This document provides details on an upcoming federal contract solicitation for construction services to repair historic structures at Kennecott Mines National Historic Landmark in Alaska. The National Park Service seeks to stabilize the landmark's 14-story timber frame Mill Building through selective replacement of deteriorated wood members, removal and reinstallation of siding, construction of a new frame and roof, and partial demolition and reconstruction of an exterior ore chute. The firm-fixed price contract will be competitively awarded to a small business via a best value determination considering both technical capability and price. The estimated value is between $1-5 million, with a performance period of 730 days from notice to proceed. A pre-proposal site visit will be held on September 10, 2019. The NAICS code is 236220 and place of performance is in Copper Center, Alaska.

WRST 159092C Contract Questions_NPS Responses 10.4.19 Amendment 4

View the file

Other files for this federal contract opportunity

Other files attached to Repair Historic Kennecott Mine Structures, newest first.
File Type Posted
SF30_140P2019R0021_Amd_006.pdf PDF
Clarification_on_Spec_06_10_00_2.2B_.pdf PDF
SF30_140P2019R0021_Amd_0005.pdf PDF
WRST_159092C_Contract_Questions_NPS_Responses_10.15.19_Amendment_5.pdf PDF
Mill_North_Slope_Scaffolding_and_Deck_work_plan.pdf PDF
Kennecott_Mill_North_Slope_Scaffold_and_Deck_Stabilization_Pads_Report.pdf PDF
SF30_140P2019R0021_Amd_0004.pdf PDF
Kennecott_ORE_CHUTE_9-2019_Revised_Volume_2.pdf PDF
Kennecott_Mines_NHL_Photographs_2.pdf PDF
WRST_159092C_Contract_Questions_NPS_Responses_10.1.19_Final.pdf PDF
SF30_140P2019R0021_Amd_0003.pdf PDF
Revised_Specs_and_Drawings_Portfolio_9-18-19.pdf PDF
NPS-ProjectSustainabilityChecklist-LEED2009_5-28-10.xls XLS spreadsheet
SF30_140P2019R0021_Amd_002.pdf PDF
WRST_159092C_Site_Visit_Meeting_Minutes_9-10-19.pdf PDF
B08_RFP_Submission_Package.pdf PDF
Sol_140P2019R0021_Amd_0001.pdf PDF
E15_LmtOnSubconRpt_REQD.xlsx XLSX spreadsheet
B08_Attch_4_Rec_Hall_Parking_map_Rev1.docx DOCX document
SF24-Bid_Bond.pdf PDF
B08_140P2019R0021.pdf PDF
B03_WDOL_Builing_and_Heavy_Construction.pdf PDF
B08_140P2019R0021.pdf PDF
B08_Attch_4_Rec_Hall_Parking_map.docx DOCX document
B08_WRST_159092C_drawings_.pdf PDF
B08_WRST_159092C_Specs_8-22-19.pdf PDF
Show all 26

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

WRST 159092C

October 4, 2019

Structural:

1. Ore Chute S33: It [Amendment 3] mentioned that contractor is supposed to coordinate with Phase 1 work and to tie into slope stabilization anchors and elements as required.

Can you provide a detail showing how this is to be done? Can you verify that the locations identified on this page are the only locations?

NPS Response: In order to place footings for the Ore Chute bents, the Contractor will be required to excavate the surface material, cut through the cyclone fence and geomembrane sufficient to form the footings. The NPS expects Contractor to execute work with as minimal disturbance to the existing slope stabilization systems as possible.

The footing details are illustrated in Detail 12/S41. Bidders should assume no soil nails will be encountered at the footing locations. If a soil nail is encountered at the specific location, a determination of changed site conditions will be made during construction.

Specifications:

1. Existing Materials: Please verify where NPS procured the current timbers on site?

NPS Response: The timbers listed as Government Furnished Materials were procured during a project in 2008 to reconstruct the National Creek Trestle and records to determine where they were procured are not readily available. Contractors should research available vendors.

Addendum 3:

1. Historical Electrical Question #1: Is Contractor to assume we will not be doing this work for bid purposes and if encountered work with Contracting Officer for an adjustment?

NPS Response: Contractor will be required to carefully remove and reinstall any electrical or mechanical equipment that impedes the stabilization work to be accomplished. NPS archaeologists will be on site to prepare records of the location through photographs, sketches and written documentation to aid in the removal/reinstallation of historic electrical/equipment.