1364315_dwg_17of18_PH2_V4_Mechanical.pdf

PDF 33 MB Posted

Attached to
P-678 Dry Dock 8 Saltwater System for CVN-78, Norfolk Naval Shipyard, Portsmouth, Virginia
Solicitation number
N40085-22-R-2598_Drawings
Issued by

About this file

This document provides details for a federal contract opportunity for mechanical drawings and specifications to support the P-678 Dry Dock 8 Saltwater System project at the Norfolk Naval Shipyard in Portsmouth, Virginia. The solicitation number is N40085-22-R-2598 and is seeking mechanical drawings identified in file 1364315_dwg_17of18_PH2_V4_Mechanical.pdf. Offerors should review Notice ID N40085-22-R-2598_Drawings for the required drawings and Notice ID N40085-22-R-2598_Specificiations for the project specifications. The opportunity is a special notice issued by the Department of the Navy Naval Facilities Engineering Command for mechanical engineering services to support upgrades to the saltwater system that services Dry Dock 8 at the Norfolk Naval Shipyard in Portsmouth, Virginia.

View the file

Other files

Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1. THESE GENERAL NOTES APPLY TO ALL MECHANICAL DRAWINGS IN THIS SET.

SHEET SPECIFIC NOTES ARE INDICATED ON EACH SHEET UNDER GENERAL

SHEET NOTES.

2. PROVIDE ALL MATERIALS, VALVES, HANGERS, SUPPORTS, ETC., AND PERFORM

ALL LABOR REQUIRED TO INSTALL A COMPLETE AND OPERABLE MECHANICAL

SYSTEM.

3. INSTALL ALL MECHANICAL EQUIPMENT AND APPURTENANCES IN ACCORDANCE

WITH MANUFACTURER'S RECOMMENDATIONS, AS INDICATED, AND AS

REQUIRED BY CODE. WHERE THE ABOVE REQUIREMENTS ARE IN CONFLICT,

PROVIDE THE MOST STRINGENT.

4. PROVIDE PIPE SLEEVES FOR ALL PIPING PENETRATIONS THROUGH WALLS AND

FLOORS. EACH PIPE SHALL BE SEPARATELY SLEEVED. PROVIDE CONTINUOUS

SEALANT JOINT AROUND PIPE SLEEVE, BOTH SIDES OF WALL, WATERTIGHT.

5. MECHANICAL DRAWINGS ARE SCHEMATIC IN NATURE AND MAY NOT SHOW

EVERY OFFSET, FITTING, AND CONNECTION NECESSARY FOR A COMPLETE

INSTALLATION. PROVIDE ADDITIONAL OFFSETS, FITTINGS, AND CONNECTIONS

REQUIRED FOR COMPLETE AND OPERABLE SYSTEM.

6. VERIFY AND COORDINATE INSTALLATION OF MECHANICAL SYSTEMS WITH

OTHER TRADES PRIOR TO BEGINNING WORK. WORK MUST PROVIDE ACCESS

FOR MAINTENANCE WITHOUT REQUIRING REMOVAL OR DISASSEMBLY OF

ADJACENT SYSTEMS.

7. INSTALL TEMPERATURE CONTROLS AT 48" ABOVE FINISHED FLOOR AND

COORDINATE WITH OTHER DEVICES LOCATED ON WALLS. COORDINATE WITH

ALL WALL-MOUNTED EQUIPMENT.

8. DESIGN AND PROVIDE SEISMIC SUPPORTS, ISOLATORS, AND RESTRAINT

DEVICES IN ACCORDANCE WITH 23 05 48.19 AND STRUCTURAL SPECIFICATIONS.

WHERE SEISMIC SUPPORT REQUIREMENTS CONFLICT WITH ATFP

REQUIREMENTS PROVIDE THE MORE STRINGENT.

9. MECHANICAL WORK MUST BE IN ACCORDANCE WITH UFC 3-401-01, UFC 3-410-01,

UFC 4-213-10, THE INTERNATIONAL MECHANICAL CODE, AND APPLICABLE

ASHRAE AND NFPA STANDARDS.

10. FIELD VERIFY EXISTING CONDITIONS AND COORDINATE PIPE ROUTES TO AVOID

INTERFERENCE WITH OTHER UTILITIES AND EQUIPMENT. PROVIDE THE

MINIMUM NUMBER OF ELBOWS AND OFFSETS NECESSARY FOR A COMPLETE

INSTALLATION.

11. ROUTE NEW PIPING WITH CONSIDERATION OF SPACE USE WITH OTHER

TRADES. PIPE MUST NOT BLOCK SERVICE CLEARANCES FOR EQUIPMENT.

GENERAL MECHANICAL NOTES

° DEGREES

Ø DIAMETER

AD ACCESS DOOR

AFF ABOVE FINISHED FLOOR

AHU AIR HANDLING UNIT

AP ACCESS PANEL

APD AIR PRESSURE DROP

AS AIR SEPARATOR

ATFP ANTITERRORISM FORCE PROTECTION

BD BALANCING DAMPER

BFP BACKFLOW PREVENTER

BHP BRAKE HORSEPOWER

BOD BOTTOM OF DUCT

BR BASEBOARD RADIATOR

BTUH BRITISH THERMAL UNITS PER HOUR

C COMMON

Cv LOSS COEFFICIENT

CFM CUBIC FEET PER MINUTE

CLG CEILING

CND CONDENSER

CONT CONTINUATION

COP COEFFICIENT OF PERFORMANCE

CRAHU COMPUTER ROOM AIR HANDLING UNIT

CU CONDENSING UNIT

CHW CHILLED WATER

CW CONDENSER WATER

D CONDENSATE DRAIN

DB DRY BULB

DDC DIRECT DIGITAL CONTROL

DEG DEGREE

DP DIFFERNTIAL PRESSURE

DX DIRECT EXPANSION

EAT ENTERING AIR TEMPERATURE

EER ENERGY EFFICENCY RATIO

EF EXHAUST FAN

EFF EFFECTIVENESS

EQPT EQUIPMENT

ESP EXTERNAL STATIC PRESSURE

EWT ENTERING WATER TEMPERATURE

F FAHRENHEIT

FCU FAN COIL UNIT

FD FIRE DAMPER

FFP FUEL FILL PORT

FT FEET

FT WG FEET WATER GAUGE

G NATURAL GAS

GPM GALLONS PER MINUTE

HB HOSE BIBB

HGT HEIGHT

HP HEAT PUMP, HORSEPOWER

HR HOUR, HUMIDITY RATIO

HW HOT WATER

HX HEAT EXCHANGER

IAW IN ACCORDANCE WITH

IWG INCHES WATER GAUGE

kW KILOWATT

LAT LEAVING AIR TEMPERATURE

LBS POUNDS

LV LOUVER

LWT LEAVING WATER TEMPERATURE

LPS LOW PRESSURE STEAM (< 15PSIG)

MAU MAKEUP AIR UNIT

MAX MAXIMUM

MCWB MEAN COINCIDENT WET BLUB

MIN MINIMUM

N NORTH

NC NORMALLY CLOSED, NOISE CRITERIA

NO NUMBER, NORMALLY OPEN

OA OUTSIDE AIR

OAU OUTSIDE AIR UNIT

PH PHASE

PSI POUNDS PER SQUARE INCH

QTY QUANTITY

RA RETURN AIR

RH RELATIVE HUMIDITY

RL REFRIGERANT LIQUID

RS REFRIGERANT SUCTION

RTU ROOF TOP UNIT

SA SUPPLY AIR

SEER SEASONAL ENERGY EFFICIENCY RATIO

SIM SIMILAR

SP STATIC PRESSURE

SQ SQUARE

SW SALTWATER

TYP TYPICAL

UH UNIT HEATER

UOI UNLESS OTHERWISE INDICATED

V VOLTS

VAV VARIABLE AIR VOLUME

VFD VARIABLE FREQUENCY DRIVE

W WIDTH, WEST

WB WET BULB

WPD WATER PRESSURE DROP

MECHANICAL ABBREVIATIONS

T

HUMIDITY SENSORH

THERMOSTAT

DOWNWARD DIRECTION OF SLOPED PIPING

GLOBE VALVE

GATE VALVE

BUTTERFLY VALVE

CHECK VALVE

PRESSURE REDUCING VALVE

DRAIN VALVE WITH HOSE CONNECTION

2-WAY CONTROL VALVE

3-WAY CONTROL VALVE

BACKFLOW PREVENTER

RELIEF VALVE

MANUAL AIR VENT

AUTOMATIC AIR VENT

WYE STRAINER

STRAINER WITH BLOWDOWN VALVE

CLEAN OUT

PIPE REDUCER

ECCENTRIC REDUCER

UNION

PRESSURE GAUGE WITH SHUTOFF COCK

THERMOMETER

PIPE CAP

FLANGE

FLEXIBLE PIPE CONNECTOR

C.O.

M

M

MV

AV

R/D RISE (R) DROP (D) IN DIRECTION OF FLOW

MANUAL CALIBRATED BALANCING VALVE

MECHANICAL LEGEND

BALL VALVE

SIGHT GLASS

FLOW METER

FLOOR CLEANOUT (FCO)

FLOOR DRAIN (FD)

WALL HYDRANT (WH)

PIPE SUPPORT

PIPE ANCHOR

STRAINER

SURGE TANK

VERTICAL TURBINE PUMP

PIPING TO BE REMOVED

COMPRESSED AIR PIPING

DRAIN PIPING (ABOVE GRADE)

DRAIN PIPING (BELOW GRADE)

REFRIGERANT LIQUID PIPING

REFRIGERANT SUCTION PIPING

CA

D

RL

RS

FRESH WATER

MECHANICAL PIPING LEGEND

SALTWATER RETURN (ABOVE GRADE)SWR

SALTWATER SUPPLY (ABOVE GRADE)SWS

D

FW

SANITARYS

STEAMSTM

CLEAN WATER HEADER RETURNCWHR

SALTWATER RETURN (BELOW GRADE)SWR

SALTWATER SUPPLY (BELOW GRADE)SWS

POINT OF CONNECTION

POINT OF DISCONNECTION

CONSTRUCTION INTERFACE

DEMO

WORK

EXISTING

TO REMAIN

WORK EXISTING

TO REMAIN

EXISTING TO REMAIN

DEMO WORK

WORK

ROOM TAG

DETAIL NUMBER

SHEET WHERE DRAWN

DETAIL TAG

ROOM NAME

ROOM NUMBER

DETAIL NUMBER

SCALE

SHEET

REFERENCED

FROM

SECTION TAG

SECTION NUMBER

SHEET WHERE DRAWN

GENERAL PROJECT SYMBOLS

KEYNOTE TAG

KEYNOTE NUMBER

? PHOTOGRAPH TAG

PHOTOGRAPH NUMBER

SHEET WHERE SHOWN

PLAN

NORTH

SCALE

TRUE NORTH

SHEET

REFERENCED

FROM

EQUIPMENT

IDENTIFICATION

VAV - XX

EQUIPMENT

TYPE

EQUIPMENT

NUMBER

36.9 N

LONGITUDE:

ELEVATION:

LATITUDE:

SUMMER DESIGN WET BULB (0.4%):

SUMMER DESIGN DRY BULB (0.4%):

WINTER DESIGN DRY BULB (99.6%):

STANDARD OUTDOOR DESIGN CONDITIONS:

21°F

79°F 94°F

76.2 W

30 FT.

HVAC DESIGN CRITERIA

LOCATION: PORTSMOUTH, VA

WMO# 723080

SUMMER

DESIGN DRY

BULB:

WINTER

DESIGN DRY

BULB:

STANDARD INDOOR DESIGN CONDITIONS:

SUMMER

DESIGN

HUMIDITY:

ROOM TYPE:

*UC - UNCONTROLLED

*NC - HUMIDITY NOT DIRECTLY CONTROLLED

WINTER

DESIGN

HUMIDITY:

CLIMATE ZONE 3A

CONDENSING UNIT (0.4% DB + 5°F): 99°F

1% HR/MCWB WET BLUB

1% HR/MCWB DRY BLUB

77.1°F 81.6°F

MECH / ELEC ROOMS 80°F 45% RH 55°F UC*

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT NO.:

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y N

A V

A L

F A

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

S

Y S

T E

M S

C O

M M

A N

D

DRAWFORM REVISION: 25 AUGUST 2020

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

Y S

T E

M S

C O

M M

A N

D

M

ID

-A T

LA

N

TI

C

N A

V A

L S

T A

T

IO

N

N O

R F

O L

K V

A

AS NOTED

F

IL

E N

A M

E

P

LO

T T

E D

C

R e v it P ro je ct s \D

R Y

D P

-1

-M

-P S tj g o d fr e y .r v t

/2

/2

:0 :5

P

M

2-M-001

P D

R Y

D O

C K

S

A L T

W A

T E

R S

Y S

T E

M

F O

R C

V N

-7

M E

C H

A N

IC

A

L

LE

G E

N D

, A B

B R

E V

IA

T

IO

N

S A

N D

N O

TE

S

DKH

12857932

TJG CPM

02/02/2022

DEVIN POULIN,

C984 FACILITIES PLANNER, NNSY

JTL/TLH

1364315

N40085-22-R-2598

P O

R T

S M

O U

T H

, V

IR

G

IN

IA

N

O R

F O

LK

N

A V

A L

S H

IP

Y

A R

D

EJA

ALG

DSN

S Y

M D

E S

C R

IP

TI

O N

D A

TE

A

P P

R

IS

S U

E D

F O

R B

ID

/2 8/

Mechanical | Electrical | Plumbing | Fire Protection 4456 Corporation Ln, Ste 320 Tel: (757) 502-8882

Virginia Beach, Virginia 23462 Fax: (757) 499-1757

ADVANCED

ENGINEERING

CONSULTANTS

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT NO.:

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y N

A V

A L

F A

C

IL

IT

IE

S E

N G

IN

E

E R

S

T E

M S

C O

M M

A N

D

DRAWFORM REVISION: 25 AUGUST 2020

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

Y S

T E

M S

C O

M M

A N

D

M

ID

-A T

LA

N

T

IC

N A

V A

L S

T A

T

IO

N

N O

R F

O L

K

V A

AS NOTED

FI

LE

N A

M E

P

LO

T

TE

D

ALG

N40085-22-R-2598

C U s e rs

\E ri n C

\D o c u m e n ts

\D R

Y D

P

-1

-F

-D R

Y D

E ri n C

V

E R

.r v t

/2

/2

:5

:1

A

M

2-M-010

P D

R Y

D O

C K

S

A L T

W A

T E

R S

Y S

T E

M

F O

R C

V N

-7

M E

C H

A N

IC

A

L G

E N

E R

A L

S H

E E

T

AEC

12857933

PJB EBC

02/02/2022

DEVIN POULIN,

C984 FACILITIES PLANNER, NNSY

JTL / TLH

1364315

P O

R T

S M

O U

T H

, V

IR

G

IN

IA

N

O R

F O

LK

N

A V

A L

S H

IP

Y

A R

D

EJA

DSN

ABBREVIATIONS

NOTE: NOT ALL ABBREVIATIONS MAY BE USED.

AUTO AUTOMATIC

BLDG. BUILDING

BOP BOTTOM OF PIPE

BV BYPASS VALVE

CA COMPRESSED AIR

CHT SANITARY SEWER

CS CARBON STEEL

CV CONTROL VALVE

CWHR CLEAN WATER HEADER PIPING

DD DRY DOCK

DDF DRY DOCK FIREFIGHTING (SEE MF SHEETS)

DIA DIAMETER

DIP DUCTILE IRON PIPE

DV DRAIN VALVE

DWG DRAWING

EMBED. EMBEDMENT

EXIST EXISTING

F FLUSHING

FC FLEX CONNECTION

FD FLOOR DRAIN

FM FORCE MAIN

FW FRESH WATER

GA GAGE

GPM GALLONS PER MINUTE

HC HOSE CONNECTION

HP HIGH PRESSURE

HYD HYDRANT

IN. INCH

INSUL INSULATION

INV. EL INVERT ELEVATION

LP LOW PRESSURE

LR LONG RADIUS (FITTING)

LVL LEVEL

MAX. MAXIMUM

MFGR. MANUFACTURER

MH MANHOLE

NC NORMALLY CLOSED

NO NORMALLY OPEN

OS&Y OUTSIDE STEM & YOKE VALVE

PSI POUNDS PER SQUARE INCH

SPRT SUPPORT

SS STAINLESS STEEL

STM STEAM

STA STATION

SW SALTWATER

THD THREADED

THRU THROUGH

TOC TOP OF CONCRETE

T.O.P. TOP OF PIPE

TOS TOP OF STEEL

TYP TYPICAL

V VALVE

VERT VERTICAL

WTR WATER

COMPRESSED AIR (125 PSIG) CA

TEE

CAP

FLOW ARROW

BUTTERFLY VALVE

BALL VALVE

CHECK VALVE

BALANCE VALVE

STRAINER

UNION

PIPE SLEEVE

GATE VALVE OR GENERAL SERVICE VALVE

OUTSIDE STEM & YOKE VALVE

CONNECT TO EXISTING, LEVEL DESIGNATION

BEGINNING AND/OR END OF DEMOLITION

WORK NOTE

PIPING

PIPING (FITTINGS, VALVES, AND MISCELLANEOUS)

PIPE TURNING UP

PIPE TURNING DOWN

NOTATIONS

NOTE: NOT ALL SYMBOLS MAY BE USED.

GENERAL NOTES:SYMBOLS LIST

RISER CALL OUT DEFINITION

SANITARY SEWER SAN

FRESH WATER FW

SALTWATER SW

STEAM (150 PSIG) STM

FMD8SR3

RISER NUMBER AT THAT LEVEL AND SIDE

OF DRY DOCK.

SIDE OF DRY DOCK

(N = NORTH, S = SOUTH)

DRY DOCK LOCATION

SYSTEM CLASSIFICATION

1. COORDINATE EXACT REQUIREMENTS AND LOCATION OF WORK

WITH THE WORK OF OTHER TRADES PRIOR TO FABRICATION.

PROVIDE ADDITIONAL OFF-SETS AND SECTIONS OF PIPING AS MAY

BE REQUIRED TO MEET THE APPLICABLE JOB CONDITION

REQUIREMENTS. VERIFY EXISTING JOB-SITE ELEVATIONS,

DIMENSIONS, AND CONDITIONS, PRIOR TO FABRICATION OR

INSTALLATION OF THE WORK. COORDINATE EXACT ROUTING OF

PIPING WITH OTHER TRADES SO THAT NO CONFLICTS OCCUR WITH

DUCTBANKS, PIPING, LIGHTS, STRUCTURE, ETC. MATCH NEW

MATERIALS WITH EXISTING MATERIALS OF CONSTRUCTION TO THE

FULLEST EXTENT POSSIBLE.

2. ALL SEALS, BEARINGS, PACKINGS, AND ACCESSORIES FOR ALL

EQUIPMENT AND/OR PIPING SPECIALTIES MUST BE SUITABLE FOR

THE CONTINUOUS OPERATIONAL TEMPERATURES, PRESSURES

AND CHARACTERISTICS, OF THE SYSTEMS THEY SERVE.

3. COORDINATE PHASING OF ALL DEMOLITION WORK WITH

CONTRACTING OFFICER AND TRADES AS WELL AS PHASING OF

NEW WORK. REVIEW DRAWINGS TO VERIFY AND/OR DETERMINE

EXTENT OF, AND SCHEDULING FOR ALL DEMOLITION PRIOR TO

PERFORMING DEMOLITION WORK.

4. COORDINATE ALL DEMOLITION WORK WITH THE WORK. REVIEW

DRAWINGS TO VERIFY AND/OR DETERMINE EXTENT OF

DEMOLITION PRIOR TO PERFORMING DEMOLITION WORK.

5. FIELD VERIFY ALL SIZES AND LOCATION OF EXISTING PIPING TO

REMAIN. NOTIFY CONTRACTING OFFICER OF DEVIATIONS WHICH

AFFECT ALL WORK PRIOR TO PROCEEDING WITH THE WORK.

ELEVATIONS ARE BASED ON NEARBY TEST HOLES; FIELD VERIFY.

6. WORK MUST NOT INTERFERE OR INTERRUPT SERVICES TO AREAS

OUTSIDE OF THE DESIGNATED CONTRACT AREAS. UNAVOIDABLE

INTERRUPTIONS ARE TO BE MINIMIZED AND SCHEDULED WITH THE

CONTRACTING OFFICER A MINIMUM OF 15 DAYS IN ADVANCED.

7. SCHEDULE ALL WORK TO CAUSE A MINIMUM OF "DOWN TIME" FOR

SHIPYARD OPERATIONS. AS ANY INTERRUPTIONS OF EXISTING

SERVICES BECOMES NECESSARY, SCHEDULE EACH INTERRUPTION

A MINIMUM OF 15 DAYS IN ADVANCE. WORK SHALL BE PERFORMED

AT SUCH TIMES AS DIRECTED BY THE CONTRACTING OFFICER.

8. ALL WORK IS PART OF PHASE 2 AS INDICATED ON THE PHASING

DRAWINGS. THE CONTRACTOR IS RESPONSIBLE FOR MAINTAINING

SERVICES THROUGHOUT THE CONSTRUCTION SCHEDULE.

9. STOCK PARTS FOR SUPPORTS AND RESTRAINING HARDWARE

MUST BE USED WHEREVER POSSIBLE AND SHALL BE TYPE 316

STAINLESS STEEL ON ALL SALTWATER PIPING LOCATED WITHIN

THE TUNNELS, ON THE GALLERY, OR GOING UP TO AND ON THE

COPING LEVEL; INCLUDING BOLTS, RODS, CLAMPS, CLEVISES,

WASHERS, ETC. DIELECTRIC FITTING MUST BE UTILIZED BETWEEN

PIPING OF DISSIMILAR MATERIALS. ISOLATION KITS MUST BE

UTILIZED BETWEEN FLANGES AND FASTENING COMPONENTS.

10. ALL ABOVEGROUND DUCTILE IRON AND STEEL PIPE RISERS MUST

BE COATED IN ACCORDANCE WITH PIPING SYSTEM SECTION.

11. IN EACH PHASE OF CONSTRUCTION, (REFER TO THE GENERAL

SHEETS) THE CONTRACTOR MUST NOTIFY CONTRACTING OFFICER

IN WRITING 2 WEEKS PRIOR TO START OF DEMOLITION OF ABOVE

GROUND PIPING TO ALLOW NNSY TO SALVAGE VALVES AND OTHER

ITEMS.

12. PROVIDE STAINLESS STEEL RESTRAINING RODS FOR ALL ABOVE

GROUND THRUST RESTRAINTS AT ALL CHANGES IN PIPE

DIRECTION. REFER TO RESTRAINING RODS DETAIL A3 / 2-MS523

FOR ADDITIONAL REQUIREMENTS FOR INSTALLATION OF

RESTRAINING RODS.

13. SW PIPING AND COMPONENTS ARE SPECIFIED IN SECTION 33 11

00.01 22 "SALTWATER UTILITY DISTRIBUTION PIPING". SAN PIPING

AND COMPONENTS ARE SPECIFIED IN SECTION 33 30 00 "SANITARY

SEWERS".

14. ALL PIPING WITHIN THE UTILITY TUNNEL MUST BE COATED IN

ACCORDANCE WITH PIPING SYSTEM SECTION SPECIFICATIONS.

ALL OTHER NON-BURIED DUCTILE IRON PIPING AND RISERS MUST

BE COATED IN ACCORDANCE PER THE UTILITY RISER COATING

REQUIREMENTS OF THE PIPING SYSTEM SECTION

SPECIFICATIONS. COLOR OF TOP COATING IS AS FOLLOWS:

SALTWATER: REDFM = FIRE MAIN (SHIP FIRE MAIN CONNECTION)

TF = TEMPORARY SERVICE FIREFIGHTING

CC = COMPONENT COOLING

SAN SANITARY

DW DRY DOCK WALL OF TUNNEL

GW GRADE WALL OF TUNNEL

15. CONTRACTOR MUST PROTECT ALL EXISTING TO REMAIN PIPING,

VALVES, AND ACCESSORIES WITHIN THE UTILITY TUNNEL AND IN

THE GALLERY DURING DEMOLITION AND NEW CONSTRUCTION.

ANY EXISTING TO REMAIN COMPONENTS THAT ARE DAMAGED

ARE TO BE REPLACED AT NO ADDITIONAL COST TO THE

GOVERNMENT.

16. EXISTING SALTWATER AND SANITARY PIPING IS CEMENT LINED

DUCTILE IRON WITH FLANGED CONNECTIONS.

(E) EXISTING

OILY WASTE / WASTE OIL OWWO

OWWO OILY WASTE / WASTE OIL

CFM CUBIC FEET PER MINUTE

EXP JT EXPANSION JOINT

MJ MECHANICALLY RESTRAINED JOINT

SR SHORT RADIUS (FITTING)

GAL. HR GALLERY HEADER

S Y

M D

E S

C R

IP

T

I O N

D A

TE

A

P P

R

IS

S U

E D

F O

R C

O N

S T

R U

C

TI

O N

/2

8/

IS

SU

ED

F

OR

B

ID

PS6-FOT-1

FUEL FILL PORT

CONTROL

PANEL/ANNUNCIATOR

PS6-FPU-1

GENERATOR

ENCLOSURE

DRY DOCK 8

E

LI

Z A

B E

T H

R

IV

E R

PUMP STATION 6

2"ø FOR

2"ø FOS

SHEET NOTES

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT NO.:

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y N

A V

A L

F A

C

IL

IT

IE

S E

N G

IN

E

E R

S

T E

M S

C O

M M

A N

D

DRAWFORM REVISION: 25 AUGUST 2020

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

Y S

T E

M S

C O

M M

A N

D

M

ID

-A T

LA

N

TI

C

N A

V A

L S

T A

T

IO

N

N O

R F

O L

K V

A

AS NOTED

F

IL

E N

A M

E

P

LO

T T

E D

C

R e v it P ro je ct s \D

R Y

D P

-1

-M

-P S tj g o d fr e y .r v t

/2

/2

:0 :5

P

M

2-M-101

P D

R Y

D O

C K

S

A L T

W A

T E

R S

Y S

T E

M

F O

R C

V N

-7

M E

C H

A N

IC

A

L S

IT

E

P

LA

N

P U

M P

S

TA

T

IO

N

DKH

12857934

TJG JR

02/02/2022

DEVIN POULIN,

C984 FACILITIES PLANNER, NNSY

JTL/TLH

1364315

N40085-22-R-2598

P O

R T

S M

O U

T H

, V

IR

G

IN

IA

N

O R

F O

LK

N

A V

A L

S H

IP

Y

A R

D

EJA

ALG

DSN

1" = 10'-0" A1

MECHANICAL SITE PLAN – PUMP STATION 6

PLAN

NORTH

KEY PLAN

PS-6

SHEET KEYNOTES

33 COORDINATE FUEL OIL SYSTEM WITH GENERATOR MANUFACTURER'S

REQUIREMENTS. PROVIDE ALL FOS/FOR PIPING, SUPPORTS AND

APPURENTANCES NEEDED FOR A COMPLETE AND FUNCTIONAL SYSTEM.

PROVIDE CONTROL CONNECTIONS BETWEEN GENERATOR DAYTANK

CONTROLLER AND TRANSFER PUMP CONTROLLER.

37 FUEL PIPING TO BE ROUTED ABOVE GRADE; REFER TO DETAIL A4 / 2-M-501.

38 REFER TO STRUCTURAL DRAWING 1-SS504 FOR FUEL TANK FOUNDATION

DETAILS.

39 WALL MOUNT CONDENSING UNITS; UNITS TO BE ELEVATED TO ELEVATION 109'.

0" 10' 30'20'

1. REFER TO DRAWING 2-M-001 FOR MECHANICAL LEGEND, ABBREVIATIONS AND

NOTES.

2. BUILDING AND EQUIPMENT LOCATIONS SHOWN FOR REFERENCE. REFER TO

CIVIL DRAWINGS FOR ACUTAL LOCATIONS.

3. INSTALL FUEL FILL PORT, FUEL POLISHING UNIT, AND CONTROL

PANEL/ANNUCIATOR ABOVE FLOOD ELEVATION 107'.

4. REFER TO CIVIL DRAWING FOR PUMP STATION 6 OVERALL SITE LOCATION

S Y

M D

E S

C R

IP

TI

O N

D A

TE

A

P P

R

IS

S U

E D

F O

R B

ID

/2 8/

1. REFER TO DRAWING 2-M-001 FOR MECHANICAL LEGEND, ABBREVIATIONS

AND NOTES.

SHEET NOTES

A1

2-M-302

A1

2-M-301

HB

HB

1"ø FW

20"ø SWS

HB

HB

"ø S

W S

PS6-ST-2

PS6-ST-1

PS6-V-11A

PS6-V-7A

PS6-V-3A

P S

6- V

-9

PS6-DSS-CU-1

PS6-DSS-CU-2

PS6-DSS-CU-3

PS6-DSS-CU-4

T

T

PS6-V-2

P S

6- V

-1

PS6-V-17

PS6-P-2

PS6-V-12

PS6-V-14

PS6-V-15

PS6-V-8

P S

6- V

-5 P

S 6-

V -1

PS6-STR-1

PS6-STR-2

PS6-STR-3

20"ø SWS

PS6-V-3B

PS6-V-7B

PS6-V-11B

PS6-RPZ-11"ø FW

PS6-SP-2

PS6-SP-1

PS6-V-6

PS6-V-10

PS6-V-4

1"ø CA

1"ø FW

1"ø CA

1"ø CA

SEE CIVIL FOR

CONTINUATION

RS/L

PIPE SUPPORT (TYP.)

FLOOR TRENCH

P S

6- F

M -1

P S

6- F

M -3

P S

6- F

M -2

P S

6- V

-1

2-M-503

C1

H

H

16"ø SWS

BELOW GRADE 16"⌀ SWS

TO PIER 6, SEE CIVIL

PS6 PUMP CTRL

BELOW GRADE 36"⌀

SWS, SEE CIVIL

BELOW GRADE 36"⌀ SWS

TO DD8, SEE CIVIL

PS6-P-3

PS6-P-1

10"ø SWR

4"ø SWR

4"ø SWR

10"ø SWR

4"ø SWR

10"ø SWR

PS6-V-13

16"ø SWS

PS6-V-19

20"ø SWS

"ø

S W

S

RL/S

RS/L

3/4"ø D

RL/S

3/4"ø D

3/4"ø D

3/4"ø D

2"ø D 2"ø D

PS6-DSS-3

PS6-DSS-2

P S

6- V

-2

4"ø SWS

PS6-STOPLOG

11' - 3"

FLOOR TRENCH

36"ø SWS

36"ø SWS

4"ø SWR

10"ø SWR

10"ø SWR

4"ø SWR

4"ø SWR

10"ø SWR

2"ø D

10"ø SWR

3/4"ø D

RS/L

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT NO.:

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y N

A V

A L

F A

C

IL

IT

IE

S E

N G

IN

E

E R

S

T E

M S

C O

M M

A N

D

DRAWFORM REVISION: 25 AUGUST 2020

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

Y S

T E

M S

C O

M M

A N

D

M

ID

-A T

LA

N

TI

C

N A

V A

L S

T A

T

IO

N

N O

R F

O L

K V

A

AS NOTED

F

IL

E N

A M

E

P

LO

T T

E D

C

R e v it P ro je ct s \D

R Y

D P

-1

-M

-P S tj g o d fr e y .r v t

/2

/2

:0 :0

P

M

2-M-102

P D

R Y

D O

C K

S

A L T

W A

T E

R S

Y S

T E

M

F O

R C

V N

-7

M E

C H

A N

IC

A

L

LO

W E

R L

E V

E L

P

LA

N

P U

M P

S

TA

T

IO

N

DKH

12857935

TJG CPM

02/02/2022

DEVIN POULIN,

C984 FACILITIES PLANNER, NNSY

JTL/TLH

1364315

N40085-22-R-2598

P O

R T

S M

O U

T H

, V

IR

G

IN

IA

N

O R

F O

LK

N

A V

A L

S H

IP

Y

A R

D

EJA

ALG

DSN

PLAN

NORTH

KEY PLAN

PS-6

SHEET KEYNOTES

15 PROVIDE HOSE BIBB VACUUM BREAKER.

16 ISOLATION BALL VALVE ON SUPPLY TO EXTERIOR.

17 COMPRESSED AIR DROP; REFER TO DETAIL A5/2-M-504.

18 4"ø SWS HOSE CONNECTION WITH BUTTERFLY VALVE AND THREADED CAP. TO

BE USED FOR INTAKE STRUCTURE SCREEN CLEANING/SPRAY DOWN.

21 RS/RL UP TO DSS UNIT ON FLOOR ABOVE

22 WALL MOUNT UNIT MINIMUM ELEVATION 109'.

23 AIR RELEASE AND VACUUM BREAKER VALVE.

25 ECCENTRIC FLAT BOTTOM REDUCER FITTING.

35 BYPASS LINE FOR SITE SW TO STRAINER. LINE TO ONLY BE USED WHEN PUMP

STATION IS OFF.

40 TERMINATE CONDENSATE IN DOWNSPOUT.

41 PROVIDE ONE STOPLOG PER PUMPSTATION; PROVIDE EMBEDDED WALL

GUIDES AND RECESSED FLOOR SLOT IN ALL INTAKE STRUCTURES. STOPLOG

TO BE UNIVERSAL AND ABLE TO BE INSERTED IN ANY INTAKE STRUCTURE.

42 PROVIDE TURN-DOWN ELBOW ON ALL PIPES DISCHARGING INTO INTAKE

STRUCTURE. 10" SWR LINE MUST BE EXTENDED TO DISCHARGE MINIMUM

1-FOOT BELOW WATER AT ALL TIMES.

43 PROVIDE LINE DRAIN AT PIPE LOW POINT. REFER TO DETAIL A3/2-M-503.

44 3' LONG X 2' WIDE X 2' DEEP SUMP PIT.

45 PIPE SUPPORT, TYP.

46 PIPE ANCHOR, TYP.

PLAN

NORTH

2' 4' 8'0'1/4" = 1'-0" A1

MECHANICAL LOWER LEVEL PLAN - PUMP STATION 6

S Y

M D

E S

C R

IP

TI

O N

D A

TE

A

P P

R

IS

S U

E D

F O

R B

ID

/2 8/

SHEET NOTES

A1

2-M-302

A1

2-M-301

ELECTRICAL

EQUIPMENT (TYP.)

PS6 ELECT

EQUIP.

T

T

PS6-P-1 CONTROL PANEL

PS6-P-2 CONTROL PANEL

PS6-P-3 CONTROL PANEL

HMI PANEL

PLC CONTROL PANEL

H

H

RL/S

3/4"ø D

RL/S

3/4"ø D

PS6-DSS-1

PS6-DSS-4

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT NO.:

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y N

A V

A L

F A

C

IL

IT

IE

S E

N G

IN

E

E R

S

T E

M S

C O

M M

A N

D

DRAWFORM REVISION: 25 AUGUST 2020

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

Y S

T E

M S

C O

M M

A N

D

M

ID

-A T

LA

N

TI

C

N A

V A

L S

T A

T

IO

N

N O

R F

O L

K V

A

AS NOTED

F

IL

E N

A M

E

P

LO

T T

E D

C

R e v it P ro je ct s \D

R Y

D P

-1

-M

-P S tj g o d fr e y .r v t

/2

/2

:0 :0

P

M

2-M-103

P D

R Y

D O

C K

S

A L T

W A

T E

R S

Y S

T E

M

F O

R C

V N

-7

M E

C H

A N

IC

A

L U

P P

E R

L E

V E

L P

LA

N

P

U M

P S

TA

T

IO

N

DKH

12857936

TJG CPM

02/02/2022

DEVIN POULIN,

C984 FACILITIES PLANNER, NNSY

JTL/TLH

1364315

N40085-22-R-2598

P O

R T

S M

O U

T H

, V

IR

G

IN

IA

N

O R

F O

LK

N

A V

A L

S H

IP

Y

A R

D

EJA

ALG

DSN

SHEET KEYNOTES

28 RS/RL DOWN TO FLOOR BELOW.

PLAN

NORTH

2' 4' 8'0'

1/4" = 1'-0" A1

MECHANICAL UPPER LEVEL PLAN - PUMP STATION 6

PLAN

NORTH

KEY PLAN

PS-6

S Y

M D

E S

C R

IP

TI

O N

D A

TE

A

P P

R

IS

S U

E D

F O

R B

ID

/2 8/

PS8-FOT-1 GENERATOR ENCLOSURE

2"ø FOR

2"ø FOS

PUMP STATION 8

PS8-FPU-1

FUEL FILL PORT

CONTROL PANEL/ANNUNCIATOR

DISCHARGE FLUME

STOPLOG

SHEET NOTES

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT NO.:

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y N

A V

A L

F A

C

IL

IT

IE

S E

N G

IN

E

E R

S

T E

M S

C O

M M

A N

D

DRAWFORM REVISION: 25 AUGUST 2020

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

Y S

T E

M S

C O

M M

A N

D

M

ID

-A T

LA

N

TI

C

N A

V A

L S

T A

T

IO

N

N O

R F

O L

K V

A

AS NOTED

F

IL

E N

A M

E

P

LO

T T

E D

C

R e v it P ro je c ts

\D R

Y D

P -1

-M

-P S tj g o d fr e y .r v t

/2

/2

:2 :3

P

M

2-M-104

P D

R Y

D O

C K

S

A L T

W A

T E

R S

Y S

T E

M

F O

R C

V N

-7

M E

C H

A N

IC

A

L S

IT

E

P

LA

N

P U

M P

S T

A T

IO

N

DKH

12857937

TJG JR

02/02/2022

DEVIN POULIN,

C984 FACILITIES PLANNER, NNSY

JTL/TLH

1364315

N40085-22-R-2598

P O

R T

S M

O U

T H

, V

IR

G

IN

IA

N

O R

F O

LK

N

A V

A L

S H

IP

Y

A R

D

EJA

ALG

DSN

SHEET KEYNOTES

33 COORDINATE FUEL OIL SYSTEM WITH GENERATOR MANUFACTURER'S

REQUIREMENTS. PROVIDE ALL FOS/FOR PIPING, SUPPORTS AND

APPURENTANCES NEEDED FOR A COMPLETE AND FUNCTIONAL SYSTEM.

PROVIDE CONTROL CONNECTIONS BETWEEN GENERATOR DAYTANK

CONTROLLER AND TRANSFER PUMP CONTROLLER.

37 FUEL PIPING TO BE ROUTED ABOVE GRADE; REFER TO DETAIL A4 / 2-M-501.

38 REFER TO STRUCTURAL DRAWING 1-SS504 FOR FUEL TANK FOUNDATION

DETAILS.

39 WALL MOUNT CONDENSING UNITS; UNITS TO BE ELEVATED TO ELEVATION 109'.

PLAN

NORTH

KEY PLAN

PS-8

1" = 10'-0" A1

MECHANICAL SITE PLAN – PUMP STATION 8

1. REFER TO DRAWING 2-M-001 FOR MECHANICAL LEGEND, ABBREVIATIONS AND

NOTES.

2. BUILDING AND EQUIPMENT LOCATIONS SHOWN FOR REFERENCE. REFER TO

CIVIL DRAWINGS FOR ACUTAL LOCATIONS.

3. INSTALL FUEL FILL PORT, FUEL POLISHING UNIT, AND CONTROL

PANEL/ANNUCIATOR ABOVE FLOOD ELEVATION 107'.

0" 10' 30'20'

S Y

M D

E S

C R

IP

T

IO

N

D A

T E

A P

P R

IS

S U

E D

F O

R B

ID

/2 8/

SHEET NOTES

A1

2-M-303

A1

2-M-304

T

HB

HB

PS8 SUMP AREA

108S

PS8-ST-1 PS8-ST-2

T

HB

HB

PS8-STR-1 PS8-STR-3

PS8-P-1 PS8-P-2 PS8-P-3

36"ø SWS

36"ø SWS

PS8-SP-1

PS8-SP-2

PS8-STR-2

36"ø SWS

PS8-V-2

P S

8- V

-4

P S

8- V

-1

P S

8- V

-8

P S

8- V

-1

P S

8- V

-1

PS8-V-16

PS8-V-6

P S

8- V

-1

PS8-V-12

PS8-DSS-CU-1 PS8-DSS-CU-2 PS8-DSS-CU-3 PS8-DSS-CU-4

23 23 23

"ø

S W

S PS8-V-9PS8-V-5PS8-V-1

SEE CIVIL FOR

CONTINUATION

1"ø FW 1"ø CA

PS8-RPZ-1

"ø

S W

S

"ø

S W

S

"ø

S W

S

22 22 22 22

21 21

1"ø CA

PS8-V-7A

PS8-V-7B

PS8-V-3A

PS8-V-3B

P S

8- V

-1 1A

P S

8- V

-1 1B

REFER TO CIVIL DRAWINGS

PIPE SUPPORT

(TYP.)

RL/S

RL/S

12"ø SWS

FLOOR

TRENCHPS8-V-18

PS8-FM-3PS8-FM-2PS8-FM-1

B1

2-M-503

H H

10"ø SWR10"ø SWR

4"ø SWR

10"ø SWR

4"ø SWR

10"ø SWR

P S

8- V

-1

16 16

RL/S

3/4"ø D

3/4"ø D

3/4"ø D

3/4"ø D RL/S

4"ø SWR

10"ø SWR

"ø

S W

R

"ø

S W

R

"ø

S W

R

2"ø D

P S

8- D

S S

-2

P S

8- D

S S

-3

4"ø D

PS8-STOPLOG

2"ø D

"ø

S W

S

"ø

S W

S

"ø

S W

S

4" ø

S W

S

4" ø

S W

S

1"ø FW

41 41 41

4" ø

S W

R

4" ø

S W

R

4" ø

S W

R

2' - 0"

3/4"ø D

RL/S

1"ø FW

1"ø FW

1"ø CA

1"ø FW 1"ø CA

4" ø

S W

R

"ø

S W

R

"ø

S W

R

4" ø

S W

R

4" ø

S W

R

"ø

S W

R

2" ø

D

25 25 25

"ø S

W S

"ø

S W

S

36"ø SWS1"ø FW 1"ø CA

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT NO.:

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y N

A V

A L

F A

C

IL

IT

IE

S E

N G

IN

E

E R

S

T E

M S

C O

M M

A N

D

DRAWFORM REVISION: 25 AUGUST 2020

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

Y S

T E

M S

C O

M M

A N

D

M

ID

-A T

LA

N

TI

C

N A

V A

L S

T A

T

IO

N

N O

R F

O L

K V

A

AS NOTED

F

IL

E N

A M

E

P

LO

T T

E D

C

R e v it P ro je c ts

\D R

Y D

P -1

-M

-P S tj g o d fr e y .r v t

/2

/2

:2 :3

P

M

2-M-105

P D

R Y

D O

C K

S

A L T

W A

T E

R S

Y S

T E

M

F O

R C

V N

-7

M E

C H

A N

IC

A

L

LO

W E

R L

E V

E L

P

LA

N

P U

M P

S T

A T

IO

N

DKH

12857938

TJG CPM

02/02/2022

DEVIN POULIN,

C984 FACILITIES PLANNER, NNSY

JTL/TLH

1364315

N40085-22-R-2598

P O

R T

S M

O U

T H

, V

IR

G

IN

IA

N

O R

F O

LK

N

A V

A L

S H

IP

Y

A R

D

EJA

ALG

DSN

PLAN

NORTH

KEY PLAN

PS-8

SHEET KEYNOTES

16 ISOLATION BALL VALVE ON SUPPLY TO EXTERIOR.

17 COMPRESSED AIR DROP; REFER TO DETAIL A5/2-M-504.

18 4"ø SWS HOSE CONNECTION WITH BUTTERFLY VALVE AND THREADED CAP. TO

BE USED FOR INTAKE STRUCTURE SCREEN CLEANING/SPRAY DOWN.

21 RS/RL UP TO DSS UNIT ON FLOOR ABOVE

22 WALL MOUNT UNIT MINIMUM ELEVATION 109'.

23 AIR RELEASE AND VACUUM BREAKER VALVE.

25 ECCENTRIC FLAT BOTTOM REDUCER FITTING.

40 TERMINATE CONDENSATE IN DOWNSPOUT.

42 PROVIDE TURN-DOWN ELBOW ON ALL PIPES DISCHARGING INTO INTAKE

STRUCTURE. 10" SWR LINE MUST BE EXTENDED TO DISCHARGE MINIMUM

1-FOOT BELOW WATER AT ALL TIMES.

43 PROVIDE LINE DRAIN AT PIPE LOW POINT. REFER TO DETAIL A3/2-M-503.

45 PIPE SUPPORT, TYP.

46 PIPE ANCHOR, TYP.

PLAN

NORTH

2' 4' 8'0'1/4" = 1'-0" A1

MECHANICAL LOWER LEVEL PLAN - PUMP STATION 8

S Y

M D

E S

C R

IP

T

IO

N

D A

T E

A P

P R

IS

S U

E D

F O

R B

ID

/2 8/

SHEET NOTES

A1

2-M-303

A1

2-M-304

T

PS8 ELECT

EQUIP.

ELECTRICAL

EQUIPMENT (TYP.)

RL/S

PS8-P-3 CONTROL PANELPS8-P-2 CONTROL PANELPS8-P-1 CONTROL PANEL HMI PANEL PLC CONTROL PANEL

T

28 28

PS8-DSS-1

PS8-DSS-4

H H

3/4"ø D

RL/S

3/4"ø D

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT NO.:

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y N

A V

A L

F A

C

IL

IT

IE

S E

N G

IN

E

E R

S

T E

M S

C O

M M

A N

D

DRAWFORM REVISION: 25 AUGUST 2020

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

Y S

T E

M S

C O

M M

A N

D

M

ID

-A T

LA

N

TI

C

N A

V A

L S

T A

T

IO

N

N O

R F

O L

K V

A

AS NOTED

F

IL

E N

A M

E

P

LO

T T

E D

C

R e v it P ro je c ts

\D R

Y D

P -1

-M

-P S tj g o d fr e y .r v t

/2

/2

:2 :3

P

M

2-M-106

P D

R Y

D O

C K

S

A L T

W A

T E

R S

Y S

T E

M

F O

R C

V N

-7

M E

C H

A N

IC

A

L U

P P

E R

L E

V E

L P

LA

N

P

U M

P S

TA

T

IO

N

DKH

12857939

TJG CPM

02/02/2022

DEVIN POULIN,

C984 FACILITIES PLANNER, NNSY

JTL/TLH

1364315

N40085-22-R-2598

P O

R T

S M

O U

T H

, V

IR

G

IN

IA

N

O R

F O

LK

N

A V

A L

S H

IP

Y

A R

D

EJA

ALG

DSN

SHEET KEYNOTES

28 RS/RL DOWN TO FLOOR BELOW.

1/4" = 1'-0" A1

MECHANICAL UPPER LEVEL PLAN - PUMP STATION 8

PLAN

NORTH

2' 4' 8'0'

PLAN

NORTH

KEY PLAN

PS-8

S Y

M D

E S

C R

IP

T

IO

N

D A

T E

A P

P R

IS

S U

E D

F O

R B

ID

/2 8/

ROOF TOS

136' - 0"

GRADE LEVEL

103' - 0"

SECOND LEVEL

121' - 0"

8'x6' - INLET OPENING

(VELOCITY < 0.5 FPS)

INTAKE STRUCTURE

83' - 0"

PS6 ELECT

EQUIP.

FIRST LEVEL

103' - 6"

PS6 PUMP CTRL

MEAN HIGH HIGH

WATER (WHHW)

96' - 4"

MEAN LOWER LOW

WATER (MLLW)

93' - 4"

S T

O P

LO

G

C O

U R

S E

S C

R E

E N

F

E S

C R

E E

N

F

IN

E S

C R

E E

N

ELECTRICAL

EQUIPMENT (TYP.)

GRATING

CONDENSING

UNIT SUPPORT

36" SWS SEE CIVIL

FOR CONTINUATION

PIPE SUPPORT (TYP.)

PS6-DSS-CU-1

PS6-V-20

PS6-P-1

20"ø SWS

4"ø SWR

10"ø SWR

24 24 24 24 13

PS6-ST-1

PS6-DSS-2

PS6-DSS-1

4"ø SWS

PS6-STR-1

PS6-V-19

PS6-V-18

PS6-RPZ-1

P S

6- V

-1

FLOOR TRENCH

36"ø SWS

1"ø CA

1"ø FW

RL/S

RS/L

3/4"ø D

16"ø SWS

P E

R M

F R

.R E

Q U

IR

E

M E

N T

1. REFER TO DRAWING 2-M-001 FOR MECHANICAL LEGEND, ABBREVIATIONS

AND NOTES.

SHEET NOTES

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT NO.:

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y N

A V

A L

F A

C

IL

IT

IE

S E

N G

IN

E

E R

S

T E

M S

C O

M M

A N

D

DRAWFORM REVISION: 25 AUGUST 2020

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

Y S

T E

M S

C O

M M

A N

D

M

ID

-A T

LA

N

TI

C

N A

V A

L S

T A

T

IO

N

N O

R F

O L

K V

A

AS NOTED

F

IL

E N

A M

E

P

LO

T T

E D

C

R e v it P ro je ct s \D

R Y

D P

-1

-M

-P S tj g o d fr e y .r v t

/2

/2

:0 :0

P

M

2-M-301

P D

R Y

D O

C K

S

A L T

W A

T E

R S

Y S

T E

M

F O

R C

V N

-7

M E

C H

A N

IC

A

L S

E C

T

IO

N

P U

M P

S

TA

T

IO

N

DKH

12857940

TJG TJG

02/02/2022

DEVIN POULIN,

C984 FACILITIES PLANNER, NNSY

JTL/TLH

1364315

N40085-22-R-2598

P O

R T

S M

O U

T H

, V

IR

G

IN

IA

N

O R

F O

LK

N

A V

A L

S H

IP

Y

A R

D

EJA

ALG

DSN

1/4" = 1'-0" A1

MECHANICAL SECTION - PUMP STATION 6

2' 4' 8'0'

SHEET KEYNOTES

13 SEE STRUCTURAL FOUNDATION PLAN FOR INTAKE STRUCTURE

CONSTRUCTION DETAILS.

22 WALL MOUNT UNIT MINIMUM ELEVATION 109'.

23 AIR RELEASE AND VACUUM BREAKER VALVE.

24 REFER TO MECHANICAL DETAIL SHEET 2-M-505 FOR STOP LOG AND SCREEN

CONSTRUCTION INFORMATION.

PLAN

NORTH

KEY PLAN

PS-6

S Y

M D

E S

C R

IP

TI

O N

D A

TE

A

P P

R

IS

S U

E D

F O

R B

ID

/2 8/

ROOF TOS

136' - 0"

GRADE LEVEL

103' - 0"

SECOND LEVEL

121' - 0"

A1

2-M-301

PS6 ELECT

EQUIP.

FIRST LEVEL

103' - 6"

PS6-ST-2PS6-ST-1

P S

6- S

T R

-1

P S

6- S

T R

-2

P S

6- S

T R

-3

PS6-SP-2

1"ø FW

1"ø CA

PS6-RPZ-1

36"ø SWS

36"ø SWS

RS/L

RS/L

PS6-DSS-2 PS6-DSS-3

PS6-DSS-1 PS6-DSS-4

ELECTRICAL

EQUIPMENT (TYP.)

PIPE SUPPORT (TYP.)

DOOR HATCH

LOCATION

D O

O R

H A

T C

H

LO

A T

IO

N

D O

O R

H A

T

H

LO

A T

IO

N

P S

6- V

-1

P S

6- V

-1

P S

6- V

-1

2"ø D

RS/L

RL/S

4"ø SWS

P S

6- V

-1

RL/S

1. REFER TO DRAWING 2-M-001 FOR MECHANICAL LEGEND, ABBREVIATIONS

AND NOTES.

SHEET NOTES

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT NO.:

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y N

A V

A L

F A

C

IL

IT

IE

S E

N G

IN

E

E R

S

T E

M S

C O

M M

A N

D

DRAWFORM REVISION: 25 AUGUST 2020

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

Y S

T E

M S

C O

M M

A N

D

M

ID

-A T

LA

N

TI

C

N A

V A

L S

T A

T

IO

N

N O

R F

O L

K V

A

AS NOTED

F

IL

E N

A M

E

P

LO

T T

E D

C

R e v it P ro je ct s \D

R Y

D P

-1

-M

-P S tj g o d fr e y .r v t

/2

/2

:0 :0

P

M

2-M-302

P D

R Y

D O

C K

S

A L T

W A

T E

R S

Y S

T E

M

F O

R C

V N

-7

M E

C H

A N

IC

A

L S

E C

T

IO

N

P U

M P

S

TA

T

IO

N

DKH

12857941

TJG TJG

02/02/2022

DEVIN POULIN,

C984 FACILITIES PLANNER, NNSY

JTL/TLH

1364315

N40085-22-R-2598

P O

R T

S M

O U

T H

, V

IR

G

IN

IA

N

O R

F O

LK

N

A V

A L

S H

IP

Y

A R

D

EJA

ALG

DSN

1/4" = 1'-0" A1

MECHANICAL SECTION - PUMP STATION 6

2' 4' 8'0'

PLAN

NORTH

KEY PLAN

PS-6

SHEET KEYNOTES

31 1"ø CA AND 1"ø FW FROM SITE; REFER TO CIVIL DRAWINGS.

S Y

M D

E S

C R

IP

TI

O N

D A

TE

A

P P

R

IS

S U

E D

F O

R B

ID

/2 8/

SHEET NOTES

FIRST LEVEL

103' - 6"

ROOF/T.O.S.

136' - 0"

SECOND LEVEL

121' - 0"

A1

2-M-304

INTAKE STRUCTURE

83' - 0"

PS8 ELECT

EQUIP.

S T

O P

L O

G

C O

U R

S E

S C

R E

E N

F

IN

E S

C R

E E

N

F

IN

E S

C R

E E

N

GRADING LEVEL

103' - 0"

PS8 PUMP CTRL

8'x6' - INLET OPENING

(VELOCITY < 0.5 FPS)

MEAN HIGH HIGH

WATER (WHHW)

96' - 4"

MEAN LOWER LOW

WATER (MLLW)

93' - 4"

ELECTRICAL

EQUIPMENT (TYP.)

CONDENSING

UNIT SUPPORT

GRATING

PS8-DSS-2

PS8-DSS-CU-1

PIPE SUPPORT (TYP.)

PS8-DSS-1

3/4"ø D

RL/S

PS8-FM-1

P S

8- R

P Z

-1

1"ø FW

1"ø CA

4"ø SWS

4"ø SWR

10"ø SWR

FLOOR TRENCH

PS8-P-1

24 24 24 24 13

20"ø SWS

PS8-STR-1

PS8-ST-1

PS8-V-3B

P S

8- V

-3 A

PS8-V-18

RL/S

3/4"ø D

16"ø SWS

P S

8- V

-1

36"ø SWS

FROM CIVIL

P E

R M

F R

. R E

Q U

IR

E

M E

N T

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT NO.:

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y N

A V

A L

F A

C

IL

IT

IE

S E

N G

IN

E

E R

S

T E

M S

C O

M M

A N

D

DRAWFORM REVISION: 25 AUGUST 2020

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

Y S

T E

M S

C O

M M

A N

D

M

ID

-A T

LA

N

TI

C

N A

V A

L S

T A

T

IO

N

N O

R F

O L

K V

A

AS NOTED

F

IL

E N

A M

E

P

LO

T T

E D

C

R e v it P ro je c ts

\D R

Y D

P -1

-M

-P S tj g o d fr e y .r v t

/2

/2

:2 :4

P

M

2-M-303

P D

R Y

D O

C K

S

A L T

W A

T E

R S

Y S

T E

M

F O

R C

V N

-7

M E

C H

A N

IC

A

L S

E C

T

IO

N

P U

M P

S T

A T

IO

N

DKH

12857942

TJG CPM

02/02/2022

DEVIN POULIN,

C984 FACILITIES PLANNER, NNSY

JTL/TLH

1364315

N40085-22-R-2598

P O

R T

S M

O U

T H

, V

IR

G

IN

IA

N

O R

F O

LK

N

A V

A L

S H

IP

Y

A R

D

EJA

ALG

DSN

SHEET KEYNOTES

13 SEE STRUCTURAL FOUNDATION PLAN FOR INTAKE STRUCTURE

CONSTRUCTION DETAILS.

22 WALL MOUNT UNIT MINIMUM ELEVATION 109'.

23 AIR RELEASE AND VACUUM BREAKER VALVE.

24 REFER TO MECHANICAL DETAIL SHEET 2-M-505 FOR STOP LOG AND SCREEN

CONSTRUCTION INFORMATION.

1/4" = 1'-0" A1

MECHANICAL SECTION - PUMP STATION 8

2' 4' 8'0'

PLAN

NORTH

KEY PLAN

PS-8

S Y

M D

E S

C R

IP

T

IO

N

D A

T E

A P

P R

IS

S U

E D

F O

R B

ID

/2 8/

FIRST LEVEL

103' - 6"

ROOF/T.O.S.

136' - 0"

SECOND LEVEL

121' - 0"

PS8 ELECT

EQUIP.

ENTRY LEVEL

109' - 0"

GRADING LEVEL

103' - 0"

PS8 PUMP CTRL

P S

8- V

-1

PS8-V-8

P S

8- V

-1

P S

8- V

-1

PS8-V-12

PS8-SP-2

RL/S

P S

8- V

-4

PS8-RPZ-1

1"ø FW 1"ø CA

36"ø SWS

ELECTRICAL

EQUIPMENT (TYP.)

PS8-DSS-2

PS8-DSS-3

PIPE SUPPORT (TYP.)

DOOR HATCH

LOCATION

DOOR HATCH

LOCATION

PS8-STR-2

PS8-DSS-1

PS8-DSS-4

DOOR HATCH

LOCATION

2"ø D

2'

0"

4"ø D

RL/S

PS8-ST-1 PS8-ST-2

PS8-STR-1 PS8-STR-3

P S

8- V

-1

3/4"ø D

RL/S

1"ø CA1"ø FW

RL/S

3/4"ø D

RL/S

3/4"ø D

1. REFER TO DRAWING 2-M-001 FOR MECHANICAL LEGEND, ABBREVIATIONS

AND NOTES.

SHEET NOTES

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT NO.:

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y N

A V

A L

F A

C

IL

IT

IE

S E

N G

IN

E

E R

S

T E

M S

C O

M M

A N

D

DRAWFORM REVISION: 25 AUGUST 2020

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

Y S

T E

M S

C O

M M

A N

D

M

ID

-A T

LA

N

TI

C

N A

V A

L S

T A

T

IO

N

N O

R F

O L

K V

A

AS NOTED

F

IL

E N

A M

E

P

LO

T T

E D

C

R e v it P ro je c ts

\D R

Y D

P -1

-M

-P S tj g o d fr e y .r v t

/2

/2

:2 :4

P

M

2-M-304

P D

R Y

D O

C K

S

A L T

W A

T E

R S

Y S

T E

M

F O

R C

V N

-7

M E

C H

A N

IC

A

L S

E C

T

IO

N

P U

M P

S T

A T

IO

N

DKH

12857943

TJG CPM

02/02/2022

DEVIN POULIN,

C984 FACILITIES PLANNER, NNSY

JTL/TLH

1364315

N40085-22-R-2598

P O

R T

S M

O U

T H

, V

IR

G

IN

IA

N

O R

F O

LK

N

A V

A L

S H

IP

Y

A R

D

EJA

ALG

DSN

1/4" = 1'-0" A1

MECHANICAL SECTION - PUMP STATION 8

2' 4' 8'0'

SHEET KEYNOTES

31 1"ø CA AND 1"ø FW FROM SITE; REFER TO CIVIL DRAWINGS.

PLAN

NORTH

KEY PLAN

PS-8

S Y

M D

E S

C R

IP

T

IO

N

D A

T E

A P

P R

IS

S U

E D

F O

R B

ID

/2 8/

LD TS

FUEL OIL FILL FROM FUEL

FILL PORT (FFP) (4" PORT)

1 1/2" FUEL OIL RETURN FROM SYSYEM

(4" PORT)

TEMPERATURE SENSOR

(4" PORT)

FLOAT TREE LEVEL SENSOR

(4" PORT)

EMERGENCY VENT

(PRIMARY TANK)

24" DIAMETER

MANWAY

EMERGENCY VENT

(INTERSTITIAL TANK)

TANK LEAK

DETECTION

(4" PORT)

OVERFILL PREVENTION

VALVE, EXTEND DROP TUBE

TO WITHIN 6" OF BOTTOM OF TANK

DOUBLE WALL FUEL

OIL STORAGE TANK

FUEL OIL RETURN FROM

FUEL POLISHING UNIT (FPU)

(4" PORT)

AUTOMATIC TANK

GAUGING LEVEL

SENSOR (4" PORT)

FUEL TANK CONTROLLER

LEVEL SENSOR (4" PORT)

MAIN TANK VENT WITH BIRD SCREEN

FUEL OIL SUPPLY (FOS) (4" PORT)

FUEL OIL TRANSFER PUMP (FTP)

FUEL OIL SUPPLY (FOS) TO

FUEL POLISHING UNIT (FPU-1)

STRICKER PLATE (TYP)

DROP TUBE, EXTEND

DROP TUBE TO WITHIN 6"

OF BOTTOM OF TANK (TYP)

PIPING REDUCER

(TYP)

FOOT VALVE

S

COALESCER

FILTER

FUEL OIL SUPPLY

FROM FUEL OIL TANK

FUEL OIL SUPPLY

TO FUEL OIL TANK

PUMP

WASTE TANK

FUEL POLISHING UNIT

STEEL PIPE SUPPORT

POST ANCHORED TO CONCRETE

SLAB AT 5'-0" ON CENTER

FUEL OIL PIPE

CONCRETE SLAB

GROUT

FUEL OIL SUPPLY TO

FUEL OIL TANK

WEATHERPROOF LOCKABLE BOX

QUICK DISCONNECT

HOSE COUPLING

WITH INTEGRAL

CHECK VALVE AND

DUST PLUG

SHUTOFF VALVE

HAND PUMP FOR

SPILL CONTAINMENT

SPILL CONTAINMENT CATCH BASIN

(MINIMUM 7 GAL CAPACITY)

CHECK VALVE

SHUTOFF VALVE

G R

O U

N D

S T

U D

1. REFER TO DRAWING 2-M-001 FOR MECHANICAL LEGEND, ABBREVIATIONS

AND NOTES.

GENERAL NOTES

EXTRACTED FROM MSS SP-58, 2018.

PLASTIC AND FIBERGLASS REINFORCED PIPE: FOLLOW PIPE

MANUFACTURER'S RECOMMENDATIONS FOR SPACING AND

SERVICE CONDITIONS.

CAST IRON AND DUCTILE IRON PIPE: MIN. OF ONE (1) HANGER PER

PIPE SECTION CLOSE TO JOINT ON THE BARREL. ALSO AT CHANGE OF

DIRECTION AND BRANCH CONNECTIONS.

CAST IRON PRESSURE PIPE: 12 FT. MAX. SPACING.

CAST IRON SOIL PIPE: 10 FT. MAX. SPACING.

DOES NOT APPLY WHERE SPAN CALCULATIONS ARE MADE OR WHERE

THERE ARE CONCENTRATED LOADS BETWEEN SUPPORTS SUCH AS

FLANGES, VALVES, SPECIALTIES, ETC., OR CHANGES IN DIRECTION

REQUIRING ADDITIONAL SUPPORTS.

FT.FT.FT.FT.IN.

MAXIMUM HORIZONTAL PIPE HANGER AND SUPPORT SPACING

THIS TABLE PROVIDED FOR REFERENCE ONLY. PROVIDE HANGER

AND SUPPORT SPACING IN ACCORDANCE WITH MSS SP-58 AND

SPECIFICATIONS.

STANDARD WEIGHT

STEEL PIPE

VAPOR

SERVICE

WATER

SERVICE

VAPOR

SERVICE

WATER

SERVICE

COPPER TUBE

3 1/2

2 1/2

1 1/2

1 1/4

3/4

1/2

3/8

1/4

NOMINAL

PIPE OR

TUBE DIA

281930

251826

231624

201421

181319

161217

151116

141015

13914

11813

10812

1.

2.

3.

4.

5.

NOTES:

36 35

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT NO.:

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y N

A V

A L

F A

C

IL

IT

IE

S E

N G

IN

E

E R

S

T E

M S

C O

M M

A N

D

DRAWFORM REVISION: 25 AUGUST 2020

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

Y S

T E

M S

C O

M M

A N

D

M

ID

-A T

LA

N

TI

C

N A

V A

L S

T A

T

IO

N

N O

R F

O L

K V

A

AS NOTED

F

IL

E N

A M

E

P

LO

T T

E D

C

R e v it P ro je ct s \D

R Y

D P

-1

-M

-P S tj g o d fr e y .r v t

/2

/2

:0 :0

P

M

2-M-501

P D

R Y

D O

C K

S

A L T

W A

T E

R S

Y S

T E

M

F O

R C

V N

-7

M E

C H

A N

IC

A

L D

E

TA

IL

S

DKH

12857944

TJG CPM

02/02/2022

DEVIN POULIN,

C984 FACILITIES PLANNER, NNSY

JTL/TLH

1364315

N40085-22-R-2598

P O

R T

S M

O U

T H

, V

IR

G

IN

IA

N

O R

F O

LK

N

A V

A L

S H

IP

Y

A R

D

EJA

ALG

DSN

NOT TO SCALEC1

FUEL OIL STORAGE TANK DETAIL (FOT) - 20,000 GAL

NOT TO SCALEA5

FUEL POLISHING UNIT DETAIL (FPU)

NOT TO SCALEA4

TYPICAL FUEL OIL PIPE SUPPORT RACK DETAIL

NOT TO SCALE

A1

FUEL FILL PORT DETAIL (FPU)

2. REFER TO CIVIL DRAWINGS FOR FUEL TANK AND GENERATOR LOCATIONS.

S Y

M D

E S

C R

IP

TI

O N

D A

TE

A

P P

R

IS

S U

E D

F O

R B

ID

/2 8/

NOT TO SCALE

B5

PIPE SUPPORT SPAN TABLE

PS6-FOT-1

PS8-FOT-1

(20,000 GAL)

LD

S

TS

S

SS

S

PS6-FPU-1

PS8-FPU-1

FOR

PS6-FFP-1

PS8-FFP-1

S

NC

FOSFOS

FOS

PS6-FTP-1

PS8-FTP-1

BELLYTANK

NC

S

FOR

FOS

F O

R

F O

S

PS6 GENERATOR

PS8 GENERATOR

DAY TANK VENT

ANTI-SIPHON

VALVE

FOR

FOS

F O

R

F O

S

F O

S

F O

R

2-M-501

A5 Sim

1" 1"

1"

1"

3"

1"

NC

NC

PS6-FTP-2

PS8-FTP-2

10 GAL CATCH BASIN MIN.

1. REFER TO DRAWING 2-M-001 FOR MECHANICAL LEGEND, ABBREVIATIONS

AND NOTES.

GENERAL NOTES

UNIT MOUNTED

DIFFERENTIAL

PRESSURE SWITCH

CHAMBER

DRAIN LINE

BLOW-OFF

DRAIN LINE

BACKWASH CONTROL VALVE

WITH ELECTRIC ACTUATOR

MANUAL THROTTLING VALVE

WIRING CONNECTION

FORMOTORIZED OPERATOR

UNIT MOUNTED ELECTRICAL

CONTROL PANEL WITH HIGH

DIFFERENTIAL PRESSURE SIGNAL

POWER SOURCE

POWER TO MOTOR

PRESSURE GAUGE

GAS PLATE ASSEMBLY

BLADDER; WATER IN

BLADDER TYPE

1/2" RUPTURE DISC

GAS CHARGING VALVE

1/8" NPT PIPE PLUG

1/8" NPT PIPE PLUG

DIFFUSER NOZZLE

TANK LEVEL

INDICATOR 4" FEMALE OUTLET

CONNECTION

TRENCH COVER

GRATING

DRAIN PIPE

DISCHARGE

TO SUMP PIT

SUMP PIT

FLOOR

TRENCH

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT NO.:

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y N

A V

A L

F A

C

IL

IT

IE

S E

N G

IN

E

E R

S

T E

M S

C O

M M

A N

D

DRAWFORM REVISION: 25 AUGUST 2020

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

Y S

T E

M S

C O

M M

A N

D

M

ID

-A T

LA

N

TI

C

N A

V A

L S

T A

T

IO

N

N O

R F

O L

K V

A

AS NOTED

F

IL

E N

A M

E

P

LO

T T

E D

C

R e v it P ro je ct s \D

R Y

D P

-1

-M

-P S tj g o d fr e y .r v t

/2

/2

:0 :0

P

M

2-M-502

P D

R Y

D O

C K

S

A L T

W A

T E

R S

Y S

T E

M

F O

R C

V N

-7

M E

C H

A N

IC

A

L D

E

TA

IL

S

DKH

12857945

TJG CPM

02/02/2022

DEVIN POULIN,

C984 FACILITIES PLANNER, NNSY

JTL/TLH

1364315

N40085-22-R-2598

P O

R T

S M

O U

T H

, V

IR

G

IN

IA

N

O R

F O

LK

N

A V

A L

S H

IP

Y

A R

D

EJA

ALG

DSN

NOT TO SCALEC1

FUEL OIL SCHEMATIC - PS-6 & PS-8

2. REFER TO CIVIL DRAWINGS FOR FUEL TANK AND GENERATOR LOCATIONS.

NOT TO SCALEA1

STRAINER DETAIL

NOT TO SCALEA3

SURGE TANK DETAIL

S Y

M D

E S

C R

IP

TI

O N

D A

TE

A

P P

R

IS

S U

E D

F O

R B

ID

/2 8/

NOT TO SCALEA5

FLOOR TRENCH DETAIL

CHECK VALVE

FOR CONT. OF PIPING SEE

PLAN SHEETS

UNION

SUBMERSIBLE SUMP

PUMP

SUMP PIT. SEE

STRUCTURAL

FLOAT SWITCH

(TYPICAL)

PUMP ON FLOAT

HIGH LEVEL ALARM FLOAT

OIL SENSING PROBE

SUMP PUMP

CONTROL PANEL

EXTERIOR SIDE

INTERIOR SIDE

ELEVATION

SECTION

MULTIPLE SECTION

RUBBER SEAL (SEE

SPECIFICATIONS)

PIPE

WALL SLEEVE

WALL

SLEEVE

CONTINUOUS SEALANT

AS SPECIFIED

∅ PIPE THRU WALL

INSTALL SUCH THAT

PIPE SEAL MAY BE

TIGHTENED FROM

INTERIOR SIDE

1/2"∅ HEADED STUDS @ 12"

SPACED RADIALLY

AROUND SLEEVE (4 MIN.)

FLANGE PIPE SUPPORT

COORDINATE RADIUS AND BOLT

PATTERN WITH PIPE FLANGE

CONCRETE FLOOR

1" MIN GROUT

EXPANSION BOLT, SIZE PER BASE

PLATE HOLES (TYP.4)

PROVIDE MINIMUM EMBEDMENT

12 X BOLT DIAMETER.

GUSSET

MIN.

120°

NOTES:

1. DIMENSION ARE MINIMUM. FINAL DIMENSIONS TO BE DETERMINED BY PIPING,

EQUIPMENT, CONNECTIONS, CLEARANCES, AND OBSTRUCTIONS.

2. PROVIDE SHOP MANUFACTURERED SUPPORTS. COORDINATE AND CONSTRUCT

SUPPORTS FOR ALL LOADS.

DRAIN RUN FULL SIZE TO

TO SLAB TRENCH

NOTES:

1. PROVIDE REDUCED PRESSURE ZONE ASSEMBLY CONSISTING OF A PRESSURE DIFFERENTIAL RELIEF VALVE LOCATED IN A ZONE BETWEEN TWO

POSITIVE SEATING CHECK VALVES. SEATS AND SEAT DISCS MUST BE REPLACEABLE IN BOTH CHECK VALVE AND THE RELIEF VALVES.

2. VERIFY WITH LOCAL GOVERNING AUTHORITIES FOR SITE SPECIFIC INSTALLATION REQUIREMENTS.

3. PROVIDE WATER FLOW METER. WATER METER SHALL BE CONNECTED TO THE BASE WIDE ENERGY AND UTILITY MONITORING AND CONTROL SYSTEM USING THE INSTALLATION'S ADVANCED METERING PROTOCOLS AND THE BUILDING CONTROL SYSTEM.

REDUCED PRESSURE

BACKFLOW PREVENTOR

Y-TYPE STRAINERSHUT-OFF

VALVE

FLOW METER

FROM FRESH

WATER SERVICE

TO HOSE BIBBS

1/4"

PIPE SLEEVE

BACKUP MATERIAL

SEALANT

INSULATION

WHEN REQUIRED

CENTER OF PIPE

3/8"

PIPE

ESCUTCHEON

INTERIOR SIDE OF

EXTERIOR WALL

NOTES:

1. REFER TO ARCH DRAWINGS FOR

ADDITIONAL PENETRATION DETAILS.

4" DI WELDED OUTLET WITH FLANGE.

PROVIDE ELBOW, ISOLATION

VALVE, AND BLANK FLANGE

DUCTILE IRON PIPING

LOCATED AT SURGE

TANKS AND STRAINERS

GALVANIZED FRAMING SUPPORT, UNISTRUT

SERIES P-5500, POWER-STRUT SERIES

PS-150 OR EQUAL AT 5'-0" MAX UNLESS

OTHERWISE SHOWN ON DRAWINGS

"Z" FITTING UNISTRUT NO. P-5545,

POWER-STRUT NO. PS-2601, OR

EQUAL (TYP.)

PIPE CLAMP POWER STRUT SERIES 3126, ELCIN FIG.

42, UNISTRUT 2558 OR EQUAL. WHEN USED WITH PVC

OR FIBERGLASS PIPE, PROVIDE STEEL SHIELD

AROUND PIPE AT CLAMP WITH LOOSE FIT. FOR

COPPER TUBES PROVIDE 2" WIDE RUBBER FABRIC

STRIP

WHERE LENGTH EXCEEDS 3'-0", PROVIDE INTERMEDIATE

SUPPORTS AT MAX 3'-0" OC UNISTRUT NO. P-5547,

POWER-STRUT NO. PS-2648, OR EQUAL

ADHESIVE EPOXY ANCHOR 3/4" DIA

(MIN) W/ NUT AND LOCKWASHER (TYP.)

LE

N

G T

H T

O S

T R

U T

FLAT BAR WITH 2 BOLTS AND NUTS GALVANIZE AFTER

FABRICATION:

-1/4" x 1-1/4" FLAT BAR SIZE FOR 3/4" TO 3 1/2" PIPE -1/4" x 1-1/2" FLAT BAR SIZE FOR 4" TO 5" PIPE -3/8" x 1-1/2" FLAT BAR SIZE FOR 6" TO 8" PIPE -3/8" x 3" FLAT BAR SIZE FOR 10" TO 12" PIPE

GALVANIZED ADHESIVE STUD ANCHOR

WITH NUT AND LOCKWASHER (TYP.)

3/8" DIA FOR 3/4" TO 3 1/2" PIPE

1/2" DIA FOR 4" TO 8" PIPE

3/4" DIA FOR 10" TO 12" PIPE

1. REFER TO DRAWING 2-M-001 FOR MECHANICAL LEGEND, ABBREVIATIONS

AND NOTES.

GENERAL NOTES

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT NO.:

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y N

A V

A L

F A

C

IL

IT

IE

S E

N G

IN

E

E R

S

T E

M S

C O

M M

A N

D

DRAWFORM REVISION: 25 AUGUST 2020

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

Y S

T E

M S

C O

M M

A N

D

M

ID

-A T

LA

N

TI

C

N A

V A

L S

T A

T

IO

N

N O

R F

O L

K V

A

AS NOTED

F

IL

E N

A M

E

P

LO

T T

E D

C

R e v it P ro je ct s \D

R Y

D P

-1

-M

-P S tj g o d fr e y .r v t

/2

/2

:0 :0

P

M

2-M-503

P D

R Y

D O

C K

S

A L T

W A

T E

R S

Y S

T E

M

F O

R C

V N

-7

M E

C H

A N

IC

A

L D

E

TA

IL

S

DKH

12857946

TJG CPM

02/02/2022

DEVIN POULIN,

C984 FACILITIES PLANNER, NNSY

JTL/TLH

1364315

N40085-22-R-2598

P O

R T

S M

O U

T H

, V

IR

G

IN

IA

N

O R

F O

LK

N

A V

A L

S H

IP

Y

A R

D

EJA

ALG

DSN

NOT TO SCALEA1

SUMP PUMP DETAIL (SP)

NOT TO SCALEC4

HYDROSTATIC SEAL DETAIL

NOT TO SCALE

A4

FLOOR MOUNTED FLANGE PIPE SUPPORT

NOT TO SCALE

C1

BACKFLOW PREVENTER - FW

NOT TO SCALE

C3

PIPE PENETRATIONS

NOT TO SCALEA3

LINE DRAIN

NOT TO SCALED1

FLUSH MOUNTED PIPE SUPPORT

NOT TO SCALED2

PIPE CLAMP FOR WALL MOUNTED PIPES

S Y

M D

E S

C R

IP

TI

O N

D A

TE

A

P P

R

IS

S U

E D

F O

R B

ID

/2 8/

CA MAIN

COMBINATION PRESSURE REGULATING

VALVE/IN-LINE FILTER WITH INTEGRAL

PRESSURE GAUGE; OPERATING RANGE 5 TO 150

PSIG; INTEGRAL 1 MICRON COALESCING FILTER.

QUICK DISCONNECT 1/4"

MILTON "M" STYLE OR EQUAL

BALL VALVE (TYP.)

BEAM CLAMP

HANGER ROD

LOCKING NUT

SUPPORT NUT

INSULATION (IF REQUIRED)

PIPE

HEAVY DUTY

CLEVIS HANGER

14 GAUGE HIELD 18" LONG

TO PROTECT INSULATION

360° PROTECTION, 14 GAUGE

SHIELD, WHERE INSULATED

DOUBLE NUTTED U-BOLT

MSS SP-69 (TYPE 24)

(LOOSE FIT)

2" ANGLE IRON

SUPPORT STEEL

INSULATION

WHERE SPECIFIED

PIPE SIZE

120.00°

U-BOLT

3/8" MIN. GUSSET PLATE

(6" & LARGER PIPE)

RECEIVER WITH SET SCREW

'B' SCH 40 THREADED PIPE RISER

'A' SCH 40 THREADED PIPE

EXPANSION BOLT, SIZE PER BASE

PLATE HOLES (TYP.4)

PROVIDE MINIMUM EMBEDMENT

12 X BOLT DIAMETER.

1" MIN GROUT

1/4

1/4

FLOOR

PIPE SIZE

INCHES

2 1/2

3 1/2

'A'

INCHES

2 1/2

2 1/2

2 1/2

'B'

INCHES

1 1/2

1 1/2

1 1/2

2 1/2

2 1/2

2 1/2

2 1/2

2 1/2

U-BOLT

INCHES

ø3/8 ø1/2 ø1/2 ø1/2 ø5/8 ø5/8 ø3/4 ø7/8 ø7/8 ø7/8 ø1 ø1 ø1 ø1 ø1

BASE PLATE

INCHES

3/8 x 8 1/2 SQ.

3/8 x 8 1/2 SQ.

3/8 x 8 1/2 SQ.

3/8 x 12 SQ.

3/8 x 12 SQ.

3/8 x 12 SQ.

3/8 x 12 SQ.

3/8 x 12 SQ.

1/2 x 13 1/2 SQ.

1/2 x 13 1/2 SQ.

1/2 x 18 SQ.

1/2 x 13 1/2 SQ.

1/2 x 13 1/2 SQ.

1/2 x 13 1/2 SQ.

1/2 x 13 1/2 SQ.

BASE PLATE

NOTES:

1. PROVIDE IN ACCORDANCE WITH MSS-SP-58 TYPE 37 & 38.

2. DIMENSION ARE MINIMUM. FINAL DIMENSIONS TO BE DETERMINED BY PIPING, EQUIPMENT, CONNECTIONS, CLEARANCES, AND OBSTRUCTIONS.

3. PROVIDE SHOP MANUFACTURERED SUPPORTS. COORDINATE AND CONSTRUCT SUPPORTS FOR ALL LOADS.

30.00°

RIB PLATE

END PLATE

BASE PLATE

END PLATE

BASE PLATE

RIB PLATE

1-INCH GROUT

CLAMP

NOTES:

1. PROVIDE IN ACCORDANCE WITH MSS-SP-58 TYPE 65.

2. DIMENSION ARE MINIMUM. FINAL DIMENSIONS TO BE DETERMINED BY PIPING, EQUIPMENT, CONNECTIONS, CLEARANCES, AND OBSTRUCTIONS.

3. PROVIDE SHOP MANUFACTURERED SUPPORTS. COORDINATE AND CONSTRUCT SUPPORTS FOR ALL LOADS.

60.00° 60.00°

WIDTH "B" OF

SADDLE, SEE

NOTES BELOW

SEE PLAN FOR

ELEVATION

GALVANIZED

STEEL STRAP,

1/4" x 3" WIDE

D /4

D .4"

V A

R

IE

S (2

D

M A

X

1" MIN NON-

SHRINK GROUT,

POURABLE

2 LAYERS OF

ROOFING FELT

SECURE TIGHT

TO PIPE DURING

POURING

#3 BARS

30.00°

#5 @ 12"

MAX

VERTICAL

SPACING

6"

6"

3" CLR (TYP)

1/

2" C

LR

#5 @ 12", EXTEND TO

1 1/2" CLR

AT TOP OF

CONCRETE

CONCRETE SLAB

DRILL AND ADHESIVE ANCHOR

REINFORCE INTO EXISTING

CONCRETE & PROVIDE 9" MIN.

EMBED

.2"

NOTES:

1. THICKNESS "B" OF SADDLE

B=8" WHEN D<12"

B=10" WHEN 12"≤D<24"

B=12" WHEN 24"≤D<36"

B=14" WHEN 36"≤D<48"

2. FOR "B"=12" OR THICKER, USE 2 LAYERS OF REINFORCING, TURN HORIZONTAL BARS 90° TO HOOK

AROUND VERTICALS, 1 1/2" CLEAR OF CONCRETE.

3. FORM 3/4" BEVEL ON ALL EXPOSED CORNERS OF SUPPORT.

1. REFER TO DRAWING 2-M-001 FOR MECHANICAL LEGEND, ABBREVIATIONS

AND NOTES.

GENERAL NOTES

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT NO.:

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y N

A V

A L

F A

C

IL

IT

IE

S E

N G

IN

E

E R

S

T E

M S

C O

M M

A N

D

DRAWFORM REVISION: 25 AUGUST 2020

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

Y S

T E

M S

C O

M M

A N

D

M

ID

-A T

LA

N

TI

C

N A

V A

L S

T A

T

IO

N

N O

R F

O L

K V

A

AS NOTED

F

IL

E N

A M

E

P

LO

T T

E D

C

R e v it P ro je ct s \D

R Y

D P

-1

-M

-P S tj g o d fr e y .r v t

/2

/2

:0 :0

P

M

2-M-504

P D

R Y

D O

C K

S

A L T

W A

T E

R S

Y S

T E

M

F O

R C

V N

-7

M E

C H

A N

IC

A

L D

E

TA

IL

S

DKH

12857947

TJG CPM

02/02/2022

DEVIN POULIN,

C984 FACILITIES PLANNER, NNSY

JTL/TLH

1364315

N40085-22-R-2598

P O

R T

S M

O U

T H

, V

IR

G

IN

IA

N

O R

F O

LK

N

A V

A L

S H

IP

Y

A R

D

EJA

ALG

DSN

NOT TO SCALEA5

SERVICE AIR DROP

NOT TO SCALEA1

CLEVIS HANGER

NOT TO SCALEA3

KNEE BRACE PIPE SUPPORT

NOT TO SCALEC3

PEDESTAL PIPE SUPPORT

NOT TO SCALEC1

PIPE BASE CLAMP

NOT TO SCALEC5

CONCRETE PIPE SADDLE

S Y

M D

E S

C R

IP

TI

O N

D A

TE

A

P P

R

IS

S U

E D

F O

R B

ID

/2 8/

2-1/2ø LIFTING EYE

(TYPICAL OF 2)

DEBRIS/TRASH

CATCH BASKET

TERMINATE FLUSH

WITH BOTTOM OF

INTAKE STRUCTURE

INTERMEDIATE SUPPORT

COORDINATE SIZE AND

SPAN WITH GRATING AND

DEFLECTION LIMITS

FIBERGLASS FLOOR

GRATING PANEL

FLOOR

COORDINATE

FINAL DIMENSION

WITH INTAKE

STRUCTURE (TYP.)

COORDINATE WITH INTAKE STRUCTURE DIMENSIONS

COORDINATE FINAL

DIMENSION WITH INTAKE

STRUCTURE (TYP.)

COORDINATE WITH INTAKE STRUCTURE DIMENSIONS

2-1/2ø LIFTING EYE

(TYPICAL OF 2)

TERMINATE FLUSH

WITH BOTTOM OF

INTAKE STRUCTURE

INTERMEDIATE SUPPORT

COORDINATE SIZE AND

SPAN WITH GRATING AND

DEFLECTION LIMITS

FIBERGLASS FLOOR

GRATING PANEL

FLOOR

1. REFER TO DRAWING 2-M-001 FOR MECHANICAL LEGEND, ABBREVIATIONS

AND NOTES.

GENERAL NOTES

COORDINATE WITH INTAKE STRUCTURE DIMENSIONS

STOPLOG

LOG MOUNTED SEAL

PROVIDE CONTINUOUS

SEAL ON DOWNSTREAM

SIDES AND BOTTOM OF

LOG

OVERLAP AND CONNECT

ALL SEAL JOINTS

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT NO.:

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y N

A V

A L

F A

C

IL

IT

IE

S E

N G

IN

E

E R

S

T E

M S

C O

M M

A N

D

DRAWFORM REVISION: 25 AUGUST 2020

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

Y S

T E

M S

C O

M M

A N

D

M

ID

-A T

LA

N

TI

C

N A

V A

L S

T A

T

IO

N

N O

R F

O L

K V

A

AS NOTED

F

IL

E N

A M

E

P

LO

T T

E D

C

R e v it P ro je ct s \D

R Y

D P

-1

-M

-P S tj g o d fr e y .r v t

/2

/2

:0 :0

P

M

2-M-505

P D

R Y

D O

C K

S

A L T

W A

T E

R S

Y S

T E

M

F O

R C

V N

-7

M E

C H

A N

IC

A

L D

E

TA

IL

S

DKH

12857948

TJG CPM

02/02/2022

DEVIN POULIN,

C984 FACILITIES PLANNER, NNSY

JTL/TLH

1364315

N40085-22-R-2598

P O

R T

S M

O U

T H

, V

IR

G

IN

IA

N

O R

F O

LK

N

A V

A L

S H

IP

Y

A R

D

EJA

ALG

DSN

NOT TO SCALEA1

FINE INTAKE SCREEN

NOT TO SCALEB2

FINE SCREEN - SECTION A

NOT TO SCALEB1

FINE SCREEN - SECTION B

NOT TO SCALEA2

COURSE INTAKE SCREEN

NOT TO SCALEB3

COURSE SCREEN - SECTION B

NOT TO SCALEB4

COURSE SCREEN - SECTION A

SCREEN NOTES:

1. PROVIDE TWO (2) REMOVEABLE FINE INTAKE SCREENS AND ONE

(1) COURSE INTAKE SCREEN FOR EACH INTAKE STRUCTURE.

2. PROVIDE COMPLETE SCREEN ASSEMBLIES WITH ALL MOUNTING

HARDWARE, EMBEDDED GUIDES AND APPURTENANCES NEEDED

FOR A FULLY FUNCTIONAL SYSTEM .

3. EACH SCREEN TO BE IDENTICAL AND FULLY INTERCHANGEABLE

WITH ANY OTHER SCREEN.

4. SCREEN SECTION MUST BE DESIGNED TO BE REMOVED FROM

ABOVE UTILIZING LIFTING EYES.

5. CONSTRUCT EACH SCREEN WITH A RIGID PERIMETER

STRUCTURAL FRAME WITH INTERIOR MESH PANELS. DESIGN

ASSEMBLY FOR A MAXIMUM DEFLECTION OF L/360.

6. PROVIDE EMBEDDED GUIDE RAILS IN INTAKE STRUCTURE TO

SUPPORT SCREEN ASSEMBLIES. GUIDE RAILS TO BE

RECESSED IN CONCRETE WALLS AND BE CONTINOUSE UHMWPE

SLIDESCONFIGURE GUIDE RAILS TO BE IDENTICAL FOR ALL

INTAKES. COORDINATE GUIDE RAIL POCKETS WITH INTAKE

STRUCTURE AND FINAL SCREEN FABRICATION DIMENSIONS.

7. PROVIDE UHMWPE SLIDES ON GUIDE RAILS.

8. SCREEN FRAMES TO BE CONSTRUCTED OF DUPLEX 2205.

9. MESH PANELS TO BE CONSTRUCTED OF FIBERGLASS GRATE

PANELS OR SIMILAR PRODUCT.

A. FINE SCREEN - OPENING SIZE 1/2" WITH MINIMUM 40%

FREE AREA.

B. COURSE SCREEN - OPENING SIZE 1-1/2" WITH MINIMUM

70% FREE AREA.

10. PROVIDE FINAL WEIGHT PERMANENTLY MARKED ON EACH

SCREEN SECTION.

S Y

M D

E S

C R

IP

TI

O N

D A

TE

A

P P

R

IS

S U

E D

F O

R B

ID

/2 8/

NOT TO SCALE

B5

STOPLOG - SECTION B

STOPLOG NOTES:

1. PROVIDE SINGLE-PIECE STOPLOG ASSEMBLY TO INCLUDE

STOPLOGS, GUIDES, AND LIFTING EYES.

2. VERIFY ACTUAL DIMENSION IN FIELD PRIOR TO PURCHASE.

3. STOPLOG ASSEMBLY TO BE A FABRICATED PRODUCT

MANUFACTURER AND DESIGNED FOR SITE SPECIFIC CONDITIONS

AND ARRANGEMENT.

4. PROVIDE LOG MOUNTED SEALING SYSTEM WITH SEALS ON

DOWNSTREAM SIDES OF LOG AND ON BOTTOM OF LOG.

5. STOPLOG TO BE FABRICATED FROM PLATE STEEL WITH MINIMUM

THICKNESS OF 2" PROVIDE ADDITIONAL STRUCTURAL

REINFORCEMENT WELDED TO PLATE AS NEEDED TO MEET

DEFLECTION REQUIREMENTS.

6. PROVIDE EMBEDDED GUIDE RAILS IN INTAKE STRUCTURE TO

SUPPORT AND SEAL STOPLOG. GUIDE RAILS TO BE RECESSED IN

CONCRETE WALLS AND BE INCLUDE UHMWPE SLIDES. CONFIGURE

GUIDE RAILS TO BE IDENTICAL FOR ALL INTAKES. COORDINATE

GUIDE RAIL POCKETS WITH INTAKE STRUCTURE .

7. ALL GUIDES, ANCHORS, LEVELING PLATE, AND OTHER

COMPONENTS PERMENANTLY INSTALLED IN INTAKE STRUCTURE

MUST BE CONSTRUCTED FROM DUPLEX 2205.

8. EPOXY COAT STOP LOG; DO NOT COAT GUIDES.

9. PROVIDE FINAL WEIGHT PERMANENTLY MARKED ON STOPLOG.

2-1/2"ø LIFTING EYES (TYPICAL)

PROVIDE SINGLE PIECE

STOPLOG CONSTRUCTED OF

PLATE STEEL

LOG MOUNTED SEALS

NOT TO SCALE

A5

STOPLOG SEAL

LOG MOUNTED SEALS

LOG MOUNTED SEALS

NOTES:

1. MOTOR SHALL BE NON-OVERLOADING OVER ENTIRE PUMP CURVE.

2. PROVIDE MULTI-STAGE VERTICAL TURBINE PUMP.

3. DESIGNATED SEISMIC SYSTEM; PUMP MUST REMAIN OPERATIONAL AFTER AN EVENT.

4. PROVIDE SOFT-START; REFER TO ELECTRICAL.

5. PROVIDE PUMP CONTROL AND MONITORING SYSTEM. SYSTEM TO INCLUDE SENSORS, CONTROLLER AND TOUCHSCREEN HUMAN MACHINE INTERFACE. REFER TO P&ID SHEETS FOR REQUIREMENTS.

MECHANICAL PIPE SYSTEM SCHEDULE

DIAMETER RANGE (IN) MATERIALSYSTEM

SALTWATER RETURN

FRESHWATER

2 - 10 2205 SS

3/4-1 COPPER

MIN. PRESS. RATING COATINGS

LINER

250 -

150 -

COMPRESSED AIR

REFRIGERANT PIPING

DRAIN PIPING

3/4-1

PER MFG.

3/4-6

COPPER

COPPER

PVC

PER MFG.

SALTWATER SUPPLY 6 - 36 DUCTILE EPOXY250 CERAMIC EPOXY

FUEL PIPING 1-4 STEEL 275 - -

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT NO.:

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y N

A V

A L

F A

C

IL

IT

IE

S E

N G

IN

E

E R

S

T…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .