NPS-ProjectSustainabilityChecklist-LEED2009_5-28-10.xls

XLS spreadsheet 463 KB Posted

Attached to
Repair Historic Kennecott Mine Structures Federal contract opportunity
Solicitation number
140P2019R0021
Issued by
Department of the Interior National Park Service National Office

About this file

This document provides details for a federal construction contract opportunity to repair historic structures at Kennecott Mines National Historic Landmark in Wrangell-St. Elias National Park and Preserve in Alaska. The National Park Service is seeking proposals on a small business set-aside basis for stabilization of the landmark's fourteen-story Mill Building, including replacement of deteriorated timber columns, beams, and floor structures, leveling of remnant ore, siding replacement, and reconstruction of an exterior timber feature. The estimated contract value is between $1-5 million, with a performance period of 730 days from notice to proceed. A pre-proposal site visit will be held on September 10, 2019, with proposals due in August 2019. The NAICS code is 236220 for commercial and institutional building construction.

NPS-Project Sustainability Checklist

View the file

Other files for this federal contract opportunity

Other files attached to Repair Historic Kennecott Mine Structures, newest first.
File Type Posted
SF30_140P2019R0021_Amd_006.pdf PDF
Clarification_on_Spec_06_10_00_2.2B_.pdf PDF
SF30_140P2019R0021_Amd_0005.pdf PDF
WRST_159092C_Contract_Questions_NPS_Responses_10.15.19_Amendment_5.pdf PDF
WRST_159092C_Contract_Questions_NPS_Responses_10.4.19_Amendment_4.pdf PDF
Mill_North_Slope_Scaffolding_and_Deck_work_plan.pdf PDF
Kennecott_Mill_North_Slope_Scaffold_and_Deck_Stabilization_Pads_Report.pdf PDF
SF30_140P2019R0021_Amd_0004.pdf PDF
Kennecott_ORE_CHUTE_9-2019_Revised_Volume_2.pdf PDF
Kennecott_Mines_NHL_Photographs_2.pdf PDF
WRST_159092C_Contract_Questions_NPS_Responses_10.1.19_Final.pdf PDF
SF30_140P2019R0021_Amd_0003.pdf PDF
Revised_Specs_and_Drawings_Portfolio_9-18-19.pdf PDF
SF30_140P2019R0021_Amd_002.pdf PDF
WRST_159092C_Site_Visit_Meeting_Minutes_9-10-19.pdf PDF
B08_RFP_Submission_Package.pdf PDF
Sol_140P2019R0021_Amd_0001.pdf PDF
E15_LmtOnSubconRpt_REQD.xlsx XLSX spreadsheet
B08_Attch_4_Rec_Hall_Parking_map_Rev1.docx DOCX document
SF24-Bid_Bond.pdf PDF
B08_140P2019R0021.pdf PDF
B03_WDOL_Builing_and_Heavy_Construction.pdf PDF
B08_140P2019R0021.pdf PDF
B08_Attch_4_Rec_Hall_Parking_map.docx DOCX document
B08_WRST_159092C_drawings_.pdf PDF
B08_WRST_159092C_Specs_8-22-19.pdf PDF
Show all 26

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Instructions NPS Project Sustainability Checklist Building and Non Building Projects (For New Construction or Renovation) LEED 2009 Edition

INSTRUCTIONS

1This checklist is organized around the LEED NC v3, 2009 checklist and also accounts for progress in meeting federal sustainability requirements (Guiding Principles).
2To complete the checklist fill in all the blank cells under the column for the relevant submission responding with a Y, N or (in some cases) NA and a concise explanation of how the credit/regulation is or is not met. Copy to the next deliverable column unchanged answers for a particular sustainability feature.
3Sustainability features highlighted in yellow are federal requirements (links to the federal requirements are provided) for all new building projects and major renovations, regardless of size. All federal requirements must be met for all new buildings and major building renovations. For building renovation projects which cost less than 50% of the current replacement value of the building, the project must only comply with those federal requirements applicable to the planned work.
4Compliance with ALL five Guiding Principles is required for a building to be considered in compliance. Projects that meet all the certification requirements of LEED at any of the four levels may not necessarily be compliant with the Guiding Principles.
5This form automatically counts LEED NC credits. As the result, if any LEED prerequisite is not met, the LEED-NC score (located near the top of the checklist) will indicate "Missed Prereq." regardless of the other LEED NC credits achieved.
6Sustainability features that are federal requirements, but have no parallel LEED credit, are identified at the left with green. Clicking the green cell will automatically navigate to the originating federal regulation.
7All Sustainable features indicated with a LEED credit (i.e. SS Credit 2 or EA Credit 3) have defined prescriptive requirements that are indicated in , LEED Reference Guide for Green Building Design and Construction, ©2009 USGBC
8For non-building projects use this same checklist. For federal requirements that don't apply to this non-building project, indicate with NA. Non building projects are defined as construction projects that do NOT include the construction of a building. Examples may include trailside parking, utility line, and road projects.

Checklist NPS Project Sustainability Checklist Building and Non-Building Projects (For New Construction or Renovation) LEED 2009 Edition

Project TypeBuilding Renovation
Project Title:Repair Historic Kennecott Mine Structures and Utilities Ph III - Upper Mill Building Structural RepairsFund Source:Line ItemGross Project Construction Cost:
Description:Structrual repairs at the Kennecott Mines National Historic Landmar. Work will be to the Mill Building, Levels 7 through 11, including West Tower, FOK, and Tram DeckPredesign Begin Date:2009Gross Building Construction Cost:0
Park/PMIS:Wrangell St. Elias Natioanal Park and Preserve PMIS 159092CFY of Const. Funding2019Gross Non Building (i.e. Site) Cost:
Architect/Engineer Firm:RIM ArchitectsPark:WRSTBuilding Size (Square Feet)27,830
Date:September 18, 2019State:AKRegion:Alaska
Type of BuildingHistoric
Please Input CRV in block to the right for the building(s) in this projectIf Renovation, Exist. Bldg. CRV
% Federal Regulations AchievedIndicate CRV AboveIndicate CRV AboveIndicate CRV AboveIndicate CRV AboveIndicate CRV AboveIndicate CRV AboveABLI
0000640Total LEED-NC CreditsMissed Prereq.Missed Prereq.Missed Prereq.Missed Prereq.Missed Prereq.Missed Prereq.ACAD
LEED Certification LevelNot Certified/Missing Prereq.Not Certified/Missing Prereq.Not Certified/Missing Prereq.Not Certified/Missing Prereq.Not Certified/Missing Prereq.Not Certified/Missing Prereq.ADAM
AFAM
Max. Fed Reqmt?Sustainable Sites (SS)
Maximum LEED NC 2009 Credits: 26AFBG
Fed Reqmt Met?Sustainability FeaturesPMIS SubmissionPredesignSchematic DesignDesign DevelopmentConstruction DocumentsConstructionAGFO
Y, N, NAPointsConcisely explain how credit/requirement is met at this milestone:Y, N, NAPointsConcisely explain how credit/requirement is met at this milestone:Y, N, NAPointsConcisely explain how credit/requirement is met at this milestone:Y, N, NAPointsConcisely explain how credit/requirement is met at this milestone:Y, N, NAPointsConcisely explain how credit/requirement is met at this milestone:Y, N, NAPointsConcisely explain how credit/requirement is met at this milestone:ALKANOTES
0000000SS Prereq 1Construction Activity Pollution PreventionNAN/ANPS to determine as site is exisitng with historical and hazardous site conditionsNAN/ANPS to determine as site is exisitng with historical and hazardous site conditionsALAG
0000000SS Credit 1Site SelectionNA0Site is part of National ParkNA0Site is part of National ParkALCA
SS Credit 2Development Density & Community ConnectivityN0Existing Building within National Park with minimal population densityN0Existing Building within National Park with minimal population densityALEU
SS Credit 3Brownfield RedevelopmentN0Not a brownfield site. Contaaminated areas to be addressed by Hazmat protocolN0Not a brownfield site. Contaaminated areas to be addressed by Hazmat protocolALFL
SS Credit 4.1Alternative Transportation, Public Transportation AccessN0No public transportation in the areaN0No public transportation in the areaALPO
SS Credit 4.2Alternative Transportation, Bicycle Storage & Changing RoomsN0Building will not be occupiedN0Building will not be occupiedAMME
SS Credit 4.3Alternative Transportation, Low-Emitting & Fuel-Efficient VehiclesN0No parking will be provided for any vehiclesN0No parking will be provided for any vehiclesAMIS
SS Credit 4.4Alternative Transportation, Parking CapacityY2No parking will be provided for any vehiclesY2No parking will be provided for any vehiclesANAC
SS Credit 5.1Site Development, Protect or Restore HabitatN0Site is part of National Park and on disturbed groundN0Site is part of National Park and on disturbed groundANDE
SS Credit 5.2Site Development, Maximize Open SpaceN0Existing BuildingN0Existing BuildingANJO
SS Credit 6.1Stormwater Design, Quantity Control (See EISA Section 438)N0No paving is going to occurN0No paving is going to occurANIA
SS Credit 6.2Stormwater Design, Quality Control (See EISA Section 438)N0No stormwater treatment will occurN0No stormwater treatment will occurANTI
0000000EISA 2007, Section 438Protect HydrologyNN/AIntent is to stabilize exisitng builidng structually. All means possibel to mitigate water infiltration into the building to be usedNN/AIntent is to stabilize exisitng builidng structually. No site work to occurANCM
SS Credit 7.1Heat Island Effect, Non-RoofN0Existing building will be maintainedN0Existing building will be maintainedAPIS
SS Credit 7.2Heat Island Effect, RoofN0Existing roofExisting roofAPPA
SS Credit 8Light Pollution ReductionY1No electrical workNo electrical workAPCO
00001002006 NPS Mgmt Policies (Para. 4.9)Soundscape PreservationYN/ANo equipmentNo equipmentARCH
00001002006 NPS Mgmt Policies (Para. 4.10)Dark Sky PreservationYN/ANo electrical workNo electrical workARPO
LEED-NC SubtotalMissed Prereq.Missed Prereq.Missed Prereq.Missed Prereq.Missed Prereq.Missed Prereq.ARHO
Water Efficiency (WE)
Maximum LEED NC 2009 Credits: 10ASIS
Sustainability FeaturesPMIS SubmissionPredesignSchematic DesignDesign DevelopmentConstruction DocumentsConstructionAZRU
Y, N, N/APointsConcisely explain how credit/requirement is met at this milestone:Y, N, N/APointsConcisely explain how credit/requirement is met at this milestone:Y, N, N/APointsConcisely explain how credit/requirement is met at this milestone:Y, N, N/APointsConcisely explain how credit/requirement is met at this milestone:Y, N, N/APointsConcisely explain how credit/requirement is met at this milestone:Y, N, N/APointsConcisely explain how credit/requirement is met at this milestone:BADL
0000110WE Prereq 1Water Use Reduction, 20% Reduction (see Guiding Principle III - Protect and Conserve Water)YN/ANo Mechanical work included in projectYN/ANo Mechanical work included in projectBAWA
0000000WE Credit 1Water Efficient Landscaping, Reduce by 50% (see Guiding Principle III - Protect and Conserve Water)N0No vegetation will be introduced as part of this projectN0No vegetation will be introduced as part of this projectBAND
WE Credit 1
(cont'd)Water Efficient Landscaping, No Potable Use or No IrrigationN0No vegitation will be introduced as part of this projectN0No vegitation will be introduced as part of this projectBATT
WE Credit 2Innovative Wastewater TechnologiesN0No Mechanical work included in projectN0No Mechanical work included in projectBEOL
0000000NPS PolicyWater MeteringNN/ANo Mechanical work included in projectNN/ANo Mechanical work included in projectBELA
0000000EPACT 2005, Section 109Water Used for Energy ConservationNN/ANo Mechanical work included in projectNN/ANo Mechanical work included in projectBIBE
WE Credit 3Water Use Reduction (30%, 35%, 40%)N0No Mechanical work included in projectN0No Mechanical work included in projectBICY
LEED-NC SubtotalMissed Prereq.Missed Prereq.Missed Prereq.00Missed Prereq.BIHO
Energy & Atmosphere (EA)
Maximum LEED NC 2009 Credits: 35BISO
Sustainability FeaturesPMIS SubmissionPredesignSchematic DesignDesign DevelopmentConstruction DocumentsConstructionBITH
Y, N, N/APointsConcisely explain how credit/requirement is met at this milestone:Y, N, N/APointsConcisely explain how credit/requirement is met at this milestone:Y, N, N/APointsConcisely explain how credit/requirement is met at this milestone:Y, N, N/APointsConcisely explain how credit/requirement is met at this milestone:Y, N, N/APointsConcisely explain how credit/requirement is met at this milestone:Y, N, N/APointsConcisely explain how credit/requirement is met at this milestone:BICA
0000000EA Prereq 1Fundamental Commissioning of the Building Energy Systems * (see Guiding Principle I - Employ Integrated Design Principles)NN/ANo Mechanical or Electrical work included in projectNN/ANo Mechanical or Electrical work included in projectBISC
0000000EA Prereq 2Minimum Energy Performance (see Guiding Principle II Optimize Energy Performance)NN/ANo Mechanical or Electrical work included in projectNN/ANo Mechanical or Electrical work included in projectBLCA
0000000EA Prereq 3Fundamental Refrigerant Management (see Guiding Principle V - Reduce Environmental Impact of Materials)NN/ANo Mechanical or Electrical work included in projectNN/ANo Mechanical or Electrical work included in projectBLAC
0000000EA Credit 1Optimize Energy Performance:** (Federal Regulations require 30% for New Construction and 20% for Existing Building Renovation. Note that this automatically equates to 10 Points for New Construction and 7 Points for Existing Building Renovation.) (see Guiding Principle II - Optimize Energy Performance)N0No Mechanical or Electrical work included in projectN0No Mechanical or Electrical work included in projectBLRI
0000000EISA 2007, Section 433Reduce Fossil Fuel Derived EnergyNN/ANo Mechanical or Electrical work included in projectNN/ANo Mechanical or Electrical work included in projectBLUE
0000000EO 13423, Sec. 2.(h)Energy Efficient Electronic Products (Select EPEAT) (Predominantly relates to purchases of desktop/laptop computers and peripherals)NN/ANo Mechanical or Electrical work included in projectNN/ANo Mechanical or Electrical work included in projectBOWA
0000000CFR Title 10, Part 436.4Procure Energy Star or FEMP designated productsNN/ANo Mechanical or Electrical work included in projectNN/ANo Mechanical or Electrical work included in projectBOST
0000000EPACT 2005, Section 104Premium Efficiency Electric MotorsNN/ANo Mechanical or Electrical work included in projectNN/ANo Mechanical or Electrical work included in projectBOAF
0000000EISA 2007, Section 523On-Site Renewable Energy*** Solar Thermal for Hot Water (Choose NA if proven not life cycle cost effective)NN/ANo Mechanical or Electrical work included in projectNN/ANo Mechanical or Electrical work included in projectBOHA
00EA Credit 2On-Site Renewable Energy*** 1%-13% Renewable EnergyN0No Mechanical or Electrical work included in projectN0No Mechanical or Electrical work included in projectBRCR
0000000EA Credit 3Enhanced Commissioning (required for projects with building size > 5,000 sf) (see Guiding Principle I - Employ Integrated Design Principles)N0No Mechanical or Electrical work included in projectN0No Mechanical or Electrical work included in projectBRVB
0000000EA Credit 4Enhanced Refrigerant Management (see Guiding Principle V - Reduce Environmental Impact of Materials)N0No Mechanical or Electrical work included in projectN0No Mechanical or Electrical work included in projectBUIS
0000000EA Credit 5Measurement & Verification (see Guiding Principle II - Optimize Energy Performance)N0No Mechanical or Electrical work included in projectN0No Mechanical or Electrical work included in projectBUFF
00EA Credit 6Green PowerN0No Mechanical or Electrical work included in projectN0No Mechanical or Electrical work included in projectCABR
LEED-NC SubtotalMissed Prereq.Missed Prereq.Missed Prereq.Missed Prereq.Missed Prereq.Missed Prereq.CALI
Materials & Resources (MR)
Maximum LEED NC 2009 Credits: 14CANA
Sustainability FeaturesPMIS SubmissionPredesignSchematic DesignDesign DevelopmentConstruction DocumentsConstructionCRHA
Y, N, N/APointsConcisely explain how credit/requirement is met at this milestone:Y, N, N/APointsConcisely explain how credit/requirement is met at this milestone:Y, N, N/APointsConcisely explain how credit/requirement is met at this milestone:Y, N, N/APointsConcisely explain how credit/requirement is met at this milestone:Y, N, N/APointsConcisely explain how credit/requirement is met at this milestone:Y, N, N/APointsConcisely explain how credit/requirement is met at this milestone:CARI
MR Prereq 1Storage & Collection of RecyclablesNN/ABuilding will not be occupiedNN/ABuilding will not be occupiedCACH
MR Credit 1.1Building Reuse, Maintain Existing Walls, Floors & RoofY3Building to remain with new structural stabilizationY3Building to remain with new structural stabilizationCANY
MR Credit 1.2Building Reuse, Maintain Interior Nonstructural ElementsY1All remaining interior finishes to remain, be replaced or rebuiltY1All remaining interior finishes to remain, be replaced or rebuiltCACO
0000110MR Credit 2Construction Waste Management, Divert 50% from Disposal (see Guiding Principle V - Reduce Environmental Impact of Materials)Y1Waste Management Plan will be established for constructionY1Waste Management Plan will be established for constructionCAHA
MR Credit 2
(cont'd)Construction Waste Management, Divert 75% from DisposalY1Waste Management Plan will be established for constructionY1Waste Management Plan will be established for constructionCAME
MR Credit 3Materials ReuseN0No material reuseN0No material reuseCAKR
0000110MR Credit 4Recycled Content, 10% (post-consumer + ½ pre-consumer). Use EPA's CPG for designated products to use)Y1Recycled material will be used where possibleY1Recycled material will be used where possibleCALO
MR Credit 5Regional Materials, Extracted, Processed & Manufactured RegionallyN0Not availableN0Not availableCARE
0000110EO 13423, Sec. 2.(d)Biopreferred ProductsYN/AWill be used where applicableYN/AWill be used where applicableCAVO
MR Credit 6Rapidly Renewable MaterialsN0Does not applyN0Does not applyCARL
0000000MR Credit 7Certified Wood (see Guiding Principle V - Reduce Environmental Impact of Materials)N0Does not applyN0Does not applyCAVE
LEED-NC SubtotalMissed Prereq.Missed Prereq.Missed Prereq.Missed Prereq.Missed Prereq.Missed Prereq.CAWO
Indoor Environmental Quality (EQ)
Maximum LEED NC 2009 Credits: 15CAGR
Sustainability FeaturesPMIS SubmissionPredesignSchematic DesignDesign DevelopmentConstruction DocumentsConstructionCASA
Y, N, N/APointsConcisely explain how credit/requirement is met at this milestone:Y, N, N/APointsConcisely explain how credit/requirement is met at this milestone:Y, N, N/APointsConcisely explain how credit/requirement is met at this milestone:Y, N, N/APointsConcisely explain how credit/requirement is met at this milestone:Y, N, N/APointsConcisely explain how credit/requirement is met at this milestone:Y, N, N/APointsConcisely explain how credit/requirement is met at this milestone:CACL
0000000EQ Prereq 1Minimum IAQ Performance (See Guiding Principle IV, Enhance Indoor Environmental Quality)NN/ANo Mechanical or Electrical work included in projectNN/ANo Mechanical or Electrical work included in projectCATO
EQ Prereq 2Environmental Tobacco Smoke (ETS) ControlYN/ABuilding will not be occupiedYN/ABuilding will not be occupiedCEBR
EQ Credit 1Outdoor Air Delivery MonitoringN0No Mechanical or Electrical work included in projectN0No Mechanical or Electrical work included in projectCEBE
EQ Credit 2Increased VentilationN0No Mechanical or Electrical work included in projectN0No Mechanical or Electrical work included in projectCHSC
0000000EQ Credit 3.1Construction IAQ Management Plan, During Construction (See Guiding Principle IV, Enhance Indoor Environmental Quality)N0No Mechanical or Electrical work included in projectN0No Mechanical or Electrical work included in projectCHCU
0000000EQ Credit 3.2Construction IAQ Management Plan, Before Occupancy (See Guiding Principle IV, Enhance Indoor Environmental Quality)N0No Mechanical or Electrical work included in projectN0No Mechanical or Electrical work included in projectCHAM
0000000EQ Credit 4.1Low-Emitting Materials, Adhesives & Sealants (See Guiding Principle IV, Enhance Indoor Environmental Quality)N0Does not applyN0Does not applyCHIS
0000000EQ Credit 4.2Low-Emitting Materials, Paints & Coatings (See Guiding Principle IV, Enhance Indoor Environmental Quality)N0Does not applyN0Does not applyCHPI
0000000EQ Credit 4.3Low-Emitting Materials, Flooring Materials (See Guiding Principle IV, Enhance Indoor Environmental Quality)N0Does not applyN0Does not applyCHAT
00EQ Credit 4.4Low-Emitting Materials, Composite Wood & Agrifiber ProductsN0Does not applyN0Does not applyCHOH
00EQ Credit 5Indoor Chemical & Pollutant Source ControlN0Does not applyN0Does not applyCBPO
0000000MOU Guiding Principles & EO 13423Moisture ControlNN/ADoes not applyNN/ADoes not applyCHCH
0000000EQ Credit 6.1Controllability of Systems, Lighting (See Guiding Principle IV, Enhance Indoor Environmental Quality)N0No Mechanical or Electrical work included in projectN0No Mechanical or Electrical work included in projectCHIC
00EQ Credit 6.2Controllability of Systems, Thermal ComfortN0No Mechanical or Electrical work included in projectN0No Mechanical or Electrical work included in projectCHRO
0000000EQ Credit 7.1Thermal Comfort, Design (See Guiding Principle IV, Enhance Indoor Environmental Quality)N0No Mechanical or Electrical work included in projectN0No Mechanical or Electrical work included in projectCHIR
00EQ Credit 7.2Thermal Comfort, VerificationN0No Mechanical or Electrical work included in projectN0No Mechanical or Electrical work included in projectCHRI
0000000EQ Credit 8.1Daylight & Views, Daylight 75% of Spaces (See Guiding Principle IV, Enhance Indoor Environmental Quality)N0Building will not be occupiedN0Building will not be occupiedCIRO
00EQ Credit 8.2Daylight & Views, Views for 90% of SpacesN0Building will not be occupiedN0Building will not be occupiedCLBA
LEED-NC SubtotalMissed Prereq.Missed Prereq.Missed Prereq.Missed Prereq.Missed Prereq.Missed Prereq.CLMO
Innovation & Design Process (ID)
Maximum LEED NC 2009 Credits: 6COLO
Sustainability FeaturesPMIS SubmissionPredesignSchematic DesignDesign DevelopmentConstruction DocumentsConstructionCOLM
Y, N, N/APointsConcisely explain how credit/requirement is met at this milestone:Y, N, N/APointsConcisely explain how credit/requirement is met at this milestone:Y, N, N/APointsConcisely explain how credit/requirement is met at this milestone:Y, N, N/APointsConcisely explain how credit/requirement is met at this milestone:Y, N, N/APointsConcisely explain how credit/requirement is met at this milestone:Y, N, N/APointsConcisely explain how credit/requirement is met at this milestone:COSW
ID Credit 1.1Innovation in Design: Provide Specific TitleCOGA
ID Credit 1.2Innovation in Design: Provide Specific TitleCORO
ID Credit 1.3Innovation in Design: Provide Specific TitleCOWP
ID Credit 1.4Innovation in Design: Provide Specific TitleCRLA
ID Credit 1.5Innovation in Design: Provide Specific TitleCRMO
ID Credit 2LEED® Accredited ProfessionalCUGA
LEED-NC Subtotal000000CUIS
Regional Priority (RP)
Maximum LEED NC 2009 Credits: 4CURE
Sustainability FeaturesPMIS SubmissionPredesignSchematic DesignDesign DevelopmentConstruction DocumentsConstructionCUVA
Y, N, N/APointsConcisely explain how credit/requirement is met at this milestone:Y, N, N/APointsConcisely explain how credit/requirement is met at this milestone:Y, N, N/APointsConcisely explain how credit/requirement is met at this milestone:Y, N, N/APointsConcisely explain how credit/requirement is met at this milestone:Y, N, N/APointsConcisely explain how credit/requirement is met at this milestone:Y, N, N/APointsConcisely explain how credit/requirement is met at this milestone:DABE
RP Credit 1.1Regional Priority Credit: Region DefinedDAAV
RP Credit 1.2Regional Priority Credit: Region DefinedDESO
RP Credit 1.3Regional Priority Credit: Region DefinedDEVA
RP Credit 1.4Regional Priority Credit: Region DefinedDELA
LEED-NC Subtotal000000DELE
Non-LEED-NC Federal Requirements
Maximum LEED NC 2009 Credits: 26DEWA
Sustainability FeaturesPMIS SubmissionPredesignSchematic DesignDesign DevelopmentConstruction DocumentsConstructionDENA
Y, N, N/APointsConcisely explain how credit/requirement is met at this milestone:Y, N, N/APointsConcisely explain how credit/requirement is met at this milestone:Y, N, N/APointsConcisely explain how credit/requirement is met at this milestone:Y, N, N/APointsConcisely explain how credit/requirement is met at this milestone:Y, N, N/APointsConcisely explain how credit/requirement is met at this milestone:Y, N, N/APointsConcisely explain how credit/requirement is met at this milestone:DEMO
0000000MOU Guiding Principles & EO 13423 (pg. 3)Complete Integrated Design Narrative During Predesign OnlyNN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/ADEPO
DETO
Fulfillment of Guiding Principles for HPSB completes 18 LEED NC credits and 6 prerequisites.DINO
LEED Certification Rating SystemDRTO
Certified: 40-49 points, Silver: 50-59 points, Gold: 60-79 points, Platinum: 80+ pointsEBLA
For more information on LEED Certification and credits, visit www.usgbc.orgEDAL
EFMO
* For new buildings of 5,000 GSF or more and major renovations to buildings greter than or equal to 5,000 GSF, contract with an independent Commissioning Authority and comply with ASHRAE 0-2005, "The Commissioning Process". For smaller projects, comply with the requirements of LEED NC 2009, EA Prerequisite 1, "Fundamental Commissioning of the Building Energy Systems" (which allows the commissioning authority to be an employee of the design firm).EISE
** For new building projects of 5,000 GSF or more, perform whole building energy simulation(s) in accordance with ASHRAE 90.1, 2007 (or IECC 2006 for residential) to show performance at least 30% better (20% for major renovations) than a code compliant similar building. If it can be shown that meeting the 30% performance standard for new construction (or 20% for major renovations) is not life cycle cost effective (over 40 years - not 25 years per a recent regulatory change) then the project must incorporate the maximum energy savings that can be shown to be life cycle cost effective. For new building projects with a lower net construction value, an alternative method is to meet or exceed the minimum requirements prescribed by the ASHRAE Advanced Energy Design Guide (a much simpler prescriptive method for achieving the target) appropriate for the project's building. For buildings without an appropriate Advanced Energy Design Guide perform whole building energy simulation(s) in accordance with ASHRAE 90.1, 2007 (or IECC 2006 for residential).ELTE
*** The federal requirement (from EISA 2007) that relates to these LEED-NC credits is "Where life cycle cost effective, design systems to provide not less than 30 percent of the hot water demand through the installation and use of solar hot water heaters." The LEED credits for this item stipulates a percentage of total energy consumption to be provided by on site renewable sources. In some cases meeting the federal requirement will also meet the LEED requirement for these credits.ELCA
ELMA
ELMO
ELRO
ELIS
ERIE
ESSE
EUON
EVER
FAMA
FEHA
FIIS
FILA
FLNI
FLFO
FOTH
FOBO
FOCA
FODA
FODO
FDNC
FODU
FOFO
FOFR
FOLA
FOLS
FOMA
FOMC
FOMO
FONE
FOPO
FOPU
FORA
FOSC
FOSM
FOST
FOSU
FOUN
FOUS
FOVA
FOWA
FOBU
FRDE
FRDO
FRLA
FRED
FRSP
FRHI
GAAR
GATE
GARI
GEGR
GEMM
GERO
GWMP
GEWA
GWCA
GETC
GETT
GICL
GLAC
GLBA
GLCA
GLEC
GLDE
GOGA
GOSP
GOIS
GRCA
GRPO
GRTE
GRKO
GRBA
GREG
GRFA
GRSA
GRSM
GRSP
GREE
GUMO
GUCO
GUIS
HAFO
HALE
HAGR
HAMP
HAHA
HAFE
HSTR
HAVO
HEHO
PIMA
HOFR
HOME
HOCU
HOFU
HOBE
HOSP
HOVE
HUTR
IATR
ILMI
INDE
INDU
INUP
ISRO
JAGA
JAME
JELA
JEFF
JECA
JICA
JODR
JODA
JOER
JOFI
JOMU
JOFL
JOTR
JUBA
KALA
KAHO
KATM
KEFJ
KEPA
KEMO
KEWE
KIMO
KLGO
KLSE
KNRI
KOVA
KOWA
LACH
LACL
LAME
LAMR
LARO
LAVO
LABE
LECL
LEWI
LINC
LIBO
LIHO
LIBI
LIRI
LONG
LOWE
LOEA
LYJO
LYBA
MAWA
MAAC
MACA
MANA
MASI
MANZ
MABI
MALU
MAVA
MAMC
MCHO
MEVE
MIIN
MIMA
MIMI
MISS
MNRR
MOJA
MONO
MOCA
MOCR
MOPI
MORR
MORA
MORU
MUWO
NATC
NATR
NATT
NACE
NAMA
NACC
NPSA
NPNH
NWWM
NABR
NAVA
NEBE
NEJE
PINE
JAZZ
NERI
NEPE
NIFA
NICO
NISI
NIOB
NOAT
NOCA
NOCO
OBED
OCMU
OKCI
OPOT
OLSP
OLYM
OREG
ORCA
ORPI
OVVI
OXHI
OZAR
PAIS
PAAL
PARA
PERI
PECO
PIMI
PAAV
PEVI
PETE
PEFO
PETR
PIRO
PINN
PISP
PIPE
PISC
PORE
POEX
POGR
POCH
POHE
POPO
WHHO
PRSF
PRWI
PUHO
PUHE
QUSH
RABR
REDW
RICH
RIGR
ROCR
ROMO
ROWI
ROCA
RORI
ROLA
RUCA
SAHI
SAGU
SACN
SACR
SAPA
SAGA
SAMA
SAPU
SARI
SAAN
SAFR
SAJU
SAJH
SAND
SAFE
SAMO
SARA
SAIR
SCBL
SEMO
SEKI
SEBE
SHEN
SHIL
SHNC
SITK
SLBE
SPAR
STSP
STLI
STEA
STRI
SRNC
SUIT
SUCR
TAPR
THKO
OLST
THRO
THRB
THRI
THIS
EDIS
THJE
THST
TICA
TIMU
TONT
TOSY
TRTE
TUMA
TUPE
TUAI
TUIN
TUZI
USAR
ULSG
UPDE
VAFO
VAMA
VICK
VINC
VIVE
VIIS
VICR
VOYA
WACA
WAPA
WASH
WABA
WEFA
NWAK
WHIS
WHSA
WHMI
WIHO
WICR
WICA
WOTR
WORI
WRST
WRBR
WUPA
YELL
YORK
YONB
YOSE
YUHO
YUCH
ZION

&CForm E 62 (5/26/10) Erosion and Sediment Control Strategies:

1. Develop a Storm Water Pollution Prevention Plan (SWPPP)

2. Temporary seeding/planting

3. Permanent seeding/planting

4. Mulching

5. Earth dike

6. Silt fence

7. Sediment trap

8. Sediment Basin

9. If project involves interior work only, answer yes.

9. Other Site Selection:

1. Site is NOT prime farmland

2. Site is NOT previously undeveloped land lower than 5 ft. above 100 year flood plain.

3. Land is NOT habitat for threatened or endangered species.

4. Land is NOT within 100 ft. of wetlands

5. Land is public parkland (Parkland Exception)

6. Other Development Density:

1. Construct or renovate a building on a previously developed site and in a community with a min. density of 60,000 SF/Acre

2. Building is located on a previously developed site

3. Building is within 1/2 mile of a residential area with an avg. density of 10 Units/Acre

4. Building is located within 1/2 mile of at least 10 basic services

5. Building has pedestrian access between building and services

6. Other Brownfield Redevelopment:

1. Develop on a site documented as contaminated (ASTM E1903-97 Phase 2)

2. Develop on a site defined as a Brownfield by local, state, or federal agency

3. Other Alternative Transportation:

1. Locate project within 1/2 mile walking distance of an existing or planned and funded commuter rail, light rail, or subway station

2. Locate the project within 1/4 mile walking distance of 1 or more stops for 2 or more public, campus, or private bus lines useable by building occupants

3. Other Bicycle Storage and Changing Rooms:

1. Provide secure bicycle racks/storage within 200 yards of building entrance for 5% of all building users (peak) AND provide shower/changing facilities within 200 yards of building entrance for 0.5% of FTE occupants.

2. Provide covered storage facilities for securing bicycles for 15% of building occupants

3. Other Low Emitting & Fuel Efficient Vehicles:

1. Provide preferred parking for low-emitting and fuel-efficient vehicles for 5% of vehicle parking capacity (discounted parking rates may be acceptable substitute - consult ref. guide)

2. Install alternative-fuel fueling stations for 3% of the total vehicle parking capacity. Liquid or gaseous fueling facilities must be separately ventilated or located outdoors.

3. Other Parking Capacity:

1. Parking capacity sized to meet but not exceed local zoning requirements

2. Provide preferred parking for carpools/vanpools for 5% of total parking spaces.

3. The project provides parking for less than 5% of FTE occupants.

4. Provide discounted parking for carpools/vanpools may be substituted for preferred parking

5. Provide no new parking

6. Provide infrastructure/support to facilitate shared vehicle use (see ref. guide for examples)

7. Other Site Development - Protect or Restore Habitat:

1. Stack the building program

2. Tuck-under parking

3. Share parking facilities with neighbors

4. Establish construction boundaries to minimize disturbance of the existing site

5. Restore previously degraded areas to their natural state

6. Select of appropriate native or adapted plants.

7. Prohibit plants listed as invasive or noxious weed species.

8. Avoid monoculture

9. Other Maximize Open Space

1. Stacking the building program

2. Tuck-under parking

3. Sharing parking facilities

4. Other Stormwater Design-Quantity Control:

1. Vegetated Roofs,

2. Pervious Paving

3. Reuse stormwater for landscape irrigation

4. Reuse stormwater for toilet and urinal flushing

5. Reuse stormwater for custodial uses

6. Other Stormwater Design-Quality Control:

1. Vegetated roofs

2. Pervious pavement

3. Grid pavers

4. Rain Gardens

5. Vegetated Swales

6. Disconnection of Imperviousness

7. Rainwater Recycling

8. Low-impact development

9. Environmentally Sensitive Design

10. Constructed wetlands

11. Vegetated Filters

12. Other Protect Hydrology

For development footprints that exceeds 5,000 square feet maintain or restore, to the maximum extent technically feasible, the predevelopment hydrology of the property with regard to the temperature, rate, volume, and duration of flow.

1. Vegetated Roofs,

2. Pervious Paving

3. Reuse stormwater for landscape irrigation

4. Reuse stormwater for toilet and urinal flushing

5. Reuse stormwater for custodial uses

6. Grid pavers

7. Rain Gardens

8. Vegetated Swales

9. Constructed wetlands

10. Vegetated Filters

11. If project involves no site work, answer yes 12 Other Heat Island Effect, Non-Roof

1. Shade from native or adapted trees and large shrubs

2. Shade from vegetated trellises or other exterior structures supporting vegetation.

3. High albedo coatings and integral colorants for asphalt

4. Shade impervious surfaces with photovoltaic cells

5. Vegetated roofs

6. Open grid paving

7. High-albedo concrete,

8. Other Heat Island Effect, Roof

1. Install high-albedo roof(s).

2. Install vegetated roofs

3. Install PV panels on roof.

4. Other Light Pollution Reduction

1. Minimize site lighting

2. Exterior fixtures are full cutoff luminaires

3. Interior light fixtures produce no direct light spillage through windows.

4 Exterior surfaces are low-reflectance

5. Spotlights are low-angle

5. Other Soundscape Preservation:

1. No exterior noise producing equipment

2. Exterior noise producing equipment is quieter than ambient noise levels.

3. Sound screening is installed to reduce noise levels of outside noise producing equipment.

4. Other Dark Sky Preservation:

1. Minimize site lighting

2. All exterior fixtures are full cutoff luminaires

3. Exterior surfaces are low-reflectance

4. Spotlights are low-angle

5. If no exterior lighting on site/building, answer yes.

6. If existing building has existing non-cutoff lighting that will remain, answer no.

7. Other Water Use Reduction, 20%

Below is a List of Plumbing Fixtures that may be used to achieve this Prereq:

1. Water Closet (1.6 gpf)

2. Water Closet (1.28 gpf)

3. Water Closet (1.0 gpf)

4. Water Closet (Dual Flush 1.6/1.0 gpf)

5. Water Closet (No Water)

6. Urinal (1.0 gpf)

7. Urinal (0.5 gpf)

8. Urinal (0.125 gpf)

9. Urinal (No Water)

10. Lavatory (2.2 gpm)

11. Lavatory (0.5 gpm)

12. Lavatory (0.25 gal/metering cycle)

13. Shower Head (2.50 gpm)

14. Shower Head (1.5-2.0 gpm)

15. Kitchen Sink (2.5 gpm)

16. Kitchen Sink (1.8 gpm)

17. Other

The following fixtures are outside of the scope of water use reduction: Commercial Dishwasher, Ice Makers, Commercial Clothes Washers, Residential Clothes Washers, Standard and Compact Dishwashers Water Efficient Landscaping, 50% Reduction

Below is a list of strategies that could be used to achieve this credit:

1. Chose plants that easily adapt to the site

2. Use Turf in practical areas only

3. No irrigation for plants between Nov. and April

4. No irrigation for shrubs between Sept. and June

5. Use drip, micro-mist, and subsurface irrigation systems

6. Smart irrigation controllers

7. Use water sense labeled irrigation products and watersense certified contractors

8. Mulch for landscaped areas

9. Use hose bibbs for temporary irrigation

10. Use of captured rainwater

11. Use of recycled waste water

12. Use of treated water by public agency. (specifically for non-potable use)

13. Groundwater pumped away from building used for irrigation

14. Other Water Efficient Landscaping, No Potable Water

Below is a lit of strategies that could be used to achieve this credit:

Path #1:

1. Use of captured rainwater

2. Use or recycled waste water

3. Use of treated water by a public agency (specifically for non potable use)

4. Other

Path #2:

1. Install landscaping that does not require a permanent irrigation system.

2. Irrigation system removed within 1 year of installation.

3. Other Innovative Wastewater Technologies

Below is a List of strategies that may be used to achieve this Prereq:

Option #1

1. Water Closet (1.6 gpf)

2. Water Closet (1.28 gpf)

3. Water Closet (1.0 gpf)

4. Water Closet (Dual Flush 1.6/1.0 gpf)

5. Water Closet (No Water)

6. Urinal (1.0 gpf)

7. Urinal (0.5 gpf)

8. Urinal (0.125 gpf)

9. Urinal (No Water)

10. Use graywater collected from sinks, showers, and other sources for flushing water closets and urinals.

11. Use collected rainwater/stormwater for flushing water closets and urinals.

12. Other

Option #2

1. Construct wetlands

2. Mechanical re-circulating sand filters

3. Anaerobic biological treatment reactors

4. Other Water Used for Energy Conservation

For such systems insure water conservation technologies are applied to the extent that the technologies are life-cycle cost-effective. Below are systems that use water for energy conservation:

1. Evaporative Cooling

2. Cooling Tower

3. Domestic water heat rejection loop

4. Other Water Use Reduction, 30%, 35%, 40%

Below is a List of Plumbing Fixtures that may be used to achieve this Prereq:

1. Water Closet (1.6 gpf)

2. Water Closet (1.28 gpf)

3. Water Closet (1.0 gpf)

4. Water Closet (Dual Flush 1.6/1.0 gpf)

5. Water Closet (No Water)

6. Urinal (1.0 gpf)

7. Urinal (0.5 gpf)

8. Urinal (0.125 gpf)

9. Urinal (No Water)

10. Lavatory (2.2 gpm)

11. Lavatory (0.5 gpm)

12. Lavatory (0.25 gal/metering cycle)

13. Shower Head (2.50 gpm)

14. Shower Head (1.5-2.0 gpm)

15. Kitchen Sink (2.5 gpm)

16. Kitchen Sink (1.8 gpm)

17. Other

The following fixtures are outside of the scope of water use reduction: Commercial Dishwasher, Ice Makers, Commercial Clothes Washers, Residential Clothes Washers, Standard and Compact Dishwashers Fundamental Commissioning

The following systems/tests may be included under Fundamental Commissioning:

1. HVAC Systems (Mechanical & Passive) and associated controls

2. Lighting and day lighting controls

3. Domestic hot water systems

4. Renewable energy systems (wind, solar, etc.)

5. Building Envelope

6. Blower door testing

7. Other

See: http://www.wbdg.org/references/mou_commissioning.php for guidance on commissioning.

De…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .