Sol_140P2021R0127_Amd_0003.pdf

PDF 90 KB Posted

Attached to
GRCA - 229035 Phantom Ranch Wastewater Treatment P Federal contract opportunity
Solicitation number
140P2021R0127
Issued by
Department of the Interior National Park Service National Office

About this file

This document is an amendment to a solicitation for the GRCA - 229035 Phantom Ranch Wastewater Treatment Plant Short Term Improvements project. The amendment provides changes to the specifications, preproposal presentation, evaluation criteria, and extends the proposal due date. Specifically, it adds a schedule of changes to specifications and a 50-page preproposal presentation. For Factor 4 Schedule evaluation, proposals must demonstrate planning to complete on-site construction in an efficient timeframe. Drawings and specifications from Amendment 2 are valid and supersede original solicitation documents. The proposal due date is extended to August 13, 2021. The National Park Service National Office is seeking proposals for improvements to the wastewater treatment plant at Phantom Ranch in the Grand Canyon to be completed within the 180-day period of performance. Long lead procurement items must be submitted for approval by October 2021 with construction to commence in January 2022.

View the file

Other files for this federal contract opportunity

Other files attached to GRCA - 229035 Phantom Ranch Wastewater Treatment P, newest first.
File Type Posted
Sol_140P2021R0127_Amd_0006.pdf PDF
Amendment_6_Sched_of_Changes_0006.pdf PDF
Amendment_5_Sched_of_Changes_0005.pdf PDF
E15_Deliverables_LmtOnSubconRpt_REQD_0005.pdf PDF
Sol_140P2021R0127_Amd_0005.pdf PDF
WA614890_-_PRELIM_DESIGN_0004.pdf PDF
Sol_140P2021R0127_Amd_0004.pdf PDF
Amendment_4_Sched_of_Changes_0004.docx DOCX document
140P2021R0127_0004.pdf PDF
PR_WWTP_229035_Photo_Graphic_Part_3_0004.pptx PPTX presentation
PR_WWTP_229035_Photo_Graphic_Part_2_0004.pptx PPTX presentation
PR_WWTP_229035_Photo_Graphic_Part_1_0004.pptx PPTX presentation
Headworks_As-builts_C7_showing_DEMO_0004.pdf PDF
TCWL_Geotechnical_Baseline_0004.pdf PDF
PR_WWTP_ACD_GRCA_113_41073_D_0004.pdf PDF
GCNPS_Phantom_Ranch_WWTP_test_report_0004.pdf PDF
Asbestos_Survey_-_Phantom_Ranch_WWTP_0004.pdf PDF
Amendment_3_SF30_with_changes_to_L_M_0003.pdf PDF
GRCA_PreProposal_Presentation_Final8_3_0003.pdf PDF
Amendment_3_Sched_of_Changes_0003.pdf PDF
Vol1_Specifications_Final_Construction_Documents_May_2021_0002.pdf PDF
Vol2_Drawings_Final_Construction_Documents_June_2021_0002.pdf PDF
Sol_140P2021R0127_Amd_0002.pdf PDF
Question_and_Answers_0001.pdf PDF
Sol_140P2021R0127_Amd_0001.pdf PDF
A06_NPS_Phantom_Ranch_Vol3_Details_Final_Construction_Documents_0001.pdf PDF
A04_NPS_Phantom_Ranch_Vol2_Drawings_100__Complete_CD.pdf PDF
SF2416d.pdf PDF
B08_Solit_ConstructionClauseTemplate_REQD.pdf PDF
Proposal_Submission_Package.pdf PDF
A04_NPS_Phantom_Ranch_Vol1_Specifications_100__Complete_CD.pdf PDF
WDOL.pdf PDF
Sol_140P2021R0127.pdf PDF
Show all 33

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

140P2021R0127 x x

1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR

OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

PDS

Denver CO 80225-0287 P.O. Box 25287 12795 W. Alameda Pkwy NPS, DSC Contracting Services Div

GRCA 22903508/03/20210003

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

07/15/2021

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

GRCA 229035 Phantom Ranch Wastewater Treatment

The solicitation due date is changed to NLT 1500 MT, August 23, 2021.

Amendment No. 003 provides the following:

1. Document entitled "Amendment 3 Schedule of Changes to the Specifications", 1 page, is added to the solicitation specifications.

2. The preproposal presentation 50 pages is attached to the amendment.

3. Solicitation, Section L, "Factor 4 Schedule" is changed to read as follows:

Submit your proposed construction schedule for this specific project showing completion within the required period of performance contained in this solicitation with accompanying

Continued ...

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

Victoria Nosal

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

NAME OF OFFEROR OR CONTRACTOR

2 53

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

140P2021R0127/0003 schedule narrative. Submit your schedule in MS

Project Gantt Chart format; for evaluation purposes only assume a Notice to Proceed date of

October 1, 2021 FOR ALL DIVISION 1 SUBMITTALS AND

LONG LEAD PROCUREMENT ITEMS; USE REALISTIC TIMES

AND UPON APPROVAL OF ALL SUBMITTALS ASSUME A

NOTICE TO PROCEED IN JANUARY 2022 FOR

MOBILIZATION AND CONSTRUCTION. ACTUAL

CONSTRUCTION IS ESTIMATED TO BE APPROXIMATLEY 180

DAYS. Include specific activities required for this project and a clear critical path with major milestones and applicable predecessor activities.

The schedule should include anticipated approval, acquisition, and installation timeline for long lead items including influent screen, IFAS equipment, and automatic backwash filters.

In your accompanying narrative, explain schedule logic, critical path activities, and key considerations and constraints. Plan activities to account for seasonal fluctuation in water levels. Schedule narrative has a 2-page count limit.

4. Section M Factor 4 Schedule- the following is added to the evaluation criteria. DEMONSTRATING

PLANNING THAT ALLOWS ON-SITE CONSTRUCTION TO BE

COMPLETED IN A REALISTIC AND EFFICIENT TIME FRAME

WILL BE MORE FAVORABLY RATED.

5. Offerors are reminded drawings and specifications were provided in Amendment 2. The original solicitation drawings are not valid and should be discarded.

6. The proposal due date is extended to NTL 1500

Mountain Time, August 13, 2021.

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

FAR (48 CFR) 53.110

File details come from the government source that posted it. Updated .