1364315_dwg_09of18_PH1_V2_Mechanical.pdf
PDF 15 MB Posted
- Attached to
- P-678 Dry Dock 8 Saltwater System for CVN-78, Norfolk Naval Shipyard, Portsmouth, Virginia
- Solicitation number
- N40085-22-R-2598_Drawings
About this file
This document provides details for a federal contract opportunity for mechanical drawings and specifications to support the P-678 Dry Dock 8 Saltwater System project at the Norfolk Naval Shipyard in Portsmouth, Virginia. The solicitation number is N40085-22-R-2598 and is seeking mechanical drawings identified in file 1364315_dwg_09of18_PH1_V2_Mechanical.pdf as well as specifications available under notice numbers N40085-22-R-2598_Drawings and N40085-22-R-2598_Specificiations. The opportunity type is a special notice and is being conducted by the Department of the Navy Naval Facilities Engineering Command. Interested offerors are directed to the provided notice identification numbers to access the required drawings and specifications for this solicitation supporting the P-678 Dry Dock 8 Saltwater System project at the Norfolk Naval Shipyard.
View the file
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1. THESE GENERAL NOTES APPLY TO ALL MECHANICAL DRAWINGS IN THIS SET.
SHEET SPECIFIC NOTES ARE INDICATED ON EACH SHEET UNDER GENERAL
SHEET NOTES.
2. PROVIDE ALL MATERIALS, VALVES, HANGERS, SUPPORTS, ETC., AND PERFORM
ALL LABOR REQUIRED TO INSTALL A COMPLETE AND OPERABLE MECHANICAL
SYSTEM.
3. INSTALL ALL MECHANICAL EQUIPMENT AND APPURTENANCES IN ACCORDANCE
WITH MANUFACTURER'S RECOMMENDATIONS, AS INDICATED, AND AS
REQUIRED BY CODE. WHERE THE ABOVE REQUIREMENTS ARE IN CONFLICT,
PROVIDE THE MOST STRINGENT.
4. MECHANICAL DRAWINGS ARE SCHEMATIC IN NATURE AND MAY NOT SHOW
EVERY OFFSET, FITTING, AND CONNECTION NECESSARY FOR A COMPLETE
INSTALLATION. PROVIDE ADDITIONAL OFFSETS, FITTINGS, AND CONNECTIONS
REQUIRED FOR COMPLETE AND OPERABLE SYSTEM.
5. VERIFY AND COORDINATE INSTALLATION OF MECHANICAL SYSTEMS WITH
OTHER TRADES AND EXISTING CONDITIONS PRIOR TO BEGINNING WORK.
WORK MUST PROVIDE ACCESS FOR MAINTENANCE WITHOUT REQUIRING
REMOVAL OR DISASSEMBLY OF ADJACENT SYSTEMS.
6. INSTALL TEMPERATURE CONTROLS AT 48" ABOVE FINISHED FLOOR AND
COORDINATE WITH OTHER DEVICES LOCATED ON WALLS. COORDINATE WITH
ALL WALL-MOUNTED EQUIPMENT.
7. DESIGN AND PROVIDE SEISMIC SUPPORTS, ISOLATORS, AND RESTRAINT
DEVICES IN ACCORDANCE WITH STRUCTURAL SPECIFICATIONS. WHERE
SEISMIC SUPPORT REQUIREMENTS CONFLICT WITH ATFP REQUIREMENTS
PROVIDE THE MORE STRINGENT.
8. MECHANICAL WORK MUST BE IN ACCORDANCE WITH UFC 3-401-01, UFC 3-410-01,
UFC 4-213-10, THE INTERNATIONAL MECHANICAL CODE, AND APPLICABLE
ASHRAE AND NFPA STANDARDS.
9. THE CONTRACTOR SHALL PROTECT ALL SITE EQUIPMENT FROM
CONSTRUCTION DUST AND DEBRIS.
10. PATCH AND SEAL ALL VOIDS FROM THE REMOVAL OF PIPING, TUBING, OR
OTHER ASSOCIATED ITEMS FROM THE FLOOR, WALL, OR OTHER THROUGH
PENETRATIONS.
11. FIELD VERIFY EXISTING CONDITIONS AND COORDINATE PIPE ROUTES TO AVOID
INTERFERENCE WITH OTHER UTILITIES AND EQUIPMENT. PROVIDE THE
MINIMUM NUMBER OF ELBOWS AND OFFSETS NECESSARY FOR A COMPLETE
INSTALLATION. WHERE A CONFLICT IS IDENTIFIED NOTIFY THE CONTRACTING
OFFICER.
12. ROUTE NEW PIPING WITH CONSIDERATION OF SPACE USE WITH OTHER
TRADES. PIPE MUST NOT BLOCK SERVICE CLEARANCES FOR EQUIPMENT.
13. SUCTION CHAMBER, FLOOR DRAINS, FLOODING AND DRAINAGE FLUMES MAY BE
FLOODED AND HAVE CONTINOUS INFLUENT. THE CONTRACTOR SHALL
PROVIDE MEANS FOR ALL DEWATERING REQUIRED TO COMPLETE WORK AND
MAINTAIN DRY PUMPWELL DURING CONSTRUCTION.
14. CONTRACTOR SHALL NOT USE PUMPWELL DEWATERING AND DRAINAGE PUMPS
AND PIPING SYSTEMS FOR WATER REMOVAL DURING CONSTRUCTION PERIOD.
CONTRACTOR IS RESPONSIBLE FOR PROVIDING TEMPORARY DEWATERING
SYSTEMS TO SERVE ALL DRAINAGE AND DEWATERING FUNCTIONS DURING
ENTIRE CONSTRUCTION PERIOD. TYPICAL CONTINUOUS FLOW TO DOCK IS
APPROX. 300 GPM. PROVIDE ADDITIONAL CAPACITY TO HANDLE STORM
EVENTS.
15. DURING CONSTRUCTION PUMPWELL MUST BE SECURED AND ALL ACCESS
HATCHES REINSTALLED ANY TIME PUMPWELL IS UNMANNED. PROVIDE MEANS
FOR WEATHER PROTECTION ANYTIME ACCESS HATCHES ARE REMOVED.
16. THE CONTRACTOR MUST SEAL AND PROTECT PUMPWELL WITHIN 48 HOURS OF
EMERGENCY RESPONSE TO DESTRUCTIVE WEATHER OR OTHER EMERGENCY
DOCKING OPERATION.
17. DEMOLITION OF MECHANICAL ITEMS WIRED WITH POWER AND/OR CONTROL
MUST INCLUDE REMOVAL OF WIRING AND CONDUIT TO SOURCE. COORDINATE
WITH ELECTRICAL CONTRACTOR.
18. CONTRACTOR IS RESPONSIBLE FOR PROVIDING EQUIPMENT NEEDED FOR
LIFTING PUMPWELL ACCESS HATCHES AND FOR REMOVING ALL EQUIPMENT
LOCATED INSIDE OF THE PUMPWELL. RIGGING SHALL BE IN ACCORDANCE WITH
NAVFAC P-307, "MANAGEMENT OF WEIGHT HANDLING EQUIPMENT", LATEST
REVISION.
19. MULTIPLE REPAIR/REPLACEMENT PROJECTS WILL OCCUR CONCURRENT WITH
P-678 PROJECT WORK. THESE INCLUDE REPAIR OF DRY DOCK 8 CAISSON,
REPLACEMENT OF PUMPWELL 8 MAIN DEWATERING PUMP 2, AND
REPLACEMENT OF PUMPWELL 8 MAIN DEWATERING PUMP 3. COORDINATE WITH
CONTRACTING OFFICER FOR OTHER PROJECT SCHEDULES AND
CONSTRUCTION SEQUENCES.
20. CONTRACT LINE ITEMS (CLIN) ARE INDICATED ON SPECIFICATIONS AND PLAN
DRAWINGS ONLY. COORDINATE ALL WORK SHOWN ON SECTIONS, DETAILS,
SCHEDULES, ETC WITH ASSOCIATED CLIN(S).
GENERAL MECHANICAL NOTES
° DEGREES
Ø DIAMETER
AC AIR COMPRESSOR
AD ACCESS DOOR
AFF ABOVE FINISHED FLOOR
AHU AIR HANDLING UNIT
AP ACCESS PANEL
APD AIR PRESSURE DROP
AS AIR SEPARATOR
ATFP ANTITERRORISM FORCE PROTECTION
BD BALANCING DAMPER
BHP BRAKE HORSEPOWER
BOD BOTTOM OF DUCT
BR BASEBOARD RADIATOR
BTUH BRITISH THERMAL UNITS PER HOUR
C COMMON
Cv LOSS COEFFICIENT
CFM CUBIC FEET PER MINUTE
CHT COLLECTION, HOLDING, TRANSFER
CLG CEILING
CND CONDENSER
COP COEFFICIENT OF PERFORMANCE
CRAHU COMPUTER ROOM AIR HANDLING UNIT
CU CONDENSING UNIT
CHT COLLECTION, HOLDING, & TRANSFER
CHW CHILLED WATER
CW CONDENSER WATER
D CONDENSATE DRAIN
DB DRY BULB
DDC DIRECT DIGITAL CONTROL
DEG DEGREE
DP DIFFERNTIAL PRESSURE
DX DIRECT EXPANSION
(E) EXISTING
EAT ENTERING AIR TEMPERATURE
EER ENERGY EFFICENCY RATIO
EF EXHAUST FAN
EFF EFFECTIVENESS
EFSO EMERGENCY FUEL SHUTOFF
EQPT EQUIPMENT
ESP EXTERNAL STATIC PRESSURE
EWT ENTERING WATER TEMPERATURE
F FAHRENHEIT
FCU FAN COIL UNIT
FD FIRE DAMPER
FFP FUEL FILL PORT
FOR FUEL OIL RETURN
FOS FUEL OIL SUPPLY
FOT FUEL OIL TANK
FPU FUEL POLISHING UNIT
FT FEET
FT WG FEET WATER GAUGE
G NATURAL GAS
GPM GALLONS PER MINUTE
HGT HEIGHT
HP HEAT PUMP, HORSEPOWER
HR HOUR, HUMIDITY RATIO
HW HOT WATER
HX HEAT EXCHANGER
IAW IN ACCORDANCE WITH
IWG INCHES WATER GAUGE
kW KILOWATT
LAT LEAVING AIR TEMPERATURE
LBS POUNDS
LV LOUVER
LWT LEAVING WATER TEMPERATURE
LPS LOW PRESSURE STEAM (< 15PSIG)
MAU MAKEUP AIR UNIT
MAX MAXIMUM
MCWB MEAN COINCIDENT WET BLUB
MIN MINIMUM
N NORTH
NC NORMALLY CLOSED, NOISE CRITERIA
NO NUMBER, NORMALLY OPEN
OA OUTSIDE AIR
OAU OUTSIDE AIR UNIT
PH PHASE
PSI POUNDS PER SQUARE INCH
PTAC PACKAGED TERMINAL AIR CONDITIONING UNIT
PTHP PACKAGED TERMINAL HEAT PUMP
PW PUMPWELL
QTY QUANTITY
RA RETURN AIR
RH RELATIVE HUMIDITY
RL REFRIGERANT LIQUID
RS REFRIGERANT SUCTION
RTU ROOF TOP UNIT
SA SUPPLY AIR
SEER SEASONAL ENERGY EFFICIENCY RATIO
SIM SIMILAR
SP STATIC PRESSURE
SQ SQUARE
SWR SALT WATER RETURN
TYP TYPICAL
UH UNIT HEATER
UOI UNLESS OTHERWISE INDICATED
V VOLTS
VAV VARIABLE AIR VOLUME
VFD VARIABLE FREQUENCY DRIVE
W WIDTH, WEST
WB WET BULB
WPD WATER PRESSURE DROP
MECHANICAL ABBREVIATIONS
T
HUMIDITY SENSORH
THERMOSTAT
DOWNWARD DIRECTION OF SLOPED PIPING
GLOBE VALVE
GATE VALVE
BUTTERFLY VALVE
CHECK VALVE
PRESSURE REDUCING VALVE
DRAIN VALVE WITH HOSE CONNECTION
2-WAY CONTROL VALVE
3-WAY CONTROL VALVE
BACKFLOW PREVENTER
RELIEF VALVE
MANUAL AIR VENT
AUTOMATIC AIR VENT
WYE STRAINER
STRAINER WITH BLOWDOWN VALVE
CLEAN OUT
PIPE REDUCER
ECCENTRIC REDUCER
UNION
PRESSURE GAUGE WITH SHUTOFF COCK
THERMOMETER
PIPE CAP
FLANGE
C.O.
