140P2021R0084 FINAL CD Drawings Sealed 042221.pdf
PDF 13 MB Posted
- Solicitation number
- 140P2021R0084
About this file
This document provides details on a federal solicitation for construction services. The solicitation number is 140P2021R0084 and is seeking a contractor to complete the KATM 238414 Brooks Camp Wastewater Treatment Pond project located at Katmai National Park & Preserve. The Department of the Interior National Park Service National Office is the contracting agency. The attached file is the final construction drawings for the wastewater treatment pond project, with a file name of 140P2021R0084 FINAL CD Drawings Sealed 042221.pdf. No other terms or conditions are included in this document.
View the file
Other files
Show all 31
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT LOCATION
BROOKS CAMP
DRAWING INDEX
SHEET TITLE SHEET NO.
COVER SHEET & INDEX
GENERAL NOTES AND ABBREVIATIONS
LEGEND 3
PROJECT AREA MAP 4
SURVEY CONTROL 5
DESIGN CRITERIA 6
GEOTECHNICAL TEST PITS 27
WASTEWATER TREATMENT POND SITE PLAN 8
2SITE SECTIONS & PIPING PLAN 9
CIVIL DETAILS
CIVIL DETAILS
FLOW CONTROL DETAILS
OVERFLOW SWALE DETAILS
FENCE & GATE DETAILS
FENCE & GATE DETAILS
FENCE LAYOUT PLAN
EARTHWORK HAUL ROUTES
BARGE ACCESS AREA
CIVIL DETAILS
CIVIL DETAILS
FINAL CONSTRUCTION DOCUMENTS
4-20-21
ACCESS ROAD PLAN & PROFILE
CAMP AREAS
STAGING AREAS 21
C 1 C 2 C 3 C 4 C 5 C 6 C 7 C 8 C 9 C 10 C 11 C 12 C 13 C 14 C 15 C 16 C 17 C 18 C 19 C 20 C 21 C 22
BRIAN HEITMAN Digitally signed by BRIAN HEITMAN Date: 2021.04.22 11:37:23 -06'00'
FINAL CONSTRUCTION DOCUMENTS
4-20-21
AKAF AL
TS
TA
E O
49 TH
S
Douglas T. Kenley
CE-8176
REGISTERED PROFESSIONA L ENGINEER
MATERIAL DESCRIPTION UNIT OF MEASURE APPROXIMATE QUANTITY
TOTAL EXCAVATION CUBIC YARD 7250
REUSABLE EXCAVATION - CLASSIFIED FILL CUBIC YARD 595
REUSABLE EXCAVATION - UNCLASSIFIED FILL CUBIC YARD 600
EXCAVATION FOR DISPOSAL CUBIC YARD 4883
CLASSIFIED FILL, TYPE II CUBIC YARD 8600
AGGREGATE COURSE, 3/4" MINUS CUBIC YARD 225
AGGREGATE SURFACE COURSE, GRADING D-1 CUBIC YARD 220
SAND LINER FILTER CUBIC YARD 400
POROUS BACKFILL CUBIC YARD 5
BEDDING MATERIAL, CLASS B CUBIC YARD 3
AKAF AL
TS
TA
E O
49 TH
S
Douglas T. Kenley
LAKE BROOKS
NAKNEK LAKE
ILIUK ARM
FINAL CONSTRUCTION DOCUMENTS
4-20-21
AKAF AL
TS
TA
E O
49 TH
S
Douglas T. Kenley
LAKE BROOKS
BROOKS RIVER
VALLEY OF
10,000 SMOKES
PROJECT
AREA
VICINITY MAP
FINAL CONSTRUCTION DOCUMENTS
0 50 100 150 FT25
AKAF AL
TS
TA
E O
49 TH
S
Douglas T. Kenley
AKAF AL
TS
TA
E O
49 TH
S
Douglas T. Kenley
TOP OF SLOPE SCHEDULE TOP OF SLOPE SCHEDULE CLEARING LIMITS LAYOUT
4-20-21
0 20 40 60 FT10
AKAF AL
TS
TA
E O
49 TH
S
Douglas T. Kenley
SECTION - PERCOLATION CELL
SECTION - STABILIZATION POND
SECTION - WASTEWATER TREATMENT POND AND CONSTRUCTION PAD
0 30 60 90 FT2010
PLAN - WASTEWATER TREATMENT POND PIPING PLAN
TYPICAL ACCESS ROAD SECTION
FINAL CONSTRUCTION DOCUMENTS
4-20-21
AKAF AL
TS
TA
E O
49 TH
S
Douglas T. Kenley
Access Road Centerline Alignment CL PROFILE
0 20 40 60 FT10
FINAL CONSTRUCTION DOCUMENTS
4-20-21
ACCESS ROAD PLAN
ACCESS ROAD PROFILE
AKAF AL
TS
TA
E O
49 TH
S
Douglas T. Kenley
STABILIZATION CELL LINER SECTION 2
PERCOLATION CELL SOIL SECTION
LAGOON EMBANKMENT / PAD FILL SECTION
LINER KEY
TYPICAL LINER PENETRATION
FINAL CONSTRUCTION DOCUMENTS
4-20-21
AKAF AL
TS
TA
E O
49 TH
S
Douglas T. Kenley
MONITORING WELL 1 DETAIL
DUMPSTATION PLAN2
DISCHARGE PIPE
DUMPSTATION ELEVATION
MONITORING WELL 2 & 3 DETAIL
DUMPSTATION DISCHARGE PIPE OUTFALL
FINAL CONSTRUCTION DOCUMENTS
4-20-21
AKAF AL
TS
TA
E O
49 TH
S
Douglas T. Kenley
FLOW CONTROL SPILLWAY ASSEMBLY ELEVATION
SPILLWAY ASSEMBLY
PROTECTIVE APRON PLAN
BOLT DETAIL
PIPE ANCHOR ASSEMBLY
FINAL CONSTRUCTION DOCUMENTS
4-20-21
AKAF AL
TS
TA
E O
49 TH
S
Douglas T. Kenley
SWALE SPILLWAY ASSEMBLY ELEVATION
FINAL CONSTRUCTION DOCUMENTS
4-20-21
AKAF AL
TS
TA
E O
49 TH
S
Douglas T. Kenley
ISOMETRIC - FLOW CONTROL
PLAN - FLOW CONTROL ASSEMBLY
SECTION B-B - FLOW CONTROL ASSEMBLY 4
VALVE BOX ASSEMBLY
BB
FINAL CONSTRUCTION DOCUMENTS
4-20-21
AKAF AL
TS
TA
E O
49 TH
S
Douglas T. Kenley
EMERGENCY OVERFLOW SWALE 1 2
EMERGENCY OVERFLOW SWALE 2
AA BB
C
C
FINAL CONSTRUCTION DOCUMENTS
4-20-21
AKAF AL
TS
TA
E O
49 TH
S
Douglas T. Kenley
TYPICAL CORNER DETAIL 2
TYPICAL LINE DETAIL 3
FENCE/GATE POST CONCRETE FOOTING
BARB-ARM EXTENSION5
HORIZONTAL FENCE FABRIC 4
DOUBLE SWING GATE DETAIL
FINAL CONSTRUCTION DOCUMENTS
4-20-21 AKAF AL
TS
TA
E O
49 TH
S
Douglas T. Kenley
A
A
SECTION A-A
ELECTRIC FENCE GATE
CONTROLLER POST DETAIL1
TYPICAL ELECTRIC FENCE
SIGN SCHEDULE
FINAL CONSTRUCTION DOCUMENTS
4-20-21
AKAF AL
TS
TA
E O
49 TH
S
Douglas T. Kenley
FENCE LAYOUT SCHEDULE
PERCOLATION CELL STABILIZATION POND
0 15 30 45 FT105
FENCE LAYOUT PLAN
FINAL CONSTRUCTION DOCUMENTS
4-20-21
AKAF AL
TS
TA
E O
49 TH
S
Douglas T. Kenley
ILIUK ARM
MILE 1.8 PIT
WASTEWATER TREATMENT POND
SITE AREA
MILE 5 PIT
BORROW PIT
SITE AREA
FINAL CONSTRUCTION DOCUMENTS
4-20-21 AKAF AL
TS
TA
E O
49 TH
S
Douglas T. Kenley
STAGING AREA 1 - SQUIRREL CAMP 2
MINING AREA AND STAGING AREA 2 - MILE 5 BORROW PIT
FINAL CONSTRUCTION DOCUMENTS
4-20-21
AKAF AL
TS
TA
E O
49 TH
S
Douglas T. Kenley
BROOKS CAMP BARGE LANDING
FINAL CONSTRUCTION DOCUMENTS
4-20-21
AKAF AL
TS
TA E O
49 TH
S
Douglas T. Kenley
CONTRACTOR PROJECT OFFICE AND HOUSING - VRAA LOOP
FINAL CONSTRUCTION DOCUMENTS
4-20-21
0 50 100 150 FT25
AKAF AL
TS
TA
E O
49 TH
S
Douglas T. Kenley