NPS-ProjectSustainabilityChecklist-LEED2009_5-28-10.xls
XLS spreadsheet 463 KB Posted
- Attached to
- Repair Historic Kennecott Mine Structures Federal contract opportunity
- Solicitation number
- 140P2019R0021
About this file
This document provides details for a federal construction contract opportunity to repair historic structures at Kennecott Mines National Historic Landmark in Wrangell-St. Elias National Park and Preserve in Alaska. The National Park Service is seeking proposals on a small business set-aside basis for stabilization of the landmark's fourteen-story Mill Building, including replacement of deteriorated timber columns, beams, and floor structures, leveling of remnant ore, siding replacement, and reconstruction of an exterior timber feature. The estimated contract value is between $1-5 million, with a performance period of 730 days from notice to proceed. A pre-proposal site visit will be held on September 10, 2019, with proposals due in August 2019. The NAICS code is 236220 for commercial and institutional building construction.
NPS-Project Sustainability Checklist
View the file
Other files for this federal contract opportunity
Show all 26
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Instructions NPS Project Sustainability Checklist Building and Non Building Projects (For New Construction or Renovation) LEED 2009 Edition
INSTRUCTIONS
| 1 | This checklist is organized around the LEED NC v3, 2009 checklist and also accounts for progress in meeting federal sustainability requirements (Guiding Principles). |
| 2 | To complete the checklist fill in all the blank cells under the column for the relevant submission responding with a Y, N or (in some cases) NA and a concise explanation of how the credit/regulation is or is not met. Copy to the next deliverable column unchanged answers for a particular sustainability feature. |
| 3 | Sustainability features highlighted in yellow are federal requirements (links to the federal requirements are provided) for all new building projects and major renovations, regardless of size. All federal requirements must be met for all new buildings and major building renovations. For building renovation projects which cost less than 50% of the current replacement value of the building, the project must only comply with those federal requirements applicable to the planned work. |
| 4 | Compliance with ALL five Guiding Principles is required for a building to be considered in compliance. Projects that meet all the certification requirements of LEED at any of the four levels may not necessarily be compliant with the Guiding Principles. |
| 5 | This form automatically counts LEED NC credits. As the result, if any LEED prerequisite is not met, the LEED-NC score (located near the top of the checklist) will indicate "Missed Prereq." regardless of the other LEED NC credits achieved. |
| 6 | Sustainability features that are federal requirements, but have no parallel LEED credit, are identified at the left with green. Clicking the green cell will automatically navigate to the originating federal regulation. |
| 7 | All Sustainable features indicated with a LEED credit (i.e. SS Credit 2 or EA Credit 3) have defined prescriptive requirements that are indicated in , LEED Reference Guide for Green Building Design and Construction, ©2009 USGBC |
| 8 | For non-building projects use this same checklist. For federal requirements that don't apply to this non-building project, indicate with NA. Non building projects are defined as construction projects that do NOT include the construction of a building. Examples may include trailside parking, utility line, and road projects. |
Checklist NPS Project Sustainability Checklist Building and Non-Building Projects (For New Construction or Renovation) LEED 2009 Edition
| Project Type | Building Renovation | |||||||||||||||||||||||||||||
| Project Title: | Repair Historic Kennecott Mine Structures and Utilities Ph III - Upper Mill Building Structural Repairs | Fund Source: | Line Item | Gross Project Construction Cost: | ||||||||||||||||||||||||||
| Description: | Structrual repairs at the Kennecott Mines National Historic Landmar. Work will be to the Mill Building, Levels 7 through 11, including West Tower, FOK, and Tram Deck | Predesign Begin Date: | 2009 | Gross Building Construction Cost: | 0 | |||||||||||||||||||||||||
| Park/PMIS: | Wrangell St. Elias Natioanal Park and Preserve PMIS 159092C | FY of Const. Funding | 2019 | Gross Non Building (i.e. Site) Cost: | ||||||||||||||||||||||||||
| Architect/Engineer Firm: | RIM Architects | Park: | WRST | Building Size (Square Feet) | 27,830 | |||||||||||||||||||||||||
| Date: | September 18, 2019 | State: | AK | Region: | Alaska | |||||||||||||||||||||||||
| Type of Building | Historic | |||||||||||||||||||||||||||||
| Please Input CRV in block to the right for the building(s) in this project | If Renovation, Exist. Bldg. CRV | |||||||||||||||||||||||||||||
| % Federal Regulations Achieved | Indicate CRV Above | Indicate CRV Above | Indicate CRV Above | Indicate CRV Above | Indicate CRV Above | Indicate CRV Above | ABLI | |||||||||||||||||||||||
| 0 | 0 | 0 | 0 | 6 | 4 | 0 | Total LEED-NC Credits | Missed Prereq. | Missed Prereq. | Missed Prereq. | Missed Prereq. | Missed Prereq. | Missed Prereq. | ACAD | ||||||||||||||||
| LEED Certification Level | Not Certified/Missing Prereq. | Not Certified/Missing Prereq. | Not Certified/Missing Prereq. | Not Certified/Missing Prereq. | Not Certified/Missing Prereq. | Not Certified/Missing Prereq. | ADAM | |||||||||||||||||||||||
| AFAM | ||||||||||||||||||||||||||||||
| Max. Fed Reqmt? | Sustainable Sites (SS) | |||||||||||||||||||||||||||||
| Maximum LEED NC 2009 Credits: 26 | AFBG | |||||||||||||||||||||||||||||
| Fed Reqmt Met? | Sustainability Features | PMIS Submission | Predesign | Schematic Design | Design Development | Construction Documents | Construction | AGFO | ||||||||||||||||||||||
| Y, N, NA | Points | Concisely explain how credit/requirement is met at this milestone: | Y, N, NA | Points | Concisely explain how credit/requirement is met at this milestone: | Y, N, NA | Points | Concisely explain how credit/requirement is met at this milestone: | Y, N, NA | Points | Concisely explain how credit/requirement is met at this milestone: | Y, N, NA | Points | Concisely explain how credit/requirement is met at this milestone: | Y, N, NA | Points | Concisely explain how credit/requirement is met at this milestone: | ALKA | NOTES | |||||||||||
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | SS Prereq 1 | Construction Activity Pollution Prevention | NA | N/A | NPS to determine as site is exisitng with historical and hazardous site conditions | NA | N/A | NPS to determine as site is exisitng with historical and hazardous site conditions | ALAG | |||||||||||||||
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | SS Credit 1 | Site Selection | NA | 0 | Site is part of National Park | NA | 0 | Site is part of National Park | ALCA | |||||||||||||||
| SS Credit 2 | Development Density & Community Connectivity | N | 0 | Existing Building within National Park with minimal population density | N | 0 | Existing Building within National Park with minimal population density | ALEU | ||||||||||||||||||||||
| SS Credit 3 | Brownfield Redevelopment | N | 0 | Not a brownfield site. Contaaminated areas to be addressed by Hazmat protocol | N | 0 | Not a brownfield site. Contaaminated areas to be addressed by Hazmat protocol | ALFL | ||||||||||||||||||||||
| SS Credit 4.1 | Alternative Transportation, Public Transportation Access | N | 0 | No public transportation in the area | N | 0 | No public transportation in the area | ALPO | ||||||||||||||||||||||
| SS Credit 4.2 | Alternative Transportation, Bicycle Storage & Changing Rooms | N | 0 | Building will not be occupied | N | 0 | Building will not be occupied | AMME | ||||||||||||||||||||||
| SS Credit 4.3 | Alternative Transportation, Low-Emitting & Fuel-Efficient Vehicles | N | 0 | No parking will be provided for any vehicles | N | 0 | No parking will be provided for any vehicles | AMIS | ||||||||||||||||||||||
| SS Credit 4.4 | Alternative Transportation, Parking Capacity | Y | 2 | No parking will be provided for any vehicles | Y | 2 | No parking will be provided for any vehicles | ANAC | ||||||||||||||||||||||
| SS Credit 5.1 | Site Development, Protect or Restore Habitat | N | 0 | Site is part of National Park and on disturbed ground | N | 0 | Site is part of National Park and on disturbed ground | ANDE | ||||||||||||||||||||||
| SS Credit 5.2 | Site Development, Maximize Open Space | N | 0 | Existing Building | N | 0 | Existing Building | ANJO | ||||||||||||||||||||||
| SS Credit 6.1 | Stormwater Design, Quantity Control (See EISA Section 438) | N | 0 | No paving is going to occur | N | 0 | No paving is going to occur | ANIA | ||||||||||||||||||||||
| SS Credit 6.2 | Stormwater Design, Quality Control (See EISA Section 438) | N | 0 | No stormwater treatment will occur | N | 0 | No stormwater treatment will occur | ANTI | ||||||||||||||||||||||
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | EISA 2007, Section 438 | Protect Hydrology | N | N/A | Intent is to stabilize exisitng builidng structually. All means possibel to mitigate water infiltration into the building to be used | N | N/A | Intent is to stabilize exisitng builidng structually. No site work to occur | ANCM | |||||||||||||||
| SS Credit 7.1 | Heat Island Effect, Non-Roof | N | 0 | Existing building will be maintained | N | 0 | Existing building will be maintained | APIS | ||||||||||||||||||||||
| SS Credit 7.2 | Heat Island Effect, Roof | N | 0 | Existing roof | Existing roof | APPA | ||||||||||||||||||||||||
| SS Credit 8 | Light Pollution Reduction | Y | 1 | No electrical work | No electrical work | APCO | ||||||||||||||||||||||||
| 0 | 0 | 0 | 0 | 1 | 0 | 0 | 2006 NPS Mgmt Policies (Para. 4.9) | Soundscape Preservation | Y | N/A | No equipment | No equipment | ARCH | |||||||||||||||||
| 0 | 0 | 0 | 0 | 1 | 0 | 0 | 2006 NPS Mgmt Policies (Para. 4.10) | Dark Sky Preservation | Y | N/A | No electrical work | No electrical work | ARPO | |||||||||||||||||
| LEED-NC Subtotal | Missed Prereq. | Missed Prereq. | Missed Prereq. | Missed Prereq. | Missed Prereq. | Missed Prereq. | ARHO | |||||||||||||||||||||||
| Water Efficiency (WE) | ||||||||||||||||||||||||||||||
| Maximum LEED NC 2009 Credits: 10 | ASIS | |||||||||||||||||||||||||||||
| Sustainability Features | PMIS Submission | Predesign | Schematic Design | Design Development | Construction Documents | Construction | AZRU | |||||||||||||||||||||||
| Y, N, N/A | Points | Concisely explain how credit/requirement is met at this milestone: | Y, N, N/A | Points | Concisely explain how credit/requirement is met at this milestone: | Y, N, N/A | Points | Concisely explain how credit/requirement is met at this milestone: | Y, N, N/A | Points | Concisely explain how credit/requirement is met at this milestone: | Y, N, N/A | Points | Concisely explain how credit/requirement is met at this milestone: | Y, N, N/A | Points | Concisely explain how credit/requirement is met at this milestone: | BADL | ||||||||||||
| 0 | 0 | 0 | 0 | 1 | 1 | 0 | WE Prereq 1 | Water Use Reduction, 20% Reduction (see Guiding Principle III - Protect and Conserve Water) | Y | N/A | No Mechanical work included in project | Y | N/A | No Mechanical work included in project | BAWA | |||||||||||||||
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | WE Credit 1 | Water Efficient Landscaping, Reduce by 50% (see Guiding Principle III - Protect and Conserve Water) | N | 0 | No vegetation will be introduced as part of this project | N | 0 | No vegetation will be introduced as part of this project | BAND | |||||||||||||||
| WE Credit 1 | ||||||||||||||||||||||||||||||
| (cont'd) | Water Efficient Landscaping, No Potable Use or No Irrigation | N | 0 | No vegitation will be introduced as part of this project | N | 0 | No vegitation will be introduced as part of this project | BATT | ||||||||||||||||||||||
| WE Credit 2 | Innovative Wastewater Technologies | N | 0 | No Mechanical work included in project | N | 0 | No Mechanical work included in project | BEOL | ||||||||||||||||||||||
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | NPS Policy | Water Metering | N | N/A | No Mechanical work included in project | N | N/A | No Mechanical work included in project | BELA | |||||||||||||||
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | EPACT 2005, Section 109 | Water Used for Energy Conservation | N | N/A | No Mechanical work included in project | N | N/A | No Mechanical work included in project | BIBE | |||||||||||||||
| WE Credit 3 | Water Use Reduction (30%, 35%, 40%) | N | 0 | No Mechanical work included in project | N | 0 | No Mechanical work included in project | BICY | ||||||||||||||||||||||
| LEED-NC Subtotal | Missed Prereq. | Missed Prereq. | Missed Prereq. | 0 | 0 | Missed Prereq. | BIHO | |||||||||||||||||||||||
| Energy & Atmosphere (EA) | ||||||||||||||||||||||||||||||
| Maximum LEED NC 2009 Credits: 35 | BISO | |||||||||||||||||||||||||||||
| Sustainability Features | PMIS Submission | Predesign | Schematic Design | Design Development | Construction Documents | Construction | BITH | |||||||||||||||||||||||
| Y, N, N/A | Points | Concisely explain how credit/requirement is met at this milestone: | Y, N, N/A | Points | Concisely explain how credit/requirement is met at this milestone: | Y, N, N/A | Points | Concisely explain how credit/requirement is met at this milestone: | Y, N, N/A | Points | Concisely explain how credit/requirement is met at this milestone: | Y, N, N/A | Points | Concisely explain how credit/requirement is met at this milestone: | Y, N, N/A | Points | Concisely explain how credit/requirement is met at this milestone: | BICA | ||||||||||||
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | EA Prereq 1 | Fundamental Commissioning of the Building Energy Systems * (see Guiding Principle I - Employ Integrated Design Principles) | N | N/A | No Mechanical or Electrical work included in project | N | N/A | No Mechanical or Electrical work included in project | BISC | |||||||||||||||
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | EA Prereq 2 | Minimum Energy Performance (see Guiding Principle II Optimize Energy Performance) | N | N/A | No Mechanical or Electrical work included in project | N | N/A | No Mechanical or Electrical work included in project | BLCA | |||||||||||||||
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | EA Prereq 3 | Fundamental Refrigerant Management (see Guiding Principle V - Reduce Environmental Impact of Materials) | N | N/A | No Mechanical or Electrical work included in project | N | N/A | No Mechanical or Electrical work included in project | BLAC | |||||||||||||||
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | EA Credit 1 | Optimize Energy Performance:** (Federal Regulations require 30% for New Construction and 20% for Existing Building Renovation. Note that this automatically equates to 10 Points for New Construction and 7 Points for Existing Building Renovation.) (see Guiding Principle II - Optimize Energy Performance) | N | 0 | No Mechanical or Electrical work included in project | N | 0 | No Mechanical or Electrical work included in project | BLRI | |||||||||||||||
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | EISA 2007, Section 433 | Reduce Fossil Fuel Derived Energy | N | N/A | No Mechanical or Electrical work included in project | N | N/A | No Mechanical or Electrical work included in project | BLUE | |||||||||||||||
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | EO 13423, Sec. 2.(h) | Energy Efficient Electronic Products (Select EPEAT) (Predominantly relates to purchases of desktop/laptop computers and peripherals) | N | N/A | No Mechanical or Electrical work included in project | N | N/A | No Mechanical or Electrical work included in project | BOWA | |||||||||||||||
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | CFR Title 10, Part 436.4 | Procure Energy Star or FEMP designated products | N | N/A | No Mechanical or Electrical work included in project | N | N/A | No Mechanical or Electrical work included in project | BOST | |||||||||||||||
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | EPACT 2005, Section 104 | Premium Efficiency Electric Motors | N | N/A | No Mechanical or Electrical work included in project | N | N/A | No Mechanical or Electrical work included in project | BOAF | |||||||||||||||
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | EISA 2007, Section 523 | On-Site Renewable Energy*** Solar Thermal for Hot Water (Choose NA if proven not life cycle cost effective) | N | N/A | No Mechanical or Electrical work included in project | N | N/A | No Mechanical or Electrical work included in project | BOHA | |||||||||||||||
| 0 | 0 | EA Credit 2 | On-Site Renewable Energy*** 1%-13% Renewable Energy | N | 0 | No Mechanical or Electrical work included in project | N | 0 | No Mechanical or Electrical work included in project | BRCR | ||||||||||||||||||||
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | EA Credit 3 | Enhanced Commissioning (required for projects with building size > 5,000 sf) (see Guiding Principle I - Employ Integrated Design Principles) | N | 0 | No Mechanical or Electrical work included in project | N | 0 | No Mechanical or Electrical work included in project | BRVB | |||||||||||||||
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | EA Credit 4 | Enhanced Refrigerant Management (see Guiding Principle V - Reduce Environmental Impact of Materials) | N | 0 | No Mechanical or Electrical work included in project | N | 0 | No Mechanical or Electrical work included in project | BUIS | |||||||||||||||
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | EA Credit 5 | Measurement & Verification (see Guiding Principle II - Optimize Energy Performance) | N | 0 | No Mechanical or Electrical work included in project | N | 0 | No Mechanical or Electrical work included in project | BUFF | |||||||||||||||
| 0 | 0 | EA Credit 6 | Green Power | N | 0 | No Mechanical or Electrical work included in project | N | 0 | No Mechanical or Electrical work included in project | CABR | ||||||||||||||||||||
| LEED-NC Subtotal | Missed Prereq. | Missed Prereq. | Missed Prereq. | Missed Prereq. | Missed Prereq. | Missed Prereq. | CALI | |||||||||||||||||||||||
| Materials & Resources (MR) | ||||||||||||||||||||||||||||||
| Maximum LEED NC 2009 Credits: 14 | CANA | |||||||||||||||||||||||||||||
| Sustainability Features | PMIS Submission | Predesign | Schematic Design | Design Development | Construction Documents | Construction | CRHA | |||||||||||||||||||||||
| Y, N, N/A | Points | Concisely explain how credit/requirement is met at this milestone: | Y, N, N/A | Points | Concisely explain how credit/requirement is met at this milestone: | Y, N, N/A | Points | Concisely explain how credit/requirement is met at this milestone: | Y, N, N/A | Points | Concisely explain how credit/requirement is met at this milestone: | Y, N, N/A | Points | Concisely explain how credit/requirement is met at this milestone: | Y, N, N/A | Points | Concisely explain how credit/requirement is met at this milestone: | CARI | ||||||||||||
| MR Prereq 1 | Storage & Collection of Recyclables | N | N/A | Building will not be occupied | N | N/A | Building will not be occupied | CACH | ||||||||||||||||||||||
| MR Credit 1.1 | Building Reuse, Maintain Existing Walls, Floors & Roof | Y | 3 | Building to remain with new structural stabilization | Y | 3 | Building to remain with new structural stabilization | CANY | ||||||||||||||||||||||
| MR Credit 1.2 | Building Reuse, Maintain Interior Nonstructural Elements | Y | 1 | All remaining interior finishes to remain, be replaced or rebuilt | Y | 1 | All remaining interior finishes to remain, be replaced or rebuilt | CACO | ||||||||||||||||||||||
| 0 | 0 | 0 | 0 | 1 | 1 | 0 | MR Credit 2 | Construction Waste Management, Divert 50% from Disposal (see Guiding Principle V - Reduce Environmental Impact of Materials) | Y | 1 | Waste Management Plan will be established for construction | Y | 1 | Waste Management Plan will be established for construction | CAHA | |||||||||||||||
| MR Credit 2 | ||||||||||||||||||||||||||||||
| (cont'd) | Construction Waste Management, Divert 75% from Disposal | Y | 1 | Waste Management Plan will be established for construction | Y | 1 | Waste Management Plan will be established for construction | CAME | ||||||||||||||||||||||
| MR Credit 3 | Materials Reuse | N | 0 | No material reuse | N | 0 | No material reuse | CAKR | ||||||||||||||||||||||
| 0 | 0 | 0 | 0 | 1 | 1 | 0 | MR Credit 4 | Recycled Content, 10% (post-consumer + ½ pre-consumer). Use EPA's CPG for designated products to use) | Y | 1 | Recycled material will be used where possible | Y | 1 | Recycled material will be used where possible | CALO | |||||||||||||||
| MR Credit 5 | Regional Materials, Extracted, Processed & Manufactured Regionally | N | 0 | Not available | N | 0 | Not available | CARE | ||||||||||||||||||||||
| 0 | 0 | 0 | 0 | 1 | 1 | 0 | EO 13423, Sec. 2.(d) | Biopreferred Products | Y | N/A | Will be used where applicable | Y | N/A | Will be used where applicable | CAVO | |||||||||||||||
| MR Credit 6 | Rapidly Renewable Materials | N | 0 | Does not apply | N | 0 | Does not apply | CARL | ||||||||||||||||||||||
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | MR Credit 7 | Certified Wood (see Guiding Principle V - Reduce Environmental Impact of Materials) | N | 0 | Does not apply | N | 0 | Does not apply | CAVE | |||||||||||||||
| LEED-NC Subtotal | Missed Prereq. | Missed Prereq. | Missed Prereq. | Missed Prereq. | Missed Prereq. | Missed Prereq. | CAWO | |||||||||||||||||||||||
| Indoor Environmental Quality (EQ) | ||||||||||||||||||||||||||||||
| Maximum LEED NC 2009 Credits: 15 | CAGR | |||||||||||||||||||||||||||||
| Sustainability Features | PMIS Submission | Predesign | Schematic Design | Design Development | Construction Documents | Construction | CASA | |||||||||||||||||||||||
| Y, N, N/A | Points | Concisely explain how credit/requirement is met at this milestone: | Y, N, N/A | Points | Concisely explain how credit/requirement is met at this milestone: | Y, N, N/A | Points | Concisely explain how credit/requirement is met at this milestone: | Y, N, N/A | Points | Concisely explain how credit/requirement is met at this milestone: | Y, N, N/A | Points | Concisely explain how credit/requirement is met at this milestone: | Y, N, N/A | Points | Concisely explain how credit/requirement is met at this milestone: | CACL | ||||||||||||
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | EQ Prereq 1 | Minimum IAQ Performance (See Guiding Principle IV, Enhance Indoor Environmental Quality) | N | N/A | No Mechanical or Electrical work included in project | N | N/A | No Mechanical or Electrical work included in project | CATO | |||||||||||||||
| EQ Prereq 2 | Environmental Tobacco Smoke (ETS) Control | Y | N/A | Building will not be occupied | Y | N/A | Building will not be occupied | CEBR | ||||||||||||||||||||||
| EQ Credit 1 | Outdoor Air Delivery Monitoring | N | 0 | No Mechanical or Electrical work included in project | N | 0 | No Mechanical or Electrical work included in project | CEBE | ||||||||||||||||||||||
| EQ Credit 2 | Increased Ventilation | N | 0 | No Mechanical or Electrical work included in project | N | 0 | No Mechanical or Electrical work included in project | CHSC | ||||||||||||||||||||||
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | EQ Credit 3.1 | Construction IAQ Management Plan, During Construction (See Guiding Principle IV, Enhance Indoor Environmental Quality) | N | 0 | No Mechanical or Electrical work included in project | N | 0 | No Mechanical or Electrical work included in project | CHCU | |||||||||||||||
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | EQ Credit 3.2 | Construction IAQ Management Plan, Before Occupancy (See Guiding Principle IV, Enhance Indoor Environmental Quality) | N | 0 | No Mechanical or Electrical work included in project | N | 0 | No Mechanical or Electrical work included in project | CHAM | |||||||||||||||
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | EQ Credit 4.1 | Low-Emitting Materials, Adhesives & Sealants (See Guiding Principle IV, Enhance Indoor Environmental Quality) | N | 0 | Does not apply | N | 0 | Does not apply | CHIS | |||||||||||||||
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | EQ Credit 4.2 | Low-Emitting Materials, Paints & Coatings (See Guiding Principle IV, Enhance Indoor Environmental Quality) | N | 0 | Does not apply | N | 0 | Does not apply | CHPI | |||||||||||||||
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | EQ Credit 4.3 | Low-Emitting Materials, Flooring Materials (See Guiding Principle IV, Enhance Indoor Environmental Quality) | N | 0 | Does not apply | N | 0 | Does not apply | CHAT | |||||||||||||||
| 0 | 0 | EQ Credit 4.4 | Low-Emitting Materials, Composite Wood & Agrifiber Products | N | 0 | Does not apply | N | 0 | Does not apply | CHOH | ||||||||||||||||||||
| 0 | 0 | EQ Credit 5 | Indoor Chemical & Pollutant Source Control | N | 0 | Does not apply | N | 0 | Does not apply | CBPO | ||||||||||||||||||||
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | MOU Guiding Principles & EO 13423 | Moisture Control | N | N/A | Does not apply | N | N/A | Does not apply | CHCH | |||||||||||||||
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | EQ Credit 6.1 | Controllability of Systems, Lighting (See Guiding Principle IV, Enhance Indoor Environmental Quality) | N | 0 | No Mechanical or Electrical work included in project | N | 0 | No Mechanical or Electrical work included in project | CHIC | |||||||||||||||
| 0 | 0 | EQ Credit 6.2 | Controllability of Systems, Thermal Comfort | N | 0 | No Mechanical or Electrical work included in project | N | 0 | No Mechanical or Electrical work included in project | CHRO | ||||||||||||||||||||
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | EQ Credit 7.1 | Thermal Comfort, Design (See Guiding Principle IV, Enhance Indoor Environmental Quality) | N | 0 | No Mechanical or Electrical work included in project | N | 0 | No Mechanical or Electrical work included in project | CHIR | |||||||||||||||
| 0 | 0 | EQ Credit 7.2 | Thermal Comfort, Verification | N | 0 | No Mechanical or Electrical work included in project | N | 0 | No Mechanical or Electrical work included in project | CHRI | ||||||||||||||||||||
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | EQ Credit 8.1 | Daylight & Views, Daylight 75% of Spaces (See Guiding Principle IV, Enhance Indoor Environmental Quality) | N | 0 | Building will not be occupied | N | 0 | Building will not be occupied | CIRO | |||||||||||||||
| 0 | 0 | EQ Credit 8.2 | Daylight & Views, Views for 90% of Spaces | N | 0 | Building will not be occupied | N | 0 | Building will not be occupied | CLBA | ||||||||||||||||||||
| LEED-NC Subtotal | Missed Prereq. | Missed Prereq. | Missed Prereq. | Missed Prereq. | Missed Prereq. | Missed Prereq. | CLMO | |||||||||||||||||||||||
| Innovation & Design Process (ID) | ||||||||||||||||||||||||||||||
| Maximum LEED NC 2009 Credits: 6 | COLO | |||||||||||||||||||||||||||||
| Sustainability Features | PMIS Submission | Predesign | Schematic Design | Design Development | Construction Documents | Construction | COLM | |||||||||||||||||||||||
| Y, N, N/A | Points | Concisely explain how credit/requirement is met at this milestone: | Y, N, N/A | Points | Concisely explain how credit/requirement is met at this milestone: | Y, N, N/A | Points | Concisely explain how credit/requirement is met at this milestone: | Y, N, N/A | Points | Concisely explain how credit/requirement is met at this milestone: | Y, N, N/A | Points | Concisely explain how credit/requirement is met at this milestone: | Y, N, N/A | Points | Concisely explain how credit/requirement is met at this milestone: | COSW | ||||||||||||
| ID Credit 1.1 | Innovation in Design: Provide Specific Title | COGA | ||||||||||||||||||||||||||||
| ID Credit 1.2 | Innovation in Design: Provide Specific Title | CORO | ||||||||||||||||||||||||||||
| ID Credit 1.3 | Innovation in Design: Provide Specific Title | COWP | ||||||||||||||||||||||||||||
| ID Credit 1.4 | Innovation in Design: Provide Specific Title | CRLA | ||||||||||||||||||||||||||||
| ID Credit 1.5 | Innovation in Design: Provide Specific Title | CRMO | ||||||||||||||||||||||||||||
| ID Credit 2 | LEED® Accredited Professional | CUGA | ||||||||||||||||||||||||||||
| LEED-NC Subtotal | 0 | 0 | 0 | 0 | 0 | 0 | CUIS | |||||||||||||||||||||||
| Regional Priority (RP) | ||||||||||||||||||||||||||||||
| Maximum LEED NC 2009 Credits: 4 | CURE | |||||||||||||||||||||||||||||
| Sustainability Features | PMIS Submission | Predesign | Schematic Design | Design Development | Construction Documents | Construction | CUVA | |||||||||||||||||||||||
| Y, N, N/A | Points | Concisely explain how credit/requirement is met at this milestone: | Y, N, N/A | Points | Concisely explain how credit/requirement is met at this milestone: | Y, N, N/A | Points | Concisely explain how credit/requirement is met at this milestone: | Y, N, N/A | Points | Concisely explain how credit/requirement is met at this milestone: | Y, N, N/A | Points | Concisely explain how credit/requirement is met at this milestone: | Y, N, N/A | Points | Concisely explain how credit/requirement is met at this milestone: | DABE | ||||||||||||
| RP Credit 1.1 | Regional Priority Credit: Region Defined | DAAV | ||||||||||||||||||||||||||||
| RP Credit 1.2 | Regional Priority Credit: Region Defined | DESO | ||||||||||||||||||||||||||||
| RP Credit 1.3 | Regional Priority Credit: Region Defined | DEVA | ||||||||||||||||||||||||||||
| RP Credit 1.4 | Regional Priority Credit: Region Defined | DELA | ||||||||||||||||||||||||||||
| LEED-NC Subtotal | 0 | 0 | 0 | 0 | 0 | 0 | DELE | |||||||||||||||||||||||
| Non-LEED-NC Federal Requirements | ||||||||||||||||||||||||||||||
| Maximum LEED NC 2009 Credits: 26 | DEWA | |||||||||||||||||||||||||||||
| Sustainability Features | PMIS Submission | Predesign | Schematic Design | Design Development | Construction Documents | Construction | DENA | |||||||||||||||||||||||
| Y, N, N/A | Points | Concisely explain how credit/requirement is met at this milestone: | Y, N, N/A | Points | Concisely explain how credit/requirement is met at this milestone: | Y, N, N/A | Points | Concisely explain how credit/requirement is met at this milestone: | Y, N, N/A | Points | Concisely explain how credit/requirement is met at this milestone: | Y, N, N/A | Points | Concisely explain how credit/requirement is met at this milestone: | Y, N, N/A | Points | Concisely explain how credit/requirement is met at this milestone: | DEMO | ||||||||||||
| 0 | 0 | 0 | 0 | 0 | 0 | 0 | MOU Guiding Principles & EO 13423 (pg. 3) | Complete Integrated Design Narrative During Predesign Only | N | N/A | N/A | N/A | N/A | N/A | N/A | N/A | N/A | N/A | N/A | N/A | N/A | DEPO | ||||||||
| DETO | ||||||||||||||||||||||||||||||
| Fulfillment of Guiding Principles for HPSB completes 18 LEED NC credits and 6 prerequisites. | DINO | |||||||||||||||||||||||||||||
| LEED Certification Rating System | DRTO | |||||||||||||||||||||||||||||
| Certified: 40-49 points, Silver: 50-59 points, Gold: 60-79 points, Platinum: 80+ points | EBLA | |||||||||||||||||||||||||||||
| For more information on LEED Certification and credits, visit www.usgbc.org | EDAL | |||||||||||||||||||||||||||||
| EFMO | ||||||||||||||||||||||||||||||
| * For new buildings of 5,000 GSF or more and major renovations to buildings greter than or equal to 5,000 GSF, contract with an independent Commissioning Authority and comply with ASHRAE 0-2005, "The Commissioning Process". For smaller projects, comply with the requirements of LEED NC 2009, EA Prerequisite 1, "Fundamental Commissioning of the Building Energy Systems" (which allows the commissioning authority to be an employee of the design firm). | EISE | |||||||||||||||||||||||||||||
| ** For new building projects of 5,000 GSF or more, perform whole building energy simulation(s) in accordance with ASHRAE 90.1, 2007 (or IECC 2006 for residential) to show performance at least 30% better (20% for major renovations) than a code compliant similar building. If it can be shown that meeting the 30% performance standard for new construction (or 20% for major renovations) is not life cycle cost effective (over 40 years - not 25 years per a recent regulatory change) then the project must incorporate the maximum energy savings that can be shown to be life cycle cost effective. For new building projects with a lower net construction value, an alternative method is to meet or exceed the minimum requirements prescribed by the ASHRAE Advanced Energy Design Guide (a much simpler prescriptive method for achieving the target) appropriate for the project's building. For buildings without an appropriate Advanced Energy Design Guide perform whole building energy simulation(s) in accordance with ASHRAE 90.1, 2007 (or IECC 2006 for residential). | ELTE | |||||||||||||||||||||||||||||
| *** The federal requirement (from EISA 2007) that relates to these LEED-NC credits is "Where life cycle cost effective, design systems to provide not less than 30 percent of the hot water demand through the installation and use of solar hot water heaters." The LEED credits for this item stipulates a percentage of total energy consumption to be provided by on site renewable sources. In some cases meeting the federal requirement will also meet the LEED requirement for these credits. | ELCA | |||||||||||||||||||||||||||||
| ELMA | ||||||||||||||||||||||||||||||
| ELMO | ||||||||||||||||||||||||||||||
| ELRO | ||||||||||||||||||||||||||||||
| ELIS | ||||||||||||||||||||||||||||||
| ERIE | ||||||||||||||||||||||||||||||
| ESSE | ||||||||||||||||||||||||||||||
| EUON | ||||||||||||||||||||||||||||||
| EVER | ||||||||||||||||||||||||||||||
| FAMA | ||||||||||||||||||||||||||||||
| FEHA | ||||||||||||||||||||||||||||||
| FIIS | ||||||||||||||||||||||||||||||
| FILA | ||||||||||||||||||||||||||||||
| FLNI | ||||||||||||||||||||||||||||||
| FLFO | ||||||||||||||||||||||||||||||
| FOTH | ||||||||||||||||||||||||||||||
| FOBO | ||||||||||||||||||||||||||||||
| FOCA | ||||||||||||||||||||||||||||||
| FODA | ||||||||||||||||||||||||||||||
| FODO | ||||||||||||||||||||||||||||||
| FDNC | ||||||||||||||||||||||||||||||
| FODU | ||||||||||||||||||||||||||||||
| FOFO | ||||||||||||||||||||||||||||||
| FOFR | ||||||||||||||||||||||||||||||
| FOLA | ||||||||||||||||||||||||||||||
| FOLS | ||||||||||||||||||||||||||||||
| FOMA | ||||||||||||||||||||||||||||||
| FOMC | ||||||||||||||||||||||||||||||
| FOMO | ||||||||||||||||||||||||||||||
| FONE | ||||||||||||||||||||||||||||||
| FOPO | ||||||||||||||||||||||||||||||
| FOPU | ||||||||||||||||||||||||||||||
| FORA | ||||||||||||||||||||||||||||||
| FOSC | ||||||||||||||||||||||||||||||
| FOSM | ||||||||||||||||||||||||||||||
| FOST | ||||||||||||||||||||||||||||||
| FOSU | ||||||||||||||||||||||||||||||
| FOUN | ||||||||||||||||||||||||||||||
| FOUS | ||||||||||||||||||||||||||||||
| FOVA | ||||||||||||||||||||||||||||||
| FOWA | ||||||||||||||||||||||||||||||
| FOBU | ||||||||||||||||||||||||||||||
| FRDE | ||||||||||||||||||||||||||||||
| FRDO | ||||||||||||||||||||||||||||||
| FRLA | ||||||||||||||||||||||||||||||
| FRED | ||||||||||||||||||||||||||||||
| FRSP | ||||||||||||||||||||||||||||||
| FRHI | ||||||||||||||||||||||||||||||
| GAAR | ||||||||||||||||||||||||||||||
| GATE | ||||||||||||||||||||||||||||||
| GARI | ||||||||||||||||||||||||||||||
| GEGR | ||||||||||||||||||||||||||||||
| GEMM | ||||||||||||||||||||||||||||||
| GERO | ||||||||||||||||||||||||||||||
| GWMP | ||||||||||||||||||||||||||||||
| GEWA | ||||||||||||||||||||||||||||||
| GWCA | ||||||||||||||||||||||||||||||
| GETC | ||||||||||||||||||||||||||||||
| GETT | ||||||||||||||||||||||||||||||
| GICL | ||||||||||||||||||||||||||||||
| GLAC | ||||||||||||||||||||||||||||||
| GLBA | ||||||||||||||||||||||||||||||
| GLCA | ||||||||||||||||||||||||||||||
| GLEC | ||||||||||||||||||||||||||||||
| GLDE | ||||||||||||||||||||||||||||||
| GOGA | ||||||||||||||||||||||||||||||
| GOSP | ||||||||||||||||||||||||||||||
| GOIS | ||||||||||||||||||||||||||||||
| GRCA | ||||||||||||||||||||||||||||||
| GRPO | ||||||||||||||||||||||||||||||
| GRTE | ||||||||||||||||||||||||||||||
| GRKO | ||||||||||||||||||||||||||||||
| GRBA | ||||||||||||||||||||||||||||||
| GREG | ||||||||||||||||||||||||||||||
| GRFA | ||||||||||||||||||||||||||||||
| GRSA | ||||||||||||||||||||||||||||||
| GRSM | ||||||||||||||||||||||||||||||
| GRSP | ||||||||||||||||||||||||||||||
| GREE | ||||||||||||||||||||||||||||||
| GUMO | ||||||||||||||||||||||||||||||
| GUCO | ||||||||||||||||||||||||||||||
| GUIS | ||||||||||||||||||||||||||||||
| HAFO | ||||||||||||||||||||||||||||||
| HALE | ||||||||||||||||||||||||||||||
| HAGR | ||||||||||||||||||||||||||||||
| HAMP | ||||||||||||||||||||||||||||||
| HAHA | ||||||||||||||||||||||||||||||
| HAFE | ||||||||||||||||||||||||||||||
| HSTR | ||||||||||||||||||||||||||||||
| HAVO | ||||||||||||||||||||||||||||||
| HEHO | ||||||||||||||||||||||||||||||
| PIMA | ||||||||||||||||||||||||||||||
| HOFR | ||||||||||||||||||||||||||||||
| HOME | ||||||||||||||||||||||||||||||
| HOCU | ||||||||||||||||||||||||||||||
| HOFU | ||||||||||||||||||||||||||||||
| HOBE | ||||||||||||||||||||||||||||||
| HOSP | ||||||||||||||||||||||||||||||
| HOVE | ||||||||||||||||||||||||||||||
| HUTR | ||||||||||||||||||||||||||||||
| IATR | ||||||||||||||||||||||||||||||
| ILMI | ||||||||||||||||||||||||||||||
| INDE | ||||||||||||||||||||||||||||||
| INDU | ||||||||||||||||||||||||||||||
| INUP | ||||||||||||||||||||||||||||||
| ISRO | ||||||||||||||||||||||||||||||
| JAGA | ||||||||||||||||||||||||||||||
| JAME | ||||||||||||||||||||||||||||||
| JELA | ||||||||||||||||||||||||||||||
| JEFF | ||||||||||||||||||||||||||||||
| JECA | ||||||||||||||||||||||||||||||
| JICA | ||||||||||||||||||||||||||||||
| JODR | ||||||||||||||||||||||||||||||
| JODA | ||||||||||||||||||||||||||||||
| JOER | ||||||||||||||||||||||||||||||
| JOFI | ||||||||||||||||||||||||||||||
| JOMU | ||||||||||||||||||||||||||||||
| JOFL | ||||||||||||||||||||||||||||||
| JOTR | ||||||||||||||||||||||||||||||
| JUBA | ||||||||||||||||||||||||||||||
| KALA | ||||||||||||||||||||||||||||||
| KAHO | ||||||||||||||||||||||||||||||
| KATM | ||||||||||||||||||||||||||||||
| KEFJ | ||||||||||||||||||||||||||||||
| KEPA | ||||||||||||||||||||||||||||||
| KEMO | ||||||||||||||||||||||||||||||
| KEWE | ||||||||||||||||||||||||||||||
| KIMO | ||||||||||||||||||||||||||||||
| KLGO | ||||||||||||||||||||||||||||||
| KLSE | ||||||||||||||||||||||||||||||
| KNRI | ||||||||||||||||||||||||||||||
| KOVA | ||||||||||||||||||||||||||||||
| KOWA | ||||||||||||||||||||||||||||||
| LACH | ||||||||||||||||||||||||||||||
| LACL | ||||||||||||||||||||||||||||||
| LAME | ||||||||||||||||||||||||||||||
| LAMR | ||||||||||||||||||||||||||||||
| LARO | ||||||||||||||||||||||||||||||
| LAVO | ||||||||||||||||||||||||||||||
| LABE | ||||||||||||||||||||||||||||||
| LECL | ||||||||||||||||||||||||||||||
| LEWI | ||||||||||||||||||||||||||||||
| LINC | ||||||||||||||||||||||||||||||
| LIBO | ||||||||||||||||||||||||||||||
| LIHO | ||||||||||||||||||||||||||||||
| LIBI | ||||||||||||||||||||||||||||||
| LIRI | ||||||||||||||||||||||||||||||
| LONG | ||||||||||||||||||||||||||||||
| LOWE | ||||||||||||||||||||||||||||||
| LOEA | ||||||||||||||||||||||||||||||
| LYJO | ||||||||||||||||||||||||||||||
| LYBA | ||||||||||||||||||||||||||||||
| MAWA | ||||||||||||||||||||||||||||||
| MAAC | ||||||||||||||||||||||||||||||
| MACA | ||||||||||||||||||||||||||||||
| MANA | ||||||||||||||||||||||||||||||
| MASI | ||||||||||||||||||||||||||||||
| MANZ | ||||||||||||||||||||||||||||||
| MABI | ||||||||||||||||||||||||||||||
| MALU | ||||||||||||||||||||||||||||||
| MAVA | ||||||||||||||||||||||||||||||
| MAMC | ||||||||||||||||||||||||||||||
| MCHO | ||||||||||||||||||||||||||||||
| MEVE | ||||||||||||||||||||||||||||||
| MIIN | ||||||||||||||||||||||||||||||
| MIMA | ||||||||||||||||||||||||||||||
| MIMI | ||||||||||||||||||||||||||||||
| MISS | ||||||||||||||||||||||||||||||
| MNRR | ||||||||||||||||||||||||||||||
| MOJA | ||||||||||||||||||||||||||||||
| MONO | ||||||||||||||||||||||||||||||
| MOCA | ||||||||||||||||||||||||||||||
| MOCR | ||||||||||||||||||||||||||||||
| MOPI | ||||||||||||||||||||||||||||||
| MORR | ||||||||||||||||||||||||||||||
| MORA | ||||||||||||||||||||||||||||||
| MORU | ||||||||||||||||||||||||||||||
| MUWO | ||||||||||||||||||||||||||||||
| NATC | ||||||||||||||||||||||||||||||
| NATR | ||||||||||||||||||||||||||||||
| NATT | ||||||||||||||||||||||||||||||
| NACE | ||||||||||||||||||||||||||||||
| NAMA | ||||||||||||||||||||||||||||||
| NACC | ||||||||||||||||||||||||||||||
| NPSA | ||||||||||||||||||||||||||||||
| NPNH | ||||||||||||||||||||||||||||||
| NWWM | ||||||||||||||||||||||||||||||
| NABR | ||||||||||||||||||||||||||||||
| NAVA | ||||||||||||||||||||||||||||||
| NEBE | ||||||||||||||||||||||||||||||
| NEJE | ||||||||||||||||||||||||||||||
| PINE | ||||||||||||||||||||||||||||||
| JAZZ | ||||||||||||||||||||||||||||||
| NERI | ||||||||||||||||||||||||||||||
| NEPE | ||||||||||||||||||||||||||||||
| NIFA | ||||||||||||||||||||||||||||||
| NICO | ||||||||||||||||||||||||||||||
| NISI | ||||||||||||||||||||||||||||||
| NIOB | ||||||||||||||||||||||||||||||
| NOAT | ||||||||||||||||||||||||||||||
| NOCA | ||||||||||||||||||||||||||||||
| NOCO | ||||||||||||||||||||||||||||||
| OBED | ||||||||||||||||||||||||||||||
| OCMU | ||||||||||||||||||||||||||||||
| OKCI | ||||||||||||||||||||||||||||||
| OPOT | ||||||||||||||||||||||||||||||
| OLSP | ||||||||||||||||||||||||||||||
| OLYM | ||||||||||||||||||||||||||||||
| OREG | ||||||||||||||||||||||||||||||
| ORCA | ||||||||||||||||||||||||||||||
| ORPI | ||||||||||||||||||||||||||||||
| OVVI | ||||||||||||||||||||||||||||||
| OXHI | ||||||||||||||||||||||||||||||
| OZAR | ||||||||||||||||||||||||||||||
| PAIS | ||||||||||||||||||||||||||||||
| PAAL | ||||||||||||||||||||||||||||||
| PARA | ||||||||||||||||||||||||||||||
| PERI | ||||||||||||||||||||||||||||||
| PECO | ||||||||||||||||||||||||||||||
| PIMI | ||||||||||||||||||||||||||||||
| PAAV | ||||||||||||||||||||||||||||||
| PEVI | ||||||||||||||||||||||||||||||
| PETE | ||||||||||||||||||||||||||||||
| PEFO | ||||||||||||||||||||||||||||||
| PETR | ||||||||||||||||||||||||||||||
| PIRO | ||||||||||||||||||||||||||||||
| PINN | ||||||||||||||||||||||||||||||
| PISP | ||||||||||||||||||||||||||||||
| PIPE | ||||||||||||||||||||||||||||||
| PISC | ||||||||||||||||||||||||||||||
| PORE | ||||||||||||||||||||||||||||||
| POEX | ||||||||||||||||||||||||||||||
| POGR | ||||||||||||||||||||||||||||||
| POCH | ||||||||||||||||||||||||||||||
| POHE | ||||||||||||||||||||||||||||||
| POPO | ||||||||||||||||||||||||||||||
| WHHO | ||||||||||||||||||||||||||||||
| PRSF | ||||||||||||||||||||||||||||||
| PRWI | ||||||||||||||||||||||||||||||
| PUHO | ||||||||||||||||||||||||||||||
| PUHE | ||||||||||||||||||||||||||||||
| QUSH | ||||||||||||||||||||||||||||||
| RABR | ||||||||||||||||||||||||||||||
| REDW | ||||||||||||||||||||||||||||||
| RICH | ||||||||||||||||||||||||||||||
| RIGR | ||||||||||||||||||||||||||||||
| ROCR | ||||||||||||||||||||||||||||||
| ROMO | ||||||||||||||||||||||||||||||
| ROWI | ||||||||||||||||||||||||||||||
| ROCA | ||||||||||||||||||||||||||||||
| RORI | ||||||||||||||||||||||||||||||
| ROLA | ||||||||||||||||||||||||||||||
| RUCA | ||||||||||||||||||||||||||||||
| SAHI | ||||||||||||||||||||||||||||||
| SAGU | ||||||||||||||||||||||||||||||
| SACN | ||||||||||||||||||||||||||||||
| SACR | ||||||||||||||||||||||||||||||
| SAPA | ||||||||||||||||||||||||||||||
| SAGA | ||||||||||||||||||||||||||||||
| SAMA | ||||||||||||||||||||||||||||||
| SAPU | ||||||||||||||||||||||||||||||
| SARI | ||||||||||||||||||||||||||||||
| SAAN | ||||||||||||||||||||||||||||||
| SAFR | ||||||||||||||||||||||||||||||
| SAJU | ||||||||||||||||||||||||||||||
| SAJH | ||||||||||||||||||||||||||||||
| SAND | ||||||||||||||||||||||||||||||
| SAFE | ||||||||||||||||||||||||||||||
| SAMO | ||||||||||||||||||||||||||||||
| SARA | ||||||||||||||||||||||||||||||
| SAIR | ||||||||||||||||||||||||||||||
| SCBL | ||||||||||||||||||||||||||||||
| SEMO | ||||||||||||||||||||||||||||||
| SEKI | ||||||||||||||||||||||||||||||
| SEBE | ||||||||||||||||||||||||||||||
| SHEN | ||||||||||||||||||||||||||||||
| SHIL | ||||||||||||||||||||||||||||||
| SHNC | ||||||||||||||||||||||||||||||
| SITK | ||||||||||||||||||||||||||||||
| SLBE | ||||||||||||||||||||||||||||||
| SPAR | ||||||||||||||||||||||||||||||
| STSP | ||||||||||||||||||||||||||||||
| STLI | ||||||||||||||||||||||||||||||
| STEA | ||||||||||||||||||||||||||||||
| STRI | ||||||||||||||||||||||||||||||
| SRNC | ||||||||||||||||||||||||||||||
| SUIT | ||||||||||||||||||||||||||||||
| SUCR | ||||||||||||||||||||||||||||||
| TAPR | ||||||||||||||||||||||||||||||
| THKO | ||||||||||||||||||||||||||||||
| OLST | ||||||||||||||||||||||||||||||
| THRO | ||||||||||||||||||||||||||||||
| THRB | ||||||||||||||||||||||||||||||
| THRI | ||||||||||||||||||||||||||||||
| THIS | ||||||||||||||||||||||||||||||
| EDIS | ||||||||||||||||||||||||||||||
| THJE | ||||||||||||||||||||||||||||||
| THST | ||||||||||||||||||||||||||||||
| TICA | ||||||||||||||||||||||||||||||
| TIMU | ||||||||||||||||||||||||||||||
| TONT | ||||||||||||||||||||||||||||||
| TOSY | ||||||||||||||||||||||||||||||
| TRTE | ||||||||||||||||||||||||||||||
| TUMA | ||||||||||||||||||||||||||||||
| TUPE | ||||||||||||||||||||||||||||||
| TUAI | ||||||||||||||||||||||||||||||
| TUIN | ||||||||||||||||||||||||||||||
| TUZI | ||||||||||||||||||||||||||||||
| USAR | ||||||||||||||||||||||||||||||
| ULSG | ||||||||||||||||||||||||||||||
| UPDE | ||||||||||||||||||||||||||||||
| VAFO | ||||||||||||||||||||||||||||||
| VAMA | ||||||||||||||||||||||||||||||
| VICK | ||||||||||||||||||||||||||||||
| VINC | ||||||||||||||||||||||||||||||
| VIVE | ||||||||||||||||||||||||||||||
| VIIS | ||||||||||||||||||||||||||||||
| VICR | ||||||||||||||||||||||||||||||
| VOYA | ||||||||||||||||||||||||||||||
| WACA | ||||||||||||||||||||||||||||||
| WAPA | ||||||||||||||||||||||||||||||
| WASH | ||||||||||||||||||||||||||||||
| WABA | ||||||||||||||||||||||||||||||
| WEFA | ||||||||||||||||||||||||||||||
| NWAK | ||||||||||||||||||||||||||||||
| WHIS | ||||||||||||||||||||||||||||||
| WHSA | ||||||||||||||||||||||||||||||
| WHMI | ||||||||||||||||||||||||||||||
| WIHO | ||||||||||||||||||||||||||||||
| WICR | ||||||||||||||||||||||||||||||
| WICA | ||||||||||||||||||||||||||||||
| WOTR | ||||||||||||||||||||||||||||||
| WORI | ||||||||||||||||||||||||||||||
| WRST | ||||||||||||||||||||||||||||||
| WRBR | ||||||||||||||||||||||||||||||
| WUPA | ||||||||||||||||||||||||||||||
| YELL | ||||||||||||||||||||||||||||||
| YORK | ||||||||||||||||||||||||||||||
| YONB | ||||||||||||||||||||||||||||||
| YOSE | ||||||||||||||||||||||||||||||
| YUHO | ||||||||||||||||||||||||||||||
| YUCH | ||||||||||||||||||||||||||||||
| ZION |
&CForm E 62 (5/26/10) Erosion and Sediment Control Strategies:
1. Develop a Storm Water Pollution Prevention Plan (SWPPP)
2. Temporary seeding/planting
3. Permanent seeding/planting
4. Mulching
5. Earth dike
6. Silt fence
7. Sediment trap
8. Sediment Basin
9. If project involves interior work only, answer yes.
9. Other Site Selection:
1. Site is NOT prime farmland
2. Site is NOT previously undeveloped land lower than 5 ft. above 100 year flood plain.
3. Land is NOT habitat for threatened or endangered species.
4. Land is NOT within 100 ft. of wetlands
5. Land is public parkland (Parkland Exception)
6. Other Development Density:
1. Construct or renovate a building on a previously developed site and in a community with a min. density of 60,000 SF/Acre
2. Building is located on a previously developed site
3. Building is within 1/2 mile of a residential area with an avg. density of 10 Units/Acre
4. Building is located within 1/2 mile of at least 10 basic services
5. Building has pedestrian access between building and services
6. Other Brownfield Redevelopment:
1. Develop on a site documented as contaminated (ASTM E1903-97 Phase 2)
2. Develop on a site defined as a Brownfield by local, state, or federal agency
3. Other Alternative Transportation:
1. Locate project within 1/2 mile walking distance of an existing or planned and funded commuter rail, light rail, or subway station
2. Locate the project within 1/4 mile walking distance of 1 or more stops for 2 or more public, campus, or private bus lines useable by building occupants
3. Other Bicycle Storage and Changing Rooms:
1. Provide secure bicycle racks/storage within 200 yards of building entrance for 5% of all building users (peak) AND provide shower/changing facilities within 200 yards of building entrance for 0.5% of FTE occupants.
2. Provide covered storage facilities for securing bicycles for 15% of building occupants
3. Other Low Emitting & Fuel Efficient Vehicles:
1. Provide preferred parking for low-emitting and fuel-efficient vehicles for 5% of vehicle parking capacity (discounted parking rates may be acceptable substitute - consult ref. guide)
2. Install alternative-fuel fueling stations for 3% of the total vehicle parking capacity. Liquid or gaseous fueling facilities must be separately ventilated or located outdoors.
3. Other Parking Capacity:
1. Parking capacity sized to meet but not exceed local zoning requirements
2. Provide preferred parking for carpools/vanpools for 5% of total parking spaces.
3. The project provides parking for less than 5% of FTE occupants.
4. Provide discounted parking for carpools/vanpools may be substituted for preferred parking
5. Provide no new parking
6. Provide infrastructure/support to facilitate shared vehicle use (see ref. guide for examples)
7. Other Site Development - Protect or Restore Habitat:
1. Stack the building program
2. Tuck-under parking
3. Share parking facilities with neighbors
4. Establish construction boundaries to minimize disturbance of the existing site
5. Restore previously degraded areas to their natural state
6. Select of appropriate native or adapted plants.
7. Prohibit plants listed as invasive or noxious weed species.
8. Avoid monoculture
9. Other Maximize Open Space
1. Stacking the building program
2. Tuck-under parking
3. Sharing parking facilities
4. Other Stormwater Design-Quantity Control:
1. Vegetated Roofs,
2. Pervious Paving
3. Reuse stormwater for landscape irrigation
4. Reuse stormwater for toilet and urinal flushing
5. Reuse stormwater for custodial uses
6. Other Stormwater Design-Quality Control:
1. Vegetated roofs
2. Pervious pavement
3. Grid pavers
4. Rain Gardens
5. Vegetated Swales
6. Disconnection of Imperviousness
7. Rainwater Recycling
8. Low-impact development
9. Environmentally Sensitive Design
10. Constructed wetlands
11. Vegetated Filters
12. Other Protect Hydrology
For development footprints that exceeds 5,000 square feet maintain or restore, to the maximum extent technically feasible, the predevelopment hydrology of the property with regard to the temperature, rate, volume, and duration of flow.
1. Vegetated Roofs,
2. Pervious Paving
3. Reuse stormwater for landscape irrigation
4. Reuse stormwater for toilet and urinal flushing
5. Reuse stormwater for custodial uses
6. Grid pavers
7. Rain Gardens
8. Vegetated Swales
9. Constructed wetlands
10. Vegetated Filters
11. If project involves no site work, answer yes 12 Other Heat Island Effect, Non-Roof
1. Shade from native or adapted trees and large shrubs
2. Shade from vegetated trellises or other exterior structures supporting vegetation.
3. High albedo coatings and integral colorants for asphalt
4. Shade impervious surfaces with photovoltaic cells
5. Vegetated roofs
6. Open grid paving
7. High-albedo concrete,
8. Other Heat Island Effect, Roof
1. Install high-albedo roof(s).
2. Install vegetated roofs
3. Install PV panels on roof.
4. Other Light Pollution Reduction
1. Minimize site lighting
2. Exterior fixtures are full cutoff luminaires
3. Interior light fixtures produce no direct light spillage through windows.
4 Exterior surfaces are low-reflectance
5. Spotlights are low-angle
5. Other Soundscape Preservation:
1. No exterior noise producing equipment
2. Exterior noise producing equipment is quieter than ambient noise levels.
3. Sound screening is installed to reduce noise levels of outside noise producing equipment.
4. Other Dark Sky Preservation:
1. Minimize site lighting
2. All exterior fixtures are full cutoff luminaires
3. Exterior surfaces are low-reflectance
4. Spotlights are low-angle
5. If no exterior lighting on site/building, answer yes.
6. If existing building has existing non-cutoff lighting that will remain, answer no.
7. Other Water Use Reduction, 20%
Below is a List of Plumbing Fixtures that may be used to achieve this Prereq:
1. Water Closet (1.6 gpf)
2. Water Closet (1.28 gpf)
3. Water Closet (1.0 gpf)
4. Water Closet (Dual Flush 1.6/1.0 gpf)
5. Water Closet (No Water)
6. Urinal (1.0 gpf)
7. Urinal (0.5 gpf)
8. Urinal (0.125 gpf)
9. Urinal (No Water)
10. Lavatory (2.2 gpm)
11. Lavatory (0.5 gpm)
12. Lavatory (0.25 gal/metering cycle)
13. Shower Head (2.50 gpm)
14. Shower Head (1.5-2.0 gpm)
15. Kitchen Sink (2.5 gpm)
16. Kitchen Sink (1.8 gpm)
17. Other
The following fixtures are outside of the scope of water use reduction: Commercial Dishwasher, Ice Makers, Commercial Clothes Washers, Residential Clothes Washers, Standard and Compact Dishwashers Water Efficient Landscaping, 50% Reduction
Below is a list of strategies that could be used to achieve this credit:
1. Chose plants that easily adapt to the site
2. Use Turf in practical areas only
3. No irrigation for plants between Nov. and April
4. No irrigation for shrubs between Sept. and June
5. Use drip, micro-mist, and subsurface irrigation systems
6. Smart irrigation controllers
7. Use water sense labeled irrigation products and watersense certified contractors
8. Mulch for landscaped areas
9. Use hose bibbs for temporary irrigation
10. Use of captured rainwater
11. Use of recycled waste water
12. Use of treated water by public agency. (specifically for non-potable use)
13. Groundwater pumped away from building used for irrigation
14. Other Water Efficient Landscaping, No Potable Water
Below is a lit of strategies that could be used to achieve this credit:
Path #1:
1. Use of captured rainwater
2. Use or recycled waste water
3. Use of treated water by a public agency (specifically for non potable use)
4. Other
Path #2:
1. Install landscaping that does not require a permanent irrigation system.
2. Irrigation system removed within 1 year of installation.
3. Other Innovative Wastewater Technologies
Below is a List of strategies that may be used to achieve this Prereq:
Option #1
1. Water Closet (1.6 gpf)
2. Water Closet (1.28 gpf)
3. Water Closet (1.0 gpf)
4. Water Closet (Dual Flush 1.6/1.0 gpf)
5. Water Closet (No Water)
6. Urinal (1.0 gpf)
7. Urinal (0.5 gpf)
8. Urinal (0.125 gpf)
9. Urinal (No Water)
10. Use graywater collected from sinks, showers, and other sources for flushing water closets and urinals.
11. Use collected rainwater/stormwater for flushing water closets and urinals.
12. Other
Option #2
1. Construct wetlands
2. Mechanical re-circulating sand filters
3. Anaerobic biological treatment reactors
4. Other Water Used for Energy Conservation
For such systems insure water conservation technologies are applied to the extent that the technologies are life-cycle cost-effective. Below are systems that use water for energy conservation:
1. Evaporative Cooling
2. Cooling Tower
3. Domestic water heat rejection loop
4. Other Water Use Reduction, 30%, 35%, 40%
Below is a List of Plumbing Fixtures that may be used to achieve this Prereq:
1. Water Closet (1.6 gpf)
2. Water Closet (1.28 gpf)
3. Water Closet (1.0 gpf)
4. Water Closet (Dual Flush 1.6/1.0 gpf)
5. Water Closet (No Water)
6. Urinal (1.0 gpf)
7. Urinal (0.5 gpf)
8. Urinal (0.125 gpf)
9. Urinal (No Water)
10. Lavatory (2.2 gpm)
11. Lavatory (0.5 gpm)
12. Lavatory (0.25 gal/metering cycle)
13. Shower Head (2.50 gpm)
14. Shower Head (1.5-2.0 gpm)
15. Kitchen Sink (2.5 gpm)
16. Kitchen Sink (1.8 gpm)
17. Other
The following fixtures are outside of the scope of water use reduction: Commercial Dishwasher, Ice Makers, Commercial Clothes Washers, Residential Clothes Washers, Standard and Compact Dishwashers Fundamental Commissioning
The following systems/tests may be included under Fundamental Commissioning:
1. HVAC Systems (Mechanical & Passive) and associated controls
2. Lighting and day lighting controls
3. Domestic hot water systems
4. Renewable energy systems (wind, solar, etc.)
5. Building Envelope
6. Blower door testing
7. Other
See: http://www.wbdg.org/references/mou_commissioning.php for guidance on commissioning.