1364315_dwg_11of18_PH2_V3_General.pdf
PDF 6 MB Posted
- Attached to
- P-678 Dry Dock 8 Saltwater System for CVN-78, Norfolk Naval Shipyard, Portsmouth, Virginia
- Solicitation number
- N40085-22-R-2598_Drawings
About this file
This document package contains construction drawings and specifications for a federal solicitation to provide saltwater system improvements at Dry Dock 8 at Norfolk Naval Shipyard in Portsmouth, Virginia. The scope of work includes demolishing existing pump stations and constructing new Pump Station 6 and Pump Station 8, along with associated site utilities and infrastructure. Relevant details include specifications for structural, architectural, fire protection, mechanical, electrical, and civil work. The solicitation number is N40085-22-R-2598 and responses are due by the date specified on the notices. The Navy Facilities Engineering Command is the contracting agency.
View the file
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
GATE F
PIER 324
BERTH 42
BERTH 42DRYDOCK 8 BERTH 42
BERTH 42
(2)EMH
EMH
EMH
EMH
(2)EM H
EMH
(2)EM H
EMH
(2)EM H
(2)EM H
EMH
EMH
EMH
EMH
EMH
EMH
(2)EM H
EMH
A-33-1
EMH
EMH
(2)EM H
(2)EM H
NN SY S S 207
EMH
(2)EM H
EMH
(2)EM H
NO#
SUB ST AT ION
ELE CT RI C
GENER AT ORAUXI LIA R Y
EMH
EMH
EMH
EMH
EMH
EMH
EC
EMH
EMH
EMH
(2)EM H
EMH
EMH
(2)EM H
(2)EM H
EB
EB
EB
EB
EB
EB
EB
EMH
EMH
EMH
EB
EMH
EMH
SUB- STA
EMH
Z-2
EB
EB
EB
EB
EB
EB
EMH
EMH
EMH
EMH
EMH
EMH
EMH
EMH
EMH
EMH
EMH
EMH
EMH
EMH
EMH
EMH
EMH
EMH
EMH
EMH
EMH
EMH
EB
EMH
EB
EB
EB
EB
EMH
EMH
(2)EM H
EMH
EMH
EMH
EMH
EMH
EMH
EMH
EMH
EMH
EMH
EMH
EMH
EB
EB
EB
EB
EB
EB
EB
EB
EMH
EMH
EMH
EMH
EMH
EMH
EMH
EMH
EMH
EMH
EMH
EMH
EMH
EMH
EMH
T RA
N
EMH
TRA N
EMH
EMH
EMH
SUB- STAT I ON
EMH
EMH
EMH
EMH
EMH
EMH
EMH
EMH
EMH
EMH
EMH
EMH
EMH
EMH
EMH
SU B-ST AT ION
ELE CT RI C
EC
TRA NS
EMH
EMH
#1533
DIS TR IB UT ION
STA TI ON A
EMH
EMH
EMH
EMH
EMH
EMH
NNS Y
EMH
SUB ST AT ION
ELE C
SUB ST AT ION
ELE C
EB
EB
EB
EB
EB
EB
EB
EMH
EMH
EMH
EMH
EMH EMH
EMH
EMH
EMH EMH
EMH
EMH
EMH
EMH
EMH
EMH
EMH
EMH
EMH
(2)EM H
EMH
(2)EM H
EMH
EMH
EMH
(3)E LEC BOX
EMH
EMH
EMH
EMH
EMH
EMH
EC
EMH
SUB
-S
T A TI
ON
EMH
EMH
EMH
EC
SUB
-S
T A TI
ON
EC
SU B-S TA T ION #1535
DIS TR IB UT ION ST AT ION 'C '
EC
EMH
EMH
EMH
EMHEMH
EC
EMH
EMH
EMH
EMH
EMH
EMH
EMH
EMH
EMH
MB-4
SU B-ST AT ION
TRA N
EB
MB-5A MB-5
SUB -S TA TI ON S
TRA N
TRA N
EMH
(2)EMH
EMH
EMH
EMH
M-32
M-22
M-
M-
SNACK
41533
1368 1367
51547
15171518
1515A
1548 55 5 55
W
ILL
IA
MS
A V.
PENNOCK ST.
MAHONEY ST.
ST
EV
EN
S S
T.
PENNOCK ST.
ST
EV
EN
S S
T.
GRAVEL ELM AV.
MGR
MGR
BRUMBY AV.
HIT
CH
CO
CK
ST
WAL
LIN
ST
ST
EV
EN
S S
T.
SPROWLEY ST.
GR
EE
N
ST
OL
D W
ILL
IA
MS
A
V.
MCLEAN ST.
WEAVER ST.
MCCAWLEY ST.
DALE ST.
GA
TE
GATE RR-8
GATES M&N
GA
TE
'K
6' C
LF
WA
LL
BL
DG
7' CLF
7' C
LF
SUBSTATION
H6&H7
BE
RT
H
EMH
EMH
PIER 6
PIER 5
PROJECT LOCATION
SO
UT
HE
RN
BR
AN
CH
EL
IZA
BE
TH
R
IVE
R
BA
SIN
NORFOLK NAVAL
SHIPYARD
NAVAL STATION
NORFOLK
BRANCH
SOUTHERN
NANSEMOND RIVER
WESTERN
ELIZABETH RIVER
BRANCH
EASTERN BRANCH
WILLOUGHBY
BAY
CHESAPEAKE
CHESAPEAKE BAY
PORTSMOUTH
NORFOLK
VIRGINIA
BEACH
PROJECT LOCATION
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D
EP
AR
TM
EN
T
O F
TH
E
N
AV
Y N
AV
AL
F
AC
IL
IT
IE
S
EN
G
IN
EE
R
IN
G S
YS
TE
M S
C O
M M
AN
D
DRAWFORM REVISION: 25 AUGUST 2020
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
NA
VA
L
FA
CI
LI
TI
ES
E
NG
IN
EE
RI
NG
S
YS
TE
M
S
CO
M M
AN
D
M
ID
-A
TL
AN
TI
C
N
AV
AL
S
TA
TI
O N
N
O R
FO
LK
, V A
AS NOTED
FI
LE
N
AM
E:
PL
OT
TE
D:
C
:\R ev it_ Pr oj ec ts \D
R
YD
P6
-1
-G _p gr eg or y@ bu rn sm cd
.c om
.rv t
2/
/2
2:
:1
PM
2-G-030
P
D
R Y
D O
C K
S
A
LT
W A
TE
R
S Y
S
TE
M
FO
R C
V N
-7
CO
VE
R
SH
EE
T
AJM
12857781
AJM PFG
02/02/2022
DEVIN POULIN,
C984 FACILITIES PLANNER, NNSY
JTL/TLH
1364315
N40085-22-R-2598
PO
RT
SM
OU
TH
, V
IR
GI
NI
A
NO
RF
OL
K
NA
VA
L S
HI
PY
AR
D
EJA
ALG
DSN
P678 DRY DOCK 8 SALTWATER SYSTEM
FOR CVN-78
NORFOLK NAVAL SHIPYARD - PORTSMOUTH, VIRGINIA
NAVAL FACILITIES ENGINEERING SYSTEMS COMMAND MID-ATLANTIC
ACQUISTITION CORE
NORFOLK, VIRGINIA
ISSUED FOR CONSTRUCTION - 02/28/2022
PHASE 2
VOLUME 3 OF 4
NOT TO SCALE
LOCATION MAP
NOT TO SCALE
VICINITY MAP
SY
M
DE
S C
RI
PT
I O N
DA
TE
AP
PR
IS
SU
ED
F
OR
C
ON
ST
RU
C T
IO
N
/28 /20
IS
SU
ED
F
OR
B
ID
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D
EP
AR
TM
EN
T
O F
TH
E
N
AV
Y N
AV
AL
F
AC
IL
IT
IE
S
EN
G
IN
EE
R
IN
G S
YS
TE
M S
C O
M M
AN
D
DRAWFORM REVISION: 25 AUGUST 2020
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
NA
VA
L
FA
CI
LI
TI
ES
E
NG
IN
EE
RI
NG
S
YS
TE
M
S
CO
M M
AN
D
M
ID
-A
TL
AN
TI
C
N
AV
AL
S
TA
TI
O N
N
O R
FO
LK
, V A
AS NOTED
FI
LE
N
AM
E:
PL
OT
TE
D:
C
:\R ev it_ Pr oj ec ts \D
R
YD
P6
-1
-G _p gr eg or y@ bu rn sm cd
.c om
.rv t
2/
/2
1:
:2
PM
2-G-031
P
D
R Y
D O
C K
S
A
LT
W A
TE
R
S Y
S
TE
M
FO
R C
V N
-7
IN
DE
X O
F
DR
AW
IN
G S
-V O
LU
M
E
O F
AJM
12857782
AJM PFG
02/02/2022
DEVIN POULIN,
C984 FACILITIES PLANNER, NNSY
JTL/TLH
1364315
N40085-22-R-2598
PO
RT
SM
OU
TH
, V
IR
GI
NI
A
NO
RF
OL
K
NA
VA
L S
HI
PY
AR
D
EJA
ALG
DSN
INDEX OF DRAWINGS
SHEET NO. NAVFAC NO. SHEET NO. SHEET NAME
105 12857885 2-S-303 PUMP STATION 6 AND 8 SECTIONS &
DETAILS
106 12857886 2-S-415 PUMP STATION 6 AND 8 ROOF ENLARGED
PLAN
107 12857887 2-S-416 ROOF HATCH PLAN AND SECTIONS
108 12857888 2-S-430 EXTERIOR STAIR ENLARGED PLAN
109 12857889 2-S-431 EXTERIOR STAIR ENLARGED PLAN
110 12857890 2-S-503 PUMP STATION 6 AND 8 TYPICAL FRAMING
DETAILS
111 12857891 2-S-515 PUMP STATION 6 AND 8 STANDARD BASE
PLATE AND ANCHOR BOLT DETAILS
112 12857892 2-SS501 TYPICAL SITE STRUCTURAL PIPE
SUPPORT DETAILS
113 12857893 2-SS502 TYPICAL CRANE RAIL RECONSTRUCTION
DETAILS
114 12857894 2-SS504 GENERATOR AND FUEL TANK
FOUNDATION PLANS
115 12857895 2-SS505 STOP LOG FOUNDATION PLAN, SECTIONS
AND DETAILS
116 12857896 2-SB110 STRUCTURAL FOUNDATION PLAN - PUMP
STATION PS-6 - AREA 10
117 12857897 2-SB115 STRUCTURAL FOUNDATION PLAN - PUMP
STATION PS-8 - AREA 15
118 12857898 2-SB301 PUMP STATION PS-6 FOUNDATION
SECTIONS
119 12857899 2-SB302 PUMP STATION PS-6 FOUNDATION
SECTIONS
120 12857900 2-SB303 PUMP STATION PS-8 FOUNDATION
SECTIONS
121 12857901 2-SB401 PUMP STATION PS-6 ENLARGED
FOUNDATION PLAN
122 12857902 2-SB402 PUMP STATION PS-8 ENLARGED
FOUNDATION PLAN
123 12857903 2-SB403 NORTH FLOOD FLUME OUTFALL DETAILS
124 12857904 2-SB501 PILE AND PUMP STATION FOUNDATION
DETAILS
125 12857905 2-SB502 PUMP STATION PS-6 INTAKE STRUCTURES
REINFOCING DETAILS
126 12857906 2-SB503 PUMP STATION PS-8 FOUNDATION SLAB
REINORCING DETAILS
127 12857907 2-SB504 PUMP STATION PS-8 INTAKE STRUCTURES
REINFOCING DETAILS
128 12857908 2-SB505 MISCELLANEOUS REINFORCING DETAILS
129 12857909 2-SB506 PS-6 FENDER DETAILS
130 12857910 2-SB507 INTAKE GRATING AND STIFFENED PLATE
DETAILS - 1 of 2
131 12857911 2-SB508 INTAKE GRATING AND STIFFENED PLATE
DETAILS - 2 of 2
132 12857912 2-SB509 INTAKE STRUCTURES SCREEN DETAILS
133 12857913 2-SB510 STRUCTURAL SLAB DETAILS
134 12857914 2-SB601 PILE SCHEDULES - PUMP STATION PS-6
135 12857915 2-SB602 PILE SCHEDULES - PUMP STATION PS-8
ARCHITECTURAL
136 12857916 2-A-151 PUMP STATION 6 - FLOOR PLAN - FIRST
LEVEL & SECOND LEVEL
137 12857917 2-A-153 PUMP STATION 6 - ROOF PLAN & DETAILS
138 12857918 2-A-161 PUMP STATION 8 - FLOOR PLAN - FIRST
LEVEL, SECOND LEVEL & ROOF
139 12857919 2-A-250 PUMP STATION 6 - BUILDING ELEVATIONS
140 12857920 2-A-260 PUMP STATION 8 - BUILDING ELEVATIONS
141 12857921 2-A-350 PUMP STATION 6 & 8 - TYP. BUILDING &
WALL SECTIONS
142 12857922 2-A-601 DOOR & FINISH SCHEDULE
FIRE PROTECTION
143 12857923 2-F-001 FIRE PROTECTION GENERAL SHEET
144 12857924 2-FA150 PUMP STATION 6 - FIRE ALARM PLAN
145 12857925 2-FA160 PUMP STATION 8 - FIRE ALARM PLAN
146 12857926 2-FA501 FIRE ALARM DETAILS
147 12857927 2-FX150 PUMP STATION 6 - FIRE SUPPRESSION
PLAN
148 12857928 2-FX160 PUMP STATION 8 - FIRE SUPPRESSION
PLAN
149 12857929 2-FX501 FIRE SUPPRESSION DETAILS
INDEX OF DRAWINGS
SHEET NO. NAVFAC NO. SHEET NO. SHEET NAME
56 12857836 2-CU225 PHASE 2 - UTILITY CORRIDOR E - PLAN
AND PROFILE
57 12857837 2-CU231 PHASE 2 - OW/WO PLAN AND PROFILE
58 12857838 2-CU307 PHASE 2 - CIVIL UTILITY PLAN
COORDINATES - AREA 7
59 12857839 2-CU308 PHASE 2 - CIVIL UTILITY PLAN
COORDINATES - AREA 8
60 12857840 2-CU309 PHASE 2 - CIVIL UTILITY PLAN
COORDINATES - AREA 9
61 12857841 2-CU310 PHASE 2 - CIVIL UTILITY PLAN
COORDINATES - AREA 10
62 12857842 2-CU312 PHASE 2 - CIVIL UTILITY PLAN
COORDINATES - AREA 12
63 12857843 2-CU313 PHASE 2 - CIVIL UTILITY PLAN
COORDINATES - AREA 13
64 12857844 2-CU314 PHASE 2 - CIVIL UTILITY PLAN
COORDINATES - AREA 14
65 12857845 2-CU315 PHASE 2 - CIVIL UTILITY PLAN
COORDINATES - AREA 15
66 12857846 2-CU321 PHASE 2 - CIVIL UTILITY COORDINATES
67 12857847 2-CU501 PHASE 2 - CIVIL UTILITY DETAILS
68 12857848 2-CU502 PHASE 2 - CIVIL UTILITY DETAILS
69 12857849 2-CG110 PHASE 2 - CIVIL GRADING AND DRAINAGE
PLAN - AREA 10
70 12857850 2-CG115 PHASE 2 - CIVIL GRADING AND DRAINAGE
PLAN - AREA 15
71 12857851 2-CG201 PHASE 2 - CIVIL STORM DRAIN PROFILES
72 12857852 2-CG202 PHASE 2 - CIVIL STORM DRAIN PROFILES
73 12857853 2-CG501 PHASE 2 - CIVIL GRADING AND DRAINAGE
DETAILS
74 12857854 2-CG502 PHASE 2 - CIVIL GRADING AND DRAINAGE
DETAILS
STRUCTURAL
75 12857855 2-S-001 GENERAL NOTES
76 12857856 2-S-002 GENERAL NOTES
77 12857857 2-S-003 LEGEND AND ABBREVIATIONS
78 12857858 2-S-004 PUMP STATION 6 AND 8 WIND ISOMETRIC
DIAGRAMS
79 12857859 2-SD110 STRUCTURAL FOUNDATION DEMO PLAN -
PUMP STATION PS-6 - AREA 10
80 12857860 2-SD115 STRUCTURAL FOUNDATION DEMO PLAN -
PUMP STATION PS-8 - AREA 15
81 12857861 2-SD301 PUMP STATION PS-6 FOUNDATION
DEMOLITION SECTIONS - STAGE 1
82 12857862 2-SD302 PUMP STATION PS-6 FOUNDATION
DEMOLITION SECTIONS - STAGE 2
83 12857863 2-SD303 PUMP STATION PS-8 FOUNDATION
DEMOLITION SECTIONS
84 12857864 2-SD401 PUMP STATION PS-6 ENLARGED
FOUNDATION DEMOLITION PLAN - STAGE
85 12857865 2-SD402 PUMP STATION PS-6 ENLARGED
FOUNDATION DEMOLITION PLAN - STAGE
86 12857866 2-SD403 PUMP STATION PS-8 ENLARGED
FOUNDATION DEMOLITION PLAN
87 12857867 2-SD404 DEMOLITION DETAILS - NORTH FLOOD
FLUME OUTFALL
88 12857868 2-SD405 TEMPORARY COFFERDAM PLAN AND
SECTIONS
89 12857869 2-SD406 INTAKE STRUCTURE DEMOLITION DETAILS
- AREA 10
90 12857870 2-SD407 INTAKE STRUCTURE DEMOLITION DETAILS
- AREA 15
91 12857871 2-S-150 PUMP STATION 6 - FOUNDATION PLAN
92 12857872 2-S-151 PUMP STATION 6 - FRAMING PLAN - FIRST
FLOOR
93 12857873 2-S-152 PUMP STATION 6 - FRAMING PLAN -
SECOND FLOOR
94 12857874 2-S-153 PUMP STATION 6 - FRAMING PLAN - ROOF
95 12857875 2-S-160 PUMP STATION 8 - FOUNDATION PLAN
96 12857876 2-S-161 PUMP STATION 8 - FRAMING PLAN - FIRST
FLOOR
97 12857877 2-S-162 PUMP STATION 8 - FRAMING PLAN -
SECOND FLOOR
98 12857878 2-S-163 PUMP STATION 8 - FRAMING PLAN - ROOF
99 12857879 2-S-215 EXTERIOR STAIR ELEVATIONS
100 12857880 2-S-216 EXTERIOR STAIR ELEVATIONS
101 12857881 2-S-217 INTERIOR STAIR ELEVATIONS
102 12857882 2-S-220 PUMP STATION 6 AND 8 TYPICAL WALL
ELEVATIONS
103 12857883 2-S-301 PUMP STATION 6 AND 8 SECTIONS &
DETAILS
104 12857884 2-S-302 PUMP STATION 6 AND 8 SECTIONS &
DETAILS
INDEX OF DRAWINGS
SHEET NO. NAVFAC NO. SHEET NO. SHEET NAME
GENERAL
1 12857781 2-G-030 COVER SHEET
2 12857782 2-G-031 INDEX OF DRAWINGS - VOLUME 3 OF 4
3 12857783 2-GD150 BUILDING 828 - DEMOLITION PLANS &
SECTION
4 12857784 2-GD160 BUILDING 829 - DEMOLITION PLANS &
SECTION
5 12857785 2-GI050 PUMP STATION 6 - LIFE SAFETY CODE
ANALYSIS
6 12857786 2-GI060 PUMP STATION 8 - LIFE SAFETY CODE
ANALYSIS
7 12857787 2-GI150 PUMP STATION 6 - LIFE SAFETY PLAN
8 12857788 2-GI160 PUMP STATION 8 - LIFE SAFETY PLAN
9 12857789 2-GC111 PHASE 2 - PROJECT SITE LIMITS
10 12857790 2-GC121 PHASE 2 - FIRE PROTECTION SITE PLAN
CIVIL
11 12857791 2-CD100 PHASE 2 - CIVIL DEMOLITION AND
EROSION CONTROL PLAN - OVERALL
12 12857792 2-CD107 PHASE 2 - CIVIL DEMOLITION AND
EROSION CONTROL PLAN - AREA 7
13 12857793 2-CD108 PHASE 2 - CIVIL DEMOLITION AND
EROSION CONTROL PLAN - AREA 8
14 12857794 2-CD109 PHASE 2 - CIVIL DEMOLITION AND
EROSION CONTROL PLAN - AREA 9
15 12857795 2-CD110 PHASE 2 - CIVIL DEMOLITION AND
EROSION CONTROL PLAN - AREA 10
16 12857796 2-CD112 PHASE 2 - CIVIL DEMOLITION AND
EROSION CONTROL PLAN - AREA 12
17 12857797 2-CD113 PHASE 2 - CIVIL DEMOLITION AND
EROSION CONTROL PLAN - AREA 13
18 12857798 2-CD114 PHASE 2 - CIVIL DEMOLITION AND
EROSION CONTROL PLAN - AREA 14
19 12857799 2-CD115 PHASE 2 - CIVIL DEMOLITION AND
EROSION CONTROL PLAN - AREA 15
20 12857800 2-CD221 PHASE 2 - UTILITY CORRIDOR A -
DEMOLITION PLAN AND PROFILE
21 12857801 2-CS100 PHASE 2 - CIVIL SITE PLAN - OVERALL
22 12857802 2-CS107 PHASE 2 - CIVIL SITE PLAN - AREA 7
23 12857803 2-CS108 PHASE 2 - CIVIL SITE PLAN - AREA 8
24 12857804 2-CS109 PHASE 2 - CIVIL SITE PLAN - AREA 9
25 12857805 2-CS110 PHASE 2 - CIVIL SITE PLAN - AREA 10
26 12857806 2-CS112 PHASE 2 - CIVIL SITE PLAN - AREA 12
27 12857807 2-CS113 PHASE 2 - CIVIL SITE PLAN - AREA 13
28 12857808 2-CS114 PHASE 2 - CIVIL SITE PLAN - AREA 14
29 12857809 2-CS115 PHASE 2 - CIVIL SITE PLAN - AREA 15
30 12857810 2-CS321 PHASE 2 - CIVIL SITE COORDINATES
31 12857811 2-CS501 PHASE 2 - CIVIL SITE IMPROVEMENT
DETAILS
32 12857812 2-CU100 PHASE 2 - CIVIL UTILITY PLAN - OVERALL
33 12857813 2-CU107 PHASE 2 - CIVIL UTILITY PLAN - AREA 7
34 12857814 2-CU108 PHASE 2 - CIVIL UTILITY PLAN - AREA 8
35 12857815 2-CU109 PHASE 2 - CIVIL UTILITY PLAN - AREA 9
36 12857816 2-CU110 PHASE 2 - CIVIL UTILITY PLAN - AREA 10
37 12857817 2-CU112 PHASE 2 - CIVIL UTILITY PLAN - AREA 12
38 12857818 2-CU113 PHASE 2 - CIVIL UTILITY PLAN - AREA 13
39 12857819 2-CU114 PHASE 2 - CIVIL UTILITY PLAN - AREA 14
40 12857820 2-CU115 PHASE 2 - CIVIL UTILITY PLAN - AREA 15
41 12857821 2-CU200 PHASE 2 - CIVIL ALIGNMENT PLAN
42 12857822 2-CU201 PHASE 2 - ELECTRICAL DUCTBANK
PROFILES
43 12857823 2-CU202 PHASE 2 - TELECOM DUCTBANK PROFILES
44 12857824 2-CU203 PHASE 2 - ELECTRICAL AND TELECOM
DUCTBANK PROFILES
45 12857825 2-CU204 PHASE 2 - TELECOM DUCTBANK PROFILES
46 12857826 2-CU211 PHASE 2 - SALTWATER SUPPLY MAIN
PROFILE - 1
47 12857827 2-CU212 PHASE 2 - SALTWATER SUPPLY MAIN
PROFILE - 2
48 12857828 2-CU213 PHASE 2 - SALTWATER SUPPLY MAIN
PROFILE - 3
49 12857829 2-CU214 PHASE 2 - SALTWATER SUPPLY MAIN
PROFILE - 4
50 12857830 2-CU215 PHASE 2 - SALTWATER SUPPLY LATERAL
PROFILES - 1
51 12857831 2-CU216 PHASE 2 - SALTWATER SUPPLY LATERAL
PROFILES - 2
52 12857832 2-CU221 PHASE 2 - UTILITY CORRIDOR A - PLAN
AND PROFILE
53 12857833 2-CU222 PHASE 2 - UTILITY CORRIDOR B - PLAN
AND PROFILE
54 12857834 2-CU223 PHASE 2 - UTILITY CORRIDOR C - PLAN
AND PROFILE
55 12857835 2-CU224 PHASE 2 - UTILITY CORRIDOR D - PLAN
AND PROFILE
VOLUME INDEX:
VOLUME 1 (PHASE 1): GENERAL, SURVEY, GEOTECHNICAL, CIVIL, STRUCTURAL.
SEE 1-G-011 FOR INDEX OF DRAWINGS.
VOLUME 2 (PHASE 1): GENERAL, ARCHITECTURAL, FIRE PROTECTION,
MECHANICAL, ELECTRICAL. SEE 1-G-021 FOR INDEX OF DRAWINGS.
VOLUME 3 (PHASE 2): GENERAL, CIVIL, STRUCTURAL, ARCHITECTURAL, FIRE
PROTECTION. SEE 2-G-031 FOR INDEX OF DRAWINGS.
VOLUME 4 (PHASE 2): GENERAL, MECHANICAL, ELECTRICAL. SEE 2-G-041 FOR
INDEX OF DRAWINGS.
SY
M
DE
S C
RI
PT
I O N
DA
TE
AP
PR
IS
SU
ED
F
OR
C
ON
ST
RU
C T
IO
N
/28 /20
IS
SU
ED
F
OR
B
SEAL
SHEET NOTES:
1. REMOVE EXISTING CONSTRUCTION TO THE EXTENT INDICATED ON THE
DRAWINGS. PROTECT OTHER EXISTING STRUCTURES ON ADJACENT
PROPERTIES FROM DAMAGE THROUGHOUT CONSTRUCTION. SHOULD
DAMAGE OCCUR TO EXISTING CONSTRUCTION ON ADJACENT
PROPERTIES OR EXISTING CONSTRUCTION TO REMAIN ON SITE, REPAIR
THE DAMAGE TO THE SATISFACTION OF THE CONTRACTING OFFICER.
REMOVE DEBRIS REGULARLY TO ELIMINATE INTERFERENCE.
2. EXCEPT FOR ITEMS OR MATERIALS INDICATED TO BE REUSED,
SALVAGED, REINSTALLED, OR OTHERWISE INDICATED TO REMAIN THE
OWNER’S PROPERTY, DEMOLISHED MATERIALS BECOME THE
CONTRACTOR’S PROPERTY AND MUST BE REMOVED FROM THE SITE
WITH FURTHER DISPOSITION AT THE CONTRACTOR’S OPTION.
3. DEMOLISHED MATERIALS MUST BE LEGALLY DISPOSED OF PROMPTLY.
DO NOT ALLOW DEMOLISHED MATERIALS TO ACCUMULATE ON SITE. NO
BURNING IS ALLOWED.
4. REFER TO SPECIFICATION SECTION 02 41 00.00 22 FOR GENERAL
REQUIREMENTS AND AUTHORIZATIONS PRIOR TO BEGINNING OF
DEMOLITION WORK.
5. THIS DEMOLITION PLAN OUTLINES THE SCOPE OF THE WORK INVOLVED
FOR THE DEMOLITION PHASE OF THIS PROJECT. REFER TO THE PHASE 1
AND 2 DRAWINGS FOR ADDITIONAL INFORMATION.
6. REFER TO STRUCTURAL DEMOLITION DRAWINGS FOR DEMOLITION
EXTENTS OF CONCRETE & ASSOCIATED COMPONENTS.
7. PROVIDE TEMPORARY BARRICADES AND OTHER PROTECTION REQUIRED
TO PREVENT INJURY TO PEOPLE AND DAMAGE TO ADJACENT BUILDING
AREAS TO REMAIN.
8. FALL PROTECTION AND ALL GOVERNMENT SAFETY REQUIREMENTS MUST
BE MAINTAINED DURING DEMOLITION AND CONSTRUCTION PER
SPECIFICATIONS.
9. HAZARDOUS MATERIALS: SEE SPECIFICATIONS APPENDIX, "HAZMAT
INSPECTION DRAWINGS AND LABORATORY REPORTS," FOR TYPICAL
LOCATIONS AND TYPES OF HAZARDOUS MATERIALS THAT MAY BE
ENCOUNTERED. SEE DIVISION 2 SPECIFICATIONS FOR REMEDIATION AND
HANDLING OF HAZARDOUS MATERIALS. PRIOR TO BEGINNING WORK,
NOTIFY THE CONTRACTING OFFICER OF ANY ADDITIONAL MATERIALS
OBSERVED THAT MAY POTENTIALLY CONTAIN HAZARDOUS MATERIALS.
C1
2-GD150
A1
A1
A2
A4 E30
E31
E32
E33
ALL
M25
M25
M25
M25
M25
M25
M24
M22
M23
M23
M21
M21
M21
6"
22' - 9"
33' - 6"
A4
6"
E35
C1
2-GD150
A1
A3
A4 E34
ALL
M20
M20
M26
M21
M23
M23
M23
22' - 9"
6"
33' - 6"
A4
M28
M28
GRADING LEVEL
103' - 0"
SUMP LEVEL
96' - 0"
A5
M25
M25 M24
M22
M20
M21 11
0"
A4
A4
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D
EP
AR
TM
EN
T
O F
TH
E
N
AV
Y N
AV
AL
F
AC
IL
IT
IE
S
EN
G
IN
EE
R
IN
G S
YS
TE
M S
C O
M M
AN
D
DRAWFORM REVISION: 25 AUGUST 2020
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
NA
VA
L
FA
CI
LI
TI
ES
E
NG
IN
EE
RI
NG
S
YS
TE
M
S
CO
M M
AN
D
M
ID
-A
TL
AN
TI
C
N
AV
AL
S
TA
TI
O N
N
O R
FO
LK
, V A
AS NOTED
FI
LE
N
AM
E:
PL
OT
TE
D:
C
:\R ev it_ Pr oj ec ts \D
R
YD
P6
-1
-G -8
_p gr eg or y@ bu rn sm cd
.c om
.rv t
2/
/2
1:
:4
PM
2-GD150
P
D
R Y
D O
C K
S
A
LT
W A
TE
R
S Y
S
TE
M
FO
R C
V N
-7
BU
IL
DI
NG
DE
M O
LI
TI
O N
PL
AN
S
SE
CT
IO
N
LES
12857783
BSG BSG
02/02/2022
DEVIN POULIN,
C984 FACILITIES PLANNER, NNSY
JTL/TLH
1364315
N40085-22-R-2598
PO
RT
SM
OU
TH
, V
IR
GI
NI
A
NO
RF
OL
K
NA
VA
L S
HI
PY
AR
D
EJA
ALG
DSN
PLAN
NORTH
2' 4' 8'0'
SHEET KEYNOTES
A1 DEMOLISH ENTIRE 12" THICK REINFORCED CAST IN PLACE CONCRETE
EXTERIOR WALL
A2 DEMOLISH STEEL DOOR & FRAMING
A3 DEMOLISH STEEL STAIRS AND RAILING
A4 DEMOLISH ENTIRE CONCRETE FLOOR SLAB ON GRADE & MAT FOUNDATION.
A5 DEMOLISH ENTIRE BUILT-UP MEMBRANE LOW SLOPE ROOF SYSTEM ABOVE &
ASSOCIATED WOOD PLANK SUBSTRATE & STEEL FRAMING.
E30 DEMOLISH MOTOR CONTROL CENTER, CONDUITS, AND CONDUCTORS BACK TO
SOURCE.
E31 DEMOLISH TRANSFORMER, CONDUITS, AND CONDUCTORS BACK TO SOURCE.
E32 DEMOLISH PANELBOARDS, CONDUITS AND CONDUCTORS BACK TO SOURCE.
E33 DEMOLISH LIGHTING FIXTURES, CONDUITS AND CONDUCTORS BACK TO
SOURCE.
E34 DEMOLISH ELECTRICAL OUTLETS, CONDUITS, AND CONDUCTORS BACK TO
SOURCE.
E35 REMOVE AND RETAIN SCADA RTU. RETURN SCADA RTU TO NNSY UTILITIES
DEPARTMENT.
M20 DEMOLISH EXISTING PUMP AND ASSOCIATED CONTROLS, WIRING, AND
APPURTENANCES
M21 DEMOLISH EXISTING TANK AND ASSOCIATED PIPING, VALVES, AND
APPURTENANCES.
M22 EXISTING PUMP VACCUM PRIMING SYSTEM IN ITS ENTIRETY MUST BE
SALVAGED AND DELIVERED TO SHIPYARD UTILITIES DEPT.
M23 DEMOLISH EXISTING SALTWATER (SW) PIPING, VALVES, AND ASSOCIATED
APPURTENANCES.
M24 DEMOLISH EXISTING CONTROL PANEL AND ASSOCIATED WIRING AND
APPURTENANCES.
M25 DEMOLISH EXISTING HEATING/VENTILATION SYSTEMS AND ASSOCIATED
APPURTENANCES.
M26 DEMOLISH EXISTING SUMP PUMP AND ASSOCIATED CONTROLS, WIRING, AND
APPURTENANCES.
M28 EXISTING LEVEL MONITORING SYSTEM ON PUMP PRIMING SYSTEM MUST BE
SALVAGED AND DELIVERED TO SHIPYARD UTILITIES DEPT.
1/4" = 1'-0"A3 BUILDING 828 - DEMO PLAN - GRADE LEVEL
1/4" = 1'-0"A1 BUILDING 828 - DEMO PLAN - SUMP LEVEL
PLAN
NORTH
2' 4' 8'0'
1/4" = 1'-0"C1 BUILDING 828 - DEMOLITION SECTION
2' 4' 8'0'
PLAN
NORTH
KEY PLAN
BLDG
SY
M
DE
S C
RI
PT
I O N
DA
TE
AP
PR
IS
SU
ED
F
OR
C
ON
ST
RU
C T
IO
N
/28 /20
IS
SU
ED
F
OR
1. SEE SHEET 2-GD150 FOR SHEET NOTES
SHEET NOTES:A3
2-GD160
A2
A3
A4A4
E30
E31
E32
E33
M24
M25
M25
M25
M25
20' - 6"
6"
E35
A3
2-GD160
A1A4
E34
M21
M20 M26
M23
M22
M21
6"
20' - 6"
A4
M27
M28
GRADING FLOOR
103' - 0"
SUMP LEVEL
96' - 0"
A5A1
A3
M20
M25
M25 M24
M21
7"
A4
A4
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D
EP
AR
TM
EN
T
O F
TH
E
N
AV
Y N
AV
AL
F
AC
IL
IT
IE
S
EN
G
IN
EE
R
IN
G S
YS
TE
M S
C O
M M
AN
D
DRAWFORM REVISION: 25 AUGUST 2020
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
NA
VA
L
FA
CI
LI
TI
ES
E
NG
IN
EE
RI
NG
S
YS
TE
M
S
CO
M M
AN
D
M
ID
-A
TL
AN
TI
C
N
AV
AL
S
TA
TI
O N
N
O R
FO
LK
, V A
AS NOTED
FI
LE
N
AM
E:
PL
OT
TE
D:
C
:\R ev it_ Pr oj ec ts \D
R
YD
P6
-1
-G -8
_p gr eg or y@ bu rn sm cd
.c om
.rv t
2/
/2
1:
:0
PM
2-GD160
P
D
R Y
D O
C K
S
A
LT
W A
TE
R
S Y
S
TE
M
FO
R C
V N
-7
BU
IL
DI
NG
DE
M O
LI
TI
O N
PL
AN
S
SE
CT
IO
N
LES
12857784
BSG BSG
02/02/2022
DEVIN POULIN,
C984 FACILITIES PLANNER, NNSY
JTL/TLH
1364315
N40085-22-R-2598
PO
RT
SM
OU
TH
, V
IR
GI
NI
A
NO
RF
OL
K
NA
VA
L S
HI
PY
AR
D
EJA
ALG
DSN
SHEET KEYNOTES
A1 DEMOLISH ENTIRE 12" THICK REINFORCED CAST IN PLACE CONCRETE
EXTERIOR WALL
A2 DEMOLISH STEEL DOOR & FRAMING
A3 DEMOLISH STEEL STAIRS AND RAILING
A4 DEMOLISH ENTIRE CONCRETE FLOOR SLAB ON GRADE & MAT FOUNDATION.
A5 DEMOLISH ENTIRE BUILT-UP MEMBRANE LOW SLOPE ROOF SYSTEM ABOVE &
ASSOCIATED WOOD PLANK SUBSTRATE & STEEL FRAMING.
E30 DEMOLISH MOTOR CONTROL CENTER, CONDUITS, AND CONDUCTORS BACK TO
SOURCE.
E31 DEMOLISH TRANSFORMER, CONDUITS, AND CONDUCTORS BACK TO SOURCE.
E32 DEMOLISH PANELBOARDS, CONDUITS AND CONDUCTORS BACK TO SOURCE.
E33 DEMOLISH LIGHTING FIXTURES, CONDUITS AND CONDUCTORS BACK TO
SOURCE.
E34 DEMOLISH ELECTRICAL OUTLETS, CONDUITS, AND CONDUCTORS BACK TO
SOURCE.
E35 REMOVE AND RETAIN SCADA RTU. RETURN SCADA RTU TO NNSY UTILITIES
DEPARTMENT.
M20 DEMOLISH EXISTING PUMP AND ASSOCIATED CONTROLS, WIRING, AND
APPURTENANCES
M21 DEMOLISH EXISTING TANK AND ASSOCIATED PIPING, VALVES, AND
APPURTENANCES.
M22 EXISTING PUMP VACCUM PRIMING SYSTEM IN ITS ENTIRETY MUST BE
SALVAGED AND DELIVERED TO SHIPYARD UTILITIES DEPT.
M23 DEMOLISH EXISTING SALTWATER (SW) PIPING, VALVES, AND ASSOCIATED
APPURTENANCES.
M24 DEMOLISH EXISTING CONTROL PANEL AND ASSOCIATED WIRING AND
APPURTENANCES.
M25 DEMOLISH EXISTING HEATING/VENTILATION SYSTEMS AND ASSOCIATED
APPURTENANCES.
M26 DEMOLISH EXISTING SUMP PUMP AND ASSOCIATED CONTROLS, WIRING, AND
APPURTENANCES.
M27 SALTWATER OVERBOARD/RELIEF CONTROL VALVES, ACTUATOR, AND
PRESSURE BREAKDOWN ORIFICE MUST BE SALVAGED AND DELIVERED TO
SHIPYARD UTILITIES DEPT.
M28 EXISTING LEVEL MONITORING SYSTEM ON PUMP PRIMING SYSTEM MUST BE
SALVAGED AND DELIVERED TO SHIPYARD UTILITIES DEPT.
PLAN
NORTH
2' 4' 8'0'
1/4" = 1'-0"B3 BUILDING 829 - DEMO PLAN - GRADE LVL
1/4" = 1'-0"B2 BUILDING 829 - DEMO PLAN - SUMP LVL
PLAN
NORTH
2' 4' 8'0'
1/4" = 1'-0"A3 BUILDING 829 - DEMOLITION SECTION
2' 4' 8'0'
PLAN
NORTH
KEY PLAN
BLDG
SY
M
DE
S C
RI
PT
I O N
DA
TE
AP
PR
IS
SU
ED
F
OR
C
ON
ST
RU
C T
IO
N
/28 /20
IS
SU
ED
F
OR
Mechanical | Electrical | Plumbing | Fire Protection 4456 Corporation Ln, Ste 320 Tel: (757) 502-8882
Virginia Beach, Virginia 23462 Fax: (757) 499-1757
ADVANCED
ENGINEERING
CONSULTANTS
EM
H -N
TYPE
EM
H -N
TYPE
W R
IS
ER
STMRISER
R
AIRRISER
U N K
V A U L T
R R
R R
R R R R
IN
T A K E
S T R U C T U R E
R
E
S D M H
S D M H
G M H
G M H
ASP
H
ALT
ASP
H
ALT
C O N C
C O N C
C O N C
C O N C
C O N C
R R F
R R
SW
R R
SW
B
LD
G
S
TY
B R
IC
K
B
LD
G
S
TY
M
ETAL
FI
R E
AC
C
ES
S
LA
N E
N O
P A R K
IN
G
N O
S
TA
G
IN
G
EXIT DISCHARGE
PATH
EXIT DISCHARGE
PATH
P
IE
R
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L
F A
C
IL
IT
IE
S E
N G
IN
E
E R
S
Y S
T E
M S
C O
M M
A N
D
DRAWFORM REVISION: 25 AUGUST 2020
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
Y S
T E
M S
C O
M M
A N
D
M
ID
-A T
LA
N
T
IC
N A
V A
L S
T A
T
IO
N
N O
R F
O L
K
V A
AS NOTED
F
IL
E N
A M
E
P
LO
T T
E D
ALG
N40085-22-R-2598
C U s e rs
\E ri n C
\D o c u m e n ts
\D R
Y D
P
-1
-F
-P S
E ri n
C V
E R
.r v t
/2
/2
:4
:3
A
M
2-GI050
P D
R Y
D O
C K
S
A L T
W A
T E
R S
Y S
T E
M
F O
R C
V N
-7
P U
M P
S
TA
TI
O
N
LI
F E
S A
F E
TY
C
O D
E A
N A
LY
S
IS
AEC
12857785
PJB EBC
02/02/2022
DEVIN POULIN,
C984 FACILITIES PLANNER, NNSY
JTL / TLH
1364315
P O
R T
S M
O U
T H
, V
IR
G
IN
IA
N
O R
F O
LK
N
A V
A L
S H
IP
Y
A R
D
EJA
DSN
1" = 20'-0" A1
PUMP STATION 6 - LIFE SAFETY - SITE PLAN
PLAN
NORTH
PLAN
NORTH
KEY PLAN
PS-6
0 20'10' 40'
SHEET NOTES
SHEET KEYNOTES#
1 LOCATION OF EXISTING FIRE HYDRANT FH5036.
2 INTENDED ENTRANCE FOR FIRE DEPARTMENT.
3 LOCATION OF FIRE DEPARTMENT CONNECTION FOR THIS BUILDING.
4 COVERAGE FROM FIRE HYDRANT TO ENDPOINT IS 127'-6".
5 SPRINKLER SERVICE WATER ENTRANCE INTO THE BUILDING.
6 FIRE DEPARTMENT VEHICLE ACCESS.
7 APPROXIMATE LOCATION OF FIRE HYDRANT FH4034.
8 APPROXIMATE LOCATION OF FIRE HYDRANT FH5034.
9 FACP LOCATION, REFER TO 2-GI150 FOR EXACT LOCATION AND ADDITIONAL
INFORMATION ON BUILDING LAYOUT.
10 PROPOSED FIRE HYDRANT LOCATION, REFER TO SHEET 2-GC121 FOR FINAL
LOCATION OF FIRE HYDRANT AND SHEET 2-CU110 FOR INSTALLATION
REQUIREMENTS OF FIRE HYDRANT.
11 COVERAGE FROM FIRE HYDRANT TO ENDPOINT IS 147'-10".
12 ASSUMED PROPERTY LINE AROUND PS6 IS 30'-0".
1 THERE IS NO WATER STORAGE TANK, HAZARDEOUS MATERIAL SPILL
CONTAINMENT TANKS, OR FIRE PUMP TO BE PROVIDED FOR THIS PROJECT.
ALSO, THE BACKFLOW PREVENTER ASSEMBLY IS LOCATED WITHIN THE
BUILDINGS (SEE FX SHEETS FOR LOCATIONS).
2 FIRE DEPARTMENT VEHICLE ACCESS TO BUILDING EITHER BY TRUCK
GOING DOWN DRY DOCK 8 BETWEEN CRANE RAILS OR DOWN PIER 6. FOR
INFORMATION ON FIRE LANES AROUND THE DRY DOCK AND TO THE PUMP
STATION, REFER TO SHEET 2-GC121.
3 FRONTAGE INCREASES ARE NOT APPLICALBE FOR THIS PROJECT.
4 THIS BUILDING IS LOCATED ON A SECURE SITE WITH ACCESS RESTRICTED
BY BADGING INTO TURNSTILES OR MANNED GATES FOR VEHICLES.
CODE REVIEW
1. PROJECT DESCRIPTION:
THE PROJECT REQUIRES THE DEMOLITION OF THE EXISTING PUMP STATIONS 828 AND 829 AND
THE CONSTRUCTION OF NEW PUMP STATION 6 (PS-6) AND PUMP STATION 8 (PS-8). THE NEW
BUILDINGS WILL BE SITED TO MINIMIZE LIFE SAFETY IMPACTS WITH EXISTING CONDITIONS
LOCATED AROUND THE BUILDING.
2. CODE ANALYSIS APPROACH AND OBJECTIVES:
THIS CODE ANALYSIS DEMONSTRATES THAT THE PUMP STATIONS ARE TO BE DESIGNED IN
ACCORDANCE WITH UFC 3-600-01 AND THE APPLICABLE CODES AND STANDARDS FOR THIS
PROJECT. THE PUMP STATIONS BOTH FALL UNDER "SPECIAL-PURPOSE INDUSTRIAL"
OCCUPANCY AS PER NFPA 101 AND STORAGE GROUP (S-1) PER IBC, AND LIFE SAFTEY
REQUIREMENTS WILL BE EVALUATED TO COMPLY IN ACCORDANCE WITH THE APPLICALBE
CODES AND STANDARDS LISTED BELOW.
3. APPLICABLE CODES AND STANDARDS (FOR REFERENCE ONLY):
• NFPA 10, STANDARD FOR PROTABLE FIRE EXTINGUISHERS, 2018 EDITION
• NFPA 13, STANDARD FOR THE INSTALLATION OF SPRINKLER SYSTEMS, 2019 EDITION
• NFPA 72, NATIONAL FIRE ALARM AND SIGNALING CODE, 2019 EDITION
• NFPA 101, LIFE SAFETY CODE, 2018 EDITION
• UFC 1-200-01, DOD BUILDING CODE WITH CHANGE 1, DATED 01 OCT. 2020
• UFC 3-600-01, FIRE PROTECTION ENGINEERING FOR FACILITIES WITH CHANGE 5, DATED
24 SEPT. 2020
• UFC 4-010-06, CYBERSECURITY OF FACILITY-RELATED CONTROL SYSTEM WITH CHANGE 1,
18 JAN. 2017
• UFC 4-150-02, DOCKSIDE UTILITIES FOR SHIP SERVICE DATED 12 NOV. 2020
• UFC 4-213-10, DESIGN: GRAVING DRYDOCKS DATED 18 MAY 2020
• INTERNATIONAL BUILDING CODE (IBC), 2018 EDITION
• OSHA, 1970 WITH AMENDMENTS THROUGH 2004 WITH 2017 UPDATES
4. OCCUPANT CLASSIFICATION AND USE DESIGNATION
CRITERIA FROM BOTH IBC AND NFPA 101 WILL BE USED AS REQUIRED IN ACCORDANCE WITH
UFC 3-600-01.
CLASSIFICATION
FOR BOTH PS-6 AND PS-8, THE CLASSIFICATION OF THESE BUILDINGS PER IBC WILL BE
STORAGE GROUP (S-1). FOR NFPA 101, THESE BUILDINGS WILL BE CONSIDERED INDUSTRIAL
OCCUPANCY.
HAZARDOUS MATERIALS
IT IS NOT ANTICIPATED THAT ANY SIGNIFICANT STORAGE OR USE OF HAZARDOUS MATERIALS
WILL OCCUR IN THIS BUILDING.
5. GENERAL BUILDING HEIGHTS AND AREAS
HEIGHTS
PER IBC TABLE 504.3 ALLOWABLE BUILDING HEIGHT IN FEET ABOVE GRADE PLANE, FOR
OCCUPANCY S-1 AND TYPE IIB CONSTRUCTION, THE ALLOWABLE BUILDING HEIGHT FOR A
SPRINKLERED (S) BUILDING IS 75 FEET ABOVE GRADE PLANE.
• FOR EACH PUMP STATION (PS-6 IS NORTH SIDE OF DRY DOCK 8 WHILE PS-8 IS SOUTH
SIDE OF DRY DOCK 8) – BUILDING HEIGHT ABOVE GRADE PLANE IS 36’-0”
PER TABLE 504.4 ALLOWABLE NUMBER OF STORIES ABOVE GRADE PLANE, FOR OCCUPANCY
S-1 AND A SPRINKLERED (S) BUILDING, THE ALLOWABLE NUMBER OF STORES ABOVE GRADE
PLANE IS 3 STORIES.
• FOR EACH PUMP STATION – THIS BUILDING IS A 2-STORY BUILDING.
AREAS
UTILIZING TABLE 506.2 ALLOWABLE AREA FACTOR (AT=NS, S1, S13R, S13D OR SM, AS
APPLICABLE) IN SQUARE FEET, FOR A ONE STORY FULLY SPRINKLERED (S1) BUILDING OF TYPE
IIB CONSTRUCTIONS FOR S-1, THE TABULAR ALLOWABLE AREA IS 70,000-SF. AS EACH
BUILDING HAS AN AREA OF APPROXIMATELY 3,000-SF, THE BUILDINGS COMPLY WITH AREA
REQUIREMENTS.
6. TYPES OF CONSTRUCTION
THE PROJECT SHALL CONFORM TO THE REQUIREMENTS OF IBC CHAPTER 6, EXCEPT AS
MODIFIED BY UFC 3-600-01.
CONSTRUCTION CLASSIFICATION AND FIRE-RESISTIVE RATING OF CONSTRUCTION ELEMENTS
THE TWO PUMP STATIONS ARE TYPE II-B IN ACCORDANCE WITH THE IBC.
IBC TABLE 601 FIRE-RESISTANCE RATING REQUIREMENTS FOR BUILDING ELEMENTS (HOURS)
BUILDING ELEMENT TYPE II - B NOTES
PRIMARY STRUCTURAL FRAME 0
BEARING WALLS
EXTERIOR 0
INTERIOR 0
NONBEARING WALLS AND PARTITIONS – EXTERIOR - SEE TABLE 602
NONBEARING WALLS AND PARTITIONS – INTERIOR 0
FLOOR CONSTRUCTION AND ASSOCIATED SECONDARY MEMBERS 0
ROOF CONSTRUCTION AND ASSOCIATED SECONDARY MEMBERS 0
*THESE RATINGS APPLY TO THE BUILDING COMPLEX.
THE CRITERIA IDENTIFIED IN IBC TABLE 602 FIRE-RESISTANCE RATING REQUIREMENTS FOR
EXTERIOR WALLS BASED ON FIRE SEPARATION DISTANCE IS TO BE 0 HOURS, AS UPON
COMPLETION OF WORK FOR THIS PROJECT, WHICH INCLUDES REMOVAL OF BUILDINGS 1490
AND 1528 ADJACENT TO PS-8, AND WITH THE GOVERNMENT’S RELOCATION OF TEMPORARY
STRUCTURES AROUND BOTH PUMP STATIONS, THERE WILL BE NO STRUCTURES WITHIN 10’-0”
OF FIRE SEPARATION DISTANCE FROM THE EXTERIOR WALLS.
S Y
M D
E S
C R
IP
T
I O N
D A
T E
A P
P R
IS
S U
E D
F O
R C
O N
S T
R U
C T
IO
N
/2
8/
IS
SU
ED
F
OR
Virginia Beach, Virginia 23462 Fax: (757) 499-1757
ADVANCED
ENGINEERING
CONSULTANTS
LP
BASE ROADWAY
MCCAWLEY STREET
WV
WV
DEAD
R
DI
BLDG
EXIT DISCHARGE
PATH
EXIT
DISCHARGE
PATH
BLDB 369
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L
F A
C
IL
IT
IE
S E
N G
IN
E
E R
S
T E
M S
C O
M M
A N
D
DRAWFORM REVISION: 25 AUGUST 2020
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
Y S
T E
M S
C O
M M
A N
D
M
ID
-A T
LA
N
T
IC
N A
V A
L S
T A
T
IO
N
N O
R F
O L
K
V A
AS NOTED
F
IL
E N
A M
E
P
LO
T T
E D
ALG
N40085-22-R-2598
C U s e rs
\E ri n C
\D o c u m e n ts
\D R
Y D
P
-1
-F
-P S
E ri n
C V
E R
.r v t
/2
/2
:4
:4
A
M
2-GI060
P D
R Y
D O
C K
S
A L T
W A
T E
R S
Y S
T E
M
F O
R C
V N
-7
P U
M P
S
TA
TI
O
N
LI
F E
S A
F E
TY
C
O D
E A
N A
LY
S
IS
AEC
12857786
PJB EBC
02/02/2022
DEVIN POULIN,
C984 FACILITIES PLANNER, NNSY
JTL / TLH
1364315
P O
R T
S M
O U
T H
, V
IR
G
IN
IA
N
O R
F O
LK
N
A V
A L
S H
IP
Y
A R
D
EJA
DSN
1" = 20'-0" A1
PUMP STATION 8 - LIFE SAFETY - SITE PLAN
PLAN
NORTH
KEY PLAN
PS-8
CODE REVIEW (CONT.)
7. FIRE PROTECTION SYSTEMS
BOTH PUMP STATIONS WILL BE PROVIDED WITH A WET PIPE FIRE SUPPRESSION SYSTEM
MEETING THE REQUIREMENTS OF UFC 3-600-01 AND NFPA 13, AS WELL AS A FIRE ALARM
SYSTEM MEETING THE REQUIREMENTS OF UFC 3-600-01 AND NFPA 72.
THE SITES FOR BOTH BUILDINGS ARE PAVED OR CONCRETE, SO THERE IS ALL WEATHER
GROUND ACCESS AVAILABLE AROUND BOTH SITES.
FIRE EXTINGUISHER WILL BE PROVIDED FOR BOTH PUMP STATIONS, AND WILL BE BASED ON
AN ORDINARY HAZARD OCCUPANCY FOR CLASS A FIRES. MAXIMUM TRAVEL DISTANCE TO
THE FIRE EXTINGUISHERS WILL BE 75'-0". FINAL CLASSIFICATION OF EXTINGUISHERS WILL BE
A MINIMUM OF TYPE A:C EXTINGUISHERS.
8. OCCUPANT LOAD AND EGRESS
UFC 3-600-01 REQUIRES THAT THE OCCUPANT LOAD FACTORS BE CALCULATED IN
ACCORDANCE WITH NFPA 101 CHAPTER 7, MEANS OF EGRESS, TABLE 7.3.1.2 OCCUPANT
LOAD FACTOR, WITH MODIFICATIONS AS NOTED IN CHAPTER 10 OF THE UFC.
HOWEVER, AS THE OCCUPANCY CLASSIFICATION FOR THE PUMP STATIONS ARE SPECIAL
INDUSTRIAL OCCUPANCY, WHICH IS INDICATED AS NOT APPLICABLE PER NFPA 101 TABLE
7.3.1.2. HOWEVER, FOR PURPOSES OF OCCUPANT LOAD CALCULATIONS, 38 OCCUPANTS ARE
ALLOWED AS PER NFPA 101 TABLE 7.3.1.2 FOR GENERAL INDUSTRIAL PER PUMP STATION,
BASED OFF TWO FLOORS WITH AN AREA OF 1,826-SF PER FLOOR, MEANING 19 OCCUPANTS
PER FLOOR.
MEANS OF EGRESS SIZING
THE SIZING IS BASED ON NFPA 101 CHAPTER 7, MEANS OF EGRESS, TABLE 7.3.3.1 CAPACITY
FACTORS WHICH IS 0.2 INCHES OF WIDTH / PERSON FOR LEVEL COMPONENTS AND 0.3
INCHES OF WIDTH / PERSON FOR STAIRS. AS STAIRS ARE THE MAIN MEANS OF EGRESS FOR
THIS FACILITY, WILL BASE SIZING ON STAIRS.
NFPA 101 TABLE 7.3.3.1 CAPACITY FACTORS
STAIRWAYS = 0.3 INCHES / PERSON
THERE ARE STAIRS WITH A CLEAR WIDTH OF 36 INCHES WITH AN EXIT CAPACITY OF 106
PERSONS (36”/0.3”/PERSON) PER EXIT DOORWAY. AS THE MAXIMUM CAPACITY IS ONLY TO BE
30 OCCUPANTS FOR EACH OF THESE BUILDINGS (BUILDINGS WILL BE DESIGNED TO HAVE NO
MORE THAN 11 REGULAR OCCUPANTS WITHIN EACH OF THE BUILDINGS), THE BUILDING
EGRESS CAPACITY IS ACCEPTABLE.
NUMBER OF EXITS
THE REQUIRED NUMBER OF EGRESS EXITS OR EXIT ACCESS DOORWAYS FOR LOW HAZARD
IN ACCORDANCE SHALL BE IN ACCORDANCE WITH NFPA 101 CHAPTERS 7, MEANS OF
EGRESS AND 40, INDUSTRIAL OCCUPANCIES.
• THERE WILL TWO MEANS OF EGRESS TO BE PROVIDED FOR EACH LEVEL OF THE
BUILDINGS, WITH TWO EXITS OUT OF THE BUILDING.
THIS BUILDING WILL BE PROVIDED WITH TWO MEANS OF EGRESS FROM THE BUILDING, ONE
LOCATED ON THE SMALL END OF THE BUILDING.
TRAVEL DISTANCE
THE ARRANGEMENT OF THE MEANS OF EGRESS WILL DEPEND ON THE CLASSIFICATION OF
THE OCCUPANCY AND SHALL BE AS FOLLOWS. FOR THE PURPOSES OF THIS ANALYSIS THE
HAZARD CLASSIFICATION IS ASSUMED TO BE LOW.
NFPA 101 CHAPTER 40, INDUSTRIAL OCCUPANCIES:
DEAD-END CORRIDOR – PROTECTED THROUGHOUT BY AN APPROVED, SUPERVISED
AUTOMATIC SPRINKLER SYSTEM.
• 50-FEET
COMMON PATH OF TRAVEL – PROTECTED THROUGHOUT BY AN APPROVED, SUPERVISED
AUTOMATIC SPRINKLER SYSTEM.
• 100-FEET
MAXIMUM TRAVEL DISTANCES – PROTECTED THROUGHOUT BY AN APPROVED, SUPERVISED
AUTOMATIC SPRINKLER SYSTEM FOR SPECIAL-PURPOSE INDUSTRIAL OCCUPANCY.
• 400-FEET
PLAN
NORTH
0 20'10' 40'
SHEET NOTES
SHEET KEYNOTES#
1 THERE IS NO WATER STORAGE TANK, HAZARDEOUS MATERIAL SPILL
CONTAINMENT TANKS, OR FIRE PUMP TO BE PROVIDED FOR THIS PROJECT.
ALSO, THE BACKFLOW PREVENTER ASSEMBLY IS LOCATED WITHIN THE
BUILDING.
2 FIRE DEPARTMENT VEHICLE ACCESS TO BUILDING EITHER BY TRUCK GOING
DOWN SOUTH SIDE DRY DOCK 8 OR VIA MCCAULEY STREET. FOR
INFORMATION ON FIRE LANES AROUND THE DRY DOCK AND TO THE PUMP
STATION, REFER TO SHEET 2-GC121.
3 FRONTAGE INCREASES ARE NOT APPLICABLE FOR THIS PROJECT.
4 THIS BUILDING IS LOCATED ON A SECURE SITE WITH ACCESS RESTRICTED
BY BADGING INTO TURNSTILES OR MANNED GATES FOR VEHICLES.
1 LOCATION OF EXISTING FIRE HYDRANT FH416.
2 INTENDED ENTRANCE FOR FIRE DEPARTMENT.
3 LOCATION OF FIRE DEPARTMENT CONNECTION FOR THIS BUILDING.
4 COVERAGE FROM FIRE HYDRANT TO ENDPOINT IS 232'-0".
5 COVERAGE FROM FIRE HYDRANT TO ENDPOINT IS 251'-0".
6 SPRINKLER SERVICE WATER ENTRANCE INTO THE BUILDING.
7 FIRE DEPARTMENT VEHICLE ACCESS.
8 APPROXIMATE LOCATION OF FIRE HYDRANT FH415.
9 APPROXIMATE LOCATION OF FIRE HYDRANT FH417.
10 FACP LOCATION, REFER TO 2-GI160 FOR EXACT LOCATION AND ADDITIONAL
INFORMATION ON BUILDING LAYOUT.
11 SEPARATION DISTANCE BETWEEN ASSUMED PROPERTY LINE BETWEEN
CORNER OF PS8 AND CORNER OF BUILDING 545 IS 24'-0" (48'-0" BETWEEN
BUILDINGS). ALLOWABLE WALL OPENINGS FOR PORTIONS OF EITHER
BUILDING LESS THAN 25' FROM PROPERTY LINE IS 45%, BETWEEN 25' TO 30'
IS 70%, AND GREATER THAN 30' IS UNLIMITED. NEITHER OF THESE
BUILDINGS HAVE WALL OPENINGS GREATER THAT 45% IN AREAS OF
CONCERN. ALL OTHER ASSUMED PROPERTY LINE AROUND PS8 IS 30'-0".
S Y
M D
E S
C R
IP
T
I O N
D A
T E
A P
P R
IS
S U
E D
F O
R C
O N
S T
R U
C T
IO
N
/2
8/
IS
SU
ED
F
OR
Virginia Beach, Virginia 23462 Fax: (757) 499-1757
ADVANCED
ENGINEERING
CONSULTANTS
S SS
ROOM / ZONE AREA
OCCUPANCY,
ALLOWABLE AREA PER
OCCUPANT
OCCUPANCY LOAD (PEOPLE)
OCCUPANCY, TYPE
A - ASSEMBLY
B - BUSINESS
S - STORAGE
I - INDUSTRIAL
1500 SF
B 150
W: NET EXIT WIDTH (INCHES)
C: CAPACITY (PEOPLE)
P: EXIT WIDTH PER PERSON
A: ACTUAL EGRESS (PEOPLE)
1 HOUR FIRE WALL
2 HOUR FIRE WALL
SMOKE PARTITION
SYMBOL DESCRIPTION
AREA NOT IN CONTRACT
COMMON PATH OF TRAVEL
TRAVEL DISTANCE
TD = X'-XX"
DEAD -END CORRIDOR
DE = X'-XX"
NUMBER OF OCCUPANTS EXITING#
1/2 HOUR FIRE WALL
3 HOUR FIRE WALL
W
C
P
A
CPT = X'-XX"
LIFE SAFETY LEGEND
TD=72'-4"
0.3
8 15
0.3
TD=83'-6"
CPT=22'-4"
CPT=22'-3"
1,500 SF
I 100
FROM SECOND LEVEL
FROM SECOND LEVEL
TD=93'-10"
TD=99'-0"
FACP
FAA
1,500 SF
I 100
CPT=9'-6"
0.3
0.3
TO ENTRY LEVEL
TO ENTRY LEVEL
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L
F A
C
IL
IT
IE
S E
N G
IN
E
E R
S
T E
M S
C O
M M
A N
D
DRAWFORM REVISION: 25 AUGUST 2020
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
Y S
T E
M S
C O
M M
A N
D
M
ID
-A T
LA
N
T
IC
N A
V A
L S
T A
T
IO
N
N O
R F
O L
K
V A
AS NOTED
F
IL
E N
A M
E
P
LO
T T
E D
ALG
N40085-22-R-2598
C U s e rs
\E ri n C
\D o c u m e n ts
\D R
Y D
P
-1
-F
-P S
E ri n
C V
E R
.r v t
/2
/2
:4
:3
A
M
2-GI150
P D
R Y
D O
C K
S
A L T
W A
T E
R S
Y S
T E
M
F O
R C
V N
-7
P U
M P
S
TA
TI
O
N
LI
F E
S A
F E
TY
P
LA
N
AEC
12857787
PJB EBC
02/02/2022
DEVIN POULIN,
C984 FACILITIES PLANNER, NNSY
JTL / TLH
1364315
P O
R T
S M
O U
T H
, V
IR
G
IN
IA
N
O R
F O
LK
N
A V
A L
S H
IP
Y
A R
D
EJA
DSN
SHEET NOTES
SHEET KEYNOTES#
1/8" = 1'-0" B1
PUMP STATION 6 - LIFE SAFETY - FIRST LEVEL
1/8" = 1'-0"
B3
PUMP STATION 6 - LIFE SAFETY - SECOND LEVEL
PLAN
NORTH
KEY PLAN
PS-6
PLAN
NORTH
PLAN
NORTH
1 REFER TO LIFE SAFETY CODE ANALYSIS FOR ADDITIONAL INFORMATION ON
THE CODE REVIEW OF THE PUMP STATION.
2 REFER TO THE ELECTRICAL LIGHTING PLANS FOR LOCATION OF
EMERGENCY LIGHTING FOR THE PUMP STATION.
3 REFER TO THE FIRE ALARM PLANS FOR LOCATION OF INITIATION AND
NOTIFICATION DEVICES.
4' 8' 16'0'
4' 8' 16'0'
1 FIRE EXTINGUISHER LOCATION. PROVIDE EXTINGUISHERS WITH WALL
BRACKETS FOR MOUNTING.
2 PRIMARY FIRE DEPARTMENT ENTRANCE.
FIRE EXTINGUISHER
POUNDS RATING # OF UNITS
REQUIRED
HOW MANY
UNITS
PROVIDED
MINIMUM
REQUIRED
DISTANCE
5 2A 2 4 75 FT
S Y
M D
E S
C R
IP
T
I O N
D A
T E
A P
P R
IS
S U
E D
F O
R C
O N
S T
R U
C T
IO
N
/2
8/
IS
SU
ED
F
OR
Virginia Beach, Virginia 23462 Fax: (757) 499-1757
ADVANCED
ENGINEERING
CONSULTANTS
S SS
ROOM / ZONE AREA
OCCUPANCY,
ALLOWABLE AREA PER
OCCUPANT
OCCUPANCY LOAD (PEOPLE)
OCCUPANCY, TYPE
A - ASSEMBLY
B - BUSINESS
S - STORAGE
I - INDUSTRIAL
1500 SF
B 150
W: NET EXIT WIDTH (INCHES)
C: CAPACITY (PEOPLE)
P: EXIT WIDTH PER PERSON
A: ACTUAL EGRESS (PEOPLE)
1 HOUR FIRE WALL
2 HOUR FIRE WALL
SMOKE PARTITION
SYMBOL DESCRIPTION
AREA NOT IN CONTRACT
COMMON PATH OF TRAVEL
TRAVEL DISTANCE
TD = X'-XX"
DEAD -END CORRIDOR
DE = X'-XX"
NUMBER OF OCCUPANTS EXITING#
1/2 HOUR FIRE WALL
3 HOUR FIRE WALL
W
C
P
A
CPT = X'-XX"
LIFE SAFETY LEGEND
1,500 SF
I 100
CPT=7'-6"
0.3
0.3
TO ENTRY LEVEL TO ENTRY LEVEL
TD=76'-10"
0.3
0.3
TD=87'-6"
CPT=20'-6"
CPT=20'-9"
1,500 SF
I 100
FROM SECOND
LEVEL
FROM SECOND LEVEL
TD=96'-9"
TD=93'-6"
1 1
F A
C P
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L
F A
C
IL
IT
IE
S E
N G
IN
E
E R
S
T E
M S
C O
M M
A N
D
DRAWFORM REVISION: 25 AUGUST 2020
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
Y S
T E
M S
C O
M M
A N
D
M
ID
-A T
LA
N
T
IC
N A
V A
L S
T A
T
IO
N
N O
R F
O L
K
V A
AS NOTED
F
IL
E N
A M
E
P
LO
T T
E D
ALG
N40085-22-R-2598
C U s e rs
\E ri n C
\D o c u m e n ts
\D R
Y D
P
-1
-F
-P S
E ri n
C V
E R
.r v t
/2
/2
:4
:5
A
M
2-GI160
P D
R Y
D O
C K
S
A L T
W A
T E
R S
Y S
T E
M
F O
R C
V N
-7
P U
M P
S
TA
TI
O
N
LI
F E
S A
F E
TY
P
LA
N
AEC
12857788
PJB EBC
02/02/2022
DEVIN POULIN,
C984 FACILITIES PLANNER, NNSY
JTL / TLH
1364315
P O
R T
S M
O U
T H
, V
IR
G
IN
IA
N
O R
F O
LK
N
A V
A L
S H
IP
Y
A R
D
EJA
DSN
SHEET NOTES
SHEET KEYNOTES#
PLAN
NORTH
KEY PLAN
PS-8
PLAN
NORTH
PLAN
NORTH
1/8" = 1'-0" C1
PUMP STATION 8 - LIFE SAFETY - SECOND LEVEL
1/8" = 1'-0" B1
PUMP STATION 8 - LIFE SAFETY - ENTRY LEVEL
4' 8' 16'0'
4' 8' 16'0'
1 REFER TO LIFE SAFETY CODE ANALYSIS FOR ADDITIONAL INFORMATION ON
THE CODE REVIEW OF THE PUMP STATION.
2 REFER TO THE ELECTRICAL LIGHTING PLANS FOR LOCATION OF
EMERGENCY LIGHTING FOR THE PUMP STATION.
3 REFER TO THE FIRE ALARM PLANS FOR LOCATION OF INITIATION AND
NOTIFICATION DEVICES.
1 FIRE EXTINGUISHER LOCATION. PROVIDE EXTINGUISHERS WITH WALL
BRACKETS FOR MOUNTING.
2 PRIMARY FIRE DEPARTMENT ENTRANCE.
FIRE EXTINGUISHER
POUNDS RATING # OF UNITS
REQUIRED
HOW MANY
UNITS
PROVIDED
MINIMUM
REQUIRED
DISTANCE
5 2A 2 4 75 FT
S Y
M D
E S
C R
IP
T
I O N
D A
T E
A P
P R
IS
S U
E D
F O
R C
O N
S T
R U
C T
IO
N
/2
8/
IS
SU
ED
F
OR
SS
x
SS
x
SS
x
SS
x
SS
x
SS
x
SSx
SSx
SSx
SSx
SSx
SS x SS x
SS x SSx
SSx SSx
SSx SSx SSx SSx
SS
x
SS
x
SS
x
SS
x
SS
x
SSx
SS
x
DI
D
DI
CO
DI
DI
DI
D
DI
DI
DI
DI
DI
DI
DI
DI
DI D
W Q
DI
DI
DI
DI
DI
DI
DI
DIDI
WQ
WQ
W Q
2"SS
2'- 6"
8"
3'- 0"
3"
1'-2
BL
DG
BA
RK
ER
S
TR
EE
T
BLDG 369
SO
UT
HE
RN
B
RA
NC
H
EL
IZ
AB
ET
H
RI
VE
R
McCAWLEY STREET
DRY DOCK 8
BLDG 2748
0+00 1+00 2+00 3+00 4+00 5+00 6+00 7+00 8+00 9+00 10+00 11+00
PUMPWELL 8
T T T T T
T T T T T
T T T
T
E
E
E
E
E
E
E
E
T
T
T
T
T
T
T E
T
E E E E E
E
E E T T
E
T T
E E E
BLDG
BLDG
BLDG
PIER 6
BERTH 39
WHARF 7BERTH 42
BLDG 44510
BERTH 41
BERTH 4012
X3
D
EP
AR
TM
EN
T
O F
TH
E
N
AV
Y
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
N
AV
AL
F
AC
IL
IT
IE
S
EN
G
IN
EE
R
IN
G
S
YS
TE
M
S C
O M
M
AN
D
DES DRW
SY
M
D
ES
C R
IP
TI
O N
D
AT
E
AP
PR
DRAWFORM REVISION: 25 AUG 2020
CHK
OF
EPROJECT NO.:
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
NA
VA
L
FA
CI
LI
TI
ES
E
NG
IN
EE
RI
NG
S
YS
TE
M
S
CO
M M
AN
D
M
ID
-A
TL
AN
TI
C
NA
VA
L S
TA
TI
ON
NO
RF
OL
K, V
A
NO
RF
O
LK
N
AV
AL
S
HI
PY
AR
D
PO
RT
SM
O
UT
H, V
IR
G
IN
IA
P
D R
Y D
O C
K S
A
LT
W A
TE
R
S Y
S
TE
M
FO
R C
V N
-7
JTL/TLH
EJA
DSN
1364315
N40085-22-R-2598
DLB
DEVIN POULIN,
C984 FACILITIES PLANNER, NNSY
02/02/2022
PH
AS
E
- P R
O
JE
C T
SI
TE
L
IM
IT
S
CLZ MDR MLC
AS NOTED
12857789
2-GC111
/28 /22
IS
SU
ED
F
OR
B1
NORTH
PLAN
SCALE: 1"=60'
PHASE 2 - PROJECT SITE LIMITS
60' 120'0
1. PUMP STATION 6
2. PUMP STATION 6 GENERATOR AND FUEL TANK
3. PUMP STATION 8
4. PUMP STATION 8 GENERATOR AND FUEL TANK
5. ACCESS TO NORTH FLOOD FLUME IMPROVEMENTS
6. ELECTRIC AND TELECOMMUNICATIONS DUCTBANK
7. LIMITS OF STAGING AND LAYDOWN
8. SALTWATER SUPPLY
9. STOPLOG FRAME AND COVER
10. SOIL STOCKPILE AND STORAGE AREA
11. OFFICE TRAILER LOCATION. ELECTRIC, SEWER, AND
WATER HOOKUPS ARE AVAILABLE.
12. LIMITS OF CONSTRUCTION
X3. CLIN 0005
SHEET KEYNOTES
D
W
QWQ
WQ
PUMP STATION 8
2'- 6"
8"
3'- 0"
3"
1'- 2"
BL
DG
BA
RK
ER
S
TR
EE
T
PIER 6
BERTH 39
WHARF 7BERTH 40
BLDG 369
SO
UT
HE
RN
B
RA
NC
H
EL
IZ
AB
ET
H
RI
VE
R
McCAWLEY STREET
DRY DOCK 8
BLDG 274
BLDG 273
0+00 1+00 2+00 3+00 4+00 5+00 6+00 7+00 8+00 9+00 10+00 11+00
PUMPWELL 8 7
6 6
1 1
255.91'
CV
N-
F
LIG
HT
D
EC
K
EX 6" FW
EX 6" FW
EX 6" FW
EX 6" FW
EX 6" FW
EX 6" FW
EX 6" FW
EX 6" FW
6" FW
EX 6" FW
EX 6"
FW
EX 8" FW
EX 12
" FW
EX 12" FW EX 12" FW EX 12" FW EX 12" FW
EX 6" FW
EX
6"
FW
EX
" F
W
EX 6" FW
EX
6"
F W
NEW
8" F
W
EX 8" FW1
EX 6" FW
125.1'
.32'
HITCHCOCK STREET
PS 8
PS 6
NE
W
" F
W
BLDG 44510
18'-9 14 "
D
EP
AR
TM
EN
T
O F
TH
E
N
AV
Y
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
N
AV
AL
F
AC
IL
IT
IE
S
EN
G
IN
EE
R
IN
G
S
YS
TE
M
S C
O M
M
AN
D
DES DRW
SY
M
D
ES
C R
IP
TI
O N
D
AT
E
AP
PR
DRAWFORM REVISION: 25 AUG 2020
CHK
OF
EPROJECT NO.:
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
NA
VA
L
FA
CI
LI
TI
ES
E
NG
IN
EE
RI
NG
S
YS
TE
M
S
CO
M M
AN
D
M
ID
-A
TL
AN
TI
C
NA
VA
L S
TA
TI
ON
NO
RF
OL
K, V
A
NO
RF
O
LK
N
AV
AL
S
HI
PY
AR
D
PO
RT
SM
O
UT
H, V
IR
G
IN
IA
P
D R
Y D
O C
K S
A
LT
W A
TE
R
S Y
S
TE
M
FO
R C
V N
-7
JTL/TLH
EJA
DSN
1364315
N40085-22-R-2598
DLB
DEVIN POULIN,
C984 FACILITIES PLANNER, NNSY
02/02/2022
PH
AS
E
- F
IR
E
PR
O
TE
C
TI
O N
S
IT
E
PL
AN
CLZ MDR MLC
AS NOTED
12857790
2-GC121
/28 /22
IS
SU
ED
F
OR
B1
NORTH
PLAN
SCALE: 1"=60'
PHASE 2 - FIRE PROTECTION SITE PLAN
60' 120'0
1. SEE SHEET 1-C-001 FOR CIVIL LEGEND, ABBREVIATIONS, AND GENERAL NOTES.
2. DIMENSIONS ARE IN SURVEY FEET UNLESS OTHERWISE NOTED.
3. WHERE APPLICABLE, THE FOLLOWING MINIMUM FIRE PROTECTION PROVISIONS HAVE BEEN INCLUDED ON THE LIFE SAFETY SITE PLAN IN
ACCORDANCE WITH UFC 3-600-01, SECTION 1-7.2.4.2:
A. LINE OF ENCROACHMENT IDENTIFYING ASSUMED PROPERTY LINES AND MINIMUM SEPARATION DISTANCES FROM ADJACENT BUILDINGS.
B. BUILDING PERIMETER USED FOR FRONTAGE INCREASES.
C. FIRE DEPARTMENT ACCESS.
D. FIRE LANE WIDTH, MARKING AND LOCATIONS, APPROACH ROADS AND TURN RADIUS AND LOCATION.
E. TYPE AND QUANTITY OF ANTITERRORISM SECURE ACCESS.
F. INTENDED FIRE DEPARTMENT MAIN ENTRANCE TO FACILITY.
G. LOCATION OF FIRE DEPARTMENT CONNECTIONS.
H. FIRE HYDRANTS, POST INDICATOR VALVE OR VALVES AND THEIR CONNECTED WATER DISTRIBUTION MAINS SERVING FACILITY.
I. FIRE PUMP ROOM.
J. WATER STORAGE TANKS.
K. HAZARDOUS MATERIAL SPILL CONTAINMENT TANKS.
L. BACKFLOW PREVENTION ASSEMBLY OR ASSEMBLIES SERVING WATER-BASED FIRE PROTECTION SYSTEMS (IF LOCATED OUTSIDE OF BUILDING).
4. THE FOLLOWING REQUIREMENTS HAVE BEEN MET AND ARE INDICATED ON THE LIFE SAFETY SITE PLAN IN ACCORDANCE WITH UFC 3-600-01:
A. FIRE HYDRANTS HAVE BEEN LOCATED IN ACCORDANCE WITH NFPA 24, AND SPACED NOT MORE THAN 300 FEET APART. A MINIMUM OF TWO
HYDRANTS HAVE BEEN PROVIDED SO THAT PROTECTED EXPOSURES CAN BE REACHED THROUGH HOSE RUNS NOT EXCEEDING 300 FEET.
(SECTION 4-16.8.3)
B. AT LEAST ONE HYDRANT HAS BEEN LOCATED WITHIN 150 FEET OF THE FIRE DEPARTMENT CONNECTION. (SECTION 9-3.5.8.4) C. HYDRANTS LOCATED ADJACENT TO PARKING AREAS, VEHICLE TRAFFIC AREAS, OR OTHER AREAS SUBJECT TO MECHANICAL DAMAGE, ARE
PROTECTED BY BOLLARDS. THE BOLLARDS ARE LOCATED SO THEY ARE NOT DIRECTLY IN FRONT OF AN OUTLET. THE BOLLARDS ALLOW CLEARANCE TO ATTACH HOSES, ALLOW FOR THE REMOVAL OF THE HYDRANT CAPS, AND FOR THE HYDRANT TO BE OPENED AND CLOSED
WITHOUT OBSTRUCTIONS. (SECTION 9-3.5.9)
SHEET NOTESSHEET KEYNOTES
1. FIRE DEPARTMENT VEHICLE ROUTE WITH FIRE LANE
PAVEMENT MARKINGS, SEE DETAIL A1/1-CS502
2. FIRE DEPARTMENT BUILDING ENTRANCE
3. WALL MOUNTED FIRE DEPARTMENT CONNECTION
4. 6" GATE VALVE
5. FIRE HYDRANT
6. EXISTING FIRE HYDRANT
7. FIRE DEPARTMENT VEHICLE ACCESS
8. 12" GATE VALVE
9. 6" FIRE SERVICE TO PUMP STATION
| 2-G-030 - COVER SHEET |
| 2-G-031 - INDEX OF DRAWINGS - VOLUME 3 OF 4 |
| 2-GD150 - BUILDING 828 - DEMOLITION PLANS & SECTION |
| 2-GD160 - BUILDING 829 - DEMOLITION PLANS & SECTION |
| 2-GI050 - PUMP STATION 6 - LIFE SAFETY CODE ANALYSIS |
| 2-GI060 - PUMP STATION 8 - LIFE SAFETY CODE ANALYSIS |
| 2-GI150 - PUMP STATION 6 - LIFE SAFETY PLAN |
| 2-GI160 - PUMP STATION 8 - LIFE SAFETY PLAN |
| 2-GC111 - PHASE 2 - PROJECT SITE LIMITS |
| 2-GC121 - PHASE 2 - FIRE PROTECTION SITE PLAN |
2022-02-25T08:04:42-0500
2022-02-25T08:04:51-0500
2022-02-25T08:05:02-0500
2022-02-25T08:05:21-0500
2022-02-25T10:33:40-0500
2022-02-25T10:33:51-0500
2022-02-25T10:33:51-0500
2022-02-25T10:33:51-0500
2022-02-25T10:34:04-0500
2022-02-25T10:34:14-0500
2022-02-25T10:34:15-0500
2022-02-25T10:34:15-0500
2022-02-25T13:26:29-0500
2022-02-25T13:26:35-0500
2022-02-25T13:26:47-0500
2022-02-25T13:26:59-0500
2022-02-28T07:39:11-0500
2022-02-28T07:39:44-0500
2022-02-28T07:40:04-0500
2022-02-28T07:40:22-0500
2022-02-28T08:39:01-0500
2022-02-28T08:39:32-0500
2022-02-28T08:40:07-0500
2022-02-28T08:40:23-0500
| 2022-03-15T23:15:00-0400 | |
| James E. Donahue, R.A. | |
| I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed. |
| 2022-03-15T23:15:13-0400 | |
| James E. Donahue, R.A. | |
| I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed. |
| 2022-03-15T23:15:14-0400 | |
| James E. Donahue, R.A. | |
| I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed. |
| 2022-03-15T23:15:15-0400 | |
| James E. Donahue, R.A. | |
| I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed. |
| 2022-03-15T23:15:16-0400 | |
| James E. Donahue, R.A. | |
| I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed. |
| 2022-03-15T23:15:17-0400 | |
| James E. Donahue, R.A. | |
| I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed. |
| 2022-03-15T23:15:18-0400 | |
| James E. Donahue, R.A. | |
| I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed. |
| 2022-03-15T23:15:19-0400 | |
| James E. Donahue, R.A. | |
| I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed. |
| 2022-03-15T23:15:19-0400 | |
| James E. Donahue, R.A. | |
| I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed. |
| 2022-03-15T23:15:20-0400 | |
| James E. Donahue, R.A. | |
| I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed. |
| 2022-03-15T23:15:52-0400 | |
| James E. Donahue, R.A. | |
| I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed. |
| 2022-03-15T23:16:27-0400 | |
| James E. Donahue, R.A. | |
| I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed. |
| 2022-03-15T23:16:28-0400 | |
| James E. Donahue, R.A. | |
| I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed. |
| 2022-03-15T23:17:00-0400 | |
| James E. Donahue, R.A. | |
| I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed. |
| 2022-03-15T23:17:23-0400 | |
| James E. Donahue, R.A. | |
| I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed. |
| 2022-03-15T23:17:24-0400 | |
| James E. Donahue, R.A. | |
| I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed. |
| 2022-03-15T23:17:25-0400 | |
| James E. Donahue, R.A. | |
| I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed. |
| 2022-03-15T23:17:26-0400 | |
| James E. Donahue, R.A. | |
| I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed. |
| 2022-03-15T23:17:51-0400 | |
| James E. Donahue, R.A. | |
| I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed. |
| 2022-03-15T23:18:13-0400 | |
| James E. Donahue, R.A. | |
| I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed. |