This document provides details of a federal presolicitation notice for construction services to repair historic structures at Kennecott Mines National Historic Landmark in Wrangell-St. Elias National Park and Preserve, Alaska. The National Park Service seeks a small business to stabilize the landmark's fourteen-story timber frame Mill Building through selective replacement of deteriorated wood members, leveling of remnant ore, siding removal and reinstallation, new frame and roof construction, and partial demolition and reconstruction of an exterior ore chute. The firm-fixed price contract value is estimated between $1 million to $5 million, with a performance period of 730 calendar days from notice to proceed. A pre-proposal site visit is scheduled for September 10, 2019. The solicitation will be issued on or around August 22, 2019 under NAICS code 236220 with a small business size standard of $36.5 million.

Clarification on Spec 06 10 00 2.2B

View the file

Other files for this federal contract opportunity

Other files attached to Repair Historic Kennecott Mine Structures, newest first.
File Type Posted
SF30_140P2019R0021_Amd_006.pdf PDF
SF30_140P2019R0021_Amd_0005.pdf PDF
WRST_159092C_Contract_Questions_NPS_Responses_10.15.19_Amendment_5.pdf PDF
WRST_159092C_Contract_Questions_NPS_Responses_10.4.19_Amendment_4.pdf PDF
Kennecott_Mill_North_Slope_Scaffold_and_Deck_Stabilization_Pads_Report.pdf PDF
Mill_North_Slope_Scaffolding_and_Deck_work_plan.pdf PDF
SF30_140P2019R0021_Amd_0004.pdf PDF
Kennecott_ORE_CHUTE_9-2019_Revised_Volume_2.pdf PDF
WRST_159092C_Contract_Questions_NPS_Responses_10.1.19_Final.pdf PDF
Kennecott_Mines_NHL_Photographs_2.pdf PDF
SF30_140P2019R0021_Amd_0003.pdf PDF
NPS-ProjectSustainabilityChecklist-LEED2009_5-28-10.xls XLS spreadsheet
Revised_Specs_and_Drawings_Portfolio_9-18-19.pdf PDF
SF30_140P2019R0021_Amd_002.pdf PDF
WRST_159092C_Site_Visit_Meeting_Minutes_9-10-19.pdf PDF
B08_RFP_Submission_Package.pdf PDF
E15_LmtOnSubconRpt_REQD.xlsx XLSX spreadsheet
B08_Attch_4_Rec_Hall_Parking_map_Rev1.docx DOCX document
SF24-Bid_Bond.pdf PDF
Sol_140P2019R0021_Amd_0001.pdf PDF
B08_140P2019R0021.pdf PDF
B08_Attch_4_Rec_Hall_Parking_map.docx DOCX document
B08_WRST_159092C_drawings_.pdf PDF
B03_WDOL_Builing_and_Heavy_Construction.pdf PDF
B08_140P2019R0021.pdf PDF
B08_WRST_159092C_Specs_8-22-19.pdf PDF
Show all 26

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Amendment 06

WRST 159092C

October 21, 2019

Clarification to Amendment 03, Specification question #4, Specification 06 10 00- 2.2.B

The question more simply put is to clarify that the 19% spec on moisture for Kiln Dried Lumber should be PRIOR to treatment, not after?

NPS Response: That is correct, the 19% specification on moisture for Kiln Dried Lumber should be prior to treatment, not after.