Repair Historic Kennecott Mine Structures Federal contract opportunity
Solicitation number
140P2019R0021
Issued by
Department of the Interior National Park Service National Office

About this file

This document provides details for a federal solicitation seeking construction services. The National Park Service is soliciting proposals on a small business set-aside to stabilize the Kennecott Mines National Historic Landmark Mill Building in Wrangell-St. Elias National Park and Preserve in Copper Center, Alaska. The project involves selective replacement of deteriorated timber columns, beams, and floor structures in the fourteen-story mill building, leveling of remnant ore, reinstallation of siding following stud replacement, construction of a new timber frame and roof, and partial demolition and reconstruction of an exterior timber feature. A firm-fixed price contract valued between $1 million and $5 million will be awarded following a tradeoff evaluation of technical capability and price. The anticipated period of performance is 730 calendar days. A pre-proposal site visit is scheduled for September 10, 2019. Proposals are due by October 25, 2019.

SF30 140P2019R0021 Amd 0005

View the file

Other files for this federal contract opportunity

Other files attached to Repair Historic Kennecott Mine Structures, newest first.
File Type Posted
SF30_140P2019R0021_Amd_006.pdf PDF
Clarification_on_Spec_06_10_00_2.2B_.pdf PDF
WRST_159092C_Contract_Questions_NPS_Responses_10.15.19_Amendment_5.pdf PDF
WRST_159092C_Contract_Questions_NPS_Responses_10.4.19_Amendment_4.pdf PDF
Mill_North_Slope_Scaffolding_and_Deck_work_plan.pdf PDF
Kennecott_Mill_North_Slope_Scaffold_and_Deck_Stabilization_Pads_Report.pdf PDF
SF30_140P2019R0021_Amd_0004.pdf PDF
Kennecott_ORE_CHUTE_9-2019_Revised_Volume_2.pdf PDF
Kennecott_Mines_NHL_Photographs_2.pdf PDF
WRST_159092C_Contract_Questions_NPS_Responses_10.1.19_Final.pdf PDF
SF30_140P2019R0021_Amd_0003.pdf PDF
Revised_Specs_and_Drawings_Portfolio_9-18-19.pdf PDF
NPS-ProjectSustainabilityChecklist-LEED2009_5-28-10.xls XLS spreadsheet
SF30_140P2019R0021_Amd_002.pdf PDF
WRST_159092C_Site_Visit_Meeting_Minutes_9-10-19.pdf PDF
B08_RFP_Submission_Package.pdf PDF
Sol_140P2019R0021_Amd_0001.pdf PDF
E15_LmtOnSubconRpt_REQD.xlsx XLSX spreadsheet
B08_Attch_4_Rec_Hall_Parking_map_Rev1.docx DOCX document
SF24-Bid_Bond.pdf PDF
B08_140P2019R0021.pdf PDF
B03_WDOL_Builing_and_Heavy_Construction.pdf PDF
B08_140P2019R0021.pdf PDF
B08_Attch_4_Rec_Hall_Parking_map.docx DOCX document
B08_WRST_159092C_drawings_.pdf PDF
B08_WRST_159092C_Specs_8-22-19.pdf PDF
Show all 26

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

140P2019R0021 x x

1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT

THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

WRST 15909208/28/20190005

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

08/28/2019

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not, is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

WRST 159092 Repair Historic Kennecott Mine Structure

Wrangell-St. Elias National Park and Preserve, Copper Center, Alaska

Amendment five answers the last questions that were received from contractors.

Please ensure to acknowledge all amendments when proposing. Currently there is an issue with amendment #3 which is being worked by FBO. The Draft title of amendment 3 is a FBO issue which they are looking into.

The Solicitation due date remains unchanged; 25 October 2019, NLT 1700 MT.

Legacy Doc #: NPS

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

Gregory Passig

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

NSN 7540-01-152-8070

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

File details come from the government source that posted it. Updated .