0

8\D

3\2 0D

1_

D3

.D W

G

XR

EF

S:

D0

\X

G-

BO

RD

ER

.D W

G;

D0

\X D-

NE

W

-S

TP

-S

CN

-0 1.D

W G;

SUMP

PUMPS

CHEMICAL STORAGE

BINS.

2" PVC

4" PVC

SUMP

TO EQ. TANK

SUMP

2" PVC

UNIONS

SUMP PUMPS

BLOWER #2 BLOWER #1

BLOWER

#3

MANOMETERS

TO AEROBIC

DIGESTER

TO AERATION TANK

2.0000

T 4" D.I.P.

2" SCHED. 80 PVC

CONCRETE

FILL

GRAVITY

DRAIN TO

SUMP

SCUM REMOVAL

THROTTLING VALVE

INLET BAFFLE (2 PRESSURE.

TREATED 2"x12"x4'-3" 'S' & 1-2"x6"x4'-3")

INLET TROUGH

OVERFLOW WEIR

SCUM BAFFLE (PRESSURE

TREATED 2"x6"x4'-3")

SCUM TROUGH

MAX. W.L.

55.45

4" OVERFLOW

PIPE

ALUMINUM GRATING

5/1 1/2

1 1 7:3

6 N H0

R2

1 C :\P

W _W

OR

KD

IR

\D

EN

3\C H2

MH

ILL

_N H0

8\D

3\2 0D

2_

D3

.D W

G

XR

EF

S:

D0

\X

G-

BO

RD

ER

.D W

G;

D0

\X D-

NE

W

-S

TP

-S

CN

-0 2.D

W G;

D0

\X

D-

NE

W -S

TP

-S

CN

-0

3.D W

G;

CHEM.

FEED

TANK

01G001
01G002
01G003
01C001
01N001
01N002
01S001
01S002
01S003
01D001
01E001
01E002
01G060
01G065
01G074
06C100
06C101
06C401
06C501
06E100
06E401
07C100
07S14C
07D130
07D301
07D302
09N001
09N002
09N003
09N004
09N005
09N006
09N007
09N008
09N009
09N010
10S130
10D130
10E130
20S130
20S14C
20D130
20D140
20D301
20D302
20E130
20E14C
20E701
20E702
20E703
20E704
20E705