KATM_Amd_6_Information_0006.pdf

PDF 130 KB Posted

Attached to
KATM 238414 Brooks Camp Wastewater Treatment Pond
Solicitation number
140P2021R0084
Issued by

About this file

This document contains questions and responses regarding Amendment 6 to solicitation number 140P2021R0084 from the National Park Service for the Brooks Camp Wastewater Treatment Pond project in Katmai National Park & Preserve in Alaska. The responses provide clarification on the project experience form to be included with proposals, confirmation that sand liner filter material can be sourced from either the Mile 5 Pit or the project site itself, and specification of minimum fracture and loss requirements for crushed gravel to be used for aggregate courses. Minimum borehole diameter for monitor wells is specified to be 10 inches.

View the file

Other files

File Type Posted
KATM_Amd_8_Information_0008.pdf PDF
Sol_140P2021R0084_Amd_0008.pdf PDF
KATM_Amd_7_Information_0007.pdf PDF
Sol_140P2021R0084_Amd_0007.pdf PDF
KATM_238414_Final_CD_Contract_Price_Schedule_Rev1_5132021_0007.xlsx XLSX spreadsheet
KATM_238414_Final_CD_Contract_Price_Schedule_Rev1_5132021_0006.xlsx XLSX spreadsheet
Attach_4_Forms_for_Use_in_Proposal_Submission_0006.pdf PDF
Sol_140P2021R0084_Amd_0006.pdf PDF
KATM_Amd_5_Information_0005.pdf PDF
Sol_140P2021R0084_Amd_0005.pdf PDF
Virtual_Site_Meeting_Attendees_0004.pdf PDF
KATM_Contractor_Solicitation_Questions_Amd_4_0004.pdf PDF
Sol_140P2021R0084_Amd_0004.pdf PDF
Amendment_4_DB_Wage_Schedule_AK20210001_Mod_3_050721_0004.pdf PDF
Barge_Landing_Bathymetry_0004.pdf PDF
KATM_238414_Prebid_Meeting_Notes_060321_0004.pdf PDF
KATM_238414_prebid_presentation_0004.pdf PDF
Sol_140P2021R0084_Amd_0003.pdf PDF
Sol_140P2021R0084_Amd_0002.pdf PDF
Contractor Solicitation QandA 051721_0002.pdf PDF
CPS Rev1 5132021_0002.xlsx XLSX spreadsheet
B09 Amd 1 KATM 238414 Prebid Meeting Agenda 051221_0001.pdf PDF
Sol_140P2021R0084_Amd_0001.pdf PDF
140P2021R0084 SF1442 042621.pdf PDF
140P2021R0084 FINAL CD Construction Specifications 042021.pdf PDF
140P2021R0084 DB Wage Schedule AK20210001 Mod 2 040921.pdf PDF
COVID 19 Protocols.pdf PDF
140P2021R0084 FINAL CD Drawings Sealed 042221.pdf PDF
140P2021R0084 Forms for Use in Proposal Submission.pdf PDF
140P2021R0084 Contract Clauses FINAL 042621.pdf PDF
Sol_140P2021R0084.pdf PDF
Show all 31

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

KATM 238414 Amendment 6 Information dated 06/08/2021

The following information is a distribution of Questions with associated Responses received after the issuance of Amendment 5 dated 06/07/2021:

Question 1: We are unable to locate the “Project Experience” form, as specified in Section L, Instructions for Submissions of Offers, Part E, 3.b, Subfactor 1.B.

a. Is there a specific form that you will require proposers to use? If so, please direct us to where we may be able to find that form.

Response 1: This form, along with additional forms to be used in your proposal submission, were included in the original solicitation and will be included in this Amendment 6 as the PDF Portfolio file

“Attach 4 Forms for Use in Proposal Submission”. Please note that the Price Schedule originally contained in the Portfolio file has been updated in Amendment 2 to this solicitation; this updated price schedule has been included in this Amendment 6 for your convenience as labeled “KATM 238414 Final

CD Contract Price Schedule Rev1 5132021”.

Question 2: Is there a sand source on or near the Treatment Pond Site?

Response 2: Sand Liner Filter material for Percolation Cell is intended to be sourced from either Mile 5

Pit or the Mile 1.8 NE Wastewater Treatment Pond project site. Importing sand is not allowed due to concerns of invasive and noxious weeds introduction to the Park. If sourcing Sand Liner Filter material

(or other earthwork materials) from Mile 1.8 NE project site, the Contractor shall not over excavate below the specified bottom of cell depth within the Percolation Cell floor footprint as to not impact the in-situ soil percolation as specified in Section 02200, Part 3.2.E.. Geotechnical test hole data collected indicates soils present at Mile 1.8 NE project site have less fines (passing no. 200) incorporated, which may be advantageous for Sand Liner Filter material production compared to Mile 5 Pit.

KATM 238414 Amendment 6 Information dated 06/08/2021

Question 3: Specification 02200 2.2. D, ¾” Aggregate Course and 02200 2.2 E, Aggregate Surface Course calls out “crushed gravel”. However, there is no specification on minimum or maximum fracture. Is it required that these aggregates be crushed or is screening an acceptable alternative?

Response 3: Crushed stone or crushed gravel is required for ¾”-Minus Aggregate Course and Aggregate

Surface Course materials referenced. Crushed stone or crushed gravel material shall consist of sound, tough, durable pebbles or rock fragments of uniform quality. In addition to aggregate gradation requirements specified in the Section 02200 of the Construction Documents, ¾”-Minus Aggregate

Course and Aggregate Surface Course shall meet the following requirements:

AGGEGATE QUALITY PROPERTIES FOR

¾”-MINUS AGGREGATE COURSE AND AGGREGATE SURFACE COURSE

PROPERTY ¾”-MINUS AGG. COURSE AGG. SURFACE COURSE TEST METHOD

L.A. Wear, % 50, max. 45, max. AASTHO T 96

Degradation Value 45, min. 45, min. ATM 313

Fracture, % 70, min. 70, min., 1 Face ATM 305

Liquid Limit --- 35, max. ATM 204

Plastic Index 6, max. 10, max. ATM 205

Sodium Sulfate Loss, % 9, max. (5 cycles) 9, max. (5 cycles) AASTHO T 104

Question 4: We are unable to find a specification for the minimum hole diameter for the Monitor Wells.

We assume that the holes are to be 12” diameter, please confirm.

Response 4: Minimum borehole diameter for Monitor Wells shall be 10-inch diameter.