M
M
MV
AV
R/D RISE (R) DROP (D) IN DIRECTION OF FLOW
MANUAL CALIBRATED BALANCING VALVE
MECHANICAL LEGEND
BALL VALVE
DIRECTION OF FLOW
PRESSURE DIFFERANTIAL GAUGE WITH
SHUTOFF COCK
VALVE ACTUATOR
PIPE HANGER
PIPE SUPPORT
PIPE ANCHOR
PIPE GUIDE
PIPING FOR REMOVAL
COMPRESSED AIR PIPING
CONDENSATE DRAIN PIPING
LOW PRESSURE CONDENSATE PIPING
REFRIGERANT LIQUID PIPING
LOW PRESSURE STEAM PIPING
REFRIGERANT SUCTION PIPING
VACUUM (AIR)
CA
D
LPC
LPS
RL
RS
VAC
MECHANICAL PIPING LEGEND
SALTWATER SUPPLYSWS
SALTWATER RETURNSWR
VENT PIPINGV
SUMP PUMP DISCHARGESP
DRAINAGE PUMP DISCHARGEDP
PIPE DROP
PIPE RISER
CLEAN WATER HEADERCHWR
POINT OF CONNECTION
POINT OF DISCONNECTION
CONSTRUCTION INTERFACE
DEMO
WORK
EXISTING
TO REMAIN
WORK EXISTING
TO REMAIN
EXISTING TO REMAIN
DEMO WORK
WORK
ROOM TAG
DETAIL NUMBER
SHEET WHERE DRAWN
DETAIL TAG
ROOM NAME
ROOM NUMBER
DETAIL NUMBER
SCALE
SHEET
REFERENCED
FROM
SECTION TAG
SECTION NUMBER
SHEET WHERE DRAWN
GENERAL PROJECT SYMBOLS
KEYNOTE TAG
KEYNOTE NUMBER
? PHOTOGRAPH TAG
PHOTOGRAPH NUMBER
SHEET WHERE SHOWN
PLAN
NORTH
SCALE
TRUE NORTH
SHEET
REFERENCED
FROM
EQUIPMENT
IDENTIFICATION
PW8-VAV - XX
EQUIPMENT
TYPE
EQUIPMENT
NUMBER
BUILDING
NAME
36.90 N
LONGITUDE:
ELEVATION:
LATITUDE:
SUMMER DESIGN WET BULB (1.0%):
SUMMER DESIGN DRY BULB (1.0%):
WINTER DESIGN DRY BULB (99.0%):
STANDARD OUTDOOR DESIGN CONDITIONS:
24°F
76°F 91°F
76.20 W
30 FT.
HVAC DESIGN CRITERIA
LOCATION: PORTSMOUTH, VA
STATION ID# 723080
SUMMER
DESIGN DRY
BULB:
WINTER
DESIGN DRY
BULB:
STANDARD INDOOR DESIGN CONDITIONS:
78°F 55°F dp 68°F NC*
SUMMER
DESIGN
HUMIDITY:
CONTROL ROOM
ROOM TYPE:
*UC - UNCONTROLLED
*NC - HUMIDITY NOT DIRECTLY CONTROLLED
WINTER
DESIGN
HUMIDITY:
CLIMATE ZONE 3A
CONDENSING UNIT (1.0% DB + 5°F): 96°F
1% HR/MC WET BLUB
1% HR/MC DRY BLUB
76.2°F 88.0°F
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L
F A
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S
Y S
T E
M S
C O
M M
A N
D
DRAWFORM REVISION: 25 AUGUST 2020
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
Y S
T E
M S
C O
M M
A N
D
M
ID
-A T
LA
N
TI
C
N A
V A
L S
T A
T
IO
N
N O
R F
O L
K V
A
AS NOTED
F
IL
E N
A M
E
P
LO
T T
E D
C
R e v it P ro je c ts
\D R
Y D
P -1
-M
-D R
Y D tj g o d fr e y .r v t
/2
/2
:3 :3
P
M
1-M-001
P D
R Y
D O
C K
S
A L T
W A
T E
R S
Y S
T E
M
F O
R C
V N
-7
LE
G
E N
D , A
B B
R E
V
IA
TI
O
N S
A N
D N
O
TE
S
DKH
12857659
TJG WBT
02/02/2022
DEVIN POULIN,
C984 FACILITIES PLANNER, NNSY
JTL/TLH
1364315
N40085-22-R-2598
P O
R T
S M
O U
T H
, V
IR
G
IN
IA
N
O R
F O
LK
N
A V
A L
S H
IP
Y
A R
D
EJA
ALG
DSN
S Y
M D
E S
C R
IP
TI
O N
D A
TE
A
P P
R
IS
S U
E D
F O
R B
ID
/2 8/
EXISTING BOLLARDS
PUMPWELL 8
EQUIPMENT
ACCESS HATCH
PUMPWELL 8
EQUIPMENT
ACCESS HATCH
ENTRY DOORWAY
(BELOW GRADE)
PUMPWELL EGRESS
TUNNEL
116116
1. REFER TO DRAWING 1-M-001 FOR MECHANICAL LEGEND, ABBREVIATIONS
AND NOTES.
SHEET NOTES
SHEET KEYNOTES#
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L
F A
C
IL
IT
IE
S E
N G
IN
E
E R
S
T E
M S
C O
M M
A N
D
DRAWFORM REVISION: 25 AUGUST 2020
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
Y S
T E
M S
C O
M M
A N
D
M
ID
-A T
LA
N
TI
C
N A
V A
L S
T A
T
IO
N
N O
R F
O L
K V
A
AS NOTED
F
IL
E N
A M
E
P
LO
T T
E D
C
R e v it P ro je c ts
\D R
Y D
P -1
-M
-D R
Y D tj g o d fr e y .r v t
/2
/2
:3 :1
P
M
1-MD101
P D
R Y
D O
C K
S
A L T
W A
T E
R S
Y S
T E
M
F O
R C
V N
-7
P U
M P
W E
LL
D
E M
O
LI
T
IO
N P
LA
N
G
R A
D E
L E
V E
L
CWS
12857660
TJG TJG
02/02/2022
DEVIN POULIN,
C984 FACILITIES PLANNER, NNSY
JTL/TLH
1364315
N40085-22-R-2598
P O
R T
S M
O U
T H
, V
IR
G
IN
IA
N
O R
F O
LK
N
A V
A L
S H
IP
Y
A R
D
EJA
ALG
DSN
1" = 10'-0" C1
DEMOLITION PLAN - GRADE LEVEL
0" 10' 30'20'
PLAN
NORTH
116 EQUIPMENT ACCESS HATCH; APPROX. 10'-0"x10'-0" AND 21,000
POUNDS.
165 EXISTING RS/RL LINES FOR EXISTING PW AIR HANDLING UNIT TO
REMAIN. EXISTING CONDENSING UNIT FOR PW AIR HANDLER TO
REMAIN.
177 EXISTING PW AIR HANDLER REMOTE CONDENSING UNIT. PROVIDE
TEMPORARY REMOVAL TO ALLOW FOR CIVIL WORK TO OCCUR IN
AREA. STORE UNIT IN A PROTECTED AREA AND SEAL ALL PIPING
AND ELECTRICAL CONNECTIONS FOR DURATION OF STORAGE
PERIOD. AT COMPLETION OF CIVIL WORK REINSTALL UNIT IN
ORIGINAL LOCATION, AND CHARGE UNIT IN ACCORDANCE WITH
MANUFACTURER'S REQUIREMENTS.
KEY PLAN
MOTOR
83'-0"
INTERMED.
68'-0"
MAIN PUMP
46'-0"
DRAINAGE
28'-3 1/4"
COPING
103'-0"
SUC. CHAM.
32'-3"
S Y
M D
E S
C R
IP
TI
O N
D A
TE
A
P P
R
IS
S U
E D
F O
R B
ID
/2 8/
(E)MDP-1 MOTOR (E)MDP-2 MOTOR (E)MDP-3 MOTOR (E)MDP-4 MOTOR
(E)DP-1 MOTOR
(E)DP-2 MOTOR
(E) CONTROL CONSOLE
EXISTING BUBBLER
(WALL MOUNTED PANEL)
EXISTING AIR COMPRESSOR
(FLOOR MOUNTED)
2 2 2
(E) AHU
(E) DUCTWORK
(E) DUCTWORK
(E) PW8-V-43
(E) PW8-V-29
(E) PW8-V-56
(E) DUCTWORK
"ø
"ø
119119
ENTRY DOORWAY
(BELOW GRADE)
81 80
X1
SHEET KEYNOTES#
SHEET NOTES
1. REFER TO DRAWING 1-M-001 FOR MECHANICAL LEGEND, ABBREVIATIONS
AND NOTES.
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L
F A
C
IL
IT
IE
S E
N G
IN
E
E R
S
T E
M S
C O
M M
A N
D
DRAWFORM REVISION: 25 AUGUST 2020
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
Y S
T E
M S
C O
M M
A N
D
M
ID
-A T
LA
N
TI
C
N A
V A
L S
T A
T
IO
N
N O
R F
O L
K V
A
AS NOTED
F
IL
E N
A M
E
P
LO
T T
E D
C
R e v it P ro je c ts
\D R
Y D
P -1
-M
-D R
Y D tj g o d fr e y .r v t
/2
/2
:3 :1
P
M
1-MD102
P D
R Y
D O
C K
S
A L T
W A
T E
R S
Y S
T E
M
F O
R C
V N
-7
P U
M P
W E
LL
D
E M
O
LI
TI
O
N P
LA
N
M
O T
O R
CWS
12857661
TJG TJG
02/02/2022
DEVIN POULIN,
C984 FACILITIES PLANNER, NNSY
JTL/TLH
1364315
N40085-22-R-2598
P O
R T
S M
O U
T H
, V
IR
G
IN
IA
N
O R
F O
LK
N
A V
A L
S H
IP
Y
A R
D
EJA
ALG
DSN
KEY PLAN
MOTOR
83'-0"
INTERMED.
68'-0"
MAIN PUMP
46'-0"
DRAINAGE
28'-3 1/4"
COPING
103'-0"
SUC. CHAM.
32'-3"
PLAN
NORTH
0' 4' 8' 12'3/16" = 1'-0" C1
DEMOLITION PLAN - MOTOR LEVEL
1 DEMOLISH PUMP IN ITS ENTIRETY; DEMOLISH, PUMP, DRIVE MOTOR,
LINESHAFT, SUPPORTS AND ALL ACCESSORIES. ALL PUMP AND MOTOR
ACCESSORIES MUST BE TURNED OVER TO THE GOVERNMENT.
2 UNINSTALL AND DISPOSE DRIVE MOTOR; RETAIN PUMP, LINESHAFT AND
ASSOCIATED SUPPORTS. PROVIDE 4160V MOTOR AS REPLACEMENT. FIELD
VERIFY CONDITION AND ARRANGEMENT OF EXISTING MOTOR SUPPORT
ASSEMBLY. COORDINATE REPLACEMENT MOTOR REQUIREMENTS WITH
EXISTING CONDITIONS. PROVIDE ALL MODIFICATIONS TO EXISTING
SYSTEMS NECESSARY FOR INSTALLATION OF REPLACEMENT MOTOR.
5 EXISTING 12"ø SUCTION CHAMBER VENT.
35 EXISTING 24"ø DP-1 & 2 DISCHARGE PIPE; DEMOLISH VALVE AND PIPE .
OPERATORS MUST BE TURNED OVER TO THE GOVERNMENT.
36 EXISTING 24"ø DP-3 DISCHARGE PIPE; DEMOLISH VALVE AND PIPE ABOVE
FLOOR. OPENING AND VERTICAL PIPING BELOW FLOOR TO REMAIN AND BE
REUSED. OPERATORS MUST BE TURNED OVER TO THE GOVERNMENT.
37 EXISTING SITE COMPRESSED AIR SUPPLY.
70 DEMOLISH EXISTING CONTROL ROOM PTAC UNIT.
80 EXISTING DP-1,2 24"ø DISCHARGE PIPE; PLUG AND CAP INSIDE PUMPWELL 8.
81 EXISTING SP-1,2 6"ø DISCHARGE PIPE; PLUG AND CAP INSIDE PUMPWELL 8.
82 EXISTING DP-3 24"ø DISCHARGE PIPE; RETAIN WALL PENETRATION PIPE
SPOOL FOR REUSE.
117 EQUIPMENT ACCESS OPENING TO BELOW; APPROX. 7'-0"x10'-0".
118 APPROX. LOCATION OF EQUIPMENT ACCESS OPENING ABOVE.
119 DEMOLISH AIR BUBBLER LINE TO SUCTION CHAMBER AND SUMP PIT.
165 EXISTING RS/RL LINES FOR EXISTING PW AIR HANDLING UNIT TO REMAIN.
EXISTING CONDENSING UNIT FOR PW AIR HANDLER TO REMAIN.
X1 CLIN 0002
S Y
M D
E S
C R
IP
TI
O N
D A
TE
A
P P
R
IS
S U
E D
F O
R B
ID
/2 8/
A1
1-MD301
C3
1-MD301
54"ø 54"ø
54"ø 54"ø
24"ø
24"ø
(E) DUCTWORK (E) DUCTWORK
(E) PW8-ACT-10
(E) PW8-ACT-7
(E) PW8-ACT-53
6"ø
119119
(E) PW8-ACT-34
A1
1-MD302
X1
1. REFER TO DRAWING 1-M-001 FOR PLUMBING LEGEND, ABBREVIATIONS AND
NOTES.
SHEET NOTES
SHEET KEYNOTES#
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L
F A
C
IL
IT
IE
S E
N G
IN
E
E R
S
T E
M S
C O
M M
A N
D
DRAWFORM REVISION: 25 AUGUST 2020
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
Y S
T E
M S
C O
M M
A N
D
M
ID
-A T
LA
N
TI
C
N A
V A
L S
T A
T
IO
N
N O
R F
O L
K V
A
AS NOTED
F
IL
E N
A M
E
P
LO
T T
E D
C
R e v it P ro je c ts
\D R
Y D
P -1
-M
-D R
Y D tj g o d fr e y .r v t
/2
/2
:3 :1
P
M
1-MD103
P D
R Y
D O
C K
S
A L T
W A
T E
R S
Y S
T E
M
F O
R C
V N
-7
P U
M P
W E
LL
D
E M
O
LI
T
IO
N P
LA
N
IN
TE
R
M E
D
IA
TE
CWS
12857662
TJG TJG
02/02/2022
DEVIN POULIN,
C984 FACILITIES PLANNER, NNSY
JTL/TLH
1364315
N40085-22-R-2598
P O
R T
S M
O U
T H
, V
IR
G
IN
IA
N
O R
F O
LK
N
A V
A L
S H
IP
Y
A R
D
EJA
ALG
DSN
3/16" = 1'-0" C1
DEMOLITION PLAN - INTERMEDIATE LEVEL
4 DEMOLISH VALVE ACTUATOR AND ALL ASSOCIATED ACCESSORIES.
OPERATORS MUST BE TURNED OVER TO THE GOVERNMENT.
5 EXISTING 12"ø SUCTION CHAMBER VENT.
38 DEMOLISH LINESHAFT AND SUPPORTS ASSOCIATED WITH MDP-1.
119 DEMOLISH AIR BUBBLER LINE TO SUCTION CHAMBER AND SUMP PIT.
153 DEMOLISH LINESHAFT AND SUPPORTS ASSOCIATED WITH DP-1/2.
X1 CLIN 0002
KEY PLAN
MOTOR
83'-0"
INTERMED.
68'-0"
MAIN PUMP
46'-0"
DRAINAGE
28'-3 1/4"
COPING
103'-0"
SUC. CHAM.
32'-3"
PLAN
NORTH
0' 4' 8' 12'
S Y
M D
E S
C R
IP
TI
O N
D A
TE
A
P P
R
IS
S U
E D
F O
R B
ID
/2 8/
1. REFER TO DRAWING 1-M-001 FOR PLUMBING LEGEND, ABBREVIATIONS AND
NOTES.
SHEET NOTES
A1
1-MD301
C3
1-MD301
(E)MDP-1 (E)MDP-2 (E)MDP-3 (E)MDP-4
(E) DUCTWORK (E) DUCTWORK
EXISTING SUCTION
CHAMBER HATCH; REFER
TO STRUCTURAL DRAWINGS
(E) DUCTWORK
(E) PW8-V-3 (E) PW8-V-4 (E) PW8-V-5
(E) PW8-V-6
(E) PW8-V-36
(E) PW8-V-37
(E) PW8-V-38
(E) PW8-V-39
(E
P W
-V
-5
119119
123123
(E) DUCTWORK
"ø
"ø
"ø
A1
1-MD302
X1
SHEET KEYNOTES#
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L
F A
C
IL
IT
IE
S E
N G
IN
E
E R
S
T E
M S
C O
M M
A N
D
DRAWFORM REVISION: 25 AUGUST 2020
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
Y S
T E
M S
C O
M M
A N
D
M
ID
-A T
LA
N
TI
C
N A
V A
L S
T A
T
IO
N
N O
R F
O L
K V
A
AS NOTED
F
IL
E N
A M
E
P
LO
T T
E D
C
R e v it P ro je c ts
\D R
Y D
P -1
-M
-D R
Y D tj g o d fr e y .r v t
/2
/2
:3 :1
P
M
1-MD104
P D
R Y
D O
C K
S
A L T
W A
T E
R S
Y S
T E
M
F O
R C
V N
-7
P U
M P
W E
LL
D
E M
O
LI
TI
O
N P
LA
N
M
A
IN
P U
M P
CWS
12857663
TJG TJG
02/02/2022
DEVIN POULIN,
C984 FACILITIES PLANNER, NNSY
JTL/TLH
1364315
N40085-22-R-2598
P O
R T
S M
O U
T H
, V
IR
G
IN
IA
N
O R
F O
LK
N
A V
A L
S H
IP
Y
A R
D
EJA
ALG
DSN
PLAN
NORTH
0' 4' 8' 12'3/16" = 1'-0" C1
DEMOLITION PLAN - MAIN PUMP LEVEL
6 DEMOLISH EXISTING MDP-1 AND ALL ASSOCIATED ACCESSORIES.
7 EXISTING 12"ø SUCTION CHAMBER VENT; DEMOLISH PIPE CONNECTION
TO SUCTION CHAMBER.
8 DEMOLISH EXISTING HIGH-WATER BACKUP ALARM. EXISTING UNIT TYPE IS
VIBRATING LIQUID LEVEL SWITCH, MFR. K-TEK, MODEL VF30/2/P7,
OPERATING POWER 120 VAC.
11 DEMOLISH 16"ø DISCHARGE FLUME DRAIN PIPING AT CONNECTION TO 54"ø MDP DISCHARGE PIPE ABOVE.
46 16"ø DISCHARGE FLUME DRAIN LINE; CAP EXISTING PIPE AT ELBOW.
79 DEMOLISH SUPPLY DUCTWORK DOWN TO BILGE SUMP.
119 DEMOLISH AIR BUBBLER LINE TO SUCTION CHAMBER AND SUMP PIT.
120 DEMOLISH EXISTING SUMP PIT AIR BUBBLER LINE AND DIP TUBE.
121 DEMOLISH EXISTING SUCTION CHAMBER AIR BUBBLER LINE AND DIP
TUBE. RETAIN CAST IN PLACE CONCRETE PIPE SPOOL.
122 DEMOLISH FLUSH WATER LINE TO MDP-1; CAP PIPE AT NORTH WALL
ADJACENT TO TAKE-OFF SERVING EXISTING MDP-2.
123 EXISTING FLUSH WATER DISTRIBUTION PIPING TO REMAIN; FIELD VERIFY
SIZE AND LOCATION.
157 DEMOLISH DUCTILE IRON DISCHARGE PIPE, SUPPORTS AND
ACCESSORIES.
158 DEMOLISH EXISTING DP-1/2 DRIVESHAFT.
159 DEMOLISH EXISTING VALVE ACTUATOR EXTENSION SHAFTS.
X1 CLIN 0002
KEY PLAN
MOTOR
83'-0"
INTERMED.
68'-0"
MAIN PUMP
46'-0"
DRAINAGE
28'-3 1/4"
COPING
103'-0"
SUC. CHAM.
32'-3"
S Y
M D
E S
C R
IP
TI
O N
D A
TE
A
P P
R
IS
S U
E D
F O
R B
ID
/2 8/
1-MD301
C3
1-MD301
(E)DP-3
(E)DP-2
(E)DP-1
(E)SP-1
(E)SP-2
(E) PW8-V-10
(E) PW8-V-8
(E) PW8-V-7
(E) PW8-V-9
(E) PW8-V-53
(E) PW8-V-59
"ø
(E
P W
-V
-5
(E) PW8-V-54
1-MD401
A1
A1
1-MD302
REFER TO
STRUCTURAL FOR
DEMO THIS AREA
X1
1. REFER TO DRAWING 1-M-001 FOR MECHANICAL LEGEND, ABBREVIATIONS
AND NOTES.
SHEET NOTES
SHEET KEYNOTES#
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L
F A
C
IL
IT
IE
S E
N G
IN
E
E R
S
T E
M S
C O
M M
A N
D
DRAWFORM REVISION: 25 AUGUST 2020
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
Y S
T E
M S
C O
M M
A N
D
M
ID
-A T
LA
N
TI
C
N A
V A
L S
T A
T
IO
N
N O
R F
O L
K V
A
AS NOTED
F
IL
E N
A M
E
P
LO
T T
E D
C
R e v it P ro je c ts
\D R
Y D
P -1
-M
-D R
Y D tj g o d fr e y .r v t
/2
/2
:3 :2
P
M
1-MD105
P D
R Y
D O
C K
S
A L T
W A
T E
R S
Y S
T E
M
F O
R C
V N
-7
P U
M P
W E
LL
D
E M
O
LI
TI
O
N P
LA
N
D
R A
IN
A
G E
P U
M P
CWS
12857664
TJG TJG
02/02/2022
DEVIN POULIN,
C984 FACILITIES PLANNER, NNSY
JTL/TLH
1364315
N40085-22-R-2598
P O
R T
S M
O U
T H
, V
IR
G
IN
IA
N
O R
F O
LK
N
A V
A L
S H
IP
Y
A R
D
EJA
ALG
DSN
PLAN
NORTH
0' 4' 8' 12'3/16" = 1'-0" C1
DEMOLITION PLAN - DRAINAGE PUMP LEVEL
84 PROTECT EXISTING DP-3 INTAKE SCREEN; COVER OPENINGS TO
PREVENT ENTRY OF CONSTRUCTION DEBRIS.
103 CUT EXISTING 8"ø CHT PIPE A MINIMUM 6" PAST FACE OF WALL; PLUG
OPENING AND SEAL WITH CONCRETE.
105 PROTECT EXISTING DP-3 PUMP TO REMAIN; COVER ALL OPENINGS TO
PREVENT ENTRY OF CONSTRUCTION DEBRIS AND PROVIDE EXTERIOR
BARRIERS TO PREVENT IMPACTS AND DAMAGE TO PUMP CASING AND
SUPPORTS. UNISTALL EXISTING DP-3 ELECTRICAL MOTOR.
121 DEMOLISH EXISTING SUCTION CHAMBER AIR BUBBLER LINE AND DIP
TUBE. RETAIN CAST IN PLACE CONCRETE PIPE SPOOL.
X1 CLIN 0002
KEY PLAN
MOTOR
83'-0"
INTERMED.
68'-0"
MAIN PUMP
46'-0"
DRAINAGE
28'-3 1/4"
COPING
103'-0"
SUC. CHAM.
32'-3"
S Y
M D
E S
C R
IP
TI
O N
D A
TE
A
P P
R
IS
S U
E D
F O
R B
ID
/2 8/
1. REFER TO DRAWING 1-M-001 FOR MECHANICAL LEGEND, ABBREVIATIONS
AND NOTES.
SHEET NOTES
B3
1-MD115
DD8 PUMPWELL 8
"ø
"ø
M D
P -1
IN
T
A K
E
C U
LV
E
R T
M D
P -2
IN
T
A
LV
E
R T
M D
P -3
IN
T
A
LV
E
R T
M D
P -4
IN
T
A
LV
E
R T
SOUTH FLOOD FLUME
M D
P -1
S U
C T
IO
N
C U
LV
E
R T
M D
P -2
S U
C T
IO
N
C U
LV
E
R T
M D
P -3
S U
C T
IO
N
C U
LV
E
R T
M D
P -4
S U
C T
IO
N
C U
LV
E
R T
VERTICAL FLOODING CULVERT (TYP.4)
DD8 DOCK FLOOR
V-46
106 106 106 106
172 172 172 172
X1
X1
COPING
103' - 0"
DRY DOCK FLOOR
47' - 9 1/4"
(E) PW8-ACT-2
(E) PW8-V-2
SOUTH FLOOD FLUME
E
LI
Z A
B E
T H
R
IV
E R
V-46
DEMO VALVE
10+5011+00
SHEET KEYNOTES#
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L
F A
C
IL
IT
IE
S E
N G
IN
E
E R
S
T E
M S
C O
M M
A N
D
DRAWFORM REVISION: 25 AUGUST 2020
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
Y S
T E
M S
C O
M M
A N
D
M
ID
-A T
LA
N
TI
C
N A
V A
L S
T A
T
IO
N
N O
R F
O L
K V
A
AS NOTED
F
IL
E N
A M
E
P
LO
T T
E D
C
R e v it P ro je c ts
\D R
Y D
P -1
-M
-D R
Y D tj g o d fr e y .r v t
/2
/2
:3 :3
P
M
1-MD115
P D
R Y
D O
C K
S
A L T
W A
T E
R S
Y S
T E
M
F O
R C
V N
-7
S O
U
TH
F
LO
O D
IN
G
F
LU
M E
D
E M
O
LI
T
IO
N P
LA
N
CWS
12857665
TJG TJG
02/02/2022
DEVIN POULIN,
C984 FACILITIES PLANNER, NNSY
JTL/TLH
1364315
N40085-22-R-2598
P O
R T
S M
O U
T H
, V
IR
G
IN
IA
N
O R
F O
LK
N
A V
A L
S H
IP
Y
A R
D
EJA
ALG
DSN
1" = 10'-0" B1
SOUTH FLOODING FLUME - DEMOLITION PLAN
1/8" = 1'-0" (1-MD115)
B3
SOUTH FLOODING FLUME - DEMOLITION SECTION
0" 10' 30'20'
PLAN
NORTH
4' 8' 16'0'
32 DEMOLISH SLUICE GATE AND ALL ACCESSORIES. EMBEDDED
COMPONENTS SUCH AS GUIDES, RAILS AND LEVELING PLATE MAY BE
ABANDONED IN PLACE.
73 DEMOLISH ACTUATOR, I-BEAMS SUPPORTS AND ALL ASSOCIATED
ACCESSORIES. OPERATORS AND FIBERGLASS GRATING MUST BE TURNED
OVER TO THE GOVERNMENT.
80 EXISTING DP-1,2 24"ø DISCHARGE PIPE; PLUG AND CAP INSIDE PUMPWELL 8.
81 EXISTING SP-1,2 6"ø DISCHARGE PIPE; PLUG AND CAP INSIDE PUMPWELL 8.
101 EXISTING 6"ø DD8 FLOOD TUNNEL DRAIN.
106 DEMOLISH GRATING WITHIN THE FLOODING FLUME AT THE TOP OF THE
VERTICAL FLOODING CULVERT.
109 DEMOLISH EXISTING UNIT HEATER.
110 DEMOLISH ALL EXISTING ELECTRICAL PANELS AND APPURTENANCES.
172 PROVIDE TEMPORARY SUCTION CULVERT PLUGS TO ALLOW FOR SUCTION
CHAMBER WORK PERFORMED WITH CAISSION OUT OF DOCK. PLUGS NEED
TO BE INSTALLED PRIOR TO CAISSON REMOVAL. COORDINATE WITH
CONTRACTING OFFICER FOR SCHEDULE. SUBMIT DRAWINGS AND
CALCULATIONS FOR PLUG CONSTRUCTION PRIOR TO START OF WORK.
X1 CLIN 0002
PLAN
NORTH
KEY PLAN
S Y
M D
E S
C R
IP
TI
O N
D A
TE
A
P P
R
IS
S U
E D
F O
R B
ID
/2 8/
SHEET NOTES
PW8-DRAINAGE PUMP
28' - 3 1/4"
SUCTION CHAMBER
32' - 3 1/4"
PW8-MAIN PUMP
46' - 0"
PW8-INTERMEDIATE
68' - 0"
PW8-MOTOR
83' - 0"
(E )D
P -1
M O
T O
R
(E )D
P -2
M O
T O
R
(E )D
P -3
(E)DP-1 (E)DP-2
1 1
(E)SP-1
(E) PW8-ACT-10
"ø
24"ø 24"ø
"ø
"ø
D P
"ø
(E
P W
-V
-5
(E) PW8-V-54
(E) PW8-V-26
(E) PW8-V-25
(E) PW8-V-27
(E) PW8-V-28
(E )D
U C
T W
O R
K
(E)SP-2
(E) PW8-V-59
16"ø
24"ø
CHAMBER CEILING
40' - 3 1/4"
PW8-DRAINAGE PUMP
28' - 3 1/4"
SUCTION CHAMBER
32' - 3 1/4"
PW8-MAIN PUMP
46' - 0"
PW8-INTERMEDIATE
68' - 0"
PW8-MOTOR
83' - 0"
(E)MDP-1 MOTOR
(E)MDP-1
12"ø V
CHAMBER CEILING
40' - 3 1/4"
(E
P W
-V
-3
(E
P W
-V
-3
EXISTING
DUCTWORK
EXISTING
DUCTWORK
SHEET KEYNOTES#
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L
F A
C
IL
IT
IE
S E
N G
IN
E
E R
S
T E
M S
C O
M M
A N
D
DRAWFORM REVISION: 25 AUGUST 2020
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
Y S
T E
M S
C O
M M
A N
D
M
ID
-A T
LA
N
TI
C
N A
V A
L S
T A
T
IO
N
N O
R F
O L
K V
A
AS NOTED
F
IL
E N
A M
E
P
LO
T T
E D
C
R e v it P ro je c ts
\D R
Y D
P -1
-M
-D R
Y D tj g o d fr e y .r v t
/2
/2
:3 :3
P
M
1-MD301
P D
R Y
D O
C K
S
A L T
W A
T E
R S
Y S
T E
M
F O
R C
V N
-7
P U
M P
W E
LL
D
E M
O
LI
T
IO
N S
E C
TI
O
N
D R
A
IN
A G
E P
U M
P
CWS
12857666
TJG TJG
02/02/2022
DEVIN POULIN,
C984 FACILITIES PLANNER, NNSY
JTL/TLH
1364315
N40085-22-R-2598
P O
R T
S M
O U
T H
, V
IR
G
IN
IA
N
O R
F O
LK
N
A V
A L
S H
IP
Y
A R
D
EJA
ALG
DSN
2' 4' 8'0'1/4" = 1'-0" (1-MD103)
C3
DEMOLITION - SECTION
1/4" = 1'-0" (1-MD103)
A1
DEMOLITION -SECTION
2' 4' 8'0'
1 DEMOLISH PUMP IN ITS ENTIRETY; DEMOLISH, PUMP, DRIVE MOTOR,
LINESHAFT, SUPPORTS AND ALL ACCESSORIES. ALL PUMP AND MOTOR
ACCESSORIES MUST BE TURNED OVER TO THE GOVERNMENT.
6 DEMOLISH EXISTING MDP-1 AND ALL ASSOCIATED ACCESSORIES.
7 EXISTING 12"ø SUCTION CHAMBER VENT; DEMOLISH PIPE CONNECTION TO
SUCTION CHAMBER.
11 DEMOLISH 16"ø DISCHARGE FLUME DRAIN PIPING AT CONNECTION TO 54"ø
MDP DISCHARGE PIPE ABOVE.
80 EXISTING DP-1,2 24"ø DISCHARGE PIPE; PLUG AND CAP INSIDE PUMPWELL 8.
81 EXISTING SP-1,2 6"ø DISCHARGE PIPE; PLUG AND CAP INSIDE PUMPWELL 8.
103 CUT EXISTING 8"ø CHT PIPE A MINIMUM 6" PAST FACE OF WALL; PLUG
OPENING AND SEAL WITH CONCRETE.
107 DEMOLISH EXISTING DUCTWORK TO ALLOW FOR ACCESS TO VALVES AND
PIPING WITHIN THE DRAINAGE PIT.
122 DEMOLISH FLUSH WATER LINE TO MDP-1; CAP PIPE AT NORTH WALL
ADJACENT TO TAKE-OFF SERVING EXISTING MDP-2.
124 FIELD INSPECT CONDITION OF EXISTING PIPING TO REMAIN FOR
DETERIORATION. INSPECTION SHALL CONSIST OF FULL INTERNAL VIDEO
SCANNING OF PIPING TO REMAIN. REPORT ISSUE TO CONTRACTING
OFFICER. IF PIPE CONDITION IS DETERMINED TO BE POOR REPLACE.
KEY PLAN
MOTOR
83'-0"
INTERMED.
68'-0"
MAIN PUMP
46'-0"
DRAINAGE
28'-3 1/4"
COPING
103'-0"
SUC. CHAM.
32'-3"
S Y
M D
E S
C R
IP
TI
O N
D A
TE
A
P P
R
IS
S U
E D
F O
R B
ID
/2 8/
PW8-DRAINAGE PUMP
28' - 3 1/4"
SUCTION CHAMBER
32' - 3 1/4"
PW8-MAIN PUMP
46' - 0"
PW8-INTERMEDIATE
68' - 0"
PW8-MOTOR
83' - 0"
TOP PUMPWELL HALL
97' - 0"
CHAMBER CEILING
40' - 3 1/4"
(E)MDP-4 (E)MDP-3 (E)MDP-2
(E)MDP-4 MOTOR (E)MDP-3 MOTOR (E)MDP-2 MOTOR (E)MDP-1 MOTOR
(E)MDP-1
2 2 2 2
116 116
54"ø 54"ø 54"ø 54"ø
1. REFER TO DRAWING 1-M-001 FOR MECHANICAL LEGEND, ABBREVIATIONS
AND NOTES.
SHEET NOTES
SHEET KEYNOTES#
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L
F A
C
IL
IT
IE
S E
N G
IN
E
E R
S
T E
M S
C O
M M
A N
D
DRAWFORM REVISION: 25 AUGUST 2020
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
Y S
T E
M S
C O
M M
A N
D
M
ID
-A T
LA
N
TI
C
N A
V A
L S
T A
T
IO
N
N O
R F
O L
K V
A
AS NOTED
F
IL
E N
A M
E
P
LO
T T
E D
C
R e v it P ro je c ts
\D R
Y D
P -1
-M
-D R
Y D tj g o d fr e y .r v t
/2
/2
:3 :3
P
M
1-MD302
P D
R Y
D O
C K
S
A L T
W A
T E
R S
Y S
T E
M
F O
R C
V N
-7
P U
M P
W E
LL
D
E M
O
LI
T
IO
N S
E C
TI
O
N
M A
IN
D
E W
A T
E R
IN
G
P U
M P
S
CWS
12857667
TJG TJG
02/02/2022
DEVIN POULIN,
C984 FACILITIES PLANNER, NNSY
JTL/TLH
1364315
N40085-22-R-2598
P O
R T
S M
O U
T H
, V
IR
G
IN
IA
N
O R
F O
LK
N
A V
A L
S H
IP
Y
A R
D
EJA
ALG
DSN
3/16" = 1'-0" A1
PUMPWELL 8 - PUMPWELL 8 - DEMOLITION SECTION - MAIN DEWATERING PUMPS
KEY PLAN
MOTOR
83'-0"
INTERMED.
68'-0"
MAIN PUMP
46'-0"
DRAINAGE
28'-3 1/4"
COPING
103'-0"
SUC. CHAM.
32'-3"
2 UNINSTALL AND DISPOSE DRIVE MOTOR; RETAIN PUMP, LINESHAFT AND
ASSOCIATED SUPPORTS. PROVIDE 4160V MOTOR AS REPLACEMENT.
FIELD VERIFY CONDITION AND ARRANGEMENT OF EXISTING MOTOR
SUPPORT ASSEMBLY. COORDINATE REPLACEMENT MOTOR
REQUIREMENTS WITH EXISTING CONDITIONS. PROVIDE ALL
MODIFICATIONS TO EXISTING SYSTEMS NECESSARY FOR
INSTALLATION OF REPLACEMENT MOTOR.
6 DEMOLISH EXISTING MDP-1 AND ALL ASSOCIATED ACCESSORIES.
7 EXISTING 12"ø SUCTION CHAMBER VENT; DEMOLISH PIPE CONNECTION
TO SUCTION CHAMBER.
116 EQUIPMENT ACCESS HATCH; APPROX. 10'-0"x10'-0" AND 21,000 POUNDS.
S Y
M D
E S
C R
IP
TI
O N
D A
TE
A
P P
R
IS
S U
E D
F O
R B
ID
/2 8/
0' 4' 8' 12' 3/16" =1'-0"
SHEET NOTES
C3
1-MD301
(E)DP-1
(E)DP-2
(E)DP-3
(E)SP-1
(E)SP-2
24"ø SWR
24"ø
16"ø
SUCTION CULVERT
SUCTION CHAMBER
16"ø
"ø
"ø
(E) PW8-V-59
(E) PW8-V-53
(E) PW8-V-7
(E) PW8-V-9
(E) PW8-V-8
(E) PW8-V-28
(E
P W
-V
-5
(E) PW8-V-10
108108
(E
P W
-V
-2
(E
P W
-V
-5
24"ø
SHEET KEYNOTES#
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L
F A
C
IL
IT
IE
S E
N G
IN
E
E R
S
T E
M S
C O
M M
A N
D
DRAWFORM REVISION: 25 AUGUST 2020
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
Y S
T E
M S
C O
M M
A N
D
M
ID
-A T
LA
N
TI
C
N A
V A
L S
T A
T
IO
N
N O
R F
O L
K V
A
AS NOTED
F
IL
E N
A M
E
P
LO
T T
E D
C
R e v it P ro je c ts
\D R
Y D
P -1
-M
-D R
Y D tj g o d fr e y .r v t
/2
/2
:3 :4
P
M
1-MD401
P D
R Y
D O
C K
S
A L T
W A
T E
R S
Y S
T E
M
F O
R C
V N
-7
P U
M P
W E
LL
D
E M
O
LI
TI
O
N E
N
LA
R G
E D
P
LA
N
D R
A
IN
A G
E P
U M
P
CWS
12857668
TJG TJG
02/02/2022
DEVIN POULIN,
C984 FACILITIES PLANNER, NNSY
JTL/TLH
1364315
N40085-22-R-2598
P O
R T
S M
O U
T H
, V
IR
G
IN
IA
N
O R
F O
LK
N
A V
A L
S H
IP
Y
A R
D
EJA
ALG
DSN
PLAN
NORTH
1' 2' 4'0'1/2" = 1'-0" A1
MECHANICAL ENLARGED DEMOLITION PLAN - DRAINAGE PUMP DP-1,2, 3
9 UNINSTALL EXISTING DP-3 DRIVE MOTOR. PROVIDE 4160V REPLACEMENT
ELECTRIC MOTOR.
39 DEMOLISH EXISTING SUCTION PIPE, INTAKE SCREEN, FITTINGS, AND ALL
ACCESSORIES.
40 DEMOLISH EXISTING DP-1 & 2 IN THEIR ENTIRETY; DEMOLISH ALL
ASSOCIATED SUCTION PIPING, DISCHARGE PIPING, VALVES, CONTROLS,
AND SUPPORTS. PUMPS AND ALL ASSOCIATED VALVES & ACCESSORIES
MUST BE TURNED OVER TO THE GOVERNMENT.
42 EXISTING DP-3 PUMP, SUCTION PIPING AND SUCTION ISOLATION VALVE TO
REMAIN.
46 16"ø DISCHARGE FLUME DRAIN LINE; CAP EXISTING PIPE AT ELBOW.
84 PROTECT EXISTING DP-3 INTAKE SCREEN; COVER OPENINGS TO PREVENT
ENTRY OF CONSTRUCTION DEBRIS.
86 DEMOLISH AIR BUBBLER TUBE, ASSOCIATED SUPPORTS, AND
ACCESSORIES.
103 CUT EXISTING 8"ø CHT PIPE A MINIMUM 6" PAST FACE OF WALL; PLUG
OPENING AND SEAL WITH CONCRETE.
108 DEMOLISH EXISTING SP-1 & 2; DEMOLISH ALL ASSOCIATED PIPING, VALVES,
CONTROLS, AND SUPPORTS. PUMPS AND ALL ASSOCIATED VALVES &
ACCESSORIES MUST BE TURNED OVER TO THE GOVERNMENT.
159 DEMOLISH EXISTING VALVE ACTUATOR EXTENSION SHAFTS.
160 DEMOLISH SUMP PIT AIR BUBBLER SUPPLY LINE TO CONTROL CONSOLE.
KEY PLAN
MOTOR
83'-0"
INTERMED.
68'-0"
MAIN PUMP
46'-0"
DRAINAGE
28'-3 1/4"
COPING
103'-0"
SUC. CHAM.
32'-3"
S Y
M D
E S
C R
IP
TI
O N
D A
TE
A
P P
R
IS
S U
E D
F O
R B
ID
/2 8/
EXISTING BOLLARDS
PW8-DSS-CU-01
PW8-FOT-1
GENERATOR
ENCLOSURE
RL/RS
PUMPWELL
ACCESS HATCH ACCESS HATCH
F U
E L
F
IL
L P
O R
T C
O N
T R
O L
P A
N E
L/ A
N N
U N
C
IA
T O
R
2"ø FOS
2"ø FOR
P W
-F
P U
-1
125125
ELECTRICAL
EQUIPMENT
SHEET KEYNOTES#SHEET NOTES
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L
F A
C
IL
IT
IE
S E
N G
IN
E
E R
S
T E
M S
C O
M M
A N
D
DRAWFORM REVISION: 25 AUGUST 2020
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
Y S
T E
M S
C O
M M
A N
D
M
ID
-A T
LA
N
TI
C
N A
V A
L S
T A
T
IO
N
N O
R F
O L
K V
A
AS NOTED
F
IL
E N
A M
E
P
LO
T T
E D
C
R e v it P ro je c ts
\D R
Y D
P -1
-M
-D R
Y D tj g o d fr e y .r v t
/2
/2
:3 :4
P
M
1-MP101
P D
R Y
D O
C K
S
A L T
W A
T E
R S
Y S
T E
M
F O
R C
V N
-7
P U
M P
W E
LL
M
E C
H A
N
IC
A L
P
LA
N
G R
A D
E L
E V
E L
CWS
12857669
TJG TJG
02/02/2022
DEVIN POULIN,
C984 FACILITIES PLANNER, NNSY
JTL/TLH
1364315
N40085-22-R-2598
P O
R T
S M
O U
T H
, V
IR
G
IN
IA
N
O R
F O
LK
N
A V
A L
S H
IP
Y
A R
D
EJA
ALG
DSN
1" = 10'-0" B1
MECHANICAL PLAN - GRADE LEVEL
0" 10' 30'20'
PLAN
NORTH
KEY PLAN
MOTOR
83'-0"
INTERMED.
68'-0"
MAIN PUMP
46'-0"
DRAINAGE
28'-3 1/4"
COPING
103'-0"
SUC. CHAM.
32'-3"
177 EXISTING PW AIR HANDLER REMOTE CONDENSING UNIT. PROVIDE
TEMPORARY REMOVAL TO ALLOW FOR CIVIL WORK TO OCCUR IN
AREA. STORE UNIT IN A PROTECTED AREA AND SEAL ALL PIPING AND
ELECTRICAL CONNECTIONS FOR DURATION OF STORAGE PERIOD. AT
COMPLETION OF CIVIL WORK REINSTALL UNIT IN ORIGINAL LOCATION,
AND CHARGE UNIT IN ACCORDANCE WITH MANUFACTURER'S
REQUIREMENTS.
12 RS/RL LINES ROUTE TIGHT TO CEILING; SIZE PER MANUFACTURER'S
REQUIREMENTS. DO NOT ROUTE REFRIGERANT LINES OVERHEAD OF
ELECTRICAL EQUIPMENT.
125 COORDINATE FUEL OIL SYSTEM WITH GENERATOR MANUFACTURER'S
REQUIREMENTS. PROVIDE ALL FOS/FOR PIPING, SUPPORTS AND
APPURENTANCES NEEDED FOR A COMPLETE AND FUNCTIONAL
SYSTEM. PROVIDE CONTROL CONNECTIONS BETWEEN GENERATOR
DAYTANK CONTROLLER AND TRANSFER PUMP CONTROLLER.
126 REFER TO ELECTRICAL FOR ADDITIONAL INFORMATION.
161 ROUTE FUEL PIPING ABOVE GRADE; REFER TO DETAIL A1/1-M-501.
162 REFER TO STRUCTURAL DRAWING 1-SS502 FOR FUEL TANK
FOUNDATION DETAILS.
163 PROVIDE EQUIPMENT STAND TO SUPPORT CONDENSING UNIT; STAND
TO ELEVATE UNIT ABOVE FLOOD ELEVATION 107'.
1. REFER TO DRAWING 1-M-001 FOR MECHANICAL LEGEND, ABBREVIATIONS AND
NOTES.
2. INSTALL FUEL FILL PORT, FUEL POLISHING UNIT, AND CONTROL
PANEL/ANNUNCIATOR ABOVE FLOOD ELEVATION 107'.
3. REFER TO DRAWING 1-M-601 FOR MECHANICAL EQUIPMENT SCHEDULES.
S Y
M D
E S
C R
IP
TI
O N
D A
TE
A
P P
R
IS
S U
E D
F O
R B
ID
/2 8/
1-MP301
A1
1-MP302
A3
1-MP301
A3
1-MP302
PW8-MDP-2 MOTOR PW8-MDP-3 MOTOR PW8-MDP-4 MOTOR
24"ø DP
CONTROL CONSOLE
LEVEL MONITORING
BUBBLE PANEL
P W
-V
-5
PW8-V-29
PW8-AC-1
(E) AHU
T
(E) DUCTWORK
PW8-V-43
P W
-A
C T
-5
PW8-ACT-29
3/4"ø CD
H
PW8-DSS-01
A1
1-MP304
164164164
RL/RS
(E)DUCTWORK
(E)DUCTWORK
"ø
S P
"ø
D P
"ø
D P
24"ø
6"ø
12"ø V
/4
"ø C
A
/4
"ø C
A
118 118
166166
8"ø SP
X1
SHEET KEYNOTES#
SHEET NOTES
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L
F A
C
IL
IT
IE
S E
N G
IN
E
E R
S
T E
M S
C O
M M
A N
D
DRAWFORM REVISION: 25 AUGUST 2020
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
Y S
T E
M S
C O
M M
A N
D
M
ID
-A T
LA
N
TI
C
N A
V A
L S
T A
T
IO
N
N O
R F
O L
K V
A
AS NOTED
F
IL
E N
A M
E
P
LO
T T
E D
C
R e v it P ro je c ts
\D R
Y D
P -1
-M
-D R
Y D tj g o d fr e y .r v t
/2
/2
:3 :4
P
M
1-MP102
P D
R Y
D O
C K
S
A L T
W A
T E
R S
Y S
T E
M
F O
R C
V N
-7
P U
M P
W E
LL
M
E C
H A
N
IC
A L
P
LA
N
M O
T O
R
CWS
12857670
TJG WBT
02/02/2022
DEVIN POULIN,
C984 FACILITIES PLANNER, NNSY
JTL/TLH
1364315
N40085-22-R-2598
P O
R T
S M
O U
T H
, V
IR
G
IN
IA
N
O R
F O
LK
N
A V
A L
S H
IP
Y
A R
D
EJA
ALG
DSN
PLAN
NORTH
0' 4' 8' 12'3/16" = 1'-0" C1
MECHANICAL PLAN - MOTOR LEVEL
5 EXISTING 12"ø SUCTION CHAMBER VENT.
12 RS/RL LINES ROUTE TIGHT TO CEILING; SIZE PER MANUFACTURER'S
REQUIREMENTS. DO NOT ROUTE REFRIGERANT LINES OVERHEAD OF
ELECTRICAL EQUIPMENT.
13 PIPE ROUTED THROUGH EXISTING WALL. PROVIDE WALL OPENING.
REFER TO A4/M-503 FOR PIPE -PENETRATING THROUGH EXISTING
CONCRETE
14 PW8-DP-1,2,3 AND SP-1,2,3,4 DISCHARGE PIPES ROUTE TO FLOODING
FLUME BELOW GRADE: 24" PIPE EXIT PW AT PIPE CENTERLINE EL 91'; 8"
PIPE EXIT AT PIPE CENTERLINE EL 94'; REFER TO CIVIL DRAWING
1-CU114.
15 CONNECT TO EXISTING LINESHAFT; COORDINATE MOTOR FOUNDATION
WITH EXISTING CONDITIONS AND PROVIDE ALL MODIFICATIONS OR
ADDITIONAL STRUCTURAL SUPPORTS AS NECESSARY.
37 EXISTING SITE COMPRESSED AIR SUPPLY.
112 3/4"ø CONDENSATE DRAIN CONNECT TO EXISTING AHU DRAIN LINE. DO
NOT ROUTE CONDENSATE LINE OVERHEAD OF ELECTRICAL EQUIPMENT.
118 APPROX. LOCATION OF EQUIPMENT ACCESS OPENING ABOVE.
128 REUSE EXISTING WALL PENETRATION PIPE SPOOL.
154 RS/RL LINES, PWR, AND CONTROL WIRES. ROUTE THROUGH WALL TO
OUTDOOR UNIT. PROVIDE CORE-DRILLED PENETRATION AND SEAL
WATER-TIGHT. REFER TO DEATIL A2/1-M-501.
164 1/4"ø COMPRESSED AIR LINE DOWN TO AIR BUBBLERS IN SUCTION
CHAMBER, SUMP PIT 1 AND SUMP PIT 2.
165 EXISTING RS/RL LINES FOR EXISTING PW AIR HANDLING UNIT TO
REMAIN. EXISTING CONDENSING UNIT FOR PW AIR HANDLER TO REMAIN.
166 MODIFY RS/RL PIPING IN AREA OF PIPE PENETRATIONS; PROVIDE NEW
COPPER PIPING, INSULATION AND FITTINGS. SIZE PIPING TO MATCH
EXISTING.
X1 CLIN 0002
KEY PLAN
MOTOR
83'-0"
INTERMED.
68'-0"
MAIN PUMP
46'-0"
DRAINAGE
28'-3 1/4"
COPING
103'-0"
SUC. CHAM.
32'-3"
1. REFER TO DRAWING 1-M-001 FOR MECHANICAL LEGEND, ABBREVIATIONS AND
NOTES.
2. REFER TO DRAWING 1-M-601 FOR MECHANICAL EQUIPMENT SCHEDULES.
S Y
M D
E S
C R
IP
TI
O N
D A
TE
A
P P
R
IS
S U
E D
F O
R B
ID
/2 8/
A1
1-MP302
A3
1-MP301
A3
1-MP302
PW8-ACT-10
PW8-ACT-8
PW8-ACT-9
(E) DUCTWORK(E) DUCTWORK
6"ø SP
6"ø SP 24"ø DP
24"ø DP
A1
1-MP304
127127127
8"⌀ SP UP
PW8-V-68
PW8-V-42
6"ø SP
"ø
S P
X1
X2
SHEET KEYNOTES#
1. REFER TO DRAWING 1-M-001 FOR MECHANICAL LEGEND, ABBREVIATIONS
AND NOTES.
2. REFER TO DRAWING 1-M-601 FOR MECHANICAL EQUIPMENT SCHEDULES.
SHEET NOTES
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L
F A
C
IL
IT
IE
S E
N G
IN
E
E R
S
T E
M S
C O
M M
A N
D
DRAWFORM REVISION: 25 AUGUST 2020
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
Y S
T E
M S
C O
M M
A N
D
M
ID
-A T
LA
N
TI
C
N A
V A
L S
T A
T
IO
N
N O
R F
O L
K V
A
AS NOTED
F
IL
E N
A M
E
P
LO
T T
E D
C
R e v it P ro je c ts
\D R
Y D
P -1
-M
-D R
Y D tj g o d fr e y .r v t
/2
/2
:3 :5
P
M
1-MP103
P D
R Y
D O
C K
S
A L T
W A
T E
R S
Y S
T E
M
F O
R C
V N
-7
P U
M P
W E
LL
M
E C
H A
N
IC
A L
P
LA
N
IN
TE
R M
E D
IA
TE
CWS
12857671
TJG WBT
02/02/2022
DEVIN POULIN,
C984 FACILITIES PLANNER, NNSY
JTL/TLH
1364315
N40085-22-R-2598
P O
R T
S M
O U
T H
, V
IR
G
IN
IA
N
O R
F O
LK
N
A V
A L
S H
IP
Y
A R
D
EJA
ALG
DSN
PLAN
NORTH
0' 4' 8' 12'3/16" = 1'-0" C1
MECHANICAL PLAN - INTERMEDIATE LEVEL
5 EXISTING 12"ø SUCTION CHAMBER VENT.
113 FLOOR SUPPORT ACTUATOR. SEE DETAIL C1/1-M-504.
COORDINATE LOCATION WITH EXISTING FLOOR OPENING.
PROVIDE EXTENDED ACTUATOR SHAFT WITH UNIVERSAL
JOINTS AND SUPPORTS AS NECCESSARY.
127 1/4"ø AIR BUBBLER COMPRESSED AIR LINES DOWN FROM
LEVEL CONTROLLER.
X1 CLIN 0002
X2 CLIN 0004
KEY PLAN
MOTOR
83'-0"
INTERMED.
68'-0"
MAIN PUMP
46'-0"
DRAINAGE
28'-3 1/4"
COPING
103'-0"
SUC. CHAM.
32'-3"
S Y
M D
E S
C R
IP
TI
O N
D A
TE
A
P P
R
IS
S U
E D
F O
R B
ID
/2 8/
A1
1-MP302
A3
1-MP301
A3
1-MP302
(E)MDP-2 (E)MDP-3 (E)MDP-4
PW8-ACT-61
PW8-V-11
(E) DUCTWORK
88 PW8-V-58
PW8-V-59
A1
1-MP304
1/4"ø CA
1/4"ø CA
1/4"ø CA127
PW8-ACT-62
130 130 130
6"ø SP
12"ø V
12"ø V
"ø
D P
"ø
S P
"ø
D P
"ø
D P
X1
X2
SHEET KEYNOTES#
1. REFER TO DRAWING 1-M-001 FOR MECHANICAL LEGEND, ABBREVIATIONS
AND NOTES.
2. REFER TO DRAWING 1-M-601 FOR MECHANICAL EQUIPMENT SCHEDULES.
SHEET NOTES
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L
F A
C
IL
IT
IE
S E
N G
IN
E
E R
S
T E
M S
C O
M M
A N
D
DRAWFORM REVISION: 25 AUGUST 2020
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
Y S
T E
M S
C O
M M
A N
D
M
ID
-A T
LA
N
TI
C
N A
V A
L S
T A
T
IO
N
N O
R F
O L
K V
A
AS NOTED
F
IL
E N
A M
E
P
LO
T T
E D
C
R e v it P ro je c ts
\D R
Y D
P -1
-M
-D R
Y D tj g o d fr e y .r v t
/2
/2
:3 :5
P
M
1-MP104
P D
R Y
D O
C K
S
A L T
W A
T E
R S
Y S
T E
M
F O
R C
V N
-7
P U
M P
W E
LL
M
E C
H A
N
IC
A L
P
LA
N
M A
IN
P
U M
P
CWS
12857672
TJG WBT
02/02/2022
DEVIN POULIN,
C984 FACILITIES PLANNER, NNSY
JTL/TLH
1364315
N40085-22-R-2598
P O
R T
S M
O U
T H
, V
IR
G
IN
IA
N
O R
F O
LK
N
A V
A L
S H
IP
Y
A R
D
EJA
ALG
DSN
PLAN
NORTH
0' 4' 8' 12'3/16" = 1'-0" C1
MECHANICAL PLAN - MAIN PUMP LEVEL
17 HIGH-WATER ALARM. CORE-DRILL THROUGH EXISTING REINFORCED
CONCRETE PLUG; PROVIDE WATER-TIGHT PIPE THIMBLE. REFER TO
DETAIL A3/1-M-504.
18 SUCTION CHAMBER VENT. CORE-DRILL THROUGH EXISTING
REINFORCED CONCRETE PLUG; PROVIDE WATER-TIGHT PIPE THIMBLE .
REFER TO DETAIL A3/1-M-504.
30 PROVIDE 54"ø THREADED REDUCING FLANGE TAPPED FOR 16"
THREADED CONNECTION; REFER TO DETAIL C4/1-M-503. LINE TO
PROVIDE DRAINAGE FUNCTION FOR DISCHARGE FLUME.
46 16"ø DISCHARGE FLUME DRAIN LINE; CAP EXISTING PIPE AT ELBOW.
87 CAP EXISTING DUCT; INSTALL 12X10 SUPPLY GRILLE LONG THROW,
4-WAY ADJUSTABLE WITH MANUAL BALANCING DAMPER. BALANCE
AIRFLOW TO 500 CFM.
88 PW8-SP-3,4 DISCHARGE PIPE; ROUTE UP TO INTERMEDIATE LEVEL AND
ACROSS PUMPWELL 8; CONNECTED TO PW8-SP-1,2 DISCHARGE PIPE.
89 AIR BUBBLER TUBE FOR LEVEL SENSOR LE-4.
127 1/4"ø AIR BUBBLER COMPRESSED AIR LINES DOWN FROM LEVEL
CONTROLLER.
130 PROVIDE FLOW SWITCH IN FLUSHING WATER SUPPLY LINE; INSTALL
SWITCH DOWNSTREAM OF EXISTING MANUAL ISOLATION VALVE.
132 VALVE EXTENSION UP TO ACTUATOR AT INTERMEDIATE FLOOR.
155 AIR BUBBLER TUBE FOR LEVEL SENSOR LE-1.
X1 CLIN 0002
X2 CLIN 0004
KEY PLAN
MOTOR
83'-0"
INTERMED.
68'-0"
MAIN PUMP
46'-0"
DRAINAGE
28'-3 1/4"
COPING
103'-0"
SUC. CHAM.
32'-3"
S Y
M D
E S
C R
IP
TI
O N
D A
TE
A
P P
R
IS
S U
E D
F O
R B
ID
/2 8/
1-MP301A1
1-MP302
A3
1-MP301
A3
1-MP302
24"ø
30"ø
30"ø
PW8-DP-2
PW8-DP-1
PW8-SP-1 PW8-SP-2
(E)DP-3
PW8-DP-3 MOTOR
6"ø SP
PW8-V-63
PW8-V-9
PW8-V-8
PW8-V-10
(E) PW8-V-53
PW8-ACT-63
1-MP402
A1
1-MP401
A1
PW8-DP-4
PW8-DP-5
PW8-V-61
PW8-V-62
PW8-V-70
PW8-V-69
PW8-V-71
PW8-V-72
A1
1-MP304
30"ø
30"ø
"ø
SUCTION CHAMBER
PW8-V-73
PW8-V-26
PW8-V-55
"ø
D P
PW8-V-74
X1
X2
SHEET KEYNOTES#
1. REFER TO DRAWING 1-M-001 FOR MECHANICAL LEGEND, ABBREVIATIONS
AND NOTES.
2. REFER TO DRAWING 1-M-601 FOR MECHANICAL EQUIPMENT SCHEDULES.
SHEET NOTES
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L
F A
C
IL
IT
IE
S E
N G
IN
E
E R
S
T E
M S
C O
M M
A N
D
DRAWFORM REVISION: 25 AUGUST 2020
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
Y S
T E
M S
C O
M M
A N
D
M
ID
-A T
LA
N
TI
C
N A
V A
L S
T A
T
IO
N
N O
R F
O L
K V
A
AS NOTED
F
IL
E N
A M
E
P
LO
T T
E D
C
R e v it P ro je c ts
\D R
Y D
P -1
-M
-D R
Y D tj g o d fr e y .r v t
/2
/2
:3 :0
P
M
1-MP105
P D
R Y
D O
C K
S
A L T
W A
T E
R S
Y S
T E
M
F O
R C
V N
-7
P U
M P
W E
LL
M
E C
H A
N
IC
A L
P
LA
N
D R
A
IN
A G
E P
U M
P
CWS
12857673
TJG WBT
02/02/2022
DEVIN POULIN,
C984 FACILITIES PLANNER, NNSY
JTL/TLH
1364315
N40085-22-R-2598
P O
R T
S M
O U
T H
, V
IR
G
IN
IA
N
O R
F O
LK
N
A V
A L
S H
IP
Y
A R
D
EJA
ALG
DSN
PLAN
NORTH
2' 4' 8'0'3/16" = 1'-0" C1
MECHANICAL PLAN - DRAINAGE PUMP LEVEL
X1 CLIN 0002
X2 CLIN 0004
KEY PLAN
MOTOR
83'-0"
INTERMED.
68'-0"
MAIN PUMP
46'-0"
DRAINAGE
28'-3 1/4"
COPING
103'-0"
SUC. CHAM.
32'-3"
S Y
M D
E S
C R
IP
TI
O N
D A
TE
A
P P
R
IS
S U
E D
F O
R B
ID
/2 8/
SHEET NOTES
C1
1-MP115
A3
1-MP303
A2
1-MP303
36"ø DP
DD8 PUMPWELL 8 24"ø DP 14
A1
1-MP303
B4
1-MP303
76 76
S U
C T
IO
N
C U
LV
E
R T
S U
C T
IO
N
C U
LV
E
R T
S U
C T
IO
N
C U
LV
E
R T
83101
24"ø DP
16"⌀ CROSS CONNECTION; COORDINATE
LOCATION OF CROSS CONNECTION WITH
LADDER
"ø
S W
R
"ø
D P
8"ø SP36"ø DP
(H D
P E
(HDPE)
36"ø DP
30"ø SWR
(HDPE)
(HDPE) BELOW
8"ø SP
36"ø DP
(HDPE)
(HDPE)
X1
X1
SUCTION CHAMBER
32' - 3 1/4"
DRY DOCK FLOOR
47' - 9 1/4"
"ø
S W
R
30"ø SWR
8"ø SP
A2
1-MP303
A1
1-MP303
B4
1-MP303
77 75 75 75
"ø
D P
36"ø DP
DD8-FG-1
DD8-FG-2
DD8-FG-3
DD8-FG-4
36"ø DP
30"ø SWR
36"ø DP
36"ø DP
8"ø SP
137(TYP.4)
(H D
P E
(H D
P E
(HDPE)
(HDPE)
36"ø DP
8"ø SP
(HDPE)
(HDPE)
SHEET KEYNOTES#
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L
F A
C
IL
IT
IE
S E
N G
IN
E
E R
S
T E
M S
C O
M M
A N
D
DRAWFORM REVISION: 25 AUGUST 2020
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
Y S
T E
M S
C O
M M
A N
D
M
ID
-A T
LA
N
TI
C
N A
V A
L S
T A
T
IO
N
N O
R F
O L
K V
A
AS NOTED
F
IL
E N
A M
E
P
LO
T T
E D
C
R e v it P ro je c ts
\D R
Y D
P -1
-M
-D R
Y D tj g o d fr e y .r v t
/2
/2
:5 :3
P
M
1-MP115
P D
R Y
D O
C K
S
A L T
W A
T E
R S
Y S
T E
M
F O
R C
V N
-7
S O
U
TH
F
LO
O D
IN
G
F
LU
M E
M
E C
H A
N
IC
A L
P
LA
N
CWS
12857674
TJG WBT
02/02/2022
DEVIN POULIN,
C984 FACILITIES PLANNER, NNSY
JTL/TLH
1364315
N40085-22-R-2598
P O
R T
S M
O U
T H
, V
IR
G
IN
IA
N
O R
F O
LK
N
A V
A L
S H
IP
Y
A R
D
EJA
ALG
DSN
0" 10' 30'20'
1" = 10'-0" A1
SOUTH FLOODING FLUME - MECHANICAL PLAN
1" = 10'-0" C1
SOUTH FLOODING FLUME - MECHANICAL SECTION
14 PW8-DP-1,2,3 AND SP-1,2,3,4 DISCHARGE PIPES ROUTE TO FLOODING
FLUME BELOW GRADE: 24" PIPE EXIT PW AT PIPE CENTERLINE EL 91'; 8"
PIPE EXIT AT PIPE CENTERLINE EL 94'; REFER TO CIVIL DRAWING
1-CU114.
20 PW8-DP-1,2,3 DISCHARGE PIPE FROM PUMPWELL 8; REFER TO CIVIL.
21 30"ø SW RETURN PIPE FOR CONNECTION IN PHASE 2. PROVIDE
TEMPORARY BLANK-FLANGE.
43 PW8-SP-1/2 & 3/4 DISCHARGE PIPE FROM PUMPWELL 8; REFER TO CIVIL.
75 PLUG EXISTING VERTICAL FLOODING FLUME CULVERT.
76 POST INSTALLATION OF PIPING FILL FLOODING FLUME WITH FLOWABLE
FILL; REFER TO STRUCTURAL DRAWINGS FOR FILL DETAILS.
77 FILL MDP-1 SUCTION CULVERT WITH FLOWABLE FILL; REFER TO
STRUCTURAL DRAWINGS FOR FILL DETAILS.
83 PLUG AND CAP PIPING AT WALL PENETRATION; PIPING CAST INTO WALL
ABANDONED IN PLACE. FILL IN EXISTING ALCOVE FLUSH WITH DOCK
WALL.
101 EXISTING 6"ø DD8 FLOOD TUNNEL DRAIN.
137 CAST IN PLACE DUCTILE IRON PIPE SPOOL; SEE DETAIL C1/1-M-503.
X1 CLIN 0002
PLAN
NORTH
KEY PLAN
0" 10' 30'20'
PLAN
NORTH
S Y
M D
E S
C R
IP
T
IO
N
D A
T E
A P
P R
IS
S U
E D
F O
R B
ID
/2 8/
SHEET NOTES
PW8-DRAINAGE PUMP
28' - 3 1/4"
SUCTION CHAMBER
32' - 3 1/4"
PW8-MAIN PUMP
46' - 0"
PW8-INTERMEDIATE
68' - 0"
PW8-MOTOR
83' - 0"
(E)DP-3
PW8-DP-2PW8-DP-1
PW8-V-29
PW8-V-56
PW8-ACT-10
PW8-V-26
PW8-V-10
PW8-V-55
PW8-SP-1
PW8-V-25
PW8-V-54
"ø
"ø
D P
"ø
S P
"ø
D P
"ø
D P
20"ø DP
PW8-V-28
PW8-V-27
P W
-V
-4
"ø
D P
"ø
D P
"ø
D P
PW8-V-17
PW8-V-19
A1
1-MP304
134 134
134 134
13 128
PW8-V-73
PW8-V-42
8"ø SP
"ø
S P
6"ø SP
PW8-V-68
"ø
S P
"ø
S P
166165
24"ø
6"ø
135 (TYP.3)
PW8-V-74
24"ø DP
"ø
D P
20"ø DP
PW8-DRAINAGE PUMP
28' - 3 1/4"
SUCTION CHAMBER
32' - 3 1/4"
PW8-MAIN PUMP
46' - 0"
PW8-INTERMEDIATE
68' - 0"
PW8-MOTOR
83' - 0"
PW8-V-56
(E) AHU
(E
D U
C T
W O
R K
(E
D U
C T
W O
R K
6"ø SP
PW8-V-28
PW8-V-27
P W
-D
P -2
PW8-V-9
30"ø
PW8-ACT-9
20"ø DP
"ø
D P
24"ø DP
6"ø SP
"ø
S P
"ø
S P
PW8-V-68
P W
-V
-4
12x12 SA
24"ø DP
SHEET KEYNOTES#
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L
F A
C
IL
IT
IE
S E
N G
IN
E
E R
S
T E
M S
C O
M M
A N
D
DRAWFORM REVISION: 25 AUGUST 2020
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
Y S
T E
M S
C O
M M
A N
D
M
ID
-A T
LA
N
TI
C
N A
V A
L S
T A
T
IO
N
N O
R F
O L
K V
A
AS NOTED
F
IL
E N
A M
E
P
LO
T T
E D
C
R e v it P ro je c ts
\D R
Y D
P -1
-M
-D R
Y D tj g o d fr e y .r v t
/2
/2
:3 :1
P
M
1-MP301
P D
R Y
D O
C K
S
A L T
W A
T E
R S
Y S
T E
M
F O
R C
V N
-7
P U
M P
W E
LL
M
E C
H A
N
IC
A L
S E
C
TI
O N
D
R A
IN
A
G E
P U
M P
P W
8- D
P -1
,2 ,3
CWS
12857675
TJG WBT
02/02/2022
DEVIN POULIN,
C984 FACILITIES PLANNER, NNSY
JTL/TLH
1364315
N40085-22-R-2598
P O
R T
S M
O U
T H
, V
IR
G
IN
IA
N
O R
F O
LK
N
A V
A L
S H
IP
Y
A R
D
EJA
ALG
DSN
2' 4' 8'0'1/4" = 1'-0" (1-MP102)
A1
PUMPWELL 8 - MECHANICAL SECTION - DRAINAGE PUMPS PW8-DP-1,2, 3
1/4" = 1'-0" (1-MP102)
A3
PUMPWELL 8 - MECHANICAL SECTION - PW8-DP-2
2' 4' 8'0'
13 PIPE ROUTED THROUGH EXISTING WALL. PROVIDE WALL OPENING.
REFER TO A4/M-503 FOR PIPE -PENETRATING THROUGH EXISTING
CONCRETE
46 16"ø DISCHARGE FLUME DRAIN LINE; CAP EXISTING PIPE AT ELBOW.
85 AIR BUBBLER TUBE FOR LEVEL SENSOR LE-3.
87 CAP EXISTING DUCT; INSTALL 12X10 SUPPLY GRILLE LONG THROW,
4-WAY ADJUSTABLE WITH MANUAL BALANCING DAMPER. BALANCE
AIRFLOW TO 500 CFM.
113 FLOOR SUPPORT ACTUATOR. SEE DETAIL C1/1-M-504. COORDINATE
LOCATION WITH EXISTING FLOOR OPENING. PROVIDE EXTENDED
ACTUATOR SHAFT WITH UNIVERSAL JOINTS AND SUPPORTS AS
NECCESSARY.
128 REUSE EXISTING WALL PENETRATION PIPE SPOOL.
133 PIPE GUIDE. REFER TO DETAIL A3/1-M-505.
134 PIPE RISER SUPPORT; REFER TO DETAIL C4/1-M-505.
135 PIPE BASE ELBOW WITH PEDESTAL. REFER TO DETAIL A5/-M-505.
136 COORDINATE PIPE ACTUATOR LOCATION WITH EXISTING FLOOR
OPENING. PROVIDE UNIVERAL JOINTS AND SUPPORTS AS NECCESSARY.
137 CAST IN PLACE DUCTILE IRON PIPE SPOOL; SEE DETAIL C1/1-M-503.
165 EXISTING RS/RL LINES FOR EXISTING PW AIR HANDLING UNIT TO
REMAIN. EXISTING CONDENSING UNIT FOR PW AIR HANDLER TO REMAIN.
166 MODIFY RS/RL PIPING IN AREA OF PIPE PENETRATIONS; PROVIDE NEW
COPPER PIPING, INSULATION AND FITTINGS. SIZE PIPING TO MATCH
EXISTING.
167 PLUG EXISTING PIPE; CAP WITH BLANK FLANGE.
168 INTAKE SCREEN; REFER TO DETAIL C1/1-M-506.
174 PUMP PEDESTAL. REFER TO DETAIL A1/1-M-503.
175 TERMINATE ELBOW FLUSH WITH SUCTION CHAMBER FLOOR.
S Y
M D
E S
C R
IP
TI
O N
D A
TE
A
P P
R
IS
S U
E D
F O
R B
ID
/2 8/
SHEET NOTES
PW8-DRAINAGE PUMP
28' - 3 1/4"
SUCTION CHAMBER
32' - 3 1/4"
PW8-MAIN PUMP
46' - 0"
PW8-INTERMEDIATE
68' - 0"
PW8-MOTOR
83' - 0"
PW8-V-63
"ø
V
PW8-ACT-61
PW8-ACT-63
SP-3/4 DISCHARGE PIPE
6"ø SP
PW8-ACT-62
PW8-V-62
P W
-V
-6
PW8-V-67
PW8-V-65
PW8-SP-4
P W
-D
P -4
PW8-DP-5
(HDPE)
DI PIPE HDPE PIPE
36"ø DP
12"ø V
P W
-V
-7
PW8-V-69
P W
-V
-7
PW8-V-70
36"ø DP
PROVIDE OFFSET VALVE
OPERATOR SHAFT FOR
CLEARANCE
PW8-DRAINAGE PUMP
28' - 3 1/4"
SUCTION CHAMBER
32' - 3 1/4"
PW8-MAIN PUMP
46' - 0"
PW8-INTERMEDIATE
68' - 0"
PW8-MOTOR
83' - 0"
12"ø V
PW8-V-58
PW8-V-59
(E) DUCTWORK
"ø
S P
(E) DUCTWORK
SUCTION CHAMBER
VENT PIPE
6"ø SP
P W
-V
-6
P W
-D
P -5
18 17
P W
-V
-1
30"ø
P W
-A
C T
-6
"ø
S W
R
SS PIPE
FRP PIPE
12"ø V
SHEET KEYNOTES#
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L
F A
C
IL
IT
IE
S E
N G
IN
E
E R
S
T E
M S
C O
M M
A N
D
DRAWFORM REVISION: 25 AUGUST 2020
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
Y S
T E
M S
C O
M M
A N
D
M
ID
-A T
LA
N
TI
C
N A
V A
L S
T A
T
IO
N
N O
R F
O L
K V
A
AS NOTED
F
IL
E N
A M
E
P
LO
T T
E D
C
R e v it P ro je c ts
\D R
Y D
P -1
-M
-D R
Y D tj g o d fr e y .r v t
/2
/2
:3 :2
P
M
1-MP302
P D
R Y
D O
C K
S
A L T
W A
T E
R S
Y S
T E
M
F O
R C
V N
-7
P U
M P
W E
LL
M
E C
H A
N
IC
A L
S E
C T
IO
N
D
R A
IN
A
G E
P U
M P
P W
8- D
P -4
,5
CWS
12857676
TJG WBT
02/02/2022
DEVIN POULIN,
C984 FACILITIES PLANNER, NNSY
JTL/TLH
1364315
N40085-22-R-2598
P O
R T
S M
O U
T H
, V
IR
G
IN
IA
N
O R
F O
LK
N
A V
A L
S H
IP
Y
A R
D
EJA
ALG
DSN
1/4" = 1'-0" (1-MP102)
A1
PUMPWELL 8 - MECHANICAL SECTION -DRAINAGE PUMP PW8-DP-4,5
1/4" = 1'-0" (1-MP102)
A3
PUMPWELL 8 - MECHANICAL SECTION 2 - DRAINAGE PUMP PW8-DP-5
2' 4' 8'0' 2' 4' 8'0'
5 EXISTING 12"ø SUCTION CHAMBER VENT.
17 HIGH-WATER ALARM. CORE-DRILL THROUGH EXISTING
REINFORCED CONCRETE PLUG; PROVIDE WATER-TIGHT PIPE
THIMBLE. REFER TO DETAIL A3/1-M-504.
18 SUCTION CHAMBER VENT. CORE-DRILL THROUGH EXISTING
REINFORCED CONCRETE PLUG; PROVIDE WATER-TIGHT PIPE
THIMBLE . REFER TO DETAIL A3/1-M-504.
89 AIR BUBBLER TUBE FOR LEVEL SENSOR LE-4.
131 16"ø DISCHARGE FLUME DRAIN LINE FROM EXISTING MDP-1 54"ø
DISCHARGE TO DP-5 SUCTION PIPE.
135 PIPE BASE ELBOW WITH PEDESTAL. REFER TO DETAIL A5/-M-505.
137 CAST IN PLACE DUCTILE IRON PIPE SPOOL; SEE DETAIL
C1/1-M-503.
138 PIPE CONTINUES THROUGH SOUTH FLOODING FLUME TO RIVER
DISCHARGE.
168 INTAKE SCREEN; REFER TO DETAIL C1/1-M-506.
173 VENT PIPING DOWNSTREAM OF VALVE TO BE FRP. ANY PIPE
UPSTREAM OF VALVE AND BETWEEN SUCTION CHAMBER
BULKHEAD PENETRATION MUST BE DUPLEX 2205.
174 PUMP PEDESTAL. REFER TO DETAIL A1/1-M-503.
175 TERMINATE ELBOW FLUSH WITH SUCTION CHAMBER FLOOR.
S Y
M D
E S
C R
IP
TI
O N
D A
TE
A
P P
R
IS
S U
E D
F O
R B
ID
/2 8/
SUCTION CHAMBER
32' - 3 1/4"
COPING
103' - 0"
ALTAR
93' - 6"
DRY DOCK FLOOR
47' - 9 1/4"
C1
1-MP115
36"ø DP
"ø
S W
R
(H D
P E
DI PIPE HDPE PIPE
49' - 0"
COPING
103' - 0"
ALTAR
93' - 6"
DRY DOCK FLOOR
47' - 9 1/4"
C1
1-MP115
36"ø DP
8"ø SP
30"ø SWR
36"ø DP
36"ø PW8-DP-4
DISCHARGE
DI PIPEHDPE PIPE
COPING
103' - 0"
ALTAR
93' - 6"
DD8-FG-3
DD8-FG-2
DD8-FG-1
DD8-FG-4
68' - 0"
72' - 0"
76' - 6"
79' - 0"
SHEET KEYNOTES#
1. REFER TO DRAWING 1-M-001 FOR MECHANICAL LEGEND, ABBREVIATIONS
AND NOTES.
SHEET NOTES
SUCTION CHAMBER
32' - 3 1/4"
DRY DOCK FLOOR
47' - 9 1/4"
16"⌀ CORE-DRILLED CROSS
CONNECTION; MAKE OPENING AS LOW
AS POSSIBLE IN SUMP PIT (TYP. 3)
MDP-1
SUCTION
CULVERT
MDP-2
SUCTION
CULVERT
FILL BOTTOM OF MDP1 SUCTION
CULVERT WITH CONCRETE AND SLOPE
TOWARDS CROSS CONNECTIONS
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L
F A
C
IL
IT
IE
S E
N G
IN
E
E R
S
T E
M S
C O
M M
A N
D
DRAWFORM REVISION: 25 AUGUST 2020
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
Y S
T E
M S
C O
M M
A N
D
M
ID
-A T
LA
N
TI
C
N A
V A
L S
T A
T
IO
N
N O
R F
O L
K V
A
AS NOTED
F
IL
E N
A M
E
P
LO
T T
E D
C
R e v it P ro je c ts
\D R
Y D
P -1
-M
-D R
Y D tj g o d fr e y .r v t
/2
/2
:3 :2
P
M
1-MP303
P D
R Y
D O
C K
S
A L T
W A
T E
R S
Y S
T E
M
F O
R C
V N
-7
S O
U
TH
F
LO
O D
IN
G
F
LU
M E
M
E C
H A
N
IC
A L
S E
C
TI
O N
CWS
12857677
TJG TJG
02/02/2022
DEVIN POULIN,
C984 FACILITIES PLANNER, NNSY
JTL/TLH
1364315
N40085-22-R-2598
P O
R T
S M
O U
T H
, V
IR
G
IN
IA
N
O R
F O
LK
N
A V
A L
S H
IP
Y
A R
D
EJA
ALG
DSN
1/4" = 1'-0" (1-MP115)
A1
SOUTH SALTWATER RETURN - SECTION
1/4" = 1'-0" (1-MP115)
A2
SOUTH FLOODING FLUME - DP-1,2,3 DISCHARGE PIPE
1/4" = 1'-0" (1-MP115)
B4
SOUTH FLOODING FLUME - DISCHARGE/OUTFALL
20 PW8-DP-1,2,3 DISCHARGE PIPE FROM PUMPWELL 8; REFER TO CIVIL.
21 30"ø SW RETURN PIPE FOR CONNECTION IN PHASE 2. PROVIDE
TEMPORARY BLANK-FLANGE.
26 PIPING ROUTED IN EXISTING FLOODING FLUME; FILL FLUME WITH
FLOWABLE FILL AFTER INSTALLATION.
27 36"ø…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .