1364315_dwg_05of18_PH1_V1_Structural.pdf
PDF 9 MB Posted
- Attached to
- P-678 Dry Dock 8 Saltwater System for CVN-78, Norfolk Naval Shipyard, Portsmouth, Virginia
- Solicitation number
- N40085-22-R-2598_Drawings
About this file
This document provides drawings and specifications for the P-678 Dry Dock 8 Saltwater System project at the Norfolk Naval Shipyard in Portsmouth, Virginia. The project involves upgrades to the existing pumpwell and saltwater system that services Dry Dock 8, including replacement of drainage pumps and modifications to piping, electrical, and structural components. The solicitation package includes drawings depicting demolition plans, equipment arrangements, and structural and piping details. Specifications cover requirements for reinforced concrete, structural steel, equipment pads, and other technical aspects of the project. Bids are due for the construction contract by February 28, 2022.
View the file
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1. GENERAL:
A. THESE NOTES, AND OTHER DRAWING NOTES CONTAINED WITHIN, ARE PROVIDED TO MEET SPECIFIC REQUIREMENTS AND TO
SUPPLEMENT CONTRACT SPECIFICATIONS. THESE NOTES NEITHER REPLACE NOR OVERRIDE PROVISIONS AND REQUIREMENTS
OF CONTRACT SPECIFICATIONS.
B. COORDINATE ALL STRUCTURAL WORK WITH WORK SHOWN ON ALL OTHER DRAWINGS.
C. VERIFY ALL DIMENSIONS OF EXISTING CONSTRUCTION AND REPORT ANY DISCREPANCIES FROM CONTRACT DRAWINGS TO
CONTRACTING OFFICER'S REPRESENTATIVE PRIOR TO COMMENCING WITH WORK. SCALING OF WORKING DIMENSIONS FROM
STRUCTURAL DRAWINGS IS PROHIBITED.
D. CONTRACT DRAWINGS AND SPECIFICATIONS REPRESENT FINISHED STRUCTURE. CONTRACTOR IS RESPONSIBLE FOR MEANS AND METHODS OF CONSTRUCTION INCLUDING, BUT NOT LIMITED TO, SHORING AND TEMPORARY BRACING. UNDERTAKE ALL NECESSARY MEASURES TO ENSURE SAFETY OF ALL PERSONS AND STRUCTURES AT SITE AND ADJACENT TO SITE. VISITS TO THE SITE BY CONTRACTING OFFICER'S REPRESENTATIVE DO NOT RELIEVE CONTRACTOR OF SUCH RESPONSIBILITY.
E. IF CERTAIN FEATURES ARE NOT FULLY SHOWN OR CALLED FOR ON THE CONTRACT DRAWINGS OR SPECIFICATIONS, PROVIDE CONSTRUCTION OF THE SAME CHARACTER AS FOR SIMILAR CONDITIONS THAT ARE SHOWN OR CALLED FOR, WITH APPROVAL OF CONTRACTING OFFICER'S REPRESENTATIVE. WHERE SECTIONS VARY, PROVIDE FOR SMOOTH TRANSITIONS BETWEEN
THEM, UNLESS NOTED OTHERWISE.
F. INSTALL ALL PRODUCTS IN ACCORDANCE WITH MANUFACTURERS' WRITTEN INSTRUCTIONS AND RECOMMENDATIONS, UNLESS
NOTED OTHERWISE.
G. FOR VERTICAL DATUM INFORMATION SEE SHEET 1-VF001.
H. 1-S-001 & 1-S-002 APPLY TO SHEETS NAMED 1-S-XXX, 1-SDXXX, & 1-SSXXX.
2. DESIGN STANDARDS:
A. PRINCIPAL CODE OF RECORD: INTERNATIONAL BUILDING CODE 2018 AS MODIFIED BY THE FOLLOWING UNIFIED FACILITIES
CRITERIA.
1. UFC 1-200-01 (8 OCTOBER 2019 WITH CHANGE 1, 1 OCTOBER 2020) DoD BUILDING CODE
2. UFC 3-301-01 (1 OCTOBER 2019) STRUCTURAL ENGINEERING
3. UFC 4-010-01 (12 DECEMBER 2018 WITH CHANGE 1, 19 AUGUST 2020) DoD MINIMUM ANITITERRORISM STANDARDS FOR
BUILDINGS
4. UFC 4-150-07 (19 JUNE 2001 WITH CHANGE 1, 1 SEPTEMBER 2012) MAINTENANCE AND OPERATION: MAINTENANCE OF
WATERFRONT FACILITIES
5. UFC 4-151-10 (10 SEPTEMBER 2001 WITH CHANGE 1, 1 SEPTEMBER 2012) GENERAL CRITERIA FOR WATERFRONT
CONSTRUCTION
6. UFC 4-152-01 (24 JANUARY 2017) DESIGN: PIERS AND WHARVES
7. UFC 4-213-10 (18 MAY 2020) GRAVING DRY DOCKS
B. ASCE 7, AMERICAN SOCIETY OF CIVIL ENGINEERS, MINIMUM DESIGN LOADS FOR BUILDINGS AND OTHER STRUCTURES, 2016.
C. ACI 318, AMERICAN CONCRETE INSTITUTE, BUILDING CODE REQUIREMENTS FOR STRUCTURAL CONCRETE, 2014.
D. AISC 325, AMERICAN INSTITUTE OF STEEL CONSTRUCTION, 15th EDITION, 2017.
E. AISC 360, AMERICAN INSTITUTE OF STEEL CONSTRUCTION, SPECIFICATION FOR STRUCTURAL STEEL BUILDINGS, 2016.
F. AISI, AMERICAN IRON AND STEEL INSTITUTE, COLD-FORMED STEEL DESIGN MANUAL, 2017.
3. SPECIAL INSPECTIONS: SEE SECTION 01 45 35 WITH ATTACHMENTS.
4. DESIGN LOADS:
A. RISK CATEGORY: IV.
B. COLLATERAL LOAD: 30 PSF ON ELEVATED FLOOR AND ROOF FRAMING TO ACCOUNT FOR DUCTWORK, PIPING INCLUDING FIRE
PROTECTION, LIGHTING, AND ELECTRICAL.
C. LIVE LOADS
1. FLOOR LIVE LOAD: 300 PSF
2. INTERMEDIATE LEVEL CONCRETE DECK (WITH SAFETY BEAMS): 125 PSF
3. MAINTENANCE ACCESS PLATFORMS: 100 PSF
D. EQUIPMENT LOADS (OPERATING)
1. AS INDICATED FOR EQUIPMENT WEIGHING IN EXCESS OF 300 LBS. FRAMING AND FOUNDATIONS ARE DESIGNED FOR
EQUIPMENT THAT SATISFIES CONTRACT SPECIFICATIONS.
2. IF EQUIPMENT FURNISHED IS HEAVIER THAN WEIGHTS INDICATED OR REQUIRES STRUCTURAL CHANGES FOR ANY OTHER
REASON, PROVIDE ENGINEERING DESIGN CALCULATIONS AND ADDITIONAL WORK NECESSARY TO SUPPORT LOADS IN ACCORDANCE WITH DESIGN STANDARDS SPECIFIED ABOVE, AT NO ADDITIONAL COST TO OWNER AND WITH NO INCREASE
IN CONTRACT TIME.
3. PUMPWELL 8 DRAINAGE PUMP 1 (DP-1): 11,470 LBF
4. PUMPWELL 8 DRAINAGE PUMP 2 (DP-2): 11,470 LBF
5. PUMPWELL 8 DRAINAGE PUMP 3 (DP-3): 11,470 LBF
6. PUMPWELL 8 DRAINAGE PUMP 4 (DP-4): 11,470 LBF
7. PUMPWELL 8 DRAINAGE PUMP 5 (DP-5): 11,470 LBF
8. PUMPWELL 8 SWITCHGEAR (PW-SWGR):28,000 LBF
9. PUMPWELL 8 MAIN DEWATERING PUMP MOTOR CONTROL CENTER (PW-MCC-MDP-2-1, PW-MCC-MDP-3-1, PW-MCC-MDP-4-1):
8,750 LBF
10. PUMPWELL 8 DRAINAGE PUMP MOTOR CONTROL CENTER (PW-MCC-DP): 8,750 LBF
11. PUMPWELL 8 TRANSFORMER 1 (PW-XFMR-1): 2,000 LBF
12. PUMPWELL 8 TRANSFORMER 2 (PW-XFMR-2): 500 LBF
13. PUMPWELL 8 GENERATOR (GEN-1): 115,000 LBF
14. PUMPWELL 8 FUEL TANK (FT-1): 104,400 LBF
A. CRANE LOADS
1. MONORAIL
a. LIFT CAPACITY: 10 TONS.
b. MINIMUM HOOK HEIGHT: 40 FT.
c. MAXIMUM WHEEL LOADS (ASD) INCLUDING IMPACT: 26.4 KIPS VERTICAL, 4.0 KIPS LATERAL, 2.0 KIPS LONGITUDINAL.
2. PORTAL CRANE
a. REFER TO PORTAL CRANE LOADING DIAGRAM ON S-002.
F. SNOW LOADS
1. GROUND SNOW LOAD: 10 PSF.
2. FLAT-ROOF SNOW LOAD: 12 PSF.
3. EXPOSURE FACTOR: 0.8.
4. IMPORTANCE FACTOR: 1.2.
5. THERMAL FACTOR: 1.2.
G. WIND LOADS
1. BASIC DESIGN WIND SPEED: 132 MPH 3-SECOND GUST.
2. ALLOWABLE STRESS DESIGN WIND SPEED: 103 MPH 3-SECOND GUST.
3. EXPOSURE: D.
4. BUILDING CONDITION: ENCLOSED, GCpi = +/- 0.18
5. TOPOGRAPHIC FACTOR: 1.0.
H. EARTHQUAKE LOADS
1. MAPPED SPECTRAL RESPONSE ACCELERATION PARAMETERS Ss = 0.086, S1 = 0.04.
2. SITE CLASS: E.
3. DESIGN SPECTRAL RESPONSE ACCELERATION PARAMETERS Sds = 0.138, Sd1 = 0.112.
4. SEISMIC DESIGN CATEGORY: C.
5. IMPORTANCE FACTOR: 1.5.
K. SERVICEABILITY CRITERIA
1. STRUCTURAL STEEL FLOOR AND ROOF FRAMING DEFLECTION LIMIT:
a. L/240: TOTAL LOAD VERTICAL DEFLECTION
2. MONORAIL BEAMS
a. L/450: WHEEL LOAD VERTICAL DEFLECTION
3. WIND DRIFT FOR STRUCTURE
a. H/480 BASED ON WIND SPEED WITH A 10 YEAR MEAN RECURRANCE INTERVAL.
5. GEOTECHNICAL INFORMATION:
A. SOURCES:
1. "REPORT OF SUBSURFACE EXPLORATION AND GEOTECHNICAL ENGINEERING SERVICES, P-678 DRY DOCK 8 SALTWATER FOR CVN-78, GET SOLUTIONS INC., DATED 23 JUNE 2021 (GET PROJECT NUMBER VB20-261G)
2. "GEOTECHNICAL MEMORANDUM FOR THE PROPOSED NEW PUMP STATIONS, NEW SUBSTATIONS, GENERATORS, FUEL TANKS, AND UPGRADES TO THE EXISTING PUMPWELL FOR P-678 DRY DOCK 8 SALTWATER SYSTEM FOR CVN-78 CLASS
SHIPS, PORTSMOUTH, VIRGINIA" DATED 21 JUNE 2021. (EMI PROJECT NUMBER 20-143)
B. SITE PREPARATION
1. PROVIDE EXCAVATION, FILL,AND BACKFILL IN ACCORDANCE WITH CONTRACT DRAWINGS AND SPECIFICATIONS DIVISION 31.
2. NOTIFY CONTRACTING OFFICER'S REPRESENTATIVE WHEN LOOSE OR SOFT SOILS ARE EXPOSED WHERE SLABS, MATS, OR
FOOTINGS ARE TO BE PLACED SO THAT A DETERMINATION MAY BE MADE REGARDING IMPROVEMENT OF THIS
POTENTIALLY UNDESIRABLE CONDITION.
C. SOIL CHARACTERISTICS
1. UNIT WEIGHT: 122 PCF MOIST.
2. FROST PENETRATION: 9".
3. WATER TABLE DEPTH: APPROXIMATELY 6 TO 8 FEET BELOW EXISTING GRADES.
D. LATERAL EARTH PRESSURE
1. UNCONTROLLED FILL (0'-41.5' BELOW GRADE)
a. AT-REST CONDITION, Ko: 0.56 PCF
b. ACTIVE CONDITION, Ka: 0.39 PCF
c. PASSIVE CONDITION, Kp: 2.66 PCF
2. YORKTOWN FORMATION (41.5' - 100' BELOW GRADE)
a. AT-REST CONDITION, Ko: 0.44 PCF
b. ACTIVE CONDITION, Ka: 0.28 PCF
c. PASSIVE CONDITION, Kp: 3.54 PCF
E. SLAB, MAT, AND FOOTING DESIGN PARAMETERS
1. MODULUS OF SUBGRADE REACTION: 20 PCI.
2. ALLOWABLE BEARING CAPACITIES
a. GRAVITY LOADS: 320 PSF.
3. MINIMUM BEARING DEPTH: 12".
F. STEEL PIPE PILES
1. PROVIDE IN ACCORDANCE WITH CONTRACT DRAWINGS AND SPECIFICATIONS, SECTION 31 62 16.13.
2. MINIMUM DESIGN CAPACITIES (FS=2.5)
a. SEE FOUNDATION DRAWINGS FOR PILE CAPACITIES USED AND TIP ELEVATIONS.
3. PILE DRIVING
a. PDA TEST PILE LOCATION AS SHOWN ON PLANS
b. ONE TEST PILE IS REQUIRED AT EACH SITE STRUCTURAL EQUIPMENT FOUNDATION.
c. TEST PILE MUST BE DRIVEN PRIOR TO PRODUCTION PILES.
d. TEST PILE MUST BE AT LEAST 10 FT LONGER THAN INDICATED PILE LENGTH.
e. TEST PILE MUST BE RESTRUCK AFTER 14 DAYS.
f. FOR PILE CAPACITY SEE 1-SS502 THROUGH 1-SS504.
G. STEEL MICROPILING
1. PROVIDE IN ACCORDANCE WITH CONTRACT DRAWINGS AND SPECIFICATIONS, SECTION 31 63 33.
2. MINIMUM DESIGN CAPACITIES (PRESSURE GROUTED; FS=3.0)
a. COMPRESSION: 150 KIPS (ALLOWABLE).
b. UPLIFT: 100 KIPS (ALLOWABLE).
c. LATERAL: 6 KIPS (ALLOWABLE).
3. ESTIMATED LENGTH: 70 FT
6. MATERIALS: SEE CONTRACT SPECIFICATIONS FOR COMPLETE REQUIREMENTS AND COMPLY WITH APPLICABLE OSHA REGULATIONS
A. REINFORCED CONCRETE: 03 30 00
1. PREPARE AND PLACE REINFORCED CONCRETE IN ACCORDANCE WITH ACI MANUAL OF CONCRETE PRACTICE AS MODIFIED
BY CONTRACT DOCUMENTS.
2. CONCRETE
a. UNLESS NOTED OTHERWISE: MINIMUM 28-DAY COMPRESSIVE STRENGTH f'c = 4,500 PSI, NORMAL WEIGHT.
3. FORMWORK
a. CONTRACTOR IS RESPONSIBLE FOR DESIGN, ENGINEERING, STRUCTURAL ADEQUACY, AND CONSTRUCTION OF
CONCRETE FORMWORK IN ACCORDANCE WITH CONTRACT SPECIFICATIONS.
b. COORDINATE CONCRETE WORK WITH PLACEMENT OF PIPING, INSERTS, FLOOR DRAINS, AND OTHER EMBEDDED
ITEMS INDICATED ON CONTRACT DRAWINGS OR IN CONTRACT SPECIFICATIONS.
c. SLEEVE OR EXISTING PIPING OR UTILITIES PASSING THROUGH CONCRETE, UNLESS NOTED OTHERWISE. SEE OTHER
DISCIPLINE DRAWINGS FOR SLEEVE DETAILS. PROVIDE MEASURES TO ENSURE THAT SLEEVES REMAIN FREE OF
DEBRIS AND WATER DURING CONSTRUCTION.
d. PROVIDE 3/4" CHAMFER STRIPS ON EDGES OF EXPOSED CONCRETE, UNLESS NOTED OTHERWISE.
4. REINFORCING STEEL
a. BARS: ASTM A706 GRADE 60 GALVANIZED PER ASTM A767 CLASS 1, OR ASTM A1094.
(1) ASTM 767 REQUIRES THAT BARS BENT COLD PRIOR TO HOT DIP GALVANIZING MUST BE FABRICATED TO A
MINIMUM BEND DIAMETER EQUAL TO 7 IN FOR #7 BAR AND 8 IN FOR #8 BAR.
b. REINFORCE ALL CONCRETE UNLESS SPECIFICALLY MARKED "NOT REINFORCED" OR "UNREINFORCED".
c. DETAIL AND PLACE REINFORCEMENT IN ACCORDANCE WITH ACI SP-66, ACI 301, ACI 318, AND CRSI MANUAL OF
STANDARD PRACTICE. DO NOT INSERT REINFORCEMENT INTO FRESH OR PARTIALLY HARDENED CONCRETE.
d. PROVIDE MINIMUM CONCRETE CLEAR COVER OVER REINFORCEMENT AS FOLLOWS, UNLESS NOTED OTHERWISE:
(1) CONCRETE CAST IN PLACE: 3".
(2) PRECAST CONCRETE: 2".
e. CONFORM EMBEDMENT AND LAP SPLICE LENGTHS TO TABLES AND DETAILS ON CONTRACT DRAWINGS, UNLESS
NOTED OTHERWISE.
f. PROVIDE ADDITIONAL REINFORCEMENT AT OPENINGS AND CORNER BARS AT INTERSECTING GRADE BEAMS, WALLS, AND CURBS IN ACCORDANCE WITH TYPICAL DETAILS ON CONTRACT DRAWINGS, UNLESS NOTED OTHERWISE.
g. EPOXY GROUT: ASTM C881, TYPE IV, GRADE 2 OR 3, WITH EMBEDMENT TO DEVELOP YIELD STRENGTH OF BAR, UNLESS NOTED OTHERWISE.
5. JOINTS
a. LOCATE CONSTRUCTION, CONTRACTION, ISOLATION, EXPANSION, AND OTHER JOINTS AS INDICATED OR SPECIFIED, OR AS OTHERWISE APPROVED BY CONTRACTING OFFICER'S REPRESENTATIVE.
b. CLEAN SURFACES OF HORIZONTAL AND VERTICAL CONSTRUCTION JOINTS OF LAITANCE TO EXPOSE CLEAN COARSE
AGGREGATE SOLIDLY EMBEDDED IN MORTAR MIX. JUST PRIOR TO DEPOSITING CONCRETE, THOROUGHLY CLEAN AND WET SURFACE OF CONSTRUCTION JOINT. THESE PROVISIONS MUST ALSO APPLY WHEN CONCRETE IS PLACED
AGAINST EXISTING CONCRETE.
c. IN ADDITION, WHEN CONCRETE IS PLACED AGAINST EXISTING CONCRETE, ADEQUATELY PREPARE SURFACE BY
ROUGHENING TO 1/4" AMPLITUDE AND APPLYING BONDING AGENT.
d. PROVIDE WATERSTOPS AT ALL CONCRETE JOINTS BELOW ELEVATION 109'-0", UNLESS NOTED OTHERWISE.
6. CONCRETE FILL
a. SELF-CONSOLIDATING CONCRETE FOR FILLING EXISTING TUNNELS AND FLUMES MUST HAVE A COMPRESSIVE STRENGTH (f'c) OF 3000 PSI MINIMUM AT 28 DAYS.
B. STRUCTURAL STEEL: SECTION 05 12 00
1. FABRICATE AND ERECT STRUCTURAL STEEL IN ACCORDANCE WITH AISC STEEL CONSTRUCTION MANUAL, 15th EDITION AND
AISC 303-16 - CODE OF STANDARD PRACTICE FOR STEEL BUILDINGS AND BRIDGES, AS MODIFIED BY CONTRACT
DOCUMENTS.
2. DESIGN AND PROVIDE TEMPORARY ERECTION BRACING AS REQUIRED, AND DO NOT REMOVE IT UNTIL ALL PERMANENT
LATERAL-LOAD-RESISTING ELEMENTS AND CONNECTIONS ARE COMPLETELY INSTALLED.
3. WIDE FLANGE SHAPES AND TEES: ASTM A992, Fy = 50 KSI.
4. OTHER SHAPES, PLATES, AND THREADED RODS
a. ASTM A36, Fy = 36 KSI, UNLESS NOTED OTHERWISE.
b. ASTM A572 GRADE 50, Fy = 50 KSI, WHERE INDICATED AS "(50)".
5. SQUARE AND RECTANGULAR HOLLOW STRUCTURAL SECTIONS: ASTM A500 GRADE C, Fy = 50 KSI.
6. ROUND HOLLOW STRUCTURAL SECTIONS: ASTM A500 GRADE C, Fy = 46 KSI.
7. PIPE: ASTM A53 TYPE E OR S, GRADE B, Fy = 35 KSI.
C. STRUCTURAL STEEL (CONTINUED): SECTION 05 12 00
8. BOLTS
a. 3/4" DIAMETER ASTM F3125 GRADE A325 HOT-DIP GALVANIZED WITH DIRECT TENSION WASHERS, UNLESS NOTED
OTHERWISE.
b. FRAMING CONNECTIONS: PRETENSIONED JOINTS WITH STANDARD HOLES, UNLESS NOTED OTHERWISE.
c. BRACING CONNECTIONS: PRETENSIONED JOINTS WITH STANDARD HOLES, UNLESS NOTED OTHERWISE.
d. DIRECT TENSION INDICATOR WASHERS: ASTM F959.
e. ON ONE SIDE OF EACH DOUBLE CONNECTION OF BEAMS TO COLUMN WEB OR GIRDER WEB DIRECTLY OVER COLUMN, PROVIDE TEMPORARY SEAT ANGLE ATTACHED TO COLUMN OR GIRDER WEB AND TO BOTTOM FLANGE OF BEAM, MINIMUM L4X3X3/8 LLH WITH TWO BOLTS EACH LEG. SINGLE AND DOUBLE STAGGERED CONNECTIONS ARE PROHIBITED WITHOUT EXPLICIT PRIOR APPROVAL IN WRITING FROM STRUCTURAL ENGINEER OF RECORD.
9. WELDING: AWS D1.1 USING E70 ELECTRODE, WITH LOW HYDROGEN WHERE REQUIRED.
10. HEADED STUDS
a. ASTM A108, GRADE 1015 OR 1020
11 ANCHOR RODS
a. ASTM F1554 GRADE 55/SUPPLEMENT S1 HOT-DIP GALVANIZED UNLESS SPECIFICALLY NOTED AS GRADE 36 OR 105.
b. LOCATE ANCHOR RODS ACCURATELY, SET WITH TEMPLATES, AND SECURELY HOLD IN POSITION WHILE PLACING
CONCRETE. PROTECT IN-PLACE ANCHOR RODS FROM CONSTRUCTION ACTIVITY.
c. THE FOLLOWING ARE PROHIBITED WITHOUT EXPLICIT PRIOR APPROVAL IN WRITING FROM STRUCTURAL ENGINEER
OF RECORD:
A. INSERTING ANCHOR RODS INTO FRESH OR PARTIALLY HARDENED CONCRETE.
B. SUBSTITUTING POST-INSTALLED ANCHORS WHERE EMBEDDED ANCHOR RODS ARE INDICATED.
C. REPAIRING, REPLACING, OR MODIFYING INSTALLED ANCHOR RODS.
12. POST-INSTALLED MECHANICAL ANCHORS
a. CARBON STEEL GALVANIZED PER ASTM A153 MANUALLY EXPANDED WEDGE TYPE, UNLESS NOTED OTHERWISE.
b. PROVIDE ANCHORS THAT HAVE BEEN TESTED AND ASSESSED IN ACORDANCE WITH LATEST EDITION OF APPLICABLE
ACCEPTANCE CRITERIA AND SUBMIT CORRESPONDING ICC EVALUATION SERVICE REPORTS
(1) MECHANICAL ANCHORS IN CONCRETE: ICC-ES AC193.
(2) EXPANSION ANCHORS IN MASONRY: ICC-ES AC01.
(3) PREDRILLED FASTENERS (SCREW ANCHORS) IN MASONRY: ICC-ES AC106.
13. POST-INSTALLED ADHESIVE ANCHORS
a. ASTM F1554 GRADE 55 HOT-DIP GALVANIZED THREADED ROD WITH ASTM C881 TYPE IV GRADE 3 EPOXY OR HYBRID
RESIN ADHESIVE (HILTI HIT-HY 200 OR APPROVED EQUIVALENT), UNLESS NOTED OTHERWISE.
b. DO NOT USE BULK-MIXED ADHESIVES. PROVIDE THREADED ROD COMPATIBLE WITH ADHESIVE AND ACCEPTABLE TO
MANUFACTURER.
c. DESIGN BOND STRENGTH HAS BEEN BASED ON CRACKED CONCRETE. SEE SPECIFICATION SECTION 05 05 20.00 27
POST INSTALLED CONCRETE AND MASONRY ANCHORS.
d. PROVIDE ANCHORS AS ENTIRE SYSTEM INCLUDING, BUT NOT LIMITED TO, MANUFACTURER'S PRINTED INSTRUCTIONS
AS FURNISHED WITH ADHESIVE, ADHESIVE CARTRIDGE, MIXING NOZZLE, EXTENSION TUBE, DISPENSER, AND ALL
REQUIRED EQUIPMENT FOR PROPERLY CLEANING DRILLED HOLE.
e. PROVIDE ANCHOR SYSTEMS THAT HAVE BEEN TESTED AND ASSESSED IN ACORDANCE WITH LATEST EDITION OF APPLICABLE ACCEPTANCE CRITERIA AND SUBMIT CORRESPONDING ICC EVALUATION SERVICE REPORTS
(1) ADHESIVE ANCHORS IN CONCRETE: ICC-ES AC308.
(2) ADHESIVE ANCHORS IN MASONRY: ICC-ES AC58.
(3) ANCHORS IN UNREINFORCED MASONRY: ICC-ES AC60.REFER TO ARCHITECTURAL DRAWINGS FOR
MISCELLANEOUS STEEL NOT INCLUDED IN STRUCTURAL DRAWINGS. INCLUDE MISCELLANEOUS STEEL IN
SHOP DRAWINGS SUBMITTED FOR REVIEW AND APPROVAL.
e. ANCHORS INSTALLED HORIZONTALLY OR UPWARDLY INCLUDED MUST BE INSTALLED BY A CERTIFIED ADHESIVE
ANCHOR INSTALLER.
f. INSTALLATIONS REQUIRING CERTIFIED INSTALLERS MUST BE INSPECTED DURING INSTALLATION BY AN INSPECTOR
SPECIFICALLY APPROVED FOR THAT PURPOSE BY THE CONTRACTING OFFICER.
14. REFER TO ARCHITECTURAL DRAWINGS FOR MISCELLANEOUS STEEL NOT INCLUDED IN STRUCTURAL DRAWINGS. INCLUDE
MISCELLANEOUS STEEL IN SHOP DRAWINGS SUBMITTED FOR REVIEW AND APPROVAL.
15. GROUT: CEMENTITIOUS NONSHRINK
16. HOT-DIP GALVANIZE ALL STRUCTURAL AND MISCELLANEOUS STEEL, INCLUDING ALL FASTENERS, WITH THE EXCEPTION OF
STAINLESS STEEL.
17. RESTORE GALVANIZING DAMAGED ACCIDENTALLY OR DUE TO FIELD WELDING WITH FIELD-APPLIED GALVANIZING
COMPOUND.
18. GALVANIZE AND FABRICATE STEEL IN ACCORDANCE WITH ASTM 123, A384 AND A385. GALVANIZED AFTER FABRICATION, UNLESS NOT RECOMMENDED BY ASTM STANDARDS SPECIFIED. THOROUGHLY CLEAN WELD SLAG, WELD SPLATTER, OIL, GREASE, DIRT AND OTHER FOREIGN MATTER FROM SURFACES FOR GALVANIZING. PROVIDE DRAIN HOLES AND BRACING
PER ASTM A384 AS REQUIRED.
19. (+/-X) INDICATES TOP OF STEEL OFFSET FROM PLAN TOP OF STEEL ELEVATION.
D. STEEL BAR GRATING: SECTION 05 53 00
1. FABRICATE AND INSTALL STEEL BAR GRATING IN ACCORDANCE WITH NAAMM MANUALS AS MODIFIED BY CONTRACT
DOCUMENTS.
2. MATERIAL: ASTM A1011, GALVANIZED.
3. CONSTRUCTION: WELDED.
4. MAIN BEARING BARS: 1 1/2" X 3/16" 19-W-4.
5. CROSS BARS: AT 4" CENTERS.
6. SURFACE: SERRATED.
7. FABRICATE GRATING IN SECTIONS NOT GREATER THAN 5 FT WIDE.
7. DEMOLITION NOTES:
A. PLANS, SECTIONS, AND DETAILS OF EXISTING STRUCTURES ARE BASED ON ORIGINAL CONSTRUCTION DOCUMENTS. DIMENSIONS
OF EXISTING CONSTRUCTION ARE APPROXIMATE. THE CONTRACTOR MUST VERIFY EXISTING CONSTRUCTION PRIOR TO
BEGINNING WORK.
B. PLANS AND DETAILS SHOWN ON THESE DEMOLITION DRAWINGS ARE FOR REFERENCE ONLY. CONTRACTOR IS DIRECTED TO
REFERENCE EXISTING DRAWINGS FOR ADDITIONAL INFORMATION.
C. COORDINATE WITH CIVIL, ARCHITECTURAL, MECHANICAL, AND ELECTRICAL DEMOLITION SHEETS.
D. EXISTING REINFORCING MUST NOT BE DISTURBED UNLESS OTHERWISE NOTED. SIZE AND LOCATION OF EXISTING REINFORCING
IS NOT SHOWN FROM ORIGINAL DESIGN DRAWINGS. IN AREAS WHERE EXISTING REINFORCING IS TO REMAIN, CONTRACTOR MUST SCAN TO VERIFY LOCATION OF REINFORCING. PROVIDE NOTIFICATION OF ANY DISCREPENCIES PRIOR TO DEMOLITION AND
DRILLING.
E. REPAIR AND/OR PATCH EXISTING-TO-REMAIN SURFACES FOLLOWING DEMOLITION OR DECONSTRUCTION OF ATTACHED OR
EMBEDDED ITEMS. REFER TO 02 41 00.00 22 FOR ADDITIONAL INFORMATION.
8. LEAD BASE PAINT AND HAZARDOUS MATERIALS ABATEMENT:
A. HAZARDOUS MATERIALS: SEE SPECIFICATIONS APPENDIX, "HAZMAT INSPECTION DRAWINGS AND LABORATORY REPORTS," FOR
TYPICAL LOCATIONS AND TYPES OF HAZARDOUS MATERIALS THAT MAY BE ENCOUNTERED. SEE DIVISION 2 SPECIFICATIONS FOR REMEDIATION AND HANDLING OF HAZARDOUS MATERIALS. PRIOR TO BEGINNING WORK, NOTIFY THE CONTRACTING OFFICER OF ANY ADDITIONAL MATERIALS OBSERVED THAT MAY POTENTIALLY CONTAIN HAZARDOUS MATERIALS.
GENERAL NOTES
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L
F A
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S
Y S
T E
M S
C O
M M
A N
D
DRAWFORM REVISION: 25 AUGUST 2020
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
Y S
T E
M S
C O
M M
A N
D
M
ID
-A T
LA
N
TI
C
N A
V A
L S
T A
T
IO
N
N O
R F
O L
K V
A
AS NOTED
F
IL
E N
A M
E
P
LO
T T
E D
C
R e v it P ro je c ts
\D R
Y D
P -1
-S
-D R
Y D m w ri d e r.
rv t
/2
/2
:3 :0
P
M
1-S-001
P D
R Y
D O
C K
S
A L T
W A
T E
R S
Y S
T E
M
F O
R C
V N
-7
G E
N E
R A
L N
O
TE
S
RCP
12857606
AJM MWR
02/02/2022
DEVIN POULIN,
C984 FACILITIES PLANNER, NNSY
JTL/TLH
1364315
N40085-22-R-2598
P O
R T
S M
O U
T H
, V
IR
G
IN
IA
N
O R
F O
LK
N
A V
A L
S H
IP
Y
A R
D
EJA
NEK
DSN
S Y
M D
E S
C R
IP
T
IO
N
D A
T E
A P
P R
IS
S U
E D
F O
R C
O N
S T
R U
C T
IO
N
/2
8/
IS
SU
ED
F
OR
B
ID
LETTER-NUMBER DESIGNATOR
INDICATES SHEET COORDINATES
WHERE TITLE IS LOCATED
DRAWING SEQUENCE NUMBER INDICATES
WHERE TITLE IS LOCATED (MAY NOT BE
PRESENT IF CALLOUT AND TITLE ARE ON
THE SAME DRAWING)
3-AD101
A1 OH
A1
DETAIL TITLE
1/8" = 1'-0"
A1
A-101
SECTION/DETAIL CALLOUT EXAMPLE
SECTION/DETAIL SYMBOL IDENTIFIERS
ONE OR TWO CHARACTER
DISCIPLINE DESIGNATOR
(MAY NOT BE PRESENT IF
CALLOUT AND TITLE ARE
ON DRAWINGS WITHIN THE
SAME DISCIPLINE)
SECTION, DETAIL, OR ELEVATION TITLE EXAMPLE
A1
A-101
ELEVATION CALLOUT EXAMPLEDETAIL CALLOUT EXAMPLE
3-AD101
A1 OH
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L
F A
C
IL
IT
IE
S E
N G
IN
E
E R
S
T E
M S
C O
M M
A N
D
DRAWFORM REVISION: 25 AUGUST 2020
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
Y S
T E
M S
C O
M M
A N
D
M
ID
-A T
LA
N
TI
C
N A
V A
L S
T A
T
IO
N
N O
R F
O L
K V
A
AS NOTED
F
IL
E N
A M
E
P
LO
T T
E D
C
R e v it P ro je c ts
\D R
Y D
P -1
-S
-D R
Y D m w ri d e r.
rv t
/2
/2
:3 :0
P
M
1-S-002
P D
R Y
D O
C K
S
A L T
W A
T E
R S
Y S
T E
M
F O
R C
V N
-7
LE
G
E N
D A
N D
A B
B R
E V
IA
T
IO
N
S
RCP
12857607
AJM MWR
02/02/2022
DEVIN POULIN,
C984 FACILITIES PLANNER, NNSY
JTL/TLH
1364315
N40085-22-R-2598
P O
R T
S M
O U
T H
, V
IR
G
IN
IA
N
O R
F O
LK
N
A V
A L
S H
IP
Y
A R
D
EJA
NEK
DSN
SDI STEEL DECK INSTITUTE
SE SOUTHEAST
SECT SECTION
SEI STRUCTURAL ENGINEERING INSTITUTE
SF SWAY FRAME
SHT SHEET
SIM SIMILAR
SJI STEEL JOIST INSTITUTE
SLNT SEALANT
SLO SHORT LEG OUTSTANDING
SLV SLEEVE
SP SPACE(S)
SPEC SPECIFICATION(S)
SQ SQUARE
SSL SHORT-SLOT HOLE(S)
SST STAINLESS STEEL
ST SNUG-TIGHT JOINT
STD STANDARD
STIF STIFFENER
STIR STIRRUP
STL STEEL
STR STRAIGHT
STRUCT STRUCTURAL
SUB SUBSTITUTE
SUPT SUPPORT
SW SOUTHWEST
SYMM SYMMETRICAL
T TON(S) OR TREAD(S)
T&B TOP AND BOTTOM
TB THROUGH BOLT
TD TRENCH DRAIN
TEMP TEMPORARY
THD THREAD(ED)
THK THICK(NESS)
THRU THROUGH
TMS THE MASONRY SOCIETY
TOC TOP OF CONCRETE
TOM TOP OF MASONRY
TOS TOP OF STEEL
TOW TOP OF WALL
TP TEST PILE
TYP TYPICAL
UNO UNLESS NOTED OTHERWISE
VAR VARIES
VB VAPOR BARRIER
VERT VERTICAL
VNR VENEER
VR VAPOR RETARDER
W WEST OR WIDE (WIDTH) OR WIDE FLANGE SHAPE
W/ WITH
W/O WITHOUT
WH WEEP HOLE
WL WIND LOAD
WLD WELD(ED)
WP WORKING POINT
WS WATERSTOP
WT WEIGHT OR WIDE FLANGE TEE SHAPE
WWR WELDED WIRE REINFORCEMENT
X EXTRA STRONG
XX DOUBLE EXTRA STRONG
± DIMENSION TO BE VERIFIED IN FIELD
N NORTH
NA NOT APPLICABLE
NAAMM NATIONAL ASSOCIATION OF ARCHITECTURAL METAL
MANUFACTURERS
NAVD NORTH AMERICAN VERTICAL DATUM
NCMA NATIONAL CONCRETE MASONRY ASSOCIATION
NE NORTHEAST
NF NEAR FACE
NIC NOT IN CONTRACT
NO NUMBER
NOM NOMINAL
NS NEAR SIDE
NTS NOT TO SCALE
NW NORTHWEST
OC ON CENTER
OD OUTSIDE DIAMETER
OF OUTSIDE FACE
OPH OPPOSITE HAND
OPNG OPENING
OPP OPPOSITE
OR OUTSIDE RADIUS
OSHA OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION
OVS OVERSIZE HOLE(S)
PAR PARALLEL
PCA PORTLAND CEMENT ASSOCIATION
PCC PRECAST CONCRETE
PCF POUND(S) PER CUBIC FOOT
PCI POUND(S) PER CUBIC INCH OR PRECAST/PRESTRESSED
CONCRETE INSTITUTE
PED PEDESTAL
PERP PERPENDICULAR
PH PHASE
PL PLATE
PLBG PLUMBING
PLC PLACE(S)
PLF POUND(S) PER LINEAR FOOT
PREFAB PREFABRICATE(D)
PREP PREPARATION
PS PIPE SUPPORT
PSF POUND(S) PER SQUARE FOOT
PSI POUND(S) PER SQUARE INCH
PT PRETENSIONED JOINT
PUR PURLIN
PVC POLYVINYL CHLORIDE
QA QUALITY ASSURANCE
QC QUALITY CONTROL
R RADIUS OR RISER(S)
RD ROOF DRAIN
REBAR REINFORCING STEEL BAR(S)
REF REFERENCE
REINF REINFORCE(D)
REQD REQUIRED
REV REVISION
RF ROOF
RM ROOM
RST REINFORCING STEEL
S SECTION MODULUS OR SOUTH OR AMERICAN STANDARD
BEAM SHAPE
SB SHEAR BAR
SC SLIP-CRITICAL JOINT
SCHED SCHEDULE
GDR GUARDRAIL
GEN GENERAL
GOVT GOVERNMENT
GR GRADE
GRTG GRATING
GT GROUT
H HIGH (HEIGHT)
HB HORIZONTAL BRACE
HC HOLLOW CORE
HGR HANGER
HORIZ HORIZONTAL
HP BEARING PILE SHAPE
HPT HIGH POINT
HS HIGH STRENGTH
HSS HOLLOW STRUCTURAL SECTION
I MOMENT OF INERTIA
IBC INTERNATIONAL BUILDING CODE
ID INSIDE DIAMETER
IF INSIDE FACE
IJ ISOLATION JOINT
IN INCH(ES)
INFO INFORMATION
INT INTERIOR
INV INVERT
IR INSIDE RADIUS
JST JOIST
JT JOINT
KB KNEE BRACE
KIP THOUSAND POUNDS
KLF KIP(S) PER LINEAR FOOT
KPL KICK PLATE
KSF KIP(S) PER SQUARE FOOT
KSI KIP(S) PER SQUARE INCH
L ANGLE SHAPE OR LENGTH
LAD LADDER
LBS POUND(S)
LD DEVELOPMENT LENGTH
LG LONG
LL LIVE LOAD
LLH LONG LEG HORIZONTAL
LLO LONG LEG OUTSTANDING
LLV LONG LEG VERTICAL
LONG LONGITUDINAL
LPT LOW POINT
LSL LONG-SLOT HOLE(S)
LTWT LIGHTWEIGHT
MATL MATERIAL
MAX MAXIMUM
MBMA METAL BUILDING MANUFACTURERS ASSOCIATION
MBS METAL BUILDING SYSTEM
MC MISCELLANEOUS CHANNEL SHAPE OR MOMENT
CONNECTION
MDP MAIN DEWATERING PUMP
MECH MECHANICAL
MEZZ MEZZANINE
MFR MANUFACTURER
MIN MINIMUM
MISC MISCELLANEOUS
MPS MISCELLANEOUS PIPE SUPPORT(S)
MSL MEAN SEA LEVEL
MTL METAL
COTR CONTRACTING OFFICER'S TECHNICAL REPRESENTATIVE
CPRS COMPRESSIBLE
CRSI CONCRETE REINFORCING STEEL INSTITUTE
CTJ CONTRACTION JOINT
CTR CENTER(ED)
CY CUBIC YARD(S)
D DEEP (DEPTH)
DBL DOUBLE
DEG DEGREE(S)
DEMO DEMOLISH (DEMOLITION)
DET DETAIL
DIA DIAMETER
DIAG DIAGONAL
DIM DIMENSION
DIR DIRECTION
DIV DIVISION
DK DECK
DL DEAD LOAD
DN DOWN
DP DRAINAGE PUMP
DWG DRAWING
DWL DOWEL
E EAST
EA EACH
EF EACH FACE
EJ EXPANSION JOINT
EL ELEVATION
EL EARTHQUAKE LOAD
ELEC ELECTRICAL
ELEV ELEVATOR
EMBED EMBEDMENT
ENGR ENGINEER
EOD EDGE OF DECK
EOS EDGE OF SLAB
EQ EQUAL
EQUIP EQUIPMENT
EQUIV EQUIVALENT
ETC AND SO FORTH
EW EACH WAY
EXP EXPANSION
EXST EXISTING
EXT EXTERIOR OR EXTERNAL
EXTN EXTENSION
FAB FABRICATE
FD FLOOR DRAIN
FDTN FOUNDATION
FF FAR FACE
FIN FINISH
FLG FLANGE
FLR FLOOR
FR FRAME
FRMG FRAMING
FRP FIBER-REINFORCED POLYMER
FS FAR SIDE
FT FOOT (FEET)
FTG FOOTING
FUT FUTURE
GA GAGE
GALV GALVANIZE(D)
GB GRADE BEAM
GC GENERAL CONTRACTOR
# NUMBER OR POUND(S)
% PERCENT
& AND
(+/-) DIMENSIONAL TOLERANCE
@ AT
AA ALUMINUM ASSOCIATION
AB ANCHOR BOLT
ACI AMERICAN CONCRETE INSTITUTE
ADDL ADDITIONAL
ADH ADHESIVE
ADJ ADJACENT
AFF ABOVE FINISH FLOOR
AGGR AGGREGATE
AHJ AUTHORITY HAVING JURISDICTION
AHR ANCHOR
AISC AMERICAN INSTITUTE OF STEEL CONSTRUCTION
AISI AMERICAN IRON AND STEEL INSTITUTE
ALT ALTERNATE
ALUM ALUMINUM
ANSI AMERICAN NATIONAL STANDARDS INSTITUTE
APPD APPROVED
APPROX APPROXIMATE
ARCH ARCHITECT(URAL)
ASCE AMERICAN SOCIETY OF CIVIL ENGINEERS
ASTM ASTM INTERNATIONAL
AWS AMERICAN WELDING SOCIETY
B/B BACK TO BACK
BC BOLT CIRCLE
BFF BELOW FINISH FLOOR
BLDG BUILDING
BLW BELOW
BM BEAM
BOS BOTTOM OF STEEL
BOT BOTTOM
BRCG BRACING
BRDG BRIDGING
BRG BEARING
BTWN BETWEEN
C CHANNEL SHAPE
C TO C CENTER TO CENTER
CAP CAPACITY
CFS COLD-FORMED STEEL
CHFR CHAMFER
CIP CAST-IN-PLACE
CIR CIRCLE
CJ CONSTRUCTION JOINT
CJP COMPLETE JOINT PENETRATION
CL CENTER LINE
CLJ CONTROL JOINT
CLL COLUMN LINE
CLR CLEAR
CMPST COMPOSITE
CMU CONCRETE MASONRY UNIT
CNR CORNER
COL COLUMN
CONC CONCRETE
CONN CONNECTION
CONSTR CONSTRUCTION
CONT CONTINUOUS
CONTR CONTRACTOR
COORD COORDINATE
CALLOUT IDENTIFICATION
ABBREVIATIONS
PORTAL CRANE LOADING DIAGRAM
S Y
M D
E S
C R
IP
T
IO
N
D A
T E
A P
P R
IS
S U
E D
F O
R C
O N
S T
R U
C T
IO
N
/2
8/
IS
SU
ED
F
OR
COPING
103' - 0"
MAIN PUMP
46' - 0"
MOTOR
83' - 0"
SUCTION CHAMBER
32' - 3 1/4"
DRAINAGE PUMP
28' - 3 1/4"
INTERMEDIATE
68' - 0"
DRAINAGE
PUMP
CHAMBER
MDP-4
CHAMBER
MDP-3
CHAMBER
MDP-2
CHAMBER
MDP-1
CHAMBER
SUCTION CHAMBER
MOTOR LEVEL
CHAMBER CEILING
40' - 3 1/4"
BOT/EXIST CONCRETE
25' - 9 1/4"
X1
X1
1. REFER TO SHEETS 1-S-001 AND 1-S-002 FOR GENERAL NOTES,
ABBREVIATIONS, PLAN LEGEND AND CALLOUT IDENTIFICATION.
2. ALL EXISTING DIMENSIONS MUST BE FIELD VERIFIED PRIOR TO
COMMENCEMENT OF WORK.
SHEET NOTES
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L
F A
C
IL
IT
IE
S E
N G
IN
E
E R
S
T E
M S
C O
M M
A N
D
DRAWFORM REVISION: 25 AUGUST 2020
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
Y S
T E
M S
C O
M M
A N
D
M
ID
-A T
LA
N
TI
C
N A
V A
L S
T A
T
IO
N
N O
R F
O L
K V
A
AS NOTED
F
IL
E N
A M
E
P
LO
T T
E D
C
R e v it P ro je c ts
\D R
Y D
P -1
-S
-D R
Y D m w ri d e r.
rv t
/2
/2
:3 :0
P
M
1-SD100
P D
R Y
D O
C K
S
A L T
W A
T E
R S
Y S
T E
M
F O
R C
V N
-7
P U
M P
W E
LL
D E
M O
LI
T
IO
N
K E
Y P
LA
N
RCP
12857608
AJM MWR
02/02/2022
DEVIN POULIN,
C984 FACILITIES PLANNER, NNSY
JTL/TLH
1364315
N40085-22-R-2598
P O
R T
S M
O U
T H
, V
IR
G
IN
IA
N
O R
F O
LK
N
A V
A L
S H
IP
Y
A R
D
EJA
NEK
DSN
3/16" = 1'-0" A1
PUMPWELL 8 DEMOLITION KEY PLAN SECTION
SHEET KEYNOTES
X1 CLIN 0002
0 4' 8' 12'
S Y
M D
E S
C R
IP
T
IO
N
D A
T E
A P
P R
IS
S U
E D
F O
R C
O N
S T
R U
C T
IO
N
/2
8/
IS
SU
ED
F
OR
M
M
A1
1-SD100
CL MDP-1
C L
M D
P
CL MDP-2 CL MDP-3 CL MDP-4
12' - 6" 24' - 0" 24' - 0" 24' - 0"
115' - 0"
OPEN OPEN OPEN OPEN
(E) FLOOR OPNG,
GRATED, TYP OF 2
(E) CONC FLOOR
BEAMS, TYP
(E) SHIPS LADDER
OPNG, TYP OF 2
(E) FLOOR OPNG,
TYP
(E) MDP FLOOR
OPNG, TYP OF 4
A1
1-SD201
(E) PUMPWELL 8
ENTRY
D11
D11
D10
D10 D10
D4 D16D16D16D16
TYP
3' - 0"
D16 D16
D4
D N
D N
UP
1. REFER TO SHEETS 1-S-001 AND 1-S-002 FOR GENERAL NOTES,
ABBREVIATIONS, PLAN LEGEND AND CALLOUT IDENTIFICATION.
2. ALL EXISTING DIMENSIONS MUST BE FIELD VERIFIED PRIOR TO
COMMENCEMENT OF WORK.
SHEET NOTES
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L
F A
C
IL
IT
IE
S E
N G
IN
E
E R
S
T E
M S
C O
M M
A N
D
DRAWFORM REVISION: 25 AUGUST 2020
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
Y S
T E
M S
C O
M M
A N
D
M
ID
-A T
LA
N
TI
C
N A
V A
L S
T A
T
IO
N
N O
R F
O L
K V
A
AS NOTED
F
IL
E N
A M
E
P
LO
T T
E D
C
R e v it P ro je c ts
\D R
Y D
P -1
-S
-D R
Y D m w ri d e r.
rv t
/2
/2
:3 :0
P
M
1-SD102
P D
R Y
D O
C K
S
A L T
W A
T E
R S
Y S
T E
M
F O
R C
V N
-7
P U
M P
W E
LL
D E
M O
LI
T
IO
N
M
O T
O R
L E
V E
L P
LA
N
RCP
12857609
AJM MWR
02/02/2022
DEVIN POULIN,
C984 FACILITIES PLANNER, NNSY
JTL/TLH
1364315
N40085-22-R-2598
P O
R T
S M
O U
T H
, V
IR
G
IN
IA
N
O R
F O
LK
N
A V
A L
S H
IP
Y
A R
D
EJA
NEK
DSN
0' 4' 8' 12'
PLAN
NORTH
3/16" = 1'-0" C1
PUMPWELL 8 MOTOR LEVEL DEMOLITION PLAN (TOC = 83'-0")
KEY PLAN
MOTOR
83'-0"
INTERMED.
68'-0"
MAIN PUMP
46'-0"
DRAINAGE
28'-3 1/4"
COPING
103'-0"
SUC. CHAM.
32'-3"
SHEET KEYNOTES
D4 DEMOLISH CONCRETE FOR DUCTBANK OPENING. EXISTING CONCRETE
REINFORCED WITH #8@6" OC AT VERT INTERIOR FACE, #8@12" OC
OTHERWISE. REFER TO C3/1-S-203. COORDINATE WITH ELECTRICAL FOR
ADDITIONAL INFORMATION.
D10 DEMOLISH ANCHOR BOLTS AT REMOVED EQUIPMENT FLUSH WITH
CONCRETE FLOOR. SEE MECHANICAL DRAWINGS FOR EQUIPMENT
DEMOLITION INFORMATION.
D11 DEMOLISH CONCRETE FOR DISCHARGE PIPE OPENING. EXISTING
CONCRETE REINFORCED WITH #8@6" OC VERT INTERIOR FACE, #8@12"
OC OTHERWISE. SEE ELEVATIONS FOR PENETRATION INFORMATION.
REFER TO C1/1-S-203. COORDINATE WITH MECHANICAL FOR ADDITIONAL
INFORMATION.
D16 DEMOLISH EXISTING CONCRETE EQUIPMENT PADS. SEE ELECTRICAL
DRAWINGS FOR EQUIPMENT DEMOLITION INFORMATION.
S Y
M D
E S
C R
IP
T
IO
N
D A
T E
A P
P R
IS
S U
E D
F O
R C
O N
S T
R U
C T
IO
N
/2
8/
IS
SU
ED
F
OR
D3
D2
CL MDP-1
C L
M D
P
CL MDP-2 CL MDP-3 CL MDP-4
4'
0"
4'
0"
4' - 0" 14' - 7" 3' - 0" 21' - 0" 3' - 0" 21' - 0" 3' - 0" 21' - 0" 3' - 0" 17' - 5" 4' - 0"
115' - 0"
OPEN TO
BELOW, TYP
OPEN TO
BELOW, TYP
(E) FLOOR OPNG,
TYP SEE NOTE 4
(E) BEAM TO
REMAIN
/4
D17 U
P
D N
DN
D18
U P
(E) BEAM TO
REMAIN
D19
X1
1. REFER TO SHEETS 1-S-001 AND 1-S-002 FOR GENERAL NOTES,
ABBREVIATIONS, PLAN LEGEND AND CALLOUT IDENTIFICATION.
2. REFER TO 1-SD102 FOR DIMENSIONS NOT INDICATED.
3. ALL EXISTING DIMENSIONS MUST BE FIELD VERIFIED PRIOR TO
COMMENCEMENT OF WORK.
4. DUE TO OBSERVED DETERIORATION UNDER EAST SIDE INTERMEDIATE
LEVEL CONCRETE, CONTRACTOR MAY NOT EXCEED 60 PSF DURING
DEMOLITION ACTIVITIES.
SHEET NOTES
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L
F A
C
IL
IT
IE
S E
N G
IN
E
E R
S
T E
M S
C O
M M
A N
D
DRAWFORM REVISION: 25 AUGUST 2020
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
Y S
T E
M S
C O
M M
A N
D
M
ID
-A T
LA
N
TI
C
N A
V A
L S
T A
T
IO
N
N O
R F
O L
K V
A
AS NOTED
F
IL
E N
A M
E
P
LO
T T
E D
C
R e v it P ro je c ts
\D R
Y D
P -1
-S
-D R
Y D m w ri d e r.
rv t
/2
/2
:3 :0
P
M
1-SD103
P D
R Y
D O
C K
S
A L T
W A
T E
R S
Y S
T E
M
F O
R C
V N
-7
P U
M P
W E
LL
D E
M O
LI
TI
O N
IN
TE
R
M E
D
IA
TE
L
E V
E L
P
LA
N
RCP
12857610
AJM MWR
02/02/2022
DEVIN POULIN,
C984 FACILITIES PLANNER, NNSY
JTL/TLH
1364315
N40085-22-R-2598
P O
R T
S M
O U
T H
, V
IR
G
IN
IA
N
O R
F O
LK
N
A V
A L
S H
IP
Y
A R
D
EJA
NEK
DSN
3/16" = 1'-0" C1
PUMPWELL 8 INTERMEDIATE LEVEL DEMOLITION PLAN (TOC = 68'-0")
SHEET KEYNOTES
D2 DEMOLISH PLATFORMS AND ASSOCIATED GUARDRAILS. NOTE THAT
ONLY PRIMARY FRAMING IS SHOWN. VERIFY QUANTITY OF STEEL PRIOR
TO DEMOLITION.
D3 DEMOLISH STEEL COLUMNS. NOTE THAT ONLY PRIMARY FRAMING IS
SHOWN. VERIFY QUANTITY OF STEEL PRIOR TO DEMOLITION.
D17 DEMOLISH EXISTING PLATFORM BEAMS, GRATING, AND HANDRAIL OVER
MDP-1 AS INDICATED.
D18 DEMOLISH W8 BEAM BELOW INTERMEDIATE LEVEL. ENSURE W10
REINFORCEMENT BEAMS ARE IN PLACE PRIOR TO W8 REMOVAL. SEE
1-S-103 FOR ADDITIONAL INFORMATION.
D19 DEMO MDP-1 OPERATOR GRATING.
X1 CLIN 0002
KEY PLAN
MOTOR
83'-0"
INTERMED.
68'-0"
MAIN PUMP
46'-0"
DRAINAGE
28'-3 1/4"
COPING
103'-0"
SUC. CHAM.
32'-3"
0' 4' 8' 12'
PLAN
NORTH
S Y
M D
E S
C R
IP
T
IO
N
D A
T E
A P
P R
IS
S U
E D
F O
R C
O N
S T
R U
C T
IO
N
/2
8/
IS
SU
ED
F
OR
D7
D2
D2
D3
D3
D9
D9
D8
CL MDP-1
C L M
D P
CL MDP-2 CL MDP-3
CL MDP-4
5' - 5" 5' - 7"
5' - 5" 5' - 7"
OPEN OPEN OPEN
6"
ALIGN WITH FACE
OF REINFORCED
CONCRETE BELOW,
TYP
A3
1-SD104
D2
D14D14
6" 6"
EXISTING
SUMP PIT
D13
D13
UP
U P
2' - 7" 3' - 6" +/-
4'
1/
2"
/2
8'
2"
4'
4"
2' - 7" 3' - 6" +/-
SUCTION CHAMBER
DEMO BELOW. SEE
A2/1-SD104
SUCTION CHAMBER
DEMO BELOW. SEE
A1/1-SD104
D20
1-SD104
B3
ALIGN WITH
FACE OF
CONCRETE
MOMENT
FRAME
C L D
P
6'
7"
X1
D1
CL MDP-1
C L M
D P
9' - 1"
/2
D6
8' - 0" 6' - 7 1/2"
8'
2"
9'
1/
2" 2'
1/ 2"
X1
MAIN PUMP
46' - 0"
(E) SUCTION
CHAMBER
5'
3/
4" ± 1'
6"
1' - 0"
DEMOLISH (E) WATERTIGHT
24"⌀ MANHOLE COVER
DEMOLITION EXTENTS
MAIN PUMP FLOOR
(E) REINFORCED SUCTION
CHAMBER WALL
2' - 6" ±
2' - 0" Ø ±
VARIES
EXISTING LADDER
CHAMBER CEILING
40' - 3 1/4"
1' - 0"
1. REFER TO SHEETS 1-S-001 AND 1-S-002 FOR GENERAL NOTES,
ABBREVIATIONS, PLAN LEGEND AND CALLOUT IDENTIFICATION.
2. REFER TO 1-SD102 FOR DIMENSIONS NOT INDICATED.
3. ALL EXISTING DIMENSIONS MUST BE FIELD VERIFIED PRIOR TO
COMMENCEMENT OF WORK.
SHEET NOTES
D6
5'
1/
2"
9' - 3 1/2"
C L M
D P
OPEN
CONCRETE
1' - 0
FRAME
MANHOLE ENLARGEMENT
TO 3' - 0" DIA
EXISTING REINFORCED
SUCTION CHAMBER WALL
EXISTING
MANHOLE
ADJUST FRAME CONCRETE
AS REQUIRED TO AVOID
THIMBLE
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L
F A
C
IL
IT
IE
S E
N G
IN
E
E R
S
T E
M S
C O
M M
A N
D
DRAWFORM REVISION: 25 AUGUST 2020
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
Y S
T E
M S
C O
M M
A N
D
M
ID
-A T
LA
N
TI
C
N A
V A
L S
T A
T
IO
N
N O
R F
O L
K V
A
AS NOTED
F
IL
E N
A M
E
P
LO
T T
E D
C
R e vi t_ P ro je ct s \D
R Y
D P
-1
-S
-D R
Y D m w ri d e r.
rv t
/2
/2
:3 :1
P
M
1-SD104
P D
R Y
D O
C K
S
A L T
W A
T E
R S
Y S
T E
M
F O
R C
V N
-7
P U
M P
W E
LL
D E
M O
LI
TI
O N
M
A
IN
P U
M P
A N
D S
U C
T
IO
N C
H A
M B
E R
L E
V E
L P
LA
N
RCP
12857611
AJM MWR
02/02/2022
DEVIN POULIN,
C984 FACILITIES PLANNER, NNSY
JTL/TLH
1364315
N40085-22-R-2598
P O
R T
S M
O U
T H
, V
IR
G
IN
IA
N
O R
F O
LK
N
A V
A L
S H
IP
Y
A R
D
EJA
NEK
DSN
3/16" = 1'-0" C1
PUMPWELL 8 MAIN PUMP LEVEL DEMOLITION PLAN (TOC = 46'-0")
3/16" = 1'-0" A1
SUCTION CHAMBER LEVEL
DEMOLITION PLAN (TOC = 32'-3 1/4")
0' 8' 16' 32'4'
PLAN
NORTH
SHEET KEYNOTES
D1 DEMOLISH REINFORCED CONCRETE. EXISTING CONCRETE REINFORCED
WITH #7@12" OC LONGITUDINAL (TOP AND BOTTOM) AND #8@12"
TRANSVERSE TOP, #10@6" OC TRANSVERSE BOTTOM.
D2 DEMOLISH PLATFORMS AND ASSOCIATED GUARDRAILS. NOTE THAT
ONLY PRIMARY FRAMING IS SHOWN. VERIFY QUANTITY OF STEEL PRIOR
TO DEMOLITION.
D3 DEMOLISH STEEL COLUMNS. NOTE THAT ONLY PRIMARY FRAMING IS
SHOWN. VERIFY QUANTITY OF STEEL PRIOR TO DEMOLITION.
D6 DEMOLISH SECTION OF SUCTION CHAMBER FLOOR AND WALL FOR
DRAINAGE PIPE INSTALLATION. EXISTING FLOOR REINFORCED WITH
#7@12" OC LONGITUDINAL AND #8@12" OC TRANSVERSE. EXISTING
WALL EXTERIOR FACE REINFORCED WITH #6@12" OC HORIZONTAL AND
#7@12" OC VERTICAL. EXISTING WALL INTERIOR FACE REINFORCED
WITH #6@12" OC HORIZONTAL AND #7@12" OC VERTICAL.
D7 DEMOLISH SHIPS LADDER AND MISCELLANEOUS DRAINAGE PUMP
SUPPORT PLATFORMS.
D8 ENLARGE MANHOLE OPENING TO 3'-0" DIAMETER.
D9 DEMOLISH REINFORCED CONCRETE. EXISTING CONCRETE REINFORCED
WITH #7@12" OC LONGITUDINAL AND #8@12" OC TRANSVERSE, EACH
FACE. AT THE EMBEDDED STEEL THIMBLES, DEMOLISH CONCRETE TO
THE EXTENT NECESSARY TO REMOVE THE THIMBLE FRAME AND COVER.
ALIGN CONCRETE DEMOLITION WITH EXISTING-TO-REMAIN REINFORCED
CONCRETE WALLS BELOW AND DO NOT DAMAGE.
D13 DEMOLISH EXISTING EMBEDDED STEEL THIMBLES.
D14 EXISTING STRUCTURAL COLUMNS AS INDICATED TO REMAIN.
CONTRACTOR TO PROTECT DURING DEMOLITION EFFORTS IN THE
PUMPWELL.
D20 DEMOLISH EXISTING LADDER AND SUPPORT STRUCTURE
X1 CLIN 0002
KEY PLAN
MOTOR
83'-0"
INTERMED.
68'-0"
MAIN PUMP
46'-0"
DRAINAGE
28'-3 1/4"
COPING
103'-0"
SUC. CHAM.
32'-3"
0' 4' 8' 12'
PLAN
NORTH
0' 4' 8' 12'3/16" = 1'-0" A3
SECTION
3/16" = 1'-0"
A2
DRAINAGE PUMP CHAMBER FLOOR
DEMOLITION PLAN (TOC = 32'-3 1/4")
0' 8' 16' 32'4'
PLAN
NORTH
S Y
M D
E S
C R
IP
TI
O N
D A
TE
A
P P
R
IS
S U
E D
F O
R C
O N
S
TR
U C
T
IO
N
/2 8/
3/16" = 1'-0" B3
SUCTION CHAMBER MANHOLE
DEMOLITION PLAN (TOC = 46'-0")
0' 4' 8' 12'
PLAN
NORTH
IS
SU
ED
F
OR
W x
W x
W x
W x Wx
Wx
Wx
Wx
SW
x
SW
x
SW
x
SW
x
SW
x
SW
x
SW
x
SW
x
SWx
SW
x
SWx
SD
x
SD
x
SD
x
SDx SDx
SSx
SDx
SD x
SD x
BASE ROADWAY
MCCAWLEY STREET
S D
S D
S D
S D
D E
P A
R
TM
E N
T O
F
TH
E N
A V
Y
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S Y
S
TE
M S
C O
M M
A N
D
DES DRW
S Y
M D
E S
C R
IP
TI
O N
D A
TE
A
P P
R
DRAWFORM REVISION: 25 AUG 2020
CHK
OF
EPROJECT NO.:
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
NA
VA
L
FA
CI
LI
TI
ES
E
NG
IN
EE
RI
NG
S
YS
TE
M
S
CO
M M
AN
D
M
ID
-A
TL
AN
TI
C
NA
VA
L
ST
AT
IO
N
- N
OR
FO
LK
, V
A
NO
RF
O
LK
N
AV
AL
S
HI
PY
AR
D
PO
RT
SM
O
UT
H, V
IR
G
IN
IA
P
D
R Y
D O
C K
S A
LT
W
A
TE
R S
Y S
TE
M
FO
R
C V
N -7
JTL/TLH
EJA
DSN
1364315
N40085-22-R-2598
DEVIN POULIN,
C984 FACILITIES PLANNER, NNSY
02/02/2022
IS
SU
ED
F
OR
B
ID
/2
8/
SHEET NOTES
NORTH
PLAN
KEY PLAN
4 5
11 12
2 3
13 14
1. SEE SHEET 1-VF001 FOR SURVEY NOTES, ABBREVIATIONS, AND
LEGEND.
2. SEE SHEETS 1-C-001 THROUGH 1-C-005 FOR CIVIL NOTES AND
LEGENDS.
3. SEE SHEETS 1-S-001 & 1-S-002 FOR SITE STRUCTURAL NOTES AND
LEGENDS.
4. SEE SHEETS 1-E-001, 1-E-011 & 1-E-012 FOR ELECTRICAL NOTES
AND LEGENDS.
DLB
BA TNT2 WMS
12857612
ST
RU
CT
UR
AL
D
EM
OL
IT
IO
N
PL
AN
AR
EA
1-SD115
AS NOTED
SCALE: 1" = 20'
WATERFRONT STRUCTURAL DEMOLITION PLAN - AREA 15A1
PLAN
NORTH
40'10'0 20'
1-SD401
C1
SOUTH FLOOD
FLUME DEMOLITION
CRANE RAIL DEMOLITION
PER SITE STRUCTURAL
EMH 897 DEMOLITION
PER ELECTRICAL
WP
N = 3462673.32 E = 12127790.58
46'-7"
'-3
X1
SHEET KEYNOTES
X1. CLIN 0002
1. REFER TO SHEETS 1-S-001 AND 1-S-002 FOR GENERAL NOTES,
ABBREVIATIONS, PLAN LEGEND AND CALLOUT IDENTIFICATION.
2. ALL EXISTING DIMENSIONS MUST BE FIELD VERIFIED PRIOR TO
COMMENCEMENT OF WORK.
3. COORDINATE ALL EQUIPMENT DIMENSIONS AND LOCATIONS WITH
MECHANICAL AND EQUIPMENT SUPPLIERS PRIOR TO COMMENCEMENT OF
WORK.
SHEET NOTES
COPING
103' - 0"
MAIN PUMP
46' - 0"
MOTOR
83' - 0"
SUCTION CHAMBER
32' - 3 1/4"
DRAINAGE PUMP
28' - 3 1/4"
INTERMEDIATE
68' - 0"
8' - 0"6"
4'
0" 5'
0"
D1
D2
D2D2
D3
D7
D2D2
D3
D8
CL MDP-1 CL MDP-2 CL MDP-3 CL MDP-4
D5
D3
CHAMBER CEILING
40' - 3 1/4"
BOT/EXIST CONCRETE
25' - 9 1/4"
8'
0"
A1
1-SD202
A3
1-SD202
D17
D9
5'
3/
4"
D6
D6
X1
X1
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L
F A
C
IL
IT
IE
S E
N G
IN
E
E R
S
T E
M S
C O
M M
A N
D
DRAWFORM REVISION: 25 AUGUST 2020
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
Y S
T E
M S
C O
M M
A N
D
M
ID
-A T
LA
N
TI
C
N A
V A
L S
T A
T
IO
N
N O
R F
O L
K V
A
AS NOTED
F
IL
E N
A M
E
P
LO
T T
E D
C
R e v it P ro je c ts
\D R
Y D
P -1
-S
-D R
Y D m w ri d e r.
rv t
/2
/2
:3 :1
P
M
1-SD201
P D
R Y
D O
C K
S
A L T
W A
T E
R S
Y S
T E
M
F O
R C
V N
-7
P U
M P
W E
LL
D E
M O
LI
TI
O N
IN
TE
R
IO
R
E
LE
V A
T
IO
N
RCP
12857613
AJM MWR
02/02/2022
DEVIN POULIN,
C984 FACILITIES PLANNER, NNSY
JTL/TLH
1364315
N40085-22-R-2598
P O
R T
S M
O U
T H
, V
IR
G
IN
IA
N
O R
F O
LK
N
A V
A L
S H
IP
Y
A R
D
EJA
NEK
DSN
SHEET KEYNOTES
D1 DEMOLISH REINFORCED CONCRETE. EXISTING CONCRETE REINFORCED
WITH #7@12" OC LONGITUDINAL (TOP AND BOTTOM) AND #8@12"
TRANSVERSE TOP, #10@6" OC TRANSVERSE BOTTOM.
D2 DEMOLISH PLATFORMS AND ASSOCIATED GUARDRAILS. NOTE THAT
ONLY PRIMARY FRAMING IS SHOWN. VERIFY QUANTITY OF STEEL PRIOR
TO DEMOLITION.
D3 DEMOLISH STEEL COLUMNS. NOTE THAT ONLY PRIMARY FRAMING IS
SHOWN. VERIFY QUANTITY OF STEEL PRIOR TO DEMOLITION.
D5 DEMOLISH UNREINFORCED LEAN CONCRETE FILL.
D6 DEMOLISH SECTION OF SUCTION CHAMBER FLOOR AND WALL FOR
DRAINAGE PIPE INSTALLATION. EXISTING FLOOR REINFORCED WITH
#7@12" OC LONGITUDINAL AND #8@12" OC TRANSVERSE. EXISTING
WALL EXTERIOR FACE REINFORCED WITH #6@12" OC HORIZONTAL AND
#7@12" OC VERTICAL. EXISTING WALL INTERIOR FACE REINFORCED
WITH #6@12" OC HORIZONTAL AND #7@12" OC VERTICAL.
D7 DEMOLISH SHIPS LADDER AND MISCELLANEOUS DRAINAGE PUMP
SUPPORT PLATFORMS.
D8 ENLARGE MANHOLE OPENING TO 3'-0" DIAMETER.
D9 DEMOLISH REINFORCED CONCRETE. EXISTING CONCRETE REINFORCED
WITH #7@12" OC LONGITUDINAL AND #8@12" OC TRANSVERSE, EACH
FACE. AT THE EMBEDDED STEEL THIMBLES, DEMOLