B08_WRST_159092C_drawings_.pdf
PDF 9 MB Posted
- Attached to
- Repair Historic Kennecott Mine Structures Federal contract opportunity
- Solicitation number
- 140P2019R0021
About this file
This presolicitation notice announces an upcoming solicitation for construction services to repair historic structures at the Kennecott Mines National Historic Landmark Mill Building in Wrangell-St. Elias National Park and Preserve in Copper Center, Alaska. The National Park Service intends to issue a competitive small business set-aside solicitation on or around August 22, 2019 seeking proposals for a firm-fixed price contract valued between $1 million and $5 million. The selected contractor will stabilize the fourteen-story timber frame mill building through tasks such as replacing deteriorated heavy timber, leveling remnant ore, reinstalling horizontal siding after stud replacement, constructing a new heavy timber frame and roof, and partially demolishing and reconstructing an exterior timber feature called the high grade ore chute. The performance period is expected to be 730 calendar days from notice to proceed. A pre-proposal site visit is scheduled for September 10, 2019.
Attachment 2: WRST 159092 Drawings
View the file
Other files for this federal contract opportunity
Show all 26
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
McCARTHY
3 3
CAN.U.S.
HQ.
CHUGACH MOUNTAINS
WRANGELL MO
UNT
AIN
S
NUTZOTIN MOUNTAINS
CHISTOCHINA
GULKANA
GAKONA
GLENNALLEN
COPPER
CENTER
NABESNA
JUNCTION
TONSINA
CHITINA
GULKANA
AIRPORT
WILLOW
LAKE
STRELNA
CHOKOSNA
MAY CREEK
DAN CREEK
CHITINA RIVER
BR
EM
NE
R RIVER
MILES LAKE
TONGASS
NATIONAL
FORESTMALASPINA
GLACIER
BAGLEY ICE FIELD
YAHTSE GLACIER
BERING
GLACIER
JEFFERIES
GLA
CIE
R
MILES GLACIER
MOUNT
ST.ELIAS
MARTIN
RIVER
GLACIER
CAPE
YAKATAGA ICY
BAY
YAKUTAT
BAY
LOGAN GLACIER
MT.WRANGELL
MT.
SANFORD
MT.
DRUM
C H
IS
AN
A R
IV
E R
PTARMIGAN
LAKE
ROCK LAKE
RUSSELL
GLACIER
BARNARD
GLACIER
JAKES
BAR
NABESNA
GLACIER
C
AN
AD
A
U N
ITE
D
S
TATE
S
Y U K O N
TE
R R
ITO
R Y
A
LAS
K A
YAKUTAT
SEWARD GLACIER
SINONA
LODGE
TO
TOK
SLANA
TO DELTA
JUNCTION
TO
ANCHORAGE
TO
VALDEZ
TETLIN INDIAN
RESERVATION
KUANE
NATIONAL
PARK
TETL
IN N
ATION
AL
WILD
LIFE
PRES
ERVE
GUYOT
GLACIER
CHUGACH
NATIONAL
FOREST
C O P P E R
RI
VE
R
BREMNER
GLACIER
CREEK
REEVE FIELD
TANADA
LAKE
COPPER
LAKE
NABESNA ROAD
DUFFYS
TAVERN
& FAIRBANKS
FAIRBANKS
ANCHORAGE
PRINCE
RUPERT
WHITEHORSE
JUNEAU
KODIAK
YU
KO
N
RI
VE
R
C A N A D A
U N
ITE
D
S
TA
TE
S
Y U K O N
A
LAS
K A
VALDEZ
WRANGELL-ST.
ELIASNATIONAL
PARK&
PRESERVE
BERING
SEA
GULF
OF
ALASKA
BASIC DATA:
SCALE OF MILES
250 0 250
UNESCO
WRANGELL-ST. ELIAS NATIONAL PARK AND PRESERVE
WRST PMIS 159092 C KENNECOTT MINES NATIONAL HISTORIC LANDMARK
KLUANE / WRANGELL- ST. ELIAS / GLACIER BAY / TATSHENSHINI-ALSEK WORLD HERITAGE SITE
LEGEND
PARK BOUNDARY
PARK / PRESERVE / WILDERNESS
CONTIGUOUS BOUNDARY
PAVE ROAD
UNPAVED ROAD
RIVER
PARK HEADQUARTERS
RANGER STATION
AIRPORT / LANDING STRIP
PARK
PARK AND WILDERNESS
PRESERVE
PRESERVE AND WILDERNESS
HQ.
100% FINAL
UNITED STATES
DEPARTMENT OF THE INTERIOR
NATIONAL PARK SERVICE
ALASKA REGIONAL OFFICE
TITLE OF DRAWING
COVER
LOCATION WITHIN PARK
KENNECOT
NAME OF PARK
WRANGELL - ST. ELIAS N.P. & PRESERVE
REGION COUNTY STATE
ALASKA ALASKA
DRAWING NO.
80,137A
PMIS/PKG NO.
WRST 159092C
SHEET
OF
SCALE OF MILES
SCALE OF KILOMETERS
15 0 15 30
15 0 15 20 25
1 25
05.24.2019 VOLUME 1
KENNECOTT
PROJECT
LOCATION
ARCHITECTURAL SYMBOLS
WALL TYPE INDICATOR
DOOR ID
GRID/COLUMN LINES
EXTERIOR ELEVATION
DESIGNATION
WINDOW OR LOUVER ID
DETAIL DESIGNATION
INTERIOR ELEVATION DESIGNATION
ELEVATION INDICATORNAME
ELEVATION
XX
DET_NO
SHT_NO
SIM
A101
A101
AFFX'XX" CEILING HEIGHT INDICATOR
XXx
FINISH MATERIAL INDICATORVCT
1 1 KEYNOTE / DEMOLITION
KEYNOTEDETAIL REFERENCE
DESIGNATOR
DET_NO
SHT_NO
SIM
SECTION DESIGNATION
DET_NO
SHT_NO
SIM
0" 3" 6"1"
A
GRID LETTER
GRID NUMBER
DRAWING LETTER / DETAIL NUMBER
1 VIEW NAME 1
A101
SHEET NUMBER
DRAWING / DETAIL DESIGNATOR
ABBREVIATIONS:
AFF ABOVE FINISH FLOOR
BATT BATTEN
BD BOARD
BLDG BUILDING
CENTER LINE
CLR CLEAR
CO CONTRACTOR OFFICER (NPS)
COL COLUMN
CONC CONCRETE
CONT CONTINUOUS
EA EACH
ELEC ELECTRICAL
GA GAUGE
G.F.E. GOVERNMENT FURNISHED EQUIPMENT
GWB GYPSUM BOARD
HMCP HAZARDOUS MATERIALS CONTROL PLAN
INSUL INSULATION
JST JOIST
M.B.M. METAL BUILDING MANUFACTURER
MFR MANUFACTURER
ES EACH SIDE
(E) EXISTING
MFR'D MANUFACTURED
MTL METAL
MECH MECHANICAL
NFS NON-FROST SUSCEPTIBLE
NIC NOT IN CONTRACT
PNL PANEL
PTD PAINTED
PWD PLYWOOD
RD ROUND
SCHED SCHEDULE
STL STEEL
STRUCT STRUCTURAL
TYP TYPICAL
UNO UNLESS NOTED OTHERWISE
VB VAPOR BARRIER
W/ WITH
WD WOOD
A600
EXISTING PHOTOGRAPH
REFERENCE
SHEET
OF
PMIS/PKG NO.
DRAWING NO.
80,137A
SUB SHEET NO.DESIGNED:
CADD:
TECH REVIEW:
DATE:
TITLE OF SHEET
VOLUME 1ST
F
RO
P
ISTE H
A
SS NOI ARL C
A
T
K
ER
IG RE
DE
F
49th
EAT
O LA SA
CE
TNo. AELA-7917
Scott A. Bohne
WZ
SB
TM
G001
ABBREVIATIONS,
SYMBOLS LEGEND,
DRAWING INDEX
KENNECOTT PHASE 3 MILL
BUILDING STABILIZATION2019.05.24
WRST 159092C
2019.05.24
DRAWING INDEX
VOL-1 COVER SHEET
G001 ABBREVIATIONS, SYMBOLS LEGEND, DRAWING INDEX
G002 PROJECT DESCRIPTION & WORK AREA SCOPE
G003 EXISTING SITE PLAN CONDITION
G004 CONSTRUCTON ACCESS MAP
C101 OVERALL SITE PLAN
C102 CONTRACTOR STAGING LAYDOWN AREAS
S001 GENERAL NOTES & ABBREVIATIONS
S101 LOWER WEST TOWER FLOOR FRAMING PLANS
S102 UPPER WEST TOWER AND ORE BIN FRAMING PLANS
S103 TRAM DECK FLOOR FRAMING PLANS
S104 UPPER MILL ROOF FRAMING PLANS
S201 PHOTOS
S301 ELEVATIONS & SECTIONS
S302 ELEVATIONS & SECTIONS
S303 ELEVATIONS & SECTIONS
S304 ELEVATIONS & SECTIONS
S501 DETAILS
S502 DETAILS
S503 DETAILS
A101 REFERENCE FLOOR PLANS AND SECTION
A102 ROOF PLAN AND DETAILS
A103 LEVEL SEVEN ROOF PLAN
A104 RAISED WALKWAY
A105 EXISTING CONDITIONS PHOTOGRAPHS
PROJECT GENERAL NOTES
1. THE SCOPE OF WORK FOR THE CONTRACT DOCUMENTS FOR THIS PROJECT, INCLUDES VOLUME 1 100% CONSTRUCTION DOCUMENTS KENNECOTT PHASE III MILL BUILDING STABILIZATION, DATED MAY 24, 2019 AND VOLUME 2 - ORE CHUTE STABILIZATION /RECONSTRUCTION, DATED NOVEMBER 21, 2003. FOR THE PURPOSE OF THIS PROJECT, ALL INFORMATION HEREIN SHALL BE TREATED EQUALLY, WITHOUT ANY HIERARCHY, AND/OR ORDER OF PRECEDENCE, UNLESS OTHERWISE NOTED.
2. THE CONSTRUCTION DOCUMENTS HAVE BEEN PREPARED UTILIZING ELECTRONIC DRAFTING
FORMATS OF AUTOCAD 2017 AND REVIT 2017. REFERENCE DIVISION 01 OF THE SPECIFICATION FOR
AVAILABILITY.
3. THE CONTRACTOR SHALL FIELD VERIFY ALL CONDITIONS AT THE SITE AND /OR BY AS-BUILT
DRAWINGS PRIOR TO THE COMMENCEMENT OF CONSTRUCTION. DISCREPANCIES SHALL BE
REPORTED TO THE CONTRACTING OFFICER'S (CO) IMMEDIATELY.
4. DRAWING SCALES THAT ARE INDICATED RELATE TO FULL SIZED DRAWINGS (22 X 34 INCHES).
SCALES WHICH APPEAR ON DRAWINGS OTHER THAN FULL SIZE SHOULD BE PROPORTIONALLY
ADJUSTED.
5. THIS PROJECT INVOLVES THE SELECTIVE DEMOLITION OF EXISTING ASSEMBLIES AND MATERIALS.
CONTRACTOR IS RESPONSIBLE FOR THE CAREFUL REMOVAL OF EXISTING MATERIAL AS MANDATED IN THE DOCUMENT TO PERFORM NEW (N) WORK AS MAY BE REQUIRED TO REINSTALL. CONSULT THE NATIONAL PARK SERVICE (NPS) CONTRACTING OFFICER (CO) PRIOR TO REMOVAL AND STORAGE OF
EXISTING MATERIAL
6. THESE CONTRACT DOCUMENTS HAVE BEEN PREPARED FROM GOVERNEMNT FURNISHED FILES
LABELED "AS-BUILTS" AND FROM FIELD OBSERVATIONS, HISTORIC AMERICAN BUILDING SURVEY (HABS) DOCUMENTS, MILL BUILDING TRAM DECK AS-BUILTS; AVAILABLE UPON REQUEST FROM NPS
FOR KNOWN AS-BUILT DIMENSIONAL CONTROLS AND ASSEMBLIES.
7. WORK BY NPS DENOTED AS NOT IN CONTRACT (NIC).
8. ALL REPLACEMENT MATERIAL TO MATCH EXISTING MATERIALS IN-KIND. (REFER TO AS-BUILTS AND
HABS DRAWINGS) CONSULT WITH NPS CO.
9. IT IS THE INTENT OF THIS SCOPE OF WORK AS DESCRIBED HEREIN TO PROVIDE STUCTURAL STABILIZATION AND RESOURCE PROTECTION IMPOVEMENTS, AS WELL AS BALANCE IMPROVEMENT OF WELFARE AND SAFETY WITH THE PRESERVATION OF THE HISTORIC VALUE OF THE MILL BUILDING
AND SITE (RESTORATION AND RECONSTRUCTION). AS DIRECTED BY THE AUTHORITY HAVING
JURISDICTIONS (NATIONAL PARK SERVICE) THIS SCOPE OF WORK HAS BEEN APPROVED PER 2012 INTERNATIONAL EXISTING BUILDING CODE (REF SEC 301, 506 AND CHAPTER 12). WELFARE AND
SAFETY OF DENOTED BUILDINGS-STRUCTURES WHERE TECHNICALLY FEASIBLE AND PRACTICAL.
WHERE TECHNICALLY INFEASIBLE AND/OR IMPRACTICAL, SCOPE OF WORK HAS BEEN PROVIDED
AND APPROVED AT THE DISCRETION OF THE AHJ (NPS) AS ALLOWED PER THE 2012 INTERNATIONAL
EXISTING BUILDING CODE (SECTION 308 & CH 11).
10. GUARDRAILS SHALL BE CONSTRUCTED OF DOUGLAS-FIR-LARCH (NORTH) #2 OR BETTER.
11. REFER TO DIVISION 01 OF THE SPECIFICATIONS FOR THE LIST OF GOVERNMENT (NPS) PROVIDED
MATERIALS.
12. HAZARDOUS MATERIALS:
SAMPLING OF AIRBORNE AND SOIL CONTAMINANTS INDICATE THE PRESENCE OF HAZARDOUS
MATERIALS IN AND AROUND THE MAIN BUILDING. IT IS THE CONTRACTOR'S RESPONSIBILITY TO
DEVELOP AND SUBMIT A HAZARDOUS MATERIALS CONTROL PLAN (HMCP) AND SAMPLING AND
ANALYSIS PLAN (SAP) PRIOR TO START UP CONSTRUCTIONS. REFER TO SECTION 01 88 80
HAZARDOUS MATERIALS FOR ADDITIONAL INFORMATION, PROCEDURES AND HAZMAT DISPOSAL
QUANTITIES ASSUMTIONS.
VOLUME 1 - MILL BUILDING STABILIZATION
VOLUME 2 - KENNECOTT ORE CHUTE STABILIZATION/RECONSTRUCTION - DATED NOVEMBER 21, 2003
VOL-2 COVER SHEET
A01 KEY ELEVATION
A02 ELEVATION & DETAILS
S10 GENERAL NOTES AND ABBREVIATIONS
S20 PLAN
S30 BENT ELEVATIONS
S31 BENT ELEVATIONS
S32 BENT ELEVATIONS
S33 BENT ELEVATIONS
S34 LOWER ELEVATION
S35 UPPER ELEVATION
S40 DETAILS
S41 DETAILS
UPPER MILL AREA OF WORK
REFER TO VOLUME 2 -
KENNECOTT ORE CHUTE
STABILIZATION /
RECONSTRUCTION DOCUMENTS
DATED MAY 24
REFER TO VOLUME 1 - KENNECOTT
PHASE 3 MILL BUILDING STABILIZATION -
DATED MAY 24, 2019
UPPER MILL AREA OF WORK
REFER TO VOLUME 1 - KENNECOTT PHASE 3 MILL
BUILDING STABILIZATION - DATED MAY 24, 2019
REFER TO VOLUME 2 -
KENNECOTT ORE CHUTE
STABILIZATION /
RECONSTRUCTION DOCUMENTS
DATED NOVEMBER 21, 2003 UPPER MILL
AREA OF WORK
REFER TO VOLUME 1 - KENNECOTT PHASE 3
MILL BUILDING STABILIZATION
DATED MAY 24, 2019
PROJECT DESCRIPTION
THE OBJECTIVE OF THIS PROJECT IS TO STABILIZE THE UPPER LEVELS (7) OF
THE KENNECOTT MINES MILL BUILDING,(VOLUME 1) WHICH HAVE DETERIORATED
DUE TO DEFFERED MAINTENANCE. THE WORK INCLUDES AN ELEVATED
WALKWAY TO PROVIDE FUTURE ACCESS OVER THE DETERIORATED TRAM DECK.
VOLUME 2 INCLUDES SELECT DEMOLITION AND REBUILD OF THE ORE CHUTE.
THE MILL BUILDING CONTRIBUTES TO THE SITES DESIGNATION AS A NATIONAL
HISTORIC LANDMARK AND ADHERENCE TO THE SECRETARY OF THE INTERIOR'S
STANDARDS FOR THE TREATMENT OF HISTORIC PROPERTIES IS REQUIRED.
LEVEL 11
142'-10"
LEVEL 10
139'-10"
LEVEL 6
63'-9"
LEVEL 2
12'-3"
LEVEL 9
131'-1"
LEVEL 7D&8
114'-1"
LEVEL 4
38'-9"
LEVEL 5
54'-10"
LEVEL 3
22'-8"
LEVEL 6C
77'-10"
GROUND
0'-0"
LEVEL 1
6'-8"
LEVEL 11
142'-10"
LEVEL 10
139'-10"
LEVEL 6
63'-9"
LEVEL 2
12'-3"
LEVEL 9
131'-1"
LEVEL 7D&8
114'-1"
LEVEL 4
38'-9"
LEVEL 5
54'-10"
LEVEL 3
22'-8"
LEVEL 6C
77'-10"
GROUND
0'-0"
LEVEL 1
6'-8"
SHEET
OF
PMIS/PKG NO.
DRAWING NO.
80,137A
SUB SHEET NO.DESIGNED:
CADD:
TECH REVIEW:
DATE:
TITLE OF SHEET
VOLUME 1ST
F
RO
P
ISTE H
A
SS NOI ARL C
A
T
K
ER
IG RE
DE
F
49th
EAT
O LA SA
CE
TNo. AELA-7917
Scott A. Bohne
WZ
SB
TM
G002
PROJECT DESCRIPTION &
WORK AREA SCOPE
KENNECOTT PHASE 3 MILL
BUILDING STABILIZATION2019.05.24
WRST 159092C
2019.05.24
1/32" = 1'-0"G002
1 OVERALL PLAN
1/32" = 1'-0"G002
3 NORTH ELEVATION
1/32" = 1'-0"G002
2 SOUTH ELEVATION
PLAN
NORTH
0" 8' 16' 32'4'0" 8' 16' 32'4'
0" 8' 16' 32'4'
B
1998.15
10020
1998.32
10019
2000.03
10018
2000.23
10017
3_1/2_BC_MSS_770
2042.21
CABLESTORE
0 2080
0 2
6" Spike in Road
CP32030.23
2007-21999.88
Rebar/Alum.
Cap
Stairs
Porch
Old
G E N E R A L M A N A G E R 'S
O F F
IC
E
Overhead Cable, Low
Clearance
CableAnchor
ORE
CA
RT
TRA
CKS
S H E D
O V E R
TR
A C K S
M A
IN
L IN
E
R A
IL R
O A D
TR
A C K S
LOT COR
2083.0
KENNICOTT THREE 2100.63
R O A D
B E D
Concrete Vault
SafeBldg.
Bldg.
Old
C rib b in g
RECONSTRUCT EXISTING UTILIDOR
(SEE DETAIL B/C202)
RECONSTRUCT EXISTING UTILIDOR
(SEE DETAIL B/C202)
RECONSTRUCT EXISTING UTILIDOR
(SEE DETAIL B/C202)
TB-9
TP-10
EXISTING MOUND
REMOVE AND
GRADE TO DRAIN
S T O R A G E
A R E A
A105P4
A105
P5
A105 P6
A105
P1
A105
P13
A105
P12
A105
A105
P3
A105
P3
A105
P7
A105
P2
SHEET
OF
PMIS/PKG NO.
DRAWING NO.
80,137A
SUB SHEET NO.DESIGNED:
CADD:
TECH REVIEW:
DATE:
TITLE OF SHEET
VOLUME 1ST
F
RO
P
ISTE H
A
SS NOI ARL C
A
T
K
ER
IG RE
DE
F
49th
EAT
O LA SA
CE
TNo. AELA-7917
Scott A. Bohne
WZ
SB
TM
G003
EXISTING SITE PLAN
CONDITION
KENNECOTT PHASE 3 MILL
BUILDING STABILIZATION2019.05.24
WRST 159092C
2019.05.24
1" = 20'-0"G003
1 EXISTING SITE PLAN
PLAN
NORTH
DN
UP
UP
LEVEL 7C
UP
DN
OF ELEVATOR
SHAFT
BOTTOM
UP
DN
BOTTOM
DN
DN
UP
DN
UP
DN
DN
EXIT C
O N V E Y O R
D E C K
M O
TO
R
H O U S
IN
G
B U
IL
T
(P R O
TE
C T)
DEPTH 6'+
L5
LEVEL 6
EXIT
MANAGER'S
OFFICE
GENERAL
EXIT
LEVEL 7
KEY
PEDESTRIAN ACCESS
EXISTING DECK
EQUIPMENT ACCESS
P R O P E R
TY
LI
N E
IN
C
LI
N E
TR
A C K
B U
IL
T
C A B
LE
FE
N C E
O
RE
C H U
TE
O
RE
C H U
TE
HISTORIC STAIR
HISTORIC INCLINE
SHEET NOTES:
1. PEDESTRIAN ACCESS TO ORE
CHUTE.
2. EQUIPMENT ACCESS TO ORE
CHUTE. CONSULT WITH CO TO
DETERMINE EXACT ROUTE AND
NECESSARY IMPROVEMENTS.
3. PEDESTRIAN ACCESS FROM INSIDE
MILL TO ORE CHUTE.
4. PRIMARY PEDESTRIAN ACCESS TO
NORTH ELEVATION PROJECT AREA
IS THROUGH MILL TO LEVEL 6 OR
LEVEL 7 EXITS.
5. NPS TO CLEAR HATCHED AREA IN
ADVANCE OF CONTRACT TO
PERMIT CONTRACTOR TO ERECT
SCAFFOLD FOR WALL AND
COLUMN REPAIRS.
6. ASSUMED AREA FOR SCAFFOLDING
TO ACCESS NORTH WALL. NPS TO
SUPPLY SCAFFOLDING TO
CONTRACTOR; CONTRACTOR TO
INSTALL.
7. NPS TO CLEAR AND STABILIZE
DECK PRIOR TO START OF
PROJECT.
8. AVOID DISTURBANCE OF HISTORIC
STAIR AND INCLINE
EXISTING
DECK
DN
OF ELEVATO
SHAFT
BOTTOMBOTTOM
LEVEL 6
EXIT
EXIT
LEVEL 7
EXISTING DECK
DN
OF ELEVATO
SHAFT
BOTTOMBOTTOM
LEVEL 6
EXIT
EXIT
LEVEL 7
EXISTING DECK
G004
SCAFFOLDING AREA
HISTORIC CRIBBING
DETERIORATED)
DEPTH 6' +
CO
NV
EY
OR
D
EC
K
MO
TO
R
HO
US
IN
G
BU
ILT
-2
4 (
PR
OT
EC
T)
DECK AT LEVEL 7
LEVEL 7 EXIT
NORTH ELEVATION
SCAFFOLDING
SHEET
OF
PMIS/PKG NO.
DRAWING NO.
80,137A
SUB SHEET NO.DESIGNED:
CADD:
TECH REVIEW:
DATE:
TITLE OF SHEET
VOLUME 1ST
F
RO
P
ISTE H
A
SS NOI ARL C
A
T
K
ER
IG RE
DE
F
49th
EAT
O LA SA
CE
TNo. AELA-7917
Scott A. Bohne
WVZ
Checker
TM
G004
CONSTRUCTON ACCESS
MAP
KENNECOTT PHASE 3 MILL
BUILDING STABILIZATION2019.05.24
WRST 159092C
2019.05.24
PLAN
NORTH
0' 6" 1' 2'100' 200' 400' 1" = 200'-0"G004
1 CONSTRUCTION ACCESS MAP
1" = 100'-0"G004
2 SCAFFOLDING DIAGRAM - PLAN
1" = 100'-0"G004
3 SCAFFOLDING DIAGRAM - ELEVATION
PLAN
NORTH
0' 6" 1' 2'50' 100' 200'
0' 6" 1' 2'50' 100' 200'
AKM
KENNECOTT PHASE 3 MILL
BUILDING STABILIZATION
2019.05.24
WRST 159092C
BSD
VOLUME 1
SHEET
OF
PMIS/PKG NO.
DRAWING NO.
80,137 A
SUB SHEET NO.DESIGNED:
CADD:
TECH REVIEW:
DATE:
TITLE OF SHEET
C101
OVERALL SITE PLAN
SCALE: 1" = 100'
C101
OVERALL SITE PLAN
AutoCAD SHX Text
FUEL TANK
AutoCAD SHX Text
FUEL TANKS
AutoCAD SHX Text
UNSTABLE
AutoCAD SHX Text
SLOPE
AutoCAD SHX Text
NATIONAL
AutoCAD SHX Text
CREEK
AutoCAD SHX Text
LEACHING PLANT
AutoCAD SHX Text
SILK STOCKING ROAD
AutoCAD SHX Text
KENNECOTT GLACIER
AutoCAD SHX Text
POWER HOUSE
AutoCAD SHX Text
MACHINE
AutoCAD SHX Text
SHOP
AutoCAD SHX Text
STORE
AutoCAD SHX Text
SCHOOL
AutoCAD SHX Text
HOUSE
AutoCAD SHX Text
KENNECOTT GLACIER
AutoCAD SHX Text
LODGE
AutoCAD SHX Text
DAIRY
AutoCAD SHX Text
BARN
AutoCAD SHX Text
TENNIS COURT
AutoCAD SHX Text
REMNANTS OF 100,000 GALLON WATER TANK
AutoCAD SHX Text
APPROXIMATE LIMITS OF CONSTRUCTION
AutoCAD SHX Text
NO ACCESS
AutoCAD SHX Text
NO ACCESS
AutoCAD SHX Text
CONSTRUCTION ACCESS
AutoCAD SHX Text
CONTRACTOR STAGING AREA. SEE DETAIL 3/C102
AutoCAD SHX Text
MILL BUILDING
AutoCAD SHX Text
ACCESS ROAD
AutoCAD SHX Text
HISTORIC STAIR DO NOT DISTURB
AutoCAD SHX Text
HISTORIC INCLINE DO NOT DISTURB
AutoCAD SHX Text
ORE CART TRACKS DO NOT DISTURB
AutoCAD SHX Text
ACCESS ROAD
AutoCAD SHX Text
FOOT TRAFFIC ONLY
AutoCAD SHX Text
ORE CHUTE
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
GRAPHIC SCALE
AutoCAD SHX Text Q:\22\62780-01\65CAD\Civil\MC16-CS-KENNECOTT-62780.dwg PLOT DATE 2019-5-23 08:57 SAVED DATE 2019-05-23 08:57 USER: rschrank PLOT DATE 2019-5-23 08:57 SAVED DATE 2019-05-23 08:57 USER: rschrank 2019-5-23 08:57 SAVED DATE 2019-05-23 08:57 USER: rschrank 08:57 SAVED DATE 2019-05-23 08:57 USER: rschrank 08:57 SAVED DATE 2019-05-23 08:57 USER: rschrank SAVED DATE 2019-05-23 08:57 USER: rschrank 2019-05-23 08:57 USER: rschrank 08:57 USER: rschrank 08:57 USER: rschrank USER: rschrank rschrank
AutoCAD SHX Text
TRUE
AutoCAD SHX Text
NORTH
AutoCAD SHX Text
PLAN
AutoCAD SHX Text
NORTH
AutoCAD SHX Text CONTRACTOR STORAGE AREAS: 1. NPS STORAGE AREA ON WEST SIDE OF KENNECOTT RIVER. (SEE 1/C102) NPS STORAGE AREA ON WEST SIDE OF KENNECOTT RIVER. (SEE 1/C102) 2. DESIGNATED AREA AT "DAIRY BARN SITE". (SEE 2/C102) DESIGNATED AREA AT "DAIRY BARN SITE". (SEE 2/C102) 3. ACCESS TO MILL TOWN LIMITED TO 10 MPH. ACCESS TO MILL TOWN LIMITED TO 10 MPH. 4. ACCESS TO TOP OF MILL IS APPROXIMATELY 1 MILE FROM DAIRY BARN. ACCESS TO TOP OF MILL IS APPROXIMATELY 1 MILE FROM DAIRY BARN. 5. STAGING AREAS MUST AVOID ALL HISTORIC FEATURES. ARTIFACTS, IF PRESENT, MAY BE DOCUMENTED BY NPS ARCHAEOLOGIST AND TEMPORARILY REMOVED TO PROVIDE ACCESS. CONSULT NPS CO IF HISTORIC FEATURES ARE DISCOVERED IN PROPOSED STORAGE AREAS.
AutoCAD SHX Text
JUMBO TRAM
AutoCAD SHX Text
BONANZA TRAM
AutoCAD SHX Text
NO ACCESS
AutoCAD SHX Text
ACCESS TO TOP OF MILL
tmullins Highlight
KENNECOTT PHASE 3 MILL
BUILDING STABILIZATION
2019.05.24
WRST 159092C
BSD
VOLUME 1
SHEET
OF
PMIS/PKG NO.
DRAWING NO.
80,137 A
SUB SHEET NO.DESIGNED:
CADD:
TECH REVIEW:
DATE:
TITLE OF SHEET
C102
CONTRACTOR STAGING/LAYDOWN AREA (WEST SIDE DEVELOPMENT)
NTS
C102
CONTRACTOR STAGING/LAYDOWN AREA (MAINTENANCE YARD)
NTS
C102
CONTRACTOR STAGING
LAYDOWN AREAS
C102
CONTRACTOR STAGING/LAYDOWN AREA (TOP OF MILL BUILDING)
NTS
AutoCAD SHX Text
TRAM TO BONANZA MINE
AutoCAD SHX Text
CABLE
AutoCAD SHX Text
STORE
AutoCAD SHX Text
CONTRACTOR STAGING AREA APPROXIMATELY 600 SF
AutoCAD SHX Text
PUBLIC ACCESS PATH TO BE MAINTAINED SEE NOTE 1
AutoCAD SHX Text
MILL BUILDING
AutoCAD SHX Text Q:\22\62780-01\65CAD\Civil\MC16-CS-KENNECOTT-62780.dwg PLOT DATE 2019-5-23 08:56 SAVED DATE 2019-05-23 08:55 USER: rschrank PLOT DATE 2019-5-23 08:56 SAVED DATE 2019-05-23 08:55 USER: rschrank 2019-5-23 08:56 SAVED DATE 2019-05-23 08:55 USER: rschrank 08:56 SAVED DATE 2019-05-23 08:55 USER: rschrank 08:56 SAVED DATE 2019-05-23 08:55 USER: rschrank SAVED DATE 2019-05-23 08:55 USER: rschrank 2019-05-23 08:55 USER: rschrank 08:55 USER: rschrank 08:55 USER: rschrank USER: rschrank rschrank
AutoCAD SHX Text
BATH HOUSE
AutoCAD SHX Text
CABINS
AutoCAD SHX Text
UNPAVED RUNWAY
AutoCAD SHX Text
TREES (TYP.)
AutoCAD SHX Text
TREES (TYP.)
AutoCAD SHX Text
FUEL STORAGE
AutoCAD SHX Text
SHEDS
AutoCAD SHX Text
LEACH FIELD & SEPTIC
AutoCAD SHX Text
DAIRY BARN
AutoCAD SHX Text
BATH HOUSE
AutoCAD SHX Text
ACCESS ROAD
AutoCAD SHX Text
OLD SCHOOL
AutoCAD SHX Text
NHL ENTRY SIGN
AutoCAD SHX Text
SHUTTLE TURNAROUND
AutoCAD SHX Text McCARTHY
AutoCAD SHX Text
ROAD
AutoCAD SHX Text
KENNECOTT - 5 MILES
AutoCAD SHX Text
NPS SITE
AutoCAD SHX Text
MILL
AutoCAD SHX Text
TOWN
AutoCAD SHX Text
AREA FOR CONTRACTOR (50'X100')
AutoCAD SHX Text
AREA FOR CONTRACTOR (50'X200')
AutoCAD SHX Text
1. PRIVATE TOLL BRIDGE APPROXIMATELY 1/2 MILE TO SOUTHEAST.PRIVATE TOLL BRIDGE APPROXIMATELY 1/2 MILE TO SOUTHEAST.
AutoCAD SHX Text McCARTHY
AutoCAD SHX Text
WAGON RD
AutoCAD SHX Text
NO ACCESS
AutoCAD SHX Text
PRIVATE
AutoCAD SHX Text
TOLL BRIDGE
AutoCAD SHX Text
1. 6' WIDE PATH TO REMAIN OPEN FOR PUBLIC/NATIONAL PARK SERVICE TO PASS BEYOND CONSTRUCTION EQUIPMENT TO ACCESS MILL AND TRAIL TO NATIONAL CREEK.
AutoCAD SHX Text
1. DO NOT BLOCK VEHICLE ACCESS TO THE ADJACENT PRIVATE LOT.
AutoCAD SHX Text
TRUE
AutoCAD SHX Text
NORTH
AutoCAD SHX Text
TRUE
AutoCAD SHX Text
NORTH
AutoCAD SHX Text
TRUE
AutoCAD SHX Text
NORTH
THE FOLLOWING NOTES APPLY UNLESS INDICATED OTHERWISE:
CODE:
INTERNATIONAL EXISTING BUILDING CODE, 2015 EDITION
PROVISIONS FOR HISTORIC STRUCTURES:
ALL EXISTING OR PREVIOUSLY EXISTING STRUCTURAL MEMBER OR CONNECTION SHALL BE REPLACED WITH LIKE MATERIALS AND SIMILAR CONSTRUCTION METHODS AS THE ORIGINAL/EXISTING CONSTRUCTION. NEW ELEMENTS THAT WERE NOT PART OF THE ORIGINAL CONSTRUCTION SHALL MEET THE REQUIREMENTS OF THE INTERNATIONAL BUILDING
CODE, 2015 EDITION.
SUBGRADE PREPARATION:
CONSTRUCT FOOTINGS ON FIRM CONSOLIDATED NATIVE SOILS. REMOVE SOILS CONTAINING ORGANICS, WOOD OR OTHER CONSTRUCTION DEBRIS, OR OTHER MATERIALS THAT MAY COMPROMISE SUBGRADE STRUCTURAL INTEGRITY, AND REPLACE WITH COMPACTED GRANULAR FILL. PLACE IN 6" MAXIMUM LIFTS AND COMPACT TO 95%.
DESIGN SOIL PRESSURE:
ALLOWABLE DESIGN SOIL PRESSURES ARE LISTED IN SOILS REPORT DATED NOV 23, 2010, DIVISION 1. PRESSURES VARY WITH FOOTING TYPE, FOOTING WIDTH, AND FOOTING DEPTH. REPRESENTATIVE VALUES ARE AS FOLLOWS:
STRIP FOOTING, 12” WIDE, 12” DEEP – 2000 PSF
STRIP FOOTING, 36” WIDE, 24” DEEP – 4800 PSF
SPREAD FOOTING, 24” SQUARE, 12” DEEP – 2500 PSF
SPREAD FOOTING, 36” SQUARE, 24” DEEP – 3100 PSF
EQUIVALENT LATERAL FLUID PRESSURES:
FOR EXISTING CRIBBING RETAINING WALLS
DEPTH (FEET) PRESSURE (PSF)
2 90 4 170 6 240 8 290 10 335 12 375 14 405 16 435
DESIGN LIVE LOADS
THE LOADING CRITERIA BELOW APPLIES ONLY TO NEW PORTIONS OF THE STRUCTURE THAT WERE NOT PART OF THE
ORIGINAL CONSTRUCTION:
ROOF Pg = 60 PSF, I = 1.0 Ce = 0.9, Ct=1.2, Pf=46 PSF
FLOORS 50 PSF
WALKWAYS 80 PSF
STRUCTURAL STEEL:
ALL STEEL ASTM A36, EXCEPT WIDE FLANGE SECTIONS TO BE ASTM A992, OR A572-50. FABRICATION AND ERECTION PER
AISC SPECIFICATIONS. STEEL TO BE BARE AND UNPAINTED.
WELDING PER AWS D1.1. MINIMUM SIZE WELDS 3/16" CONTINUOUS FILLET. WELDERS CERTIFIED PER AMERICAN WELDING SOCIETY FOR ROD AND POSITION. ELECTRODES SHALL BE E70XX MINIMUM, WITH MINIMUM CHARPY V-NOTCH
TOUGHNESS OF 20 FT-LB AT -20 DEG F.
HIGH-STRENGTH BOLTS PER ASTM A325, HOT DIP GALVANIZED.
WELDING & HOT WORK OF ANY KIND ARE NOT PERMITTED INSIDE THE BUILDING. ALL WELDING OR HOT WORK
PERFORMED ON SITE MUST BE PRE-APPROVED WITH THE NPS CONTRACTING OFFICER.
HISTORICAL WASHERS SHALL BE "MALLEABLE IRON WASHERS" BY PORTLAND BOLT COMPANY OR APPROVED
EQUIVALENT.
GLUED-LAMINATED TIMBER:
BEAMS AND GIRDERS - DOUGLAS FIR SPECIES, COMBINATION 24F-V4 FOR SIMPLE SPANS AND COMBINATION 24F-V8 FOR CONTINUOUS AND CANTILEVER SPANS, Fb = 2400 PSI. FABRICATE PER ANSI/AITC A190.1. PROVIDE WET-USE ADHESIVES.
MOISTURE CONTENT - 19 PERCENT MAXIMUM. SUBMIT SHOP DRAWINGS. TREAT WITH PRESERVATIVE. CAMBER FLOOR
BEAMS L/600 AT MIDSPAN.
STRUCTURAL SAWN LUMBER:
LUMBER VISUALLY GRADED PER WWPA STANDARD GRADING RULES. LUMBER SHALL NOT BE STAMPED. MOISTURE
CONTENT OF LUMBER 2" OR LESS IN THICKNESS - 19 PERCENT MAXIMUM.
BEAMS AND STRINGERS – DOUGLAS FIR - LARCH SPECIES, NO. 2 GRADE OR BETTER, Fb = 875 PSI.
POSTS AND TIMBERS – DOUGLAS FIR - LARCH SPECIES, NO. 2 GRADE OR BETTER, Fc = 700 PSI.
TREAT ALL HEAVY TIMBER (5"x5" OR LARGER) WITH PRESERVATIVE, ACQ-B INCISED, 0.6 PCF RETENTION. USE HOT DIP GALVANIZED MILD STEEL PLATE WASHERS AT ALL BOLT HEADS AND NUTS BEARING ON WOOD. USE COMMON NAILS ONLY, STAINLESS STEEL. USE STAINLESS STEEL FASTENERS IN ALL PRESERVATIVE TREATED WOOD. ALL VISIBLE
LUMBER TO BE BROWN TREATED.
MISCELLANEOUS:
CONTRACTOR SHALL VERIFY ALL EXISTING DIMENSIONS, MEMBER SIZES AND CONDITIONS PRIOR TO COMMENCING WORK. ALL DIMENSIONS OF EXISTING CONSTRUCTION SHOWN ON THE DRAWINGS ARE INTENDED AS GUIDELINES ONLY
AND MUST BE VERIFIED. THE EXISTING CONDITIONS SHOWN ON THE DRAWINGS ARE BASED ON
EITHER SITE OBSERVATION, ORIGINAL DRAWINGS OR WERE ASSUMED BASED ON EXPECTED
CONDITIONS. IF THE EXISTING CONDITIONS DO NOT CLOSELY MATCH THE CONDITIONS SHOWN
ON THE DRAWINGS, OR IF THE EXISTING MATERIALS ARE OF QUESTIONABLE OR SUBSTANDARD
QUALITY, NOTIFY THE CONTRACTING OFFICER PRIOR TO COMMENCING WORK.
DRAWINGS INDICATE GENERAL AND TYPICAL DETAILS OF CONSTRUCTION. WHERE CONDITIONS ARE NOT SPECIFICALLY INDICATED BUT ARE OF SIMILAR CHARACTER TO DETAILS SHOWN, SIMILAR DETAILS OF CONSTRUCTION SHALL BE USED
SUBJECT TO REVIEW AND APPROVAL BY THE NPS CO.
PROVIDE TEMPORARY ERECTION BRACING AND SHORING FOR STABILITY OF THE STRUCTURE DURING ALL PHASES OF CONSTRUCTION. THE DESIGN AND IMPLEMENTATION OF SHORING NOT SPECIFICALLY ADDRESSED IN THESE DRAWINGS AND NOT EXPLICITLY UNDERTAKEN BY THE NPS CO IS THE RESPONSIBILITY OF THE CONTRACTOR.
REFER TO SPECIFICATIONS FOR INFORMATION NOT CONTAINED IN THESE GENERAL NOTES.
SPECIAL INSPECTION:
THE GENERAL CONTRACTOR IS RESPONSIBLE FOR ALL SPECIAL INSPECTIONS. SPECIAL INSPECTION REPORTS SHALL BE PROVIDED TO THE NPS CO AND THE ENGINEER. ANY DISCREPANCIES WITH THE CONTRACT DOCUMENTS IDENTIFIED BY
THE SPECIAL INSPECTOR SHALL BE REMEDIED PRIOR TO COMMENCING WITH WORK.
PROVIDE THE FOLLOWING SPECIAL INSPECTIONS PER SECTION 1704 OF THE 2015 INTERNATIONAL BUILDING CODE (IBC):
VERIFICATION AND INSPECTION OF SOILS:
1. VERIFY MATERIALS BELOW FOOTINGS ARE ADEQUATE TO ACHIEVE THE DESIGN BEARING CAPACITY:
A. PROVIDE PERIODIC INSPECTION PRIOR TO PLACING FILL OR FOUNDATIONS TO DETERMINE THAT SOILS HAVE BEEN PREPARED IN ACCORDANCE WITH THESE GENERAL NOTES AND THE CIVIL DOCUMENTS. DURING PLACEMENT OF FILL CONFIRM THAT MATERIALS PLACED AND MAXIMUM LIFT COMPLY WITH THESE GENERAL NOTES AND THE
CIVIL DOCUMENTS.
VERIFICATION AND INSPECTION OF CONCRETE CONSTRUCTION:
1. INSPECTION OF REINFORCING STEEL AND PLACEMENT. ACI 318: 3.5, 7.1-7.7:
A. PERIODIC INSPECTION PRIOR TO CLOSING THE FORMS AND DELIVERY OF CONCRETE TO THE SITE.
B. PERIODIC INSPECTION OF PLACEMENT OF REINFORCING.
C. PERIODIC VERIFICATION OF MILL REPORT FOR MATERIAL.
2. PROVIDE CONTINUOUS INSPECTION OF ANCHOR BOLTS TO BE INSTALLED IN CONCRETE PRIOR TO AND DURING
PLACEMENT OF CONCRETE.
3. PERIODICALLY VERIFY USE OF REQUIRED DESIGN MIX. ACI 318: CH. 4, 5.2-5.4.
4. CONTINUOUSLY INSPECT DURING THE PLACING OF CONCRETE FOR PROPER APPLICATION TECHNIQUES.
5. OBSERVE THE SAMPLING OF CONCRETE FOR MOULDING TEST SPECIMENS. ASTM C 172, ASTM C 31, ACI 318: 5.6, 5.8:
A. PROVIDE CONTINUOUS INSPECTION DURING THE TAKING OF TEST SPECIMENS FOR SLUMP, AIR
ENTRAINMENT, AND COMPRESSIVE STRENGTH CYLINDERS FOR A MINIMUM OF ONE HOUR AT THE
BEGINNING OF EACH POUR.
6. PERIODICALLY INSPECT FOR MAINTENANCE OF SPECIFIED CURING TEMPERATURE AND TECHNIQUES.
ACI 318: 5.11-5.13.
7. PERIODICALLY INSPECT FORMWORK FOR SHAPE, LOCATION AND DIMENSIONS OF THE CONCRETE MEMBER BEING
FORMED. ACI 318: 6.1.1.
VERIFICATION AND INSPECTION OF DRILLED ANCHORS:
1. ADHESIVE ANCHORS:
A. CONTINUOUSLY INSPECT DURING THE DRILLING AND PLACEMENT IN ACCORDANCE WITH THE ADHESIVE
ANCHOR MANUFACTURER’S ICC EVALUATION SERVICE REPORT.
2. EXPANSION ANCHORS IN CONCRETE:
A. CONTINUOUSLY INSPECT DURING THE DRILLING AND PLACEMENT IN ACCORDANCE WITH THE
EXPANSION ANCHOR MANUFACTURER’S ICC EVALUATION SERVICE REPORT.
3. CONCRETE SCREW ANCHORS:
A. PERIODICALLY INSPECT DURING THE PLACEMENT OF SCREW ANCHORS IN ACCORDANCE WITH THE
SCREW ANCHOR MANUFACTRUER’S ICC EVALUATION SERVICE REPORT.
(A) ABOVE
AB ANCHOR BOLT
A/C ASPHALITC CONCRETE
ACI AMERICAN CONCRETE INSTITUTE
ADDL ADDITIONAL
AGGR AGGREGATE
AISC AMERICAN INSTITUTE OF STEEL CONSTRUCTION
AISI AMERICAN IRON AND STEEL INSTITUTE
AITC AMERICAN INSTITUTE OF TIMBER CONSTRUCTION
ALT ALTERNATE
ALUM ALUMINUM
ARCH ARCHITECT, ARCHITECTURAL
@ AT
APPROX APPROXIMATELY
ASCE AMERICAN SOCIETY OF CIVIL ENGINEERS
ASPH ASPHALT
ASTM AMERICAN SOCIETY FOR TESTING MATERIAL
AWS AMERICAN WELDING SOCIETY
& AND
(B) BELOW
B BOTTOM (BEAM AND JOIST SCHEDULES ONLY)
BD BOARD
BITUM BITUMINOUS
BL BUILDING LINE
BLDG BUILDING
BLK BLOCK
BLKG BLOCKING
BOD BOTTOM OF DECK ELEVATION
BM BEAM
BOT BOTTOM
BRG BEARING
BSMT BASEMENT
BTWN BETWEEN
C AMERICAN CHANNELS
CB CATCH BASIN
CG CENTER OF GRAVITY
CJ CONSTRUCTION JOINT
CIP CAST-IN-PLACE
CL CENTER LINE
CJP COMPLETE JOINT PENETRATION
CLKG CAULKING
CLR CLEAR
CMP CORRUGATED METAL PIPE
CMU CONCRETE MASONRY UNIT
CO CLEANOUT, CONCRETE OPENING
COL COLUMN
CONC CONCRETE
CONN CONNECTION
CONSTR CONSTRUCTION
CONT CONTINUOUS
CONTR CONTRACTOR
CTJ, CJ CONTROL JOINT, CONTRACTION JOINT
CTR CENTER
CTSK COUNTERSUNK
CU CUBIC
DBL DOUBLE
DEPT DEPARTMENT
DET DETAIL
DIA OR Ø DIAMETER
DIAA DRILLED-IN ADHESIVE ANCHOR
DIAB DRILLED-IN ADHESIVE BOLT
DIAG DIAGONAL
DIAPH DIAPHRAGM
DIEB DRILLED-IN EXPANSION BOLT
DIM DIMENSION
DN DOWN
do DITTO
DP DEEP
DWG DRAWING
DWL DOWEL
E EAST
EA EACH
EB EXPANSION BOLT
EF EACH FACE
EXJ EXPANSION JOINT
EL ELEVATION (HEIGHT)
ELEC ELECTRICAL
ELEV ELEVATOR
ENCL ENCLOSURE
ENGR ENGINEER
EOD EDGE OF DECK
EQ EQUAL
EQJ EARTHQUAKE JOINT
EQUIP EQUIPMENT
ES EACH SIDE
EW EACH WAY
EXIST, (E) EXISTING
EXP EXPANSION
EXT EXTERIOR
FD FLOOR DRAIN
FDN FOUNDATION
FIN FINISH, FINISHED
FF FINISHED FLOOR, FAR FACE
FLG FLANGE
FLR FLOOR
FLASH FLASHING
FOS FACE OF STUDS
FRMG FRAMING
FP FIREPROOF, FULL PENETRATION
FS FINISH SLAB ELEVATION, FAR SIDE
FT OR ‘ FOOT, FEET
FTG FOOTING
FUT FUTURE
FV FIELD VERIFY
GA GAUGE, GAGE
GALV GALVANIZED
GEN GENERAL
GIRD GIRDER
GL GLUE LAMINATED
GND GROUND
GR GRADE
GWB GYPSUM WALL BOARD
GYP GYPSUM
HDG HOT DIPPED GALVANIZED
HEF HORIZONTAL EACH FACE
HORIZ HORIZONTAL
HP HIGH POINT, HP STEEL SHAPE
HSB HIGH STRENGTH BOLT
HT HEIGHT
IBC INTERNATIONAL BUILDING CODE
ID INSIDE DIAMETER
IE INVERT ELEVATION
IF INSIDE FACE
IN OR “ INCH
INCL INCLUDE
INSUL INSULATION, INSULATED, INSULATE
INT INTERIOR
JT JOINT
JST JOIST
K KIP, KIPS
KSI KIPS PER SQUARE INCH
LB OR # POUND
LLBB LONG LEG BACK TO BACK
LLH LONG LEGS HORIZONTAL
LLV LONG LEGS VERTICAL
LONGIT LONGITUDINAL
LP LOW POINT
LSL LONG SLOTTED HOLES
LT LIGHT
LT WT LIGHT WEIGHT
L ANGLE
LVF LOW VELOCITY FASTENERS
LVL LEVEL
M MISCELLANEOUS SHAPE
MAS MASONRY
MATL MATERIAL
MAX MAXIMUM
MC MISCELLANEOUS CHANNEL SECTION
MECH MECHANICAL
MEMB MEMBRANE
MFR MANUFACTURER
MFRG MANUFACTURING
MIN MINIMUM
MISC MISCELLANEOUS
MT STRUCTURAL TEE FROM M SERIES SECTION
MTD MOUNTED
MTL METAL
N NORTH
NDT NON-DESTRUCTIVE TESTING
NF NEAR FACE
NIC NOT IN CONTRACT
No OR # NUMBER
NOM NOMINAL
NS NEAR SIDE
NTS NOT TO SCALE
OA OVERALL
OC ON CENTER
OD OUTSIDE DIAMETER
OF OUTSIDE FACE
OPNG OPENING
OPP OPPOSITE
OVS OVERSIZED
P/C PRECAST
PERP PERPINDICULAR
PJ PANEL JOINT
PL PLATE (STEEL), PROPERTY LINE
PL PLATE (WOOD)
PLCS PLACES
PLWD PLYWOOD
PP PARTIAL PENETRATION
P/S PRESTRESSED
PSF POUNDS PER SQUARE FOOT
PSI POUNDS PER SQUARE INCH
PSL PARALLEL STRAND LUMBER
PT PRESSURE TREATED
P/T POST TENSION
PVC POLYVINYL CHLORIDE
PVMT PAVEMENT
R RADIUS
RD ROOF DRAIN, ROUND
O ROUND
REF REFERENCE
REINF REINFORCING, REINFORCEMENT, REINFORCED
REQD REQUIRED
RO ROUGH OPENING
S AMERICAN STANDARD STEEL SHAPE, SOUTH
SCHED SCHEDULE
SEC- SECTION
SH SHEAR PLATE
SHT SHEET
SHTG SHEETING
SHTHG SHEATHING
SIM SIMILAR
SIP STRUCTURAL INSULATED PANEL
SLBB SHORT LEGS BACK TO BACK
SMS SHEET METAL SCREWS
SP SPIRAL
SPA SPACE, SPACING SPACES
SPEC SPECIFICATION
SQ SQUARE
SS STAINLESS STEEL
SSL SHORT SLOTTED HOLE
ST STRUCTURAL T FROM S SERIES SECTION
STA STATION
STD STANDARD
STIFF STIFFENED
STIRR STIRRUP
STL STEEL
STRUCT STRUCTURAL
SUP STRUCTURAL USE PANEL
SUPT SUPPORT
SUSP SUSPENDED
SYMM SYMMETRICAL
T TOP
TC TOP OF CURB
T&G TOUNGE AND GROOVE
TEMP TEMPERATURE, TEMPORARY
THK THICK
THRU THROUGH
TOB TOP OF BEAM ELEVATION
TOC TOP OF CONCRETE ELEVATION,
TOP OF CMU ELEVATION
TOF TOP OF FOOTING ELEVATION
TOS TOP OF STEEL ELEVATION
TOW TOP OF WALL ELEVATION
TP TOP OF PAVEMENT
TRANS TRANSVERSE
TS STRUCTURAL TUBE
TYP TYPICAL
UBC UNIFORM BUILDING CODE
UL UNDERWRITERS LABORATORY
UON UNLESS OTHERWISE NOTED
UT ULTRASONIC TEST
VEF VERTICAL EACH FACE
VERT VERTICAL
VIF VERTICAL EACH FACE
VOF VERTICAL OUTSIDE FACE
W WEST, W SERIES SECTION
W/ WITH
W/O WITHOUT
WD WOOD
WH WEEP HOLE
WP WATERPROOF, WORK POINT
WPJ WEAKENED PLANE JOINT
WT WEIGHT, STRUCTURAL TEE FROM W SERIES SECTION
WWF WELDED WIRE FABRIC
YD YARD
TYPICAL ABBREVIATIONS
A K
AF AL
T S
TA
E O
49 TH
S
REG ISTERED S TRUCTURA L ENG I NEER5-24-2019
GREG LATREILLE
SE 13870 SHEET
OF
PMIS/PKG NO.
DRAWING NO.
80,137A
SUB SHEET NO.DESIGNED:
CADD
TECH
DATE
TITLE OF
VOLUME 1
GOL
GOL
E :\R ev it
P ro je ct
P at h\
-r
_g la tr ei lle bb fm
.c om
.r vt
7/
/2
2:
:3
P
M
CMS
S001
GENERAL NOTES &
ABBREVIATIONS
KENNECOTT PHASE 3 MILL
BUILDING STABILIZATION5/24/2019
WRST 159092C
GENERAL NOTES
N4 N7 N11 N17 N20N1 N3
M
P
R
U
W
Y
BB
CC
DD
EE
FF
GG
HH
JJ
3 /S301
REPAIR BUMP-
OUT OF (E) WALL
PER 2/S303
(E) ANCHOR CABLE
(E) ANCHOR CABLE
(E) ANCHOR CABLE
LEVEL 8
(E) TIE ROD
50' - 11"
8' - 7" 6' - 5 1/2" 5' - 9 1/2" 10' - 4" 9' - 6" 10' - 3"
7'
1/
2" 6'
1/ 2"
7'
1/
2" 8'
3"
8'
1" 7'
8'
1/ 2"
7'
/4
8'
3/
4" 8'
1/ 2"
7'
1/
2" 8'
1/ 2"
8'
2"
NEW FRAME LINE
/S
1 /S301
S303
/S
S101
S101
A K
AF AL
T S
TA
E O
49 TH
S
REG ISTERED STRUC TURA L ENG INEER5-24-2019
GREG LATREILLE
SE 13870 SHEET
OF
PMIS/PKG NO.
DRAWING NO.
80,137A
SUB SHEET NO.DESIGNED:
CADD
TECH
DATE
TITLE OF
VOLUME 1
GOL
GOL
E :\R ev it
P ro je ct
P at h\
-r
_g la tr ei lle bb fm
.c om
.r vt
5/
/2
4:
:4
P
M
CMS
S101
LOWER WEST TOWER
FLOOR FRAMING PLAN
KENNECOTT PHASE 3 MILL
BUILDING STABILIZATION5/24/2019
WRST 159092C
1/8" = 1'-0"1
LEVEL SEVEN-D AND
LEVEL EIGHT FLOOR PLAN NORTH
NOTES:
1. FIELD VERIFY ALL DIMENSIONS.
0 5 10 20 30
NTS2
NORTH WALL PHOTO
NTS3
NORTH WALL PHOTO
P
R
U
W
Y
BB
CC
DD
EE
FF
GG
HH
JJ
3 /S301
(E) 1 3/4x7 1/4
@ 16" OC
(E ) 7
/4 x7
/4
(E ) 7
/4 x7
/4
(E ) 7
/4 x7
/4
(E ) 7
/4 x7
/4
(E ) 7
/4 x7
/4
(E ) 7
/4 x7
/4
(E ) 7
/4 x7
/4
NEW FRAME LINE
(E) ANCHOR CABLE
LEVEL 9
7'
1/
2" 6'
1/ 2"
7'
1/
2" 8'
3"
8'
1" 7'
8'
1/ 2"
7'
/4
8'
3/
4" 8'
1/ 2"
7'
1/
2" 8'
1/ 2"
8'
2"
8' - 7" 6' - 5 1/2" 5' - 9 1/2" 10' - 4" 9' - 6" 10' - 3"
/S
1 /S301
REMOVE SURFACE DEBRIS
& LEVEL (E) ORE IN ORE BIN
TO +/- 1'-0". SEE SECTIONS
/S
(E) SCAFFOLD TO REMAIN
NEW PERMANENT
SCAFFOLD/SUPPORT
S201
N4 N7 N11 N17 N20N1 N3
MM
PP
RR
UU
WW
YY
BBBB
CCCC
DDDD
EEEE
FFFF
GGGG
HHHH
JJJJ
(E)
(E)
(E
(E
(E
(E) TRUSS
(E) TRUSS
(E) TRUSS
(E) TRUSS
(E) TRUSS
(E) 7 3/4x7 3/4
(E)
(E)
REPLACE FLOOR FRAMING
(E) ANCHOR CABLE
NEW
7 1/2x7 1/2
COL
NEW
7 1/2x7 1/2
COL
NEW
7 1/2x7 1/2
COL
NEW
7 1/2x7 1/2
COL
NEW
7 1/2x7 1/2
COL
NEW
7 1/2x7 1/2
COL
LEVEL 10
LEVEL 11
7'
1/
2" 6'
1/ 2"
7'
1/
2" 8'
3"
8'
1" 7'
8'
1/ 2"
7'
/4
8'
3/
4" 8'
1/ 2"
7'
1/
2" 8'
1/ 2"
8'
2"
8' - 7" 6' - 5 1/2" 5' - 9 1/2" 10' - 4" 9' - 6" 10' - 3"
NEW CONT
9 1/4x9 1/4
TO REPLACE
(E) 7 3/4x7 3/4
TYP THIS LINE
NEW CONT
9 1/4x9 1/4
TO REPLACE
(E) 7 3/4x7 3/4
TYP THIS LINE
S501 3 /S302
1 /S302
2 /S302
1 /S303
NEW PERMANENT
SHORING
BELOW DECK
/S
1 /S301
2 /S302
1 /S302
3 /S302
3 /S302
NEW FRAME LINE N
E
W F
R A
M E
N E
W F
R A
M E
N E
W F
R A
M E
N E
W F
R A
M E
N E
W F
R A
M E
/S
NEW PERMANENT
SHORING
BELOW DECK
(E) SHORING
BELOW DECK
TO REMAIN
S201
S201 3
S201
S201
A K
AF AL
T S
TA
E O
49 TH
S
REG ISTERED STRUC TURA L ENG INEER5-24-2019
GREG LATREILLE
SE 13870 SHEET
OF
PMIS/PKG NO.
DRAWING NO.
80,137A
SUB SHEET NO.DESIGNED:
CADD
TECH
DATE
TITLE OF
VOLUME 1
GOL
GOL
E :\R ev it
P ro je ct
P at h\
-r
_g la tr ei lle bb fm
.c om
.r vt
5/
/2
4:
:4
P
M
CMS
S102
UPPER WEST TOWER &
ORE BIN FRAMING PLANS
KENNECOTT PHASE 3 MILL
BUILDING STABILIZATION5/24/2019
WRST 159092C
1/8" = 1'-0"1
LEVEL NINE FLOOR PLAN
NORTH
1/8" = 1'-0"2
LEVEL TEN AND LEVEL
ELEVEN - WEST FLOOR PLAN
NORTH
NOTES:
1. FIELD VERIFY ALL DIMENSIONS.
NOTE:
FIELD VERIFY ALL DIMENSIONS.
0 5 10 20 30 0 5 10 20 30
N4 N7 N11 N17 N20N3
B
C
D
E
A
F
G
H
I
J
K
M
(E ) 7
3/ 4x
7 3 /4
(E ) 7
3/ 4x
7 3 /4
(E) WALL BELOW
3x8
N21
LEVEL 11
6' - 5 1/2" 5' - 9 1/2" 10' - 4" 9' - 6" 10' - 3" 13' - 7"
/4
1'
9" 8'
0"
2'
/4 " 4'
/4
/4
1' - 1 1/2" 8' - 8 1/2"
10' - 0 1/2"
12' - 6"
16' - 0"
8'
1/
4"
6' - 5 1/2" 5' - 9 1/2" 10' - 4" 9' - 6" 10' - 3" 13' - 7"
SHADED AREA
IS 6'-0" WIDE
WALKWAY
F1
WALKWAY
FRAME
NUMBER
F2
F3
F4
F5
F6
S103
2x12 @ 16" O C
2 - 8 x8
SLEEPERS
S501
S501
2x6
DECKIN
G
2 - 2x12
(E) FRMG TO REMAIN
(E) FRMG TO REMAIN
(E) FRMG TO REMAIN
S201
S201
S201
S502
8' - 9 3
/4"
12'
- 1
1 1/ 4"
12'
- 5
2x12
CANTILEVER
EDGE GLULAMS
WALKWAY FRMG
PER 3/S103 UON
CUT (E) DECKING
AS REQD FOR
WALKWAY FRAME
COLS TYP
2x12
N4 N7 N11 N17 N20
C
D
E F
G
H
I
J
K
M
LEVEL 11-A
5' - 9 1/2" 10' - 4" 9' - 6" 10' - 3"
/4
1'
9" 8'
0"
2'
/4 "4'
/4
/4
4' - 1 3/4"
5' - 9 1/2" 10' - 4" 9' - 6" 10' - 3"
NEW8x8 COL
NEW
8x8 COL
(E) FRMG
TO REMAIN
2' - 6" 7' - 10" 5' - 7" 4' - 8"
S501
S201
CUT (E) DECKING
AS REQD FOR
NEW COLS
6x6
POST
TYP
GL5 1/8x12
2x6
DECKING
G L3
/8 x1
S501
G L3
/8 x1
G L3
/8 x1
G L3
/8 x1
GL5 1/8x12
A K
AF AL
T S
TA
E O
49 TH
S
REG ISTERED STRUC TURA L ENG INEER5-24-2019
GREG LATREILLE
SE 13870 SHEET
OF
PMIS/PKG NO.
DRAWING NO.
80,137A
SUB SHEET NO.DESIGNED:
CADD
TECH
DATE
TITLE OF
VOLUME 1
GOL
GOL
E :\R ev it
P ro je ct
P at h\
-r
_g la tr ei lle bb fm
.c om
.r vt
5/
/2
4:
:4
P
M
CMS
S103
TRAM DECK FLOOR
FRAMING PLANS
KENNECOTT PHASE 3 MILL
BUILDING STABILIZATION5/24/2019
WRST 159092C
1/8" = 1'-0"1
LEVEL ELEVEN - EAST FLOOR PLAN
1/8" = 1'-0"2
LEVEL ELEVEN - A FLOOR PLAN
NORTH
NORTH
NOTE:
FIELD VERIFY ALL
NOTE:
FIELD VERIFY ALL
0 5 10 20 30
0 5 10 20 30
1/4" = 1'-0"3
TYPICAL WALKWAY FRAMING
LEVEL 11 TRAM DECK WALKWAY NOTES:
1. THE EXISTING TRAM DECK IS BEGINNING TO FAIL AND IS NO
LONGER SAFE TO WALK ON IN SOME LOCATIONS. WALKWAY IS
INTENDED TO PROVIDE A SAFE AND STABLE ACCESS CORRIDOR
ACROSS THE TRAM DECK. WALKWAY IS CONSTRUCTED
INDEPENDNENT OF EXISTING FRAMING SO THAT TRAM DECK CAN FAIL
IN PLACE WITHOUT IMPACTING THE WALKWAY. AS TRAM DECK FAILS
IT COULD BEGIN TO CONTACT WALKWAY BRACING AND THIS SHOULD
BE INSPECTED EVERY SPRING PRIOR TO OPENING THE WALKWAY.
2. WALKWAY SUPPORT FRAMES F1-F6 LOCATIONS ARE APPROXIMATE
AND MAY BE ADJUSTED TO MINIMIZE INTERFERENCE WITH EXISTING
FRAMING AND FOUNDATIONS.
3. MAXIMUM DISTANCE BETWEEN FRAMES 16’-0”.
4. WALKWAY GL BEAMS TO BE DF 24F-V4 GRADE.
5. FRAMING HARDWARE CALLOUTS ARE PER SIMPSON COMPANY.
EQUIVALENT HARDWARE MAY BE SUBSTITUTED. ALL HARDWARE
TO BE G185 ZINC COATED (SIMPSON ZMAX OR EQUIVALENT).
P
R
U
W
Y
BB
CC
DD
EE
FF
GG
HH
JJ
SA
(E) T2
(E) T2
(E) 214066 TRUSS 2
(E) T3 ABOVE
(E) T2
(E) T3 ABOVE
(E) T2
(E) T3 ABOVE
(E) 214066 TRUSS 2
(E) T3 ABOVE
(E) 214066 TRUSS 2
(E) TRUSSES
(E) WOOD TRUSSES
TO REMAIN
3/
8"
7'
1/
2" 6'
1/ 2"
7'
1/
2" 8'
3"
8'
1" 7'
8'
1/ 2"
7'
/4
8'
3/
4" 8'
1/ 2"
7'
1/
2" 8'
1/ 2"
8'
2"
8' - 7" 6' - 5 1/2" 5' - 9 1/2" 10' - 4" 9' - 6" 10' - 3"
3 /S302
1 /S302
2 /S302
1 /S303
/S
1 /S301
2 /S302
1 /S302
3 /S302
3 /S302
/S
HH.5
S201
N4 N7 N11 N17 N20N1 N3
B
B
C
C
D
D
E
E
A
A
F
G
H
I
J
K
M
(E ) 2 x1 2 R
IDGE
(E) 2x12 RIDGE
(E) 2x12 FRAM
ING
2'-0" OC
(E) 2x12 FRAM
ING
2'-0" OC
(E) 2x12 FRAMING
@ 2'-0" OC
N21
/4
1'
9" 8'
0"
2'
/4
4'
/4
/4
8' - 7" 6' - 5 1/2" 5' - 9 1/2" 10' - 4" 9' - 6" 10' - 3" 13' - 7"
39.00°
2 /S304 NEW TRUSS2x10
@ 2'-0" OC
(E) TRAM STATION ROOF
NO WORK IN THIS AREA
2x WOOD DECKING
S502
S502
A K
AF AL
T S
TA
E O
49 TH
S
REG ISTERED STRUC TURA L ENG INEER5-24-2019
GREG LATREILLE
SE 13870 SHEET
OF
PMIS/PKG NO.
DRAWING NO.
80,137A
SUB SHEET NO.DESIGNED:
CADD
TECH
DATE
TITLE OF
VOLUME 1
GOL
GOL
E :\R ev it
P ro je ct
P at h\
-r
_g la tr ei lle bb fm
.c om
.r vt
5/
/2
4:
:4
P
M
CMS
S104
UPPER MILL ROOF
FRAMING PLAN
KENNECOTT PHASE 3 MILL
BUILDING STABILIZATION5/24/2019
WRST 159092C
1/8" = 1'-0"1
ROOF FRAMING PLAN WEST
1/8" = 1'-0"2
ROOF FRAMING PLAN EASTNORTH NORTH
NOTE:
FIELD VERIFY ALL
NOTES:
1. ELEVATIONS NOTED "AFF" IN REFERENCE TO FINISHED LEVEL 11 FLOOR.
2. FIELD VERIFY ALL DIMENSIONS.
0 5 10 20 30 0 5 10 20 30
A K
AF AL
T S
TA
E O
49 TH
S
REG ISTERED STRUC TURA L ENG INEER5-24-2019
GREG LATREILLE
SE 13870 SHEET
OF
PMIS/PKG NO.
DRAWING NO.
80,137A
SUB SHEET NO.DESIGNED:
CADD
TECH
DATE
TITLE OF
VOLUME 1
GOL
GOL
E :\R ev it
P ro je ct
P at h\
-r
_g la tr ei lle bb fm
.c om
.r vt
5/
/2
4:
:4
P
M
GOL
S201
PHOTOS
KENNECOTT PHASE 3 MILL
BUILDING STABILIZATION5/24/2019
WRST 159092C
NTS1
LEVEL 9 PHOTO
NTS2
LEVEL 9 PHOTO
NTS3
LEVEL 9 PHOTO
NTS4
LEVEL 11 PHOTO
NTS5
LEVEL 11 PHOTO
NTS6
LEVEL 11 PHOTO
NTS8
ORE BIN PHOTO
NTS7
TRAM DECK PHOTO
LEVEL 9
131' - 1"
LEVEL 11A
140' - 10"
LEVEL 11
147' - 8"
N7 N20
NEW 9 1/4x9 1/4
REMOVE WOOD DEBRIS &
LEVEL SURFACE OF (E) ORE
6 CU YD EST VOLUME DEBRIS
COVER SURFACE
W/ GEOFABRIC LINER
PER SPEC SECTION 31 05 19
NEW PERMANENT
SHORING BY CONTR
W/ ADJUSTABLE
CONNECTIONS
UNDER FLOOR
(E) SURFACE
PROFILE
2'-6"SQ
TIMBER PAD, TYP
SHORING LOAD: 850 PLF
EA SUPPORT LINE (2-TOTAL)
EXISTING
DETERIORATED TRUSS
ABANDON IN PLACE
NOTE: NEW PERMANENT SCAFFOLD SUPPORT SHOWN IS DIAGRAMATIC IN NATURE. NEW SUPPORT
TYPE AND DESIGN IS BY THE CONTRACTOR SUBJECT TO APPROVAL OF THE NPS CO.
(E) TRUSS
LEVEL 7
104' - 10"
LEVEL 7E & 8
114' - 1"
LEVEL 9
131' - 1"
LEVEL 10
146' - 9"
JJ
BO TRUSS 2
160' - 8"
REPLACE
LVL 10 FLOOR
& FRAMING
IN KIND
LVL 9 & LVL 8
FLOOR FRAMING
TO REMAIN
FIELD VERIFY
2' - 2"
NEW FRAME LINE
ADD BLKG TO LEVEL 8
EXISTING TRUSS/LATTICE
ADDED 2x4 EA SIDE
TRUSS DIAG
3 - 8d NAILS
EA END
10 1/2x10 1/2
TOP
3x7 3/4
EA SIDE
HH.5
REROUTE WALKWAY PER ARCH
(E) SHORING
TO REMAIN
(E) SHORING
REMOVE
AFTER
REPLACING
LEVEL 10
FRAMING
NEW FRAME LINE
SQUASH BLOCKS
ABOVE FLOOR BMS
S503
S503
S503
S503
LEVEL 7
104' - 10"
LEVEL 7E & 8
114' - 1"
LEVEL 9
131' - 1"
LEVEL 10
146' - 9"
N7N11N17N20
BO TRUSS 2
160' - 8"
EQUIP
EXISTING
SOUND
SUPPORT
10x10
SQUASH
BLKG UNDER
NEW COLS
NEW FRAME
LINE
6x6 SLEEPER
W/ 3/8"Ø LAG
BOLT TO
FLOOR DECK
@ 2'-0" OC
6x12
6x12
6x12 6x126x12
6x
6x6 SLEEPER
W/ 3/8"Ø LAG
BOLT TO
FLOOR DECK
@ 2'-0" OC
6x6 SLEEPER
W/ 3/8"Ø LAG
BOLT TO
FLOOR DECK
@ 2'-0" OC
REBUILD
LEVEL 10
FLOOR FRMG
IN KIND
2x4 FLAT
X-BRACING
2-10d NAIL
@ EA COL
TYP
10x10
SQUASH
BLKG UNDER
NEW COLS
S502
S502
S501
REROUTE
WALKWAY
PER ARCH
6x
6x
6x
6x
6x 62x
FL
AT
2x4 FLAT
2x
FL
AT
2x4 FLAT
6x
6x
6x
2x
FL
AT
2x4 FLAT
6x
6x
6x
REBUILD
LEVEL 10
FLOOR FRMG
IN KIND
6x
6x
6x
2x
FL
AT
2x4 FLAT
NEW FRAME LINE
6x
6x
6x
A K
AF AL
T S
TA
E O
49 TH
S
REG ISTERED S TRUCTURA L ENG I NEER5-24-2019
GREG LATREILLE
SE 13870 SHEET
OF
PMIS/PKG NO.
DRAWING NO.
80,137A
SUB SHEET NO.DESIGNED:
CADD
TECH
DATE
TITLE OF
VOLUME 1
GOL
GOL
E :\R ev it
P ro je ct
P at h\
-r
_g la tr ei lle bb fm
.c om
.r vt
7/
/2
2:
:3
P
M
CMS
S301
ELEVATIONS & SECTIONS
KENNECOTT PHASE 3 MILL
BUILDING STABILIZATION5/24/2019
WRST 159092C
1/4" = 1'-0"3
ORE BIN SHORING
0 1 2 3 4 5 10 15 1/4" = 1'-0"2
WEST TOWER SECTION (LOOKING NORTH)
1/4" = 1'-0"1
WEST TOWER SECTION (LOOKING WEST)
0 1 2 3 4 5 10 15
0 1 2 3 4 5 10 15
LEVEL 11
147' - 8"
N7 N11 N17 N20
REPLACE 8x8 COL
REPLACE 8x8 COL
REMOVE &
REPLACE FLOOR
DECK & FRAMING
IN KIND
FOR ACCESS
TO PERIMETER
SEE NOTE 5
REMOVE &
REPLACE FLOOR
DECK & FRAMING
IN KIND
FOR ACCESS
TO PERIMETER
SEE NOTE 5
NEW OR (E)
PERMANENT
SCAFFOLD
TEMP SHORING
BY CONTRACTOR
FOR COL REPLACEMENT
S501
SIM
S501
SIM
9'
0" F
V
LEVEL 11
147' - 8"
N7 N11 N17 N20
REPLACE 8x8 COL REPLACE 8x8 COL
REMOVE &
REPLACE FLOOR
DECK & FRAMING
IN KIND
FOR ACCESS
TO PERIMETER
SEE NOTE 5
REMOVE &
REPLACE FLOOR
DECK & FRAMING
IN KIND
FOR ACCESS
TO PERIMETER
SEE NOTE 5
NEW OR (E)
PERMANENT
SCAFFOLD
CONTRACTOR PROVIDE
TEMP SHORING EA SIDE TRUSS
DOWN TO LEVEL 113'
0"
9'
0" F
V
3' - 0" 1' - 7"
REMOVE ALL (E) CRIBBING
AFTER WORK COMPLETE
REPLACE TRUSS MEMBERS
(E)10x10 REMOVE
AND REPLACE
AFTER WORK COMPLETE
TEMP SHORING
BY CONTRACTOR
S501
S501
8x8
8x8
S501
108x8
6x6
6x
S501
SIM
S501
4' - 3"
S501
LEVEL 11
147' - 8"
N7 N11 N17 N20
REPLACE
8x8 COL
REMOVE &
REPLACE FLOOR
DECK & FRAMING
IN KIND
FOR ACCESS
TO PERIMETER
SEE NOTE 5
REMOVE &
REPLACE FLOOR
DECK & FRAMING
IN KIND
FOR ACCESS
TO PERIMETER
SEE NOTE 5
NEW
PERMANENT
SCAFFOLD
CONTRACTOR PROVIDE
TEMP SHORING EA SIDE TRUSS
DOWN TO LEVEL 11 DECK
REPLACE TRUSS MEMBERS & COL
TEMP SHORING
BY CONTRACTOR
2'
0"
3' - 11 3/8"
S501
6x 68x8
8x8
6x6
8x
F V
9'
0" F
V
4' - 3"
S503
S503
S503
S503
A K
AF AL
T S
TA
E O
49 TH
S
REG ISTERED S TRUCTURA L ENG I NEER5-24-2019
GREG LATREILLE
SE 13870 SHEET
OF
PMIS/PKG NO.
DRAWING NO.
80,137A
SUB SHEET NO.DESIGNED:
CADD
TECH
DATE
TITLE OF
VOLUME 1
GOL
GOL
E :\R ev it
P ro je ct
P at h\
-r
_g la tr ei lle bb fm
.c om
.r vt
7/
/2
3:
:2
P
M
Author
S302
ELEVATIONS & SECTIONS
KENNECOTT PHASE 3 MILL
BUILDING STABILIZATION5/24/2019
WRST 159092C
1/4" = 1'-0"3
TRUSS ELEVATION GRID M, P, R
1/4" = 1'-0"1
TRUSS ELEVATION GRID U, & W
1/4" = 1'-0"2
TRUSS ELEVATION GRID Y & BB
0 1 2 3 4 5 10 15 0 1 2 3 4 5 10 15
0 1 2 3 4 5 10 15
SHEET NOTES:
1. TEMPORARY SHORING SHOWN IS DIAGRAMATIC IN NATURE AND NOT INTENDED TO CONVEY A PREFERRED SHORING LOOK OR TYPE.
2. SHORING LOCATIONS ARE SHOWN TO INDICATE WHERE SHORING LOADS CAN BE TRANSMITTED TO (E) FLOOR FRAMING.
3. NEW PERMANENT SCAFFOLD/SUPPORT OF THE LEVEL 11 DECK IS TO BE PROVIDED BEFORE TEMPORARY ROOF SHORING LOADS ARE APPLIED TO
THE LEVEL 11 FLOOR FRAMING.
4. DESIGN OF THE SHORING IS BY THE CONTRACTOR.
5. REMOVE WHOLE DECKING BOARDS WHERE POSSIBLE. IF CUTTING (E) DECKING IS REQUIRED, STAGGER CUTS.
6. ALL DIMENSIONS ARE APPROXIMATE AND ARE TO BE FIELD VERIFIED.
LEVEL 11
147' - 8"
N7 N11 N17 N20
REPLACE
8x8 COL
REMOVE &
REPLACE FLOOR
DECK & FRAMING
IN KIND
FOR ACCESS
TO PERIMETER
SEE S302
NOTE 5
NEW
PERMANENT
SCAFFOLD
TEMP SHORING
BY CONTR
TEMP SHORING
BY CONTRACTOR
6x6
REPLACE COL & DIAG
IN KIND
8x
F V
9'
0" F
V
4' - 3"
S501
S503
FF GG HH JJ
F V
11' - 0" FV
2x6 STUDS
@ 2'-0" OC
REPAIR (E) WALL
REPLACE ALL
(E) WALL STUDS
& ROTTEN SUBFRAMING
REUSE (E) SIDING
TO THE EXTENT POSSIBLE
NEW SIDING TO MATCH (E)
HH.5
SEE ARCH
FOR TOP DETAIL
S502
F V
A K
AF AL
T S
TA
E O
49 TH
S
REG ISTERED S TRUCTURA L ENG I NEER5-24-2019
GREG LATREILLE
SE 13870 SHEET
OF
PMIS/PKG NO.
DRAWING NO.
80,137A
SUB SHEET NO.DESIGNED:
CADD
TECH
DATE
TITLE OF
VOLUME 1
GOL
GOL
E :\R ev it
P ro je ct
P at h\
-r
_g la tr ei lle bb fm
.c om
.r vt
7/
/2
3:
:4
P
M
CMS
S303
ELEVATIONS & SECTIONS
KENNECOTT PHASE 3 MILL
BUILDING STABILIZATION5/24/2019
WRST 159092C
1/4" = 1'-0"1
TRUSS ELEVATION GRID CC
1/4" = 1'-0"2
EXTERIOR WALL REPAIR
0 1 2 3 4 5 10 15 0 1 2 3 4 5 10 15
NOTES:
1. SEE A102 FOR DETAILS.
2. WALL FRAMING STUDS AND SIDING BOARDS IN ACCEPTABLE CONDITION CAN BE REUSED.
3. FIELD VERIFY ALL DIMENSIONS.
LEVEL 9
131' - 1"
LEVEL 11A
140' - 10"
LEVEL 10
146' - 9"
LEVEL 11
147' - 8"
MPRUWYBB
(E) SHORING TO REMAIN
NEW PERMANENT SHORING
BY CONTR W/ ADJUSTABLE
CONNECTIONS UNDER FLOOR
7' - 11 3/4" 8' - 0 3/4" 8' - 1 1/2" 7' - 9 1/2" 8' - 0 1/2" 8' - 2"
LEVEL ORE
& PROVIDE
GEOMEMBRANE
PER 3/S301
LEVEL 11
147' - 8"
N7N11N17N20 17
7'
0"
8x8
8x8
8x8
6x8
8x8 COL W/
PAD AT GRADE
PER2/S501
8x8 COL W/
PAD AT GRADE
PER 2/S501
6' - 3 3/8"4' - 0 5/8"9' - 6"10' - 3"
8'
3/
4" 8'
8"
(E) TRAM DECK & FRMG
NEW ELEVATED WALKWAY
2' - 2"4' - 4"
S503
S502
S502
S502
S502
A K
AF AL
T S
TA
E O
49 TH
S
REG ISTERED STRUC TURA L ENG INEER5-24-2019
GREG LATREILLE
SE 13870 SHEET
OF
PMIS/PKG NO.
DRAWING NO.
80,137A
SUB SHEET NO.DESIGNED:
CADD
TECH
DATE
TITLE OF
VOLUME 1
GOL
GOL
E :\R ev it
P ro je ct
P at h\
-r
_g la tr ei lle bb fm
.c om
.r vt
5/
/2
4:
:4
P
M
Author
S304
ELEVATIONS & SECTIONS
KENNECOTT PHASE 3 MILL
BUILDING STABILIZATION5/24/2019
WRST 159092C
1/4" = 1'-0"1
ORE BIN SECTION - LOOKING NORTH
1/4" = 1'-0"2
NEW TRUSS ELEVATION - LOOKING WEST
0 1 2 3 4 5 10 15 0 1 2 3 4 5 10 15
POST
8x8x2'-9"
L3x3x3/16x2" ES
(2) 1/2"Øx2" LAG SCREWS
(2) 20d TO EACH 3 1/2x11 1/4
(3) , 1/2x11 1/4x3'-0"
LAID FLAT ON COMPACTED
GRANULAR FILL
OVER GEOFABRIC
(E) COL
4 - 1/2" THRU BOLTS
NEW COL STUB
TO MATCH (E)
"B"
. 3 E
Q S
P A
C E
S.
B /3
B /3
2B
EL NOTED IN
PLANS & SCHEDULE
TYP
B\4
(E) DETERIORATED
COL TO REMAIN
NEW COL
L4x4x1/4 EA SIDE
1/2"Ø THRU BOLT TO COL
1/2"x6" LAG BOLT TO 9 1/4x9 1/4
W/ HISTORIC WASHERSLVL 11 FLOOR
NEW 9 1/4x9 1/4
LOCATE SPLICES
AS SHOWN IN PLAN
(E) LVL 11
FRAMING
8" SQ PENETRATION
THROUGH (E) DECK
6x6 SPACER
6' - 0" WALKWAY
2' - 0" 2' - 0" 2' - 0"
2x4 "X" BRACING
EVERY OTHER BAY
EA SIDE
6x
P O
S T
6x
P O
S T
1/2" BOLT
2x4 "X" BRACING
EACH BAY
6"
4 - #12x3 1/2" SCREWS
EA END TYP
GL FRMG
S501
S501
4x12x2'-0"
4x12 FLAT
6x6 POST
L3x3x1/4x0'-5" 2 - 1/2"Øx6" LAG SCREWS
@ 3" OC,
2 - 1/2"Ø BOLTS @ 3" OC
3/ 4"
2 - 1/2"Øx6"
LAG SCREWS
@ 9" OC
GRANULAR SOIL
OVER GEOFABRIC
SUITABLE
FOR BEARING
VALUE OF 1500 PSF
NOTE:
ALL HARDWARE TO BE HOT DIP GALV.
2x4 BRACE
2x6 DECKING
1/2" SPACE
BTWN BOARDS
HU3.25/10.5 HANGERAC6
POST CAP
6"
TOP OF LVL 11
(E) DECK
BRACE
PER
SECTION
6x6 POST
HUC3.25
/10.5
HANGER
GL BM
2x12 JOISTS
GREEN
TREATED
8x8
1/2"Øx3" LAG SCREW
@ 12" OC
COUNTER SINK
2x6 DECKING
4x12 2 - 1/2"Øx6
LAG SCREWS
TO EA JOIST
4"
L3x3x1/4x0'-5" 2 - 1/2"Øx4" LAG SCREWS @ 3" OC TO 8x8, 2 - 1/2"Øx1 1/2" LAG SCREWS
TO JOIST
#8 REBARx4'-0"
@ 2'-6" OC
AND WITHIN 8"
OF END OF 8x8
/2
1' - 3"
STL PL 1/4x10 1/2"x1'-3" EA SIDE
6-5/8"Ø THRU BOLTS TO DEEPER BM
4-5/8"Ø THRU BOLTS TO SHALLOWER BM
SHIM AS REQUIRED
(E) BM
(E) BM1 1/2" 3" 3" 3" 3" 1 1/2"
1/
2" T
Y P
1/
2" T
Y P
D
IS
TA
N
C E
3" E
D G
E
TIMBER COL
(E) COL @ SIM
3/4"Ø THRU BOLT
W/ BEVEL WASHER @ DIAG &
HISTORICAL WASHERS EA END
1 1/4"
6x6 DIAG
NOTCH INTO COL
4"
M A
X 3/
4"
TRUSS MEMBERS
(E) @ SIM
#12 SCREWS EMBED
3" INTO (E) PURLIN
(E) PURLINS & DECK
1/4" STL PL EA SIDE
W/ 2-3/4"Ø THRU BOLTS
W/ HISTORICAL WASHERS
NEW COL
3/4"Ø THRU BOLT
W/ HISTORICAL WASHERS
NOTCH INTO BOT CHORD
NOT REQUIRED @ SIM
A K
AF AL
T S
TA
E O
49 TH
S
REG ISTERED STRUC TURA L ENG INEER5-24-2019
GREG LATREILLE
SE 13870 SHEET
OF
PMIS/PKG NO.
DRAWING NO.
80,137A
SUB SHEET NO.DESIGNED:
CADD
TECH
DATE
TITLE OF
VOLUME 1
GOL
GOL
E :\R ev it
P ro je ct
P at h\
-r
_g la tr ei lle bb fm
.c om
.r vt
5/
/2
4:
:4
P
M
CMS
S501
DETAILS
KENNECOTT PHASE 3 MILL
BUILDING STABILIZATION5/24/2019
WRST 159092C
1 1/2" = 1'-0"2
TYPICAL POST TO PAD
1 1/2" = 1'-0"1
COLUMN SPLICE DETAIL
3/4" = 1'-0"3
NEW COL OVER TRAM DECK
3/8" = 1'-0"4
WALKWAY FRAME ELEVATION FRAMES F1-F9
1 1/2" = 1'-0"6
WALKWAY DECK FTG
1 1/2" = 1'-0"5
WALKWAY DECK DETAIL
1 1/2" = 1'-0"7
TRAM DECK AT GRADE
3/4" = 1'-0"8
(E) BM TO (E) BM REINF
3/4" = 1'-0"9
DIAG TO COLUMN
3/4" = 1'-0"10
COLUMN TO TRUSS
NOTE:
SEE ARCH FOR HANDRAIL.
(E) LATTICE
TRUSS TYP
1/4" STL PL CLIP
W/ 3/8"Øx6"
LAG SCREW
IN EA LEG
(E) 10 1/2"x12"
SUPPORT BM
6 SECTIONS OF
ANGLED 8x8 BLKG, SOLID UNDER
(E) SUPPORT BM
1 CLIP FOR BLKG
FOR PIECES
LESS THAN 6" LONG
CLIP @ EA END
FOR BLKG PIECES
6" OR LONGER
CENTER LINE
OF NEW FRAME LINE (E) INTACT EXT WALL
(E) WOOD
CROSS BEAMS
CAP/BASE DETAIL
PER ARCH
WOOD SIDING
REUSE (E) SIDING BOARDS
WHERE POSSIBLE
NEW WALL STUDS
SIMPSON A35
MIN 3 AT EA STUD
(E) TIMBERS
WOOD DECKING
(E) DECKING & FRAMING
WOOD JOIST
W/ LUS210 HANGER
2x12 LEDGER W/ 2 - 1/4"Ø
SIMPSON SDS
SCREWS @ 16" OC
TY
P
1/
2"
(E) TRUSS TOP CHORD
WOOD DECKING
(E) WOOD DECKING
& ROOFING
2x JOIST
L3x3x1/4 EA SIDE
W/ 2 - #10 SCREWS
TO 2x JOIST &
1 - 1/2"Ø LAG BOLT
TO (E) TRUSS
NEW ROOFING
PER ARCH
PL 1/4 EA SIDE
6 - 3/4"Ø THRU BOLTS
W/ HISTORICAL
WASHERS
TRUSS
TOP CHORD
3" 6"
6"
6"
4" 6" 6" 3"
6"
TRUSS BOT CHORD
PL 1/4 EA SIDE
3 - 3/4"Ø THRU BOLTS
W/ HISTORICAL WASHERS
TRUSS BOT CHORD
4" 3"
3" 6" 3"
8x8 COL
PL 1/4 EA SIDE
6 - 3/4"Ø THRU BOLTS
W/ HISTORICAL WASHERS
TRUSS
TOP CHORD
3" 6"
6" 3"
4" 6"
6" 3" 2"
2"
TRUSS DIAG
TRUSS
BOT CHORD
3" 6" 6" 3"
PL 1/4 EA SIDE
9 - 3/4"Ø THRU BOLTS
W/ HISTORICAL WASHERS
TRUSS CHORDS
2"
2"
3" 6"
4"
2x DECKING
ROOFING
PER ARCH
2x BLOCKING
BTWN JOISTS
L3x3x3/16
W/ 2 - #10 SCREWS
TO JOIST &
1 - 1/2"Ø LAG BOLT
TO TRUSS
8"
TRUSS TOP CHORD
2x JOIST
A K
AF AL
T S
TA
E O
49 TH
S
REG ISTERED STRUC TURA L ENG INEER5-24-2019
GREG LATREILLE
SE 13870 SHEET
OF
PMIS/PKG NO.
DRAWING NO.
80,137A
SUB SHEET NO.DESIGNED:
CADD
TECH
DATE
TITLE OF
VOLUME 1
GOL
GOL
E :\R ev it
P ro je ct
P at h\
-r
_g la tr ei lle bb fm
.c om
.r vt
5/
/2
4:
:4
P
M
CMS
S502
DETAILS
KENNECOTT PHASE 3 MILL
BUILDING STABILIZATION5/24/2019
WRST 159092C
3/4" = 1'-0"1
BLOCKING AT (E) SUPPORT
3/4" = 1'-0"2
EXTERIOR WALL REPAIR
3/4" = 1'-0"3
NEW DECK TO EXISTING
3/4" = 1'-0"4
NEW ROOF TO EXISTING
3/4" = 1'-0"6
TRUSS CONN
3/4" = 1'-0"7
COL TO TRUSS
3/4" = 1'-0"8
TRUSS CONNECTION
3/4" = 1'-0"9
TRUSS CONNECTION
3/4" = 1'-0"5
TRUSS EAVE
4"
6" 3"
4" 6"
3"
3" 6"
4"
TRUSS CHORD
PL1/4 EA SIDE
W/ 6-3/4"Ø THRU BOLTS
W/ HISTORICAL WASHERS
TRUSS TOP
CHORD
(E) FLOOR FRAMING
(E) FLOOR DECK SOLID BLKG ABOVE BM
NEW FRAME LINE
LAG BOLT @ 2'-0" OC
NEW OR (E) BM
TOE NAIL TO EA BM
STL CLIP
W/ 2-#10 SCREWS
EA LEG
3x7 3/4 EA SIDE
W/ 3-1/2"Ø THRU BOLTS
W/ HISTORICAL WASHERS
EA END
10 1/2x10 1/2
3x7 3/4 DIAG W/ 3-1/2"Ø
THRU BOLTS
W/ HISTORICAL WASHERS
(E) TIMBER COL
PL1/4 EA SIDE W/ 2-1/2"Ø
THRU BOLTS
W/ HISTORICAL WASHERS
10 1/2x10 1/2 BEAM
(E) TIMBER COL
#12 SCREW
3/4"Ø THRU ROD
NOTCH AT BOTH ENDS
1/
4"
TRUSS DIAG
NOTCH INTO
TOP CHORD
TRUSS VERT
1/
4"
TRUSS TOP
CHORD
1"
2"
TRUSS BOT CHORD
TRUSS VERT
NOTCH INTO
BOT CHORD
2 - #12 SCREWS
2" T
YP
1" TRUSS DIAG
3/4"Ø THRU ROD
NOTCH INTO DIAG
COL
TRUSS BOT CHORD
1/
4"
4"
3/4"Ø THRU ROD
NOTCH INTO DIAG
TRUSS BOT CHORD
1/
4"
(E) TRUSS MEMBERS
(E) CROSS TIE
ONE OF BOTH SIDES
NEW COL
PL1/4 EA SIDE
W/ 2 - 3/4"Ø
THRU BOLTS
W/ HISTORICAL WASHERS
3/4"Ø THRU BOLT
W/ HISTORICAL WASHERS
A K
AF AL
T S
TA
E O
49 TH
S
REG ISTERED S TRUCTURA L ENG I NEER5-24-2019
GREG LATREILLE
SE 13870 SHEET
OF
PMIS/PKG NO.
DRAWING NO.
80,137A
SUB SHEET NO.DESIGNED:
CADD
TECH
DATE
TITLE OF
VOLUME 1
GOL
GOL
E :\R ev it
P ro je ct
P at h\
-r
_g la tr ei lle bb fm
.c om
.r vt
7/
/2
3:
:0
P
M
CMS
S503
DETAILS
KENNECOTT PHASE 3 MILL
BUILDING STABILIZATION5/24/2019
WRST 159092C
3/4" = 1'-0"1
TRUSS CONNECTION
3/4" = 1'-0"2
NEW FRAME LINE @ FLOOR
3/4" = 1'-0"3
RECONSTRUCT 10TH LEVEL
3/4" = 1'-0"4
DIAGONAL TO COL
3/4" = 1'-0"5
FRAMING TO COLUMN
3/4" = 1'-0"6
TRUSS CONN
3/4" = 1'-0"7
TRUSS CONN
3/4" = 1'-0"8
TRUSS CONN
3/4" = 1'-0"9
TRUSS CONN
3/4" = 1'-0"10
COL REPLACEMENT
-C
SCREENS
VIBRATING
UP
DN
DN
SCREENS
VIBRATING
UP
FLOOR PLAN LEGEND
(E) EXISTING - NO WORK IN THIS AREA
WORKING AREA - REMOVE AND REPLACE
EXISTING STAIRS, RAILING AND ADJACENT
STRUCTURE IN PREPERATION FOR SHIPS
LADDER INSTALLATION.
* STORE EXISTING STAIRS WHERE
DENOTED
FLOOR PLAN GENERAL NOTES
1. REFERENCE CONCENTRATION MILL KENNECOTT
MINES N.H.L. AS-BUILT DRAWINGS, DATED JUNE 6,
2001, AND MILL BUILDING TRAM DECK AS-BUILTS
KENNECOTT MINES N.H.L. DATED SEPTEMBER 6,
2011 FOR EXISTING CONDITIONS AND
ASSEMBLIES AT DATE OF PLANS. VERIFY AS-
BUILT FLOOR, WALL, & ROOF ASSEMBLY TYPES
FOR REPLACEMENT IN-KIND U.N.O.
2. REFER TO STRUCTURAL FOR EXISTING (E) AND
NEW (N) CONSTRUCTION MEMBERS &
ASSEMBLIES.
3. CAREFULLY REMOVE AND STORE ANY EXISTING
ASSEMBLIES AS NOTED. MATERIALS DEMOLISHED
AS PART OF THE WORK SHALL FOLLOW SECTION
02 41 19 SELECT DEMOLITION OR IF NECESSARY,
SECTION 01880 HAZARDOUS MATERIALS.
4. REFER TO SHEET G001 FOR ARCHITECTURAL
ABBREVIATIONS AND SYMBOLS INFORMATION.
5. ALL INFORMATION AND DIMENSIONS INDICATED
OR IMPLIED ARE TO BE VERIFIED IN FIELD BY THE
CONTRACTOR PRIOR TO CONSTRUCTION.
6. ALL OPENING DIMENSIONS TO ROUGH OPENING
UNLESS OTHERWISE NOTED.
KEY PLANKEY SECTION
A101
NEW SHIPS LADDER
UP
REMOVE 2X DECKING AS
NEEDED TO PERMIT NEW
COLUMNS. STORE DECKING
WITH STAIRS
* EXISTING STAIRS
STORAGE AREA
REMOVE EXISTING STAIRS AND STORE
WHERE INDICATED
A101
NEW SHIPS LADDER
DN
REMOVE EXISTING
STAIR INTACT AND
STORAGE
* EXISTING STAIR
STORAGE
REMOVE EXISTING
STAIR FOR
PLACEMENT OF
NEW SHIPS LADDER
STORE (E) STAIRS
INTACT AT NOTED
LOCATIONS
A105
P11
A104
3 1
/2"
4" STEP WIDTH
4 1/8" RAIL DEPTH
1' - 0"
2' - 0"
SECTION ELEVATION
CONNECTION TO THE BEAM OR
WALL PER SHIPS LADDER
MANUFACTURER OR REFER
STRUCTURAL
(E)…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .