1364315_dwg_14of18_PH2_V3_Architectural.pdf

PDF 4 MB Posted

Attached to
P-678 Dry Dock 8 Saltwater System for CVN-78, Norfolk Naval Shipyard, Portsmouth, Virginia
Solicitation number
N40085-22-R-2598_Drawings
Issued by

About this file

This package includes construction drawings and specifications for a federal construction project to build saltwater pump stations at the Norfolk Naval Shipyard in Portsmouth, Virginia. The project involves constructing two new pump stations, numbered 6 and 8, to provide saltwater systems for Dry Dock 8 and the aircraft carrier CVN-78. The construction drawings provide floor plans, elevations, sections and details for the new pump stations, depicting structural, architectural, mechanical and electrical aspects. The specifications are likely to include requirements for materials, workmanship, testing and commissioning. The solicitation number for this project is N40085-22-R-2598. Interested contractors should review the drawings under notice ID N40085-22-R-2598_Drawings and the specifications under notice ID N40085-22-R-2598_Specifications to develop bids for construction of the new pump stations, with bids due on an unspecified future date. The construction project is for the Department of the Navy at the Norfolk Naval Shipyard.

View the file

Other files

Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

UP

UP

UP

UP

B5 2-A-350

A B

B2 2-A-250

B1 2-A-250

C1 2-A-250

C3 2-A-350

W1

W1

206A

206B

0" 1'

- 6

1'

- 6

0"

25' - 0"1' - 6" 1' - 6"

28' - 0"

PS6 ELECT EQUIP.

6"

6"

SHEET NOTES:

1. FOR ARCHITECTURAL GENERAL NOTES, MATERIAL LEGEND, AND

ABBREVIATIONS REFER TO SHEET 1-A-001.

2. REFERENCE STRUCTURAL DRAWINGS FOR ROUGH OPENING

DIMENSIONS IN CAST-IN-PLACE CONCRETE WALLS.

3. ALL DIMENSIONS ARE FROM: COLUMN GRID LINE AND FACE OF

CONCRETE WALL, UNLESS NOTED OTHERWISE.

B5 2-A-350

A B

B2 2-A-250

B1 2-A-250

C1 2-A-250

C3 2-A-350

106A

PS6 PUMP CTRL

106B

8'

- 4

1/ 2"

VE

R I

FY

W

IT

H

PU

M P

0"

VE

R I

FY

W

IT

H

PU

M P

0"

0"

25' - 0"

252525

A1 2-A-350

EQ

EQ

CE

NT

ER

LIN

E

CE

NT

ER

LIN

E

EQ

EQ

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT NO.:

D

EP

AR

TM

EN

T

O F

TH

E

N

AV

Y N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G S

YS

TE

M S

C O

M M

AN

D

DRAWFORM REVISION: 25 AUGUST 2020

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

NA

VA

L

FA

CI

LI

TI

ES

E

NG

IN

EE

RI

NG

S

YS

TE

M

S

CO

M M

AN

D

M

ID

-A

TL

AN

TI

C

N

AV

AL

S

TA

TI

O N

N

O R

FO

LK

, V A

AS NOTED

FI

LE

N

AM

E:

PL

OT

TE

D:

C

:\R ev it_ Pr oj ec ts \D

R

YD

P6

-1

-A -P

S6 _p gr eg or y@ bu rn sm cd

.c om

.rv t

2/

/2

:0 2:

A

M

2-A-151

P

D

R Y

D O

C K

S

A

LT

W A

TE

R

S Y

S

TE

M

FO

R C

V N

-7

PU

M

P

ST

AT

IO

N

-F

LO

O R

PL

AN

FI

RS

T

LE

VE

L

SE

CO

ND

L

EV

EL

LES

12857916

BSG BSG

02/02/2022

DEVIN POULIN,

C984 FACILITIES PLANNER, NNSY

JTL/TLH

1364315

N40085-22-R-2598

PO

RT

SM

OU

TH

, V

IR

GI

NI

A

NO

RF

OL

K

NA

VA

L S

HI

PY

AR

D

EJA

CGM

DSN

PLAN

NORTH

1/8" = 1'-0"B3 PUMP STATION 6 - FLOOR PLAN - SECOND LEVEL

SHEET KEYNOTES

4 METAL STAIR, PLATFORM, AND RAILING; RE: STRUCT

9 DOWNSPOUT, DRAIN TO BOOTS, BELOW GRADE

20 EXTERIOR STL LADDER TO ROOF PLATFORM; RE: STRUCT, PROVIDE LOCKABLE

LADDER GUARD AT BOTTOM RUNGS

23 STEP-OVER ABOVE SHIP STAIR & PLATFORM, COORDINATE WITH PIPE SIZING

AND EQUIPMENT BELOW TO ENSURE CLEARANCE REQUIREMENTS

25 STEEL REMOVABLE WATERTIGHT HATCH, RE: STRUCTURAL. ALIGN WITH

CENTERLINE OF PUMP

4' 8' 16'0' 4' 8' 16'0'

PLAN

NORTH

PLAN

NORTH

KEY PLAN

PS-6

1/8" = 1'-0"B1 PUMP STATION 6 - FLOOR PLAN - FIRST LEVEL

SY

M

DE

S C

RI

PT

I O N

DA

TE

AP

PR

IS

SU

ED

F

OR

C

ON

ST

RU

C T

IO

N

/18 /20

/28 /20

IS

SU

ED

F

OR

B

ID

B5 2-A-350

A B

SLOPE

1:12

B2 2-A-250

C2 2-A-250

B1 2-A-250

C1 2-A-250C3

2-A-350

0"

0"

VE

R I

FY

W

IT

H

EQ

U I

P.

0"

VE

R I

FY

W

IT

H

EQ

U I

P.

8"

VE

R I

FY

W

IT

H

EQ

U I

P.

0"

1'

- 2

0"

25' - 0"

12' - 9 3/4"

SLOPE

1:12

EQ EQ

1'

- 2

SLOPE

DOWNSPOUT

FLASHING / SCUPPER

SYSTEM

CONC WALL

ROOF LEVEL

4 1 /4"

MEMBRANE FLASHING

SYSTEM

BASE FLASHING PLY

BUILT-UP ROOFING

SYSTEM

RIGID INSULATION,

STAGGER ALL

JOINTS, FASTEN PER

SPECIFICATION

METAL ROOF

DECK, RE:

STRUC.

4" MIN.

12" MIN.

SEALANT AT FULL

PERIMETER

1/2" PROTECTION

BOARD

PIPE THROUGH

ROOF

1' - 6"

1' - 2"

2"

CONDUCTOR

HEAD

OVERFLOW

OPENING

1 1 /2"

SCUPPER

OPENING

4 1/2"

4 1 /4"

2' - 0"

OVERFLOW

SCUPPER

OPENING

2" 4 1

/4"

4 1/2"

CLEAR OPENING

12' - 0"

ALIGN RIGID INSULATION

SURFACES TO

ACCOMMODATE

CONTINUOUS BUILT-UP

MEMBRANE ROOFING

METAL DECK RE:

STRUCTURAL

DRAWINGS

RIGID INSULATION

TO ACHIEVE R30

REMOVABLE CHECKERED PLATE.

PAINT UNDERSIDE WITH SAFETY

YELLOW. RE: STRUCT

BUILT-UP MEMBRANE

ROOFING

REMOVABLE FRAMING,

PAINT WITH SAFETY

YELLOW. RE: STRUCT

RIGID INSULATION TO

ACHIEVE R30 MIN.,

ADHERED ON

CHECKERED PLATE

REMOVABLE FRAMING,

PAINT WITH SAFETY

YELLOW. RE: STRUCT

COUNTERFLASHING

BOOT W/ SS DRAW

BANDS

RE: STRUCT.

CABLE

ROOF STEEL

FRAMING

METAL

ROOF DECK

SEALANT AT FULL

PERIMETER

MEMBRANE

FLASHING SYSTEMRIGID

INSULATION

BUILT-UP ROOFING

SYSTEM

SLOPE

CONDUCTOR HEAD &

DOWNSPOUT BEYOND

FLASHING & OVERFLOW

SCUPPER SYSTEM

CONC WALL

ROOF LEVEL

4 1 /4"

2"

PROFILE OF MAIN

SCUPPER SYSTEM

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT NO.:

D

EP

AR

TM

EN

T

O F

TH

E

N

AV

Y N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G S

YS

TE

M S

C O

M M

AN

D

DRAWFORM REVISION: 25 AUGUST 2020

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

NA

VA

L

FA

CI

LI

TI

ES

E

NG

IN

EE

RI

NG

S

YS

TE

M

S

CO

M M

AN

D

M

ID

-A

TL

AN

TI

C

N

AV

AL

S

TA

TI

O N

N

O R

FO

LK

, V A

AS NOTED

FI

LE

N

AM

E:

PL

OT

TE

D:

C

:\R ev it_ Pr oj ec ts \D

R

YD

P6

-1

-A -P

S6 _p gr eg or y@ bu rn sm cd

.c om

.rv t

2/

/2

:0 2:

A

M

2-A-153

P

D

R Y

D O

C K

S

A

LT

W A

TE

R

S Y

S

TE

M

FO

R C

V N

-7

PU

M

P

ST

AT

IO

N

-R O

O F

PL

AN

D

ET

AI

LS

LES

12857917

BSG BSG

02/02/2022

DEVIN POULIN,

C984 FACILITIES PLANNER, NNSY

JTL/TLH

1364315

N40085-22-R-2598

PO

RT

SM

OU

TH

, V

IR

GI

NI

A

NO

RF

OL

K

NA

VA

L S

HI

PY

AR

D

EJA

CGM

DSN

1/8" = 1'-0"B3 PUMP STATION 6 - ROOF PLAN

SHEET KEYNOTES

3 PROVIDE FALL RESTRAINT LANYARD CABLE & SAFETY LINE SYSTEM ATTACHED

TO CABLE ANCHORS, TYP.

5 CABLE ANCHORS FOR FALL RESTRAINT SYSTEM SPACED @ 25'-0" MIN. RE:

A3/2-A-153

8 MAIN & OVERFLOW METAL SCUPPER SYSTEM. RE: D1, D2 & C1/2-A-153

10 AREA OF BUILT-UP ROOF SYSTEM ON REMOVABLE CHECKERED PLATE,

PROVIDE PERMANENT 2" WIDE STRIP OR PAINT LINE MARKINGS TO ALIGN WITH

PERIMETER OF CHECKERED PLATE BELOW TO INDICATE AREA OF FUTURE

LIFTING/LOWERING OF ELECTRICAL EQUIPMENT, RE: STRUCT

11 BUILT-UP ROOF SYSTEM

20 EXTERIOR STL LADDER TO ROOF PLATFORM; RE: STRUCT, PROVIDE LOCKABLE

LADDER GUARD AT BOTTOM RUNGS

35 PROVIDE PERMANENT PAINTED 4" HIGH COLOR YELLOW MARKINGS ON ROOF

WITH MESSAGE "ROOF AREA FOR REMOVAL TO ALLOW THE LIFTING AND

LOWERING OF ELECTRICAL EQUIPMENT BELOW, TYP.

4' 8' 16'0'

PLAN

NORTH

ROOF DRAINAGE CALCULATIONS

TYP. ROOF DRAIN

AREA MATERIAL SLOPE AREA (SF) DS QTY (AVERAGE) AREA / DS

DS AREA / 340 (SI)

100 YR *MIN. DS SIZE PROVIDED RAINFALL INTENSITY

TYP. DRAIN AREA BUILT-UP ROOF SYSTEM 1 / 12 1642 4 PER ROOF DRAIN

AREA

411 2 1.4"X1.4" (4"X4" PROVIDED) 3.5

*NOTES:

1. UFC 3-110-03 REQUIRES THE USE OF UFC 3-400-02 “DESIGN: ENGINEERING WEATHER DATA” AND INTERNATIONAL PLUMBING CODE FOR DETERMINING 100 YEAR

HOUR RAINFALL DATA. (SUPERSEDES SMACNA 5 MIN. INTENSITY DATA). AS PER SEC 1106.1, THE HOUR RAINFALL IS 3.25 TO 3.5 FOR NORFOLK, VA

2. DOWNSPOUNT SIZING:

A= 411 SF (1642SF/4);

I= 3.5 RAINFALL INTENSITY

AREA PER DOWNSPOUT AREA = 340 SQ FT PER SQ IN (SMACNA TABLE 1-2 USING I=3.5)

PLAN

NORTH

KEY PLAN

PS-6

1" = 1'-0"D1 DETAIL - SCUPPER SECTION, TYP.

3" = 1'-0"A4 PENETRATION DETAIL

1" = 1'-0"C1 DETAIL - SCUPPER ELEV. TYP.

1' 2'0' 6"

1' 2'0' 6"

0' 6"3" 9"

0' 1' 2' 3'3/4" = 1'-0"B1 DETAIL - ROOF ON REMOVABLE CHECKERED PLATE

1" = 1'-0"A3 CABLE ANCHOR DETAIL

1' 2'0' 6"

LO

CA

TI

ON

B

EL

OW

LO

CA

TI

ON

B

EL

OW

LO

CA

TI

ON

B

EL

OW

SY

M

DE

S C

RI

PT

I O N

DA

TE

AP

PR

IS

SU

ED

F

OR

C

ON

ST

RU

C T

IO

N

/18 /20

1" = 1'-0"D2 DETAIL - OVERFLOW SCUPPER SECTION, TYP.

1' 2'0' 6"

/28

/20

IS

SU

ED

F

OR

C1 2-A-260

C2 2-A-260

B1 2-A-260

B2 2-A-260

B

PS8 ELECT EQUIP.

14' - 6"

14' - 6"

C3 2-A-350

A3 2-A-350

SIM

A

208A 208B

W1 W1

C1 2-A-260

C2 2-A-260

B1 2-A-260

B2 2-A-260

B

SL

OP

E 1:1

28' - 0" 32' - 0"

VERIFY WITH EQUIP.

17' - 0"+/-

VERIFY WITH EQUIP.

22' - 8"+/-

VERIFY WITH EQUIP.

18' - 0"+/-

1' - 2" 57' - 8"

C3 2-A-350

A3 2-A-350

SIM

A

1' - 2"

SL

OP

E 1:1

9 3 /4"

LOCATION BELOW LOCATION BELOW LOCATION BELOW

8 888

C2 2-A-260

B1 2-A-260

B

C3 2-A-350

A3 2-A-350

A

8'

- 5

SIM

PS8 PUMP CTRL

108A 108B

8' - 4 1/2"

VERIFY WITH PUMP

16' - 0"+/-

VERIFY WITH PUMP

16' - 0"+/- 1' - 6" 60' - 0" 1' - 6"

63' - 0"

0" 1'

- 6

1'

- 6

4 44

EQ EQ EQ EQ

CENTERLINE CENTERLINE

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT NO.:

D

EP

AR

TM

EN

T

O F

TH

E

N

AV

Y N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G S

YS

TE

M S

C O

M M

AN

D

DRAWFORM REVISION: 25 AUGUST 2020

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

NA

VA

L

FA

CI

LI

TI

ES

E

NG

IN

EE

RI

NG

S

YS

TE

M

S

CO

M M

AN

D

M

ID

-A

TL

AN

TI

C

N

AV

AL

S

TA

TI

O N

N

O R

FO

LK

, V A

AS NOTED

FI

LE

N

AM

E:

PL

OT

TE

D:

C

:\R ev it_ Pr oj ec ts \D

R

YD

P6

-1

-A -P

S8 _p gr eg or y@ bu rn sm cd

.c om

.rv t

2/

/2

:0 8:

A

M

2-A-161

P

D

R Y

D O

C K

S

A

LT

W A

TE

R

S Y

S

TE

M

FO

R C

V N

-7

PU

M

P

ST

AT

IO

N

-F

LO

O R

PL

AN

FI

RS

T

LE

VE

L, S

EC

O

ND

L

EV

EL

R

O O

F

LES

12857918

BSG BSG

02/02/2022

DEVIN POULIN,

C984 FACILITIES PLANNER, NNSY

JTL/TLH

1364315

N40085-22-R-2598

PO

RT

SM

OU

TH

, V

IR

GI

NI

A

NO

RF

OL

K

NA

VA

L S

HI

PY

AR

D

EJA

CGM

DSN

1/8" = 1'-0"C3 PUMP STATION 8 - FLOOR PLAN - SECOND LEVEL

PLAN

NORTH

PLAN

NORTH

SHEET KEYNOTES

4 METAL STAIR, PLATFORM, AND RAILING; RE: STRUCT

5 CABLE ANCHORS FOR FALL RESTRAINT SYSTEM SPACED @ 25'-0" MIN. RE:

A3/2-A-153

8 MAIN & OVERFLOW METAL SCUPPER SYSTEM. RE: D1, D2 & C1/2-A-153

9 DOWNSPOUT, DRAIN TO BOOTS, BELOW GRADE

10 AREA OF BUILT-UP ROOF SYSTEM ON REMOVABLE CHECKERED PLATE,

PROVIDE PERMANENT 2" WIDE STRIP OR PAINT LINE MARKINGS TO ALIGN WITH

PERIMETER OF CHECKERED PLATE BELOW TO INDICATE AREA OF FUTURE

LIFTING/LOWERING OF ELECTRICAL EQUIPMENT, RE: STRUCT

11 BUILT-UP ROOF SYSTEM

20 EXTERIOR STL LADDER TO ROOF PLATFORM; RE: STRUCT, PROVIDE LOCKABLE

LADDER GUARD AT BOTTOM RUNGS

23 STEP-OVER ABOVE SHIP STAIR & PLATFORM, COORDINATE WITH PIPE SIZING

AND EQUIPMENT BELOW TO ENSURE CLEARANCE REQUIREMENTS

25 STEEL REMOVABLE WATERTIGHT HATCH, RE: STRUCTURAL. ALIGN WITH

CENTERLINE OF PUMP

4' 8' 16'0'

4' 8' 16'0'

1/8" = 1'-0"C1 PUMP STATION 8 - ROOF PLAN

PLAN

NORTH

4' 8' 16'0'

PLAN

NORTH

KEY PLAN

PS-8

1/8" = 1'-0"B3 PUMP STATION 8 - FLOOR PLAN - FIRST LEVEL

SY

M

DE

S C

RI

PT

I O N

DA

TE

AP

PR

IS

SU

ED

F

OR

C

ON

ST

RU

C T

IO

N 0 1

2/1 8/2

/28

/20

IS

SU

ED

F

OR

EXTERIOR MATERIAL SCHEDULE

DESCRIPTION

PREFIN. METAL DOWNSPOUT;

SCUPPERS, COPING, GUARDRAILS,

HANDRAILS, STRINGERS, TREADS &

EXPOSED STRUCT. STAIR COMPONENTS

CONCRETE FINISH, SMOOTH

TROWEL, ELASTOMERIC COATING

MODEL/COLOR

DARK BRONZE

COLOR PAINTED TO MATCH

FEDERAL STANDARD 27780

STEEL WATERTIGHT HATCH, DOOR,

DOOR FRAME & WINDOW FRAME

COLOR PAINTED TO MATCH

FEDERAL STANDARD 27780

ROOF TOS

136' - 0"

GRADING LEVEL

103' - 0"

SECOND LEVEL

121' - 0"

FIRST LEVEL

103' - 6"

ENTRY LEVEL

109' - 0"

252525

W1 W1

4 4

ROOF TOS

136' - 0"

GRADING LEVEL

103' - 0"

SECOND LEVEL

121' - 0"

1 2

FIRST LEVEL

103' - 6"

ENTRY LEVEL

109' - 0"

28 44

TYP.

TYP.

ROOF TOS

136' - 0"

GRADING LEVEL

103' - 0"

SECOND LEVEL

121' - 0"

A B

FIRST LEVEL

103' - 6"

ENTRY LEVEL

109' - 0"

S1

ROOF TOS

136' - 0"

GRADING LEVEL

103' - 0"

SECOND LEVEL

121' - 0"

AB

FIRST LEVEL

103' - 6"

ENTRY LEVEL

109' - 0"

S1

GENERAL NOTES - SIGNAGE

1. PROVIDE CONCEALED HARDWARE/MOUNTING ATTACHMENT.

2. BUILDING NUMBERING TO BE CONFIRMED BY GOVERNMENT END USER

PRIOR TO SIGNAGE SHOP DRAWINGS. MESSAGE TEXTS AS SHOWN ON THE

SIGN ARE PLACE HOLDERS ONLY AND ARE NOT THE FINAL TEXT MESSAGES.

MESSAGE TEXTS MUST BE CONFIRMED BY THE GOVERNMENT END USER

PRIOR TO SIGNAGE SHOP DRAWINGS.

SIGNAGE LEGEND:

SIGNAGE LOCATION NUMBERXXX

S1 (EXTERIOR)

WHITE TEXT ON BLUE

BACKGROUND. TEXT

MUST BE CONFIRMED

BY GOVERNMENT END-

USER

3' - 0"

1'

- 0

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT NO.:

D

EP

AR

TM

EN

T

O F

TH

E

N

AV

Y N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G S

YS

TE

M S

C O

M M

AN

D

DRAWFORM REVISION: 25 AUGUST 2020

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

NA

VA

L

FA

CI

LI

TI

ES

E

NG

IN

EE

RI

NG

S

YS

TE

M

S

CO

M M

AN

D

M

ID

-A

TL

AN

TI

C

N

AV

AL

S

TA

TI

O N

N

O R

FO

LK

, V A

AS NOTED

FI

LE

N

AM

E:

PL

OT

TE

D:

C

:\R ev it_ Pr oj ec ts \D

R

YD

P6

-1

-A -P

S6 _p gr eg or y@ bu rn sm cd

.c om

.rv t

2/

/2

:0 2:

A

M

2-A-250

P

D

R Y

D O

C K

S

A

LT

W A

TE

R

S Y

S

TE

M

FO

R C

V N

-7

PU

M

P

ST

AT

IO

N

-B

UI

LD

IN

G E

LE

VA

TI

O

NS

LES

12857919

BSG BSG

02/02/2022

DEVIN POULIN,

C984 FACILITIES PLANNER, NNSY

JTL/TLH

1364315

N40085-22-R-2598

PO

RT

SM

OU

TH

, V

IR

GI

NI

A

NO

RF

OL

K

NA

VA

L S

HI

PY

AR

D

EJA

CGM

DSN

SHEET KEYNOTES

4 METAL STAIR, PLATFORM, AND RAILING; RE: STRUCT

8 MAIN & OVERFLOW METAL SCUPPER SYSTEM. RE: D1, D2 & C1/2-A-153

9 DOWNSPOUT, DRAIN TO BOOTS, BELOW GRADE

12 SMOOTH TROWEL FINISH ON CONCRETE WITH EXTERIOR PAINT, REFER TO

EXTERIOR MATERIAL SCHEDULE

19 METAL COPING

20 EXTERIOR STL LADDER TO ROOF PLATFORM; RE: STRUCT, PROVIDE LOCKABLE

LADDER GUARD AT BOTTOM RUNGS

21 SAFETY SWING GATES, PAINT WITH SAFETY YELLOW

25 STEEL REMOVABLE WATERTIGHT HATCH, RE: STRUCTURAL. ALIGN WITH

CENTERLINE OF PUMP

28 CONSTRUCTION JOINT FOR CONC. WALL, RE: STRUCT. DWGS. LOCATE AT

CENTER OF BLDG. BETWEEN GRID 1 & 2. KEEP AWAY FROM OPENINGS & BEAM

BEARING POINTS @ 2'-0" MIN

4' 8' 16'0'4' 8' 16'0'

4' 8' 16'0' 4' 8' 16'0'1/8" = 1'-0"B2 PUMP STATION 6 - EAST ELEVATION

1/8" = 1'-0"C2 PUMP STATION 6 - WEST ELEVATION

1/8" = 1'-0"B1 PUMP STATION 6 - SOUTH ELEVATION

1/8" = 1'-0"C1 PUMP STATION 6 - NORTH ELEVATION

SY

M

DE

S C

RI

PT

I O N

DA

TE

AP

PR

IS

SU

ED

F

OR

C

ON

ST

RU

C T

IO

N

/18 /20

/28 /20

IS

SU

ED

F

OR

ROOF/T.O.S.

136' - 0"

GRADING LEVEL

103' - 0"

SECOND LEVEL

121' - 0"

1 2

ENTRY LEVEL

109' - 0"

PUMP STATION 8 -

FLOOR PLAN - FIRST

LEVEL

103' - 6"

ROOF/T.O.S.

136' - 0"

GRADING LEVEL

103' - 0"

SECOND LEVEL

121' - 0"

B

ENTRY LEVEL

109' - 0"

PUMP STATION 8 -

FLOOR PLAN - FIRST

LEVEL

103' - 6"

A

S2

ROOF/T.O.S.

136' - 0"

GRADING LEVEL

103' - 0"

SECOND LEVEL

121' - 0"

ENTRY LEVEL

109' - 0"

PUMP STATION 8 -

FLOOR PLAN - FIRST

LEVEL

103' - 6"

W1 W1

252525

ROOF/T.O.S.

136' - 0"

GRADING LEVEL

103' - 0"

SECOND LEVEL

121' - 0"

B

ENTRY LEVEL

109' - 0"

PUMP STATION 8 -

FLOOR PLAN - FIRST

LEVEL

103' - 6"

A

S2

EXTERIOR MATERIAL SCHEDULE

DESCRIPTION

PREFIN. METAL DOWNSPOUT;

SCUPPERS, COPING, GUARDRAILS,

HANDRAILS, STRINGERS, TREADS &

EXPOSED STRUCT. STAIR COMPONENTS

CONCRETE FINISH, SMOOTH

TROWEL, ELASTOMERIC COATING

MODEL/COLOR

DARK BRONZE

COLOR PAINTED TO MATCH

FEDERAL STANDARD 27780

STEEL WATERTIGHT HATCH, DOOR,

DOOR FRAME & WINDOW FRAME

COLOR PAINTED TO MATCH

FEDERAL STANDARD 27780

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT NO.:

D

EP

AR

TM

EN

T

O F

TH

E

N

AV

Y N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G S

YS

TE

M S

C O

M M

AN

D

DRAWFORM REVISION: 25 AUGUST 2020

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

NA

VA

L

FA

CI

LI

TI

ES

E

NG

IN

EE

RI

NG

S

YS

TE

M

S

CO

M M

AN

D

M

ID

-A

TL

AN

TI

C

N

AV

AL

S

TA

TI

O N

N

O R

FO

LK

, V A

AS NOTED

FI

LE

N

AM

E:

PL

OT

TE

D:

C

:\R ev it_ Pr oj ec ts \D

R

YD

P6

-1

-A -P

S8 _p gr eg or y@ bu rn sm cd

.c om

.rv t

2/

/2

:0 8:

A

M

2-A-260

P

D

R Y

D O

C K

S

A

LT

W A

TE

R

S Y

S

TE

M

FO

R C

V N

-7

PU

M

P

ST

AT

IO

N

-B

UI

LD

IN

G E

LE

VA

TI

O

NS

LES

12857920

BSG BSG

02/02/2022

DEVIN POULIN,

C984 FACILITIES PLANNER, NNSY

JTL/TLH

1364315

N40085-22-R-2598

PO

RT

SM

OU

TH

, V

IR

GI

NI

A

NO

RF

OL

K

NA

VA

L S

HI

PY

AR

D

EJA

CGM

DSN

1/8" = 1'-0"B2 PUMP STATION 8 - SOUTH ELEVATION

1/8" = 1'-0"B1 PUMP STATION 8 - EAST ELEVATION

1/8" = 1'-0"C2 PUMP STATION 8 - NORTH ELEVATION

1/8" = 1'-0"C1 PUMP STATION 8 - WEST ELEVATION

4' 8' 16'0'4' 8' 16'0'

4' 8' 16'0' 4' 8' 16'0'

SHEET KEYNOTES

4 METAL STAIR, PLATFORM, AND RAILING; RE: STRUCT

8 MAIN & OVERFLOW METAL SCUPPER SYSTEM. RE: D1, D2 & C1/2-A-153

9 DOWNSPOUT, DRAIN TO BOOTS, BELOW GRADE

12 SMOOTH TROWEL FINISH ON CONCRETE WITH EXTERIOR PAINT, REFER TO

EXTERIOR MATERIAL SCHEDULE

19 METAL COPING

20 EXTERIOR STL LADDER TO ROOF PLATFORM; RE: STRUCT, PROVIDE LOCKABLE

LADDER GUARD AT BOTTOM RUNGS

21 SAFETY SWING GATES, PAINT WITH SAFETY YELLOW

25 STEEL REMOVABLE WATERTIGHT HATCH, RE: STRUCTURAL. ALIGN WITH

CENTERLINE OF PUMP

28 CONSTRUCTION JOINT FOR CONC. WALL, RE: STRUCT. DWGS. LOCATE AT

CENTER OF BLDG. BETWEEN GRID 1 & 2. KEEP AWAY FROM OPENINGS & BEAM

BEARING POINTS @ 2'-0" MIN

SY

M

DE

S C

RI

PT

I O N

DA

TE

AP

PR

IS

SU

ED

F

OR

C

ON

ST

RU

C T

IO

N 0 1

2/1 8/2

/28

/20

IS

SU

ED

F

OR

ROOF TOS

136' - 0"

GRADING LEVEL

103' - 0"

SECOND LEVEL

121' - 0"

AB

2-A-350 B3

FIRST LEVEL

103' - 6"

ENTRY LEVEL

109' - 0"

2-A-350 D2

PS6 ELECT EQUIP.

PS6 PUMP CTRL

ROOF TOS

136' - 0"

GRADING LEVEL

103' - 0"

SECOND LEVEL

121' - 0"

A

FIRST LEVEL

103' - 6"

ENTRY LEVEL

109' - 0"

2-A-350 A2

EX

TE

NT

O

F

7'

- 6

W

AT

ER

PR

OO

FI

NG

AN

D

BA

CK

ER

B

D.

2-A-350 C2

2-A-350 B2

ROOF TOS

136' - 0"

GRADING LEVEL

103' - 0"

SECOND LEVEL

121' - 0"

1 2

FIRST LEVEL

103' - 6"

ENTRY LEVEL

109' - 0"

ROOF TOS

136' - 0"

B

B

FIRST LEVEL

103' - 6"

STEEL PLATE, RE: STRUCT

FOR PLATE CONSTRUCTION

AND ATTACHMENT TO WALL

RIGID INSULATION TO

ACHIEVE R16 MIN.

SHEET METAL

COVER

PROVIDE WATERTIGHT GASKET

COMPONENT SYSTEM AT

PERIMETER OF OPENING

PROVIDE Z-GIRT FRAMING

FASTENED TO STEEL PLATE

WITH WELDS OR NON-

PENETRATING FASTENERS

EX

TE

NT

O

F

7'

- 6

W

AT

ER

PR

OO

FI

NG

AN

D

BA

CK

ER

B

D.

A

FIRST LEVEL

103' - 6"

A

SECOND LEVEL

121' - 0"

A

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT NO.:

D

EP

AR

TM

EN

T

O F

TH

E

N

AV

Y N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G S

YS

TE

M S

C O

M M

AN

D

DRAWFORM REVISION: 25 AUGUST 2020

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

NA

VA

L

FA

CI

LI

TI

ES

E

NG

IN

EE

RI

NG

S

YS

TE

M

S

CO

M M

AN

D

M

ID

-A

TL

AN

TI

C

N

AV

AL

S

TA

TI

O N

N

O R

FO

LK

, V A

AS NOTED

FI

LE

N

AM

E:

PL

OT

TE

D:

C

:\R ev it_ Pr oj ec ts \D

R

YD

P6

-1

-A -P

S6 _p gr eg or y@ bu rn sm cd

.c om

.rv t

2/

/2

:0 3:

A

M

2-A-350

P

D

R Y

D O

C K

S

A

LT

W A

TE

R

S Y

S

TE

M

FO

R C

V N

-7

PU

M

P

ST

AT

IO

N

-T

YP

. B

UI

LD

IN

G

W

AL

L

SE

CT

IO

NS

LES

12857921

BSG BSG

02/02/2022

DEVIN POULIN,

C984 FACILITIES PLANNER, NNSY

JTL/TLH

1364315

N40085-22-R-2598

PO

RT

SM

OU

TH

, V

IR

GI

NI

A

NO

RF

OL

K

NA

VA

L S

HI

PY

AR

D

EJA

CGM

DSN

1/8" = 1'-0"B5 PUMP STATION TYP. BLDG SECTION

2' 4' 8'0'

SHEET KEYNOTES

8 MAIN & OVERFLOW METAL SCUPPER SYSTEM. RE: D1, D2 & C1/2-A-153

9 DOWNSPOUT, DRAIN TO BOOTS, BELOW GRADE

11 BUILT-UP ROOF SYSTEM

12 SMOOTH TROWEL FINISH ON CONCRETE WITH EXTERIOR PAINT, REFER TO

EXTERIOR MATERIAL SCHEDULE

18 RIGID INSULATION TO ACHIEVE R-30

19 METAL COPING

23 STEP-OVER ABOVE SHIP STAIR & PLATFORM, COORDINATE WITH PIPE SIZING

AND EQUIPMENT BELOW TO ENSURE CLEARANCE REQUIREMENTS

26 RIGID INSULATION TO ACHIEVE R-10

27 5/8" MOISTURE RESISTANT GYP. BOARD ON 2" Z-GIRT FRAMING

29 IMPACT & MOISTURE RESISTANT BOARD ON 2" Z-GIRT FRAMING

30 CEMENTITOUS BACKING BOARD

33 CONTINUOUS FLUID APPLIED WATERPROOFING SYSTEM WITH PROTECTION

BOARD AT PERIMETER OF INTERIOR SIDE OF WALL

34 CONTINUOUS WRAP WATERPROOFING ON TO SLAB AND WALL OPENING 6"

FROM WALL FINISH, APPLY TO PERIMETER OF INTERIOR SIDE

36 PROVIDE 3/8" GAP & SEALANT ONLY BETWEEN GWB AND BASE PLATE

CONDITIONS

37 COMPRESSIBLE FILLER

38 BASE, REFER TO FINISH SCHEDULE

39 COLUMN BASE PLATE, RE: STRUCT.

3/8" = 1'-0"B3 WALL SECTION - PUMP STN TYP.

0' 2' 4' 6'

1/8" = 1'-0" (2-A-151)C3 PUMP STATION TYP. LONGTITUDINAL BLDG. SECTION

2' 4' 8'0'

3/8" = 1'-0"D2 WALL SECTION-PUMP STN TYP.

0' 2' 4' 6'

3/4" = 1'-0"A1 SECTION - WATERTIGHT HATCH

0' 1' 2' 3' 1 1/2" = 1'-0"A2 DETAIL - WALL & FLOOR

1 1/2" = 1'-0"C2 DETAIL - WALL & ROOF

4"0' 8" 1'-4"

4"0' 8" 1'-4"

1 1/2" = 1'-0"B2 WALL SECTION - FLOOR

4"0' 8" 1'-4"

SY

M

DE

S C

RI

PT

I O N

DA

TE

AP

PR

IS

SU

ED

F

OR

C

ON

ST

RU

C T

IO

N

/18 /20

/28 /20

IS

SU

ED

F

OR

FINISH INDEX

MATERIALS DESCRIPTION

FLOORING

ACRYLIC/LATEX, EGGSHELL/SATIN FINISH, FIELD

PAINT

PA-1

CS-1 CONCRETE SEALED

MFR/PRODUCT COLOR/REMARKS

RE: STRUCT.

SHERWIN WILLIAMS SW7004 SNOWBOUND

EPOXYPE-1 SHERWIN WILLIAMS SW7004 SNOWBOUND

MOISTURE-RESISTANT GYPSUM WALL BOARD

WALL

MRG USG

RUBBERRB-1 TARKETT TRADITIONAL W/ TOE, PEPPERCORN

BASE

ACRYLIC/LATEX,SEMI GLOSS - DOOR FRAMESPA-2 SHERWIN WILLIAMS SW9163 TIN LIZZIE

IMRB -

WATERPROOFING SYSTEM WAINSCOTWS RE: SPECIFICATIONS -

IMPACT MOISTURE-RESISTANT BOARD RE: SPECIFICATIONS

F-IN FLUSH DOOR INSULATED

DOOR WIDTH

RE: SCHEDULE

WINDOW TYPES

W1

A4 2-A-601

B3 2-A-601

A3 2-A-601

4'

- 0

INSULATED

LAMINATED

SECURITY

GLAZING

2'

- 0

2' - 0"

HOLLOW METAL

FRAME

SEE DOOR

SCHEDULE

FINISH FLOOR -

SEE ROOM FINISH

SCHEDULE

METAL

THRESHOLD

SE

E

DO

OR

S

CH

ED

UL

E

DO

OR

H

EI

GH

T

GLASS PER

SCHDEDULE

GLAZING

STOP

SEALANT

HM FRAME

5/8" MOISTURE-

RESISTANT GWB

VOER 2" Z-FURRING

RIGID INSULATION

BATT

INSULATION

BACKER ROD

AND SEALANT

INTERIOR SIDE

BACKER ROD AND

SEALANT

HM FRAME

CONCRETE

WALL

WD SHIM

SEE PLAN

VARIES

DRIP INDUCER AT

EXTERIOR WALL

WD SHIM

5/8" MOISTURE-

RESISTANT GWB

OVER 2" Z-FURRING

RIGID

INSULATION

SEALANTBATT

INSULATION

INTERIOR SIDE

2"

3/

4"

BACKER ROD AND

SEALANT

HM FRAME

WD SHIM

GLAZING AS

SCHEDULED

CONCRETE

WALL

WD SHIM

SE

E

PL

AN

5/8" MOISTURE-RESISTANT

GWB OVER 2" Z-FURRING RIGID

INSULATION

SEALANT

BATT INSULATION

INTERIOR SIDE

STEEL FRAME

CONCRETE

WALL

WD SHIM

BACKER ROD &

SEALANT BOTH SIDES

SEE PLAN

DRIP INDUCER AT

EXTERIOR WALL

2"

1" CHAMFER

5/8" MOISTURE-

RESISTANT GWB

OVER Z-FURRING

RIGID INSULATION

BATT INSULATION

CONCRETE WALL

STEEL FRAME

JAMB ANCHOR

(3) PER JAMB

BACKER ROD &

SEALANT BOTH SIDES

WD SHIM

SE

E

PL

AN

VA

RI

ES

1" CHAMFER

5/8" MOISTURE-RESISTANT

GWB OVER 2" Z-FURRING

RIGID INSULATION

2"

BATT

INSULATION

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT NO.:

D

EP

AR

TM

EN

T

O F

TH

E

N

AV

Y N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G S

YS

TE

M S

C O

M M

AN

D

DRAWFORM REVISION: 25 AUGUST 2020

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

NA

VA

L

FA

CI

LI

TI

ES

E

NG

IN

EE

RI

NG

S

YS

TE

M

S

CO

M M

AN

D

M

ID

-A

TL

AN

TI

C

N

AV

AL

S

TA

TI

O N

N

O R

FO

LK

, V A

AS NOTED

FI

LE

N

AM

E:

PL

OT

TE

D:

C

:\R ev it_ Pr oj ec ts \D

R

YD

P6

-1

-A -P

S6 _p gr eg or y@ bu rn sm cd

.c om

.rv t

2/

/2

:0 3:

A

M

2-A-601

P

D

R Y

D O

C K

S

A

LT

W A

TE

R

S Y

S

TE

M

FO

R C

V N

-7

DO

O

R

FI

NI

SH

S

CH

ED

UL

E

LES

12857922

BSG BSG

02/02/2022

DEVIN POULIN,

C984 FACILITIES PLANNER, NNSY

JTL/TLH

1364315

N40085-22-R-2598

PO

RT

SM

OU

TH

, V

IR

GI

NI

A

NO

RF

OL

K

NA

VA

L S

HI

PY

AR

D

EJA

CGM

DSN

DOOR SCHEDULE

DOOR

NUMBER

DOOR FRAME

ASSEMBLY

RATING

DETAIL

HARDWARE

SET REMARKS

SIZE

TYPE MATERIAL FINISH MATERIAL FINISH HEAD JAMB SILLWIDTH HEIGHT

106A - 3' - 0" 7' - 0" F-IN HM PAINTED HM PAINTED - C4/2-A-601 B4/2-A-601 A5/2-A-601 HW-1 1 106B - 3' - 0" 7' - 0" F-IN HM PAINTED HM PAINTED - C4/2-A-601 B4/2-A-601 A5/2-A-601 HW-1 1 108A - 3' - 0" 7' - 0" F-IN HM PAINTED HM PAINTED - C4/2-A-601 B4/2-A-601 A5/2-A-601 HW-1 1 108B - 3' - 0" 7' - 0" F-IN HM PAINTED HM PAINTED - C4/2-A-601 B4/2-A-601 A5/2-A-601 HW-1 1 206A - 3' - 0" 7' - 0" F-IN HM PAINTED HM PAINTED - C4/2-A-601 B4/2-A-601 A5/2-A-601 HW-1 1 206B - 3' - 0" 7' - 0" F-IN HM PAINTED HM PAINTED - C4/2-A-601 B4/2-A-601 A5/2-A-601 HW-1 1 208A - 3' - 0" 7' - 0" F-IN HM PAINTED HM PAINTED - C4/2-A-601 B4/2-A-601 A5/2-A-601 HW-1 1 208B - 3' - 0" 7' - 0" F-IN HM PAINTED HM PAINTED - C4/2-A-601 B4/2-A-601 A5/2-A-601 HW-1 1

FINISH SCHEDULE

ROOM

FLOOR BASE WALL

CEILING

NO. NAME FINISH HEIGHT

106 PS6 PUMP CTRL CS-1 WS WS/IMRB/PE-1 PE-1 EXPOSED

108 PS8 PUMP CTRL CS-1 WS WS/IMRB/PE-1 PE-1 EXPOSED

206 PS6 ELECT EQUIP. CS-1 RB-1 MRG/PA-1 PE-1 EXPOSED

208 PS8 ELECT EQUIP. CS-1 RB-1 MRG/PA-1 PE-1 EXPOSED

3" = 1'-0"A5 SILL DETAIL

1 1/2" = 1'-0"A3 WINDOW SILL DETAIL

1 1/2" = 1'-0"B3 WINDOW HEAD DETAIL

1 1/2" = 1'-0"A4 WINDOW JAMB DETAIL

1 1/2" = 1'-0"C4 HEAD DETAIL - EXTERIOR

1 1/2" = 1'-0"B4 JAMB DETAIL - EXTERIOR

4"0' 8" 1'-4"

4"0' 8" 1'-4"

0' 6"3" 9"4"0' 8" 1'-4"4"0' 8" 1'-4"

4"0' 8" 1'-4"

REMARKS:

1. PROVIDE DOOR & FRAME PAINT FINISH "PA-2", SEE MATERIAL & FINISH INDEX SCHEDULE

SY

M

DE

S C

RI

PT

I O N

DA

TE

AP

PR

IS

SU

ED

F

OR

C

ON

ST

RU

C T

IO

N

/18 /20

/28 /20

IS

SU

ED

F

OR

2-A-151 - PUMP STATION 6 - FLOOR PLAN - FIRST LEVEL & SECOND LEVEL
2-A-153 - PUMP STATION 6 - ROOF PLAN & DETAILS
2-A-161 - PUMP STATION 8 - FLOOR PLAN - FIRST LEVEL, SECOND LEVEL & ROOF
2-A-250 - PUMP STATION 6 - BUILDING ELEVATIONS
2-A-260 - PUMP STATION 8 - BUILDING ELEVATIONS
2-A-350 - PUMP STATION 6 & 8 - TYP. BUILDING & WALL SECTIONS
2-A-601 - DOOR & FINISH SCHEDULE

2022-02-25T08:05:48-0500

2022-02-25T08:05:57-0500

2022-02-25T08:05:57-0500

2022-02-25T08:05:58-0500

2022-02-25T08:05:59-0500

2022-02-25T08:06:00-0500

2022-02-25T08:06:00-0500

2022-02-25T08:06:14-0500

2022-02-25T08:06:25-0500

2022-02-25T08:06:25-0500

2022-02-25T08:06:25-0500

2022-02-25T08:06:26-0500

2022-02-25T08:06:26-0500

2022-02-25T08:06:27-0500

2022-03-16T13:19:59-0400
James E. Donahue, R.A.
I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed.
2022-03-16T13:20:58-0400
James E. Donahue, R.A.
I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed.
2022-03-16T13:20:58-0400
James E. Donahue, R.A.
I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed.
2022-03-16T13:21:11-0400
James E. Donahue, R.A.
I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed.
2022-03-16T13:21:22-0400
James E. Donahue, R.A.
I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed.
2022-03-16T13:21:23-0400
James E. Donahue, R.A.
I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed.
2022-03-16T13:21:36-0400
James E. Donahue, R.A.
I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed.
2022-03-16T13:21:53-0400
James E. Donahue, R.A.
I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed.
2022-03-16T13:22:09-0400
James E. Donahue, R.A.
I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed.
2022-03-16T13:22:10-0400
James E. Donahue, R.A.
I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed.
2022-03-16T13:22:11-0400
James E. Donahue, R.A.
I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed.
2022-03-16T13:22:11-0400
James E. Donahue, R.A.
I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed.
2022-03-16T13:22:12-0400
James E. Donahue, R.A.
I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed.
2022-03-16T13:22:13-0400
James E. Donahue, R.A.
I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed.

File details come from the government source that posted it. Updated .