This document provides details for a federal solicitation seeking construction services to stabilize structures at the Kennecott Mines National Historic Landmark in Alaska. The National Park Service is soliciting fixed-price proposals on an unrestricted small business set-aside basis to repair the landmark's 14-story mill building. Work includes replacing deteriorated timber columns, beams and floors, removing and reinstalling siding after stud replacement, constructing a new timber frame and roof, and partially demolishing and reconstructing an exterior ore chute. The estimated contract value is between $1-5 million. The performance period is 730 calendar days from notice to proceed. A pre-proposal site visit will be held on September 10, 2019. Proposals are due October 11, 2019. Award is anticipated in late December 2019.
Site Visit Meeting Minutes 9-10-19
View the file
Other files
Show all 26
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
WRST 159092C
Repair Historic Kennecott Mine Structures and Utilities
Phase III
UPPER MILL BUILDING STRUCTURAL REPAIRS
Preproposal Conference Meeting Notes
Date: 9/10/2019
When: 9:00 am AT
Where: NPS‐WRST Rec Hall, Lot 7 Kennecott Millsite Subdivision, Kennicott Alaska
Attendees:
WRST: See attendance list
DSC: Brian Heitman – Project Manager (720) 951‐7292
Gregory Passig – Contracting Officer (303) 969‐2623 Michael Soliday – Project Specialist (303) 969‐2695
Region: Grant Crosby, Project Manager
Contractors: See attendance list
AGENDA ITEMS:
1. Sign in sheet – to be issued as an amendment to the solicitation along with the pre‐bid meeting minutes and the PowerPoint presentation we will review today.
2. Introductions for NPS staff present.
3. Thank you all for taking the time to meet with us today. The project is extremely important to the Park. This project is Phase III of the recent stabilization efforts.
The project scope essentially consists of the stabilization of levels 7 through 11 of the mill building as well as the reconstruction of the high grade ore chute.
4. We would prefer that question be sent to the CO in writing. Any questions and answers today will need to be recorded and issued in an amendment to the solicitation.
5. Source selection:
Section L outlines the information the NPS would like to see in the technical proposals.
Section M describes how the technical proposals will be evaluated.
Source selection will be best value ‐ see Part B of both sections L and M.
It is imperative that the offerors address the evaluation factors listed in L specifically.
We are primarily interested in the capabilities and experience of key personnel as it relates to the scope and conditions of this project.
6. Project milestone dates:
Proposals due 10/11/2018, 5:00 PM MT
Contractor selection by mid‐December
Construction contract award in late December
The construction Precon meeting to be held & NTP issued once the DIV I submittal requirements are complete – refer specification section 01 31 00 Part 1.4 for the
Preconstruction Meeting submittal requirements.
7. History – Power Point Slide 6:
The image on the slide is from the Historic American Building Survey (HABS) drawings.
The initial structure, the lower terminal for the aerial tramway, was constructed in 1908.
Shipments of high grade ore started in 1911.
Over the years crushing and concentration operations were added. Major modifications and additions occurred in 1915 and 1923.
From 1911 to 1938, nearly $200 million worth of copper was processed. At the peak of operation, approximately 300 people worked in the mill town and 200‐300 in the mines.
The mine closed in 1938. Little changed in the building until 1950 when a portion of the top of the structure was dismantled. Since that time exposure to the elements and scavenging contributed to the deterioration of the building.
The Kennecott site was designated a National Historic Landmark in 1986.
8. Project History – Slide 7 & 8
South elevation of the Mill building. The facility consists of 11 levels.
In the 1990’s the Friends of Kennecott, a local nonprofit that advocates for the preservation of the Kennecott site, installed new roof structure in the areas that were previously dismantled.
Also note the high grade ore chute of which the remnants which will be demolished and the chute reconstructed.
In 1998, the National Park Service acquired many of the significant buildings and lands of the historic mining town of Kennecott. Note that there are numerous private holdings within the site.
Numerous rehabilitation campaigns have occurred at the mill building over the years.
This project is Phase III of the recent rehabilitation efforts. Phase I and Phase II stabilized levels 1 through 7 as well as installed a fire detection and notification system. This project will stabilize the upper levels of the mill building.
9. Project History – Slide 9:
North elevation of the Mill building. Note the Friends of Kennecott roof structure on the upper level of the mill building. Also note the north elevation of the building at levels 7
& 8. We will review the scope in that location on the following slides.
10. Project Scope:
Note that the following slides are an overview. Refer to the Design Drawings, Specifications, and Product Data for the complete project scope. Would normally review the drawings in greater detail during the PowerPoint presentation but feel in our case it will work better if we review the drawings while in the mill building. We have several sets of drawings we can share with the group for the mill walk.
Slide 10 – Sheet G004:
i. Keynote 6 – Scaffolding location to access the north wall repairs. Scaffolding provided by the NPS, Contractor to erect the scaffolding. An elevation of the scaffolding is shown on detail 3.
ii. Keynote 5 – The NPS to clear remnant blasting caps in the hatched area to provide for safe contractor access. The NPS will also prep the area to accommodate the installation of the scaffolding base.
iii. Keynote 7 – NPS to clear and stabilize the existing deck prior to construction.
iv. Keynote 1 & 2 – Note the pedestrian and equipment access on the south (plan east) side of the mill building.
Slide 11 – North elevation and existing deck.
Slide 12 – Photo of North elevation and existing deck taken from downslope.
Slide 13 & 14 – C101 Overall Site Plan and C102 Staging and Laydown Areas
i. Construction access is denoted by fine dashed line along the site Access Road, along the east side of the mill building, and west of the mill to the top of the mill building.
ii. Staging area to the east of the Dairy Barn, also see detail 2/C102. We will review while on site.
iii. Staging area to the east (plan north) of the mill building, also see detail 3/C102.
We will review while on site.
iv. Staging on the west side of the river, detail 1/C102. The site is located in the
Park housing area, referred to as the West Side Development Area, which is in close proximity to the river and toll bridge. Also see the google map image on the following slide 15. Feel free to stop by and take a look at the site on your way out.
11. Specification Section 01 11 00 Summary of Work. The following is an overview, please be sure to review this and other specification sections for more detailed requirements.
The Contractor shall take care to protect the remaining historic material of the building and site during construction activities. Refer to section 01 35 91 “Historic Preservation
Treatment Procedures” for further information regarding preservation requirements. A
Historic Preservation Plan is a required Div 1 submittal.
The Contractor must incorporate additional health and safety measures to protect workers from potential exposure to contaminants, including elevated concentrations of lead and arsenic in area dust and soils. Refer to specification section 01 88 00 as well as supplemental reports for addition information and requirements.
i. Intrusive activities at the site, both interior‐based (e.g., demolition, remodeling, architectural renovation) and exterior‐based (e.g., earthmoving) shall be considered hazardous, and having the potential to expose involved personnel to contaminant levels above OSHA permissible exposure limits (PELs).
ii. The contractor to incorporate the use of real time air monitoring to validate that engineering controls, work practices, and PPE are adequate.
iii. NPS work practices in and around the mill building can be found in appendix E of the Contaminated Site Interim Strategy document provided in the solicitation.
Part 1.4 has a list and photos of government furnished material that can be utilized by the Contractor for the stabilization work. We will review while on site.
A construction camp will be permitted and shall comply with OSHA 29CFR1910.142, Temporary Labor Camps. The camp is to be located in the West Side Development Area shown in the PowerPoint presentation slides 14 & 15.
Vehicle access to the project site will require the use of a private toll bridge. The
Contractor will be required to enter into an agreement with the bridge owner to move personnel, material and equipment across the bridge. See specifications for the bridge owner contact information.
Good source for gravel and other fill material is Rowcon, located in McCarthy. The pit has been inspected by the NPS for invasive plants and is an approved source.
(907)554‐4498
Work restrictions:
i. The site is accessible from about mid‐May through early October based on weather.
ii. Work shall be generally performed during normal business working hours of
7:00 a.m. to 6:30 p.m., Monday through Friday.
iii. Weekend Hours: 7:00 a.m. to 6:30 p.m. with 48 hour notice and approval from
CO. Weekend work is encouraged by the NPS however certain activities may not be appropriate due to heavy visitor traffic.
Blackburn Cabins is an option for crew housing in close proximity of the project site during the construction seasons. 907‐231‐6227; 907‐554‐1075
12. Visit site:
Staging Area south (plan east) of the Dairy Barn.
i. Park to clear staging area prior to construction.
Staging area east (plan north) of the mill building.
i. Access to the private residence and pedestrian trail to be maintained.
Mill building.
i. At the top of the mill building between grid lines E and M, the existing walkway and associated guardrails are to be removed by the contractor to accommodate the installation of the new walkway shown on sheet S103. See attached photos at the end of the meeting notes.
ii. The NPS will be issuing an amendment to the solicitation clarifying the scope of work at the north elevation between grid lines FF and JJ, particularly the area in close proximity to grid line FF.
Government furnished material.
i. Government furnished material listed in specification section 01 11 00 is stored in the West Development Area. The contractors were encouraged to review the staging area and stored materials on their way out of the site.
W R A N G E L L S T. E L I A S N AT I O N A L PA R K A N D P R E S E R V E
Wrangell St. Elias National Park and Preserve
Preproposal Conference / Site Visit
September 10, 2019
Solicitation No. 140P2019R0021
2S O L I C I TAT I O N
PREPROPOSAL CONFERENCE QUESTIONS
• Please refrain from asking questions during the site visit.
• Please take notes and submit a formal Request for Information (RFI’s) to both Gregory Passig, Contracting Officer, and Gabriel Castellanos, Contract Specialist via email.
• Changes to the solicitation documents shall be made by formal written amendment only and will be issued by the Contracting Officer at the website – www.fbo.gov
• Preproposal Conference/Site Visit meeting notes, questions, and answers will be issued by a formal written amendment to the solicitation for information only.
http://www.fbo.gov/
3S O L I C I TAT I O N
QUESTIONS AFTER PREPROPOSAL CONFERENCE
• Questions directed to any other Government team member will be redirected to Gregory Passig. All questions and answers will be provided to all prospective offerors by amendment to the solicitation.
4S O L I C I TAT I O N
AWARD OF A CONTRACT
• Total Small Business Set-Aside
• Alternate Proposals shall not be accepted or evaluated
• Firm-Fixed-Price Contract resulting from the solicitation
5S O L I C I TAT I O N
Solicitation No. 140P2019R0021
Section L Instructions for the Submission of Offers
Proposals Due October 11, 2019, 5:00 p.m. Mountain Time
– Phase 1 - Volume I Technical Proposal (Electronic Copy)
– Phase 1 - Volume II – Business Proposal (Electronic Copy)
6P R O J E C T H I S T O R Y
7P R O J E C T H I S T O R Y
8P R O J E C T H I S T O R Y
9P R O J E C T H I S T O R Y
10P R O J E C T S C O P E
11P R O J E C T S C O P E
12P R O J E C T S C O P E
13P R O J E C T S C O P E
14P R O J E C T S C O P E
15P R O J E C T S C O P E
Thank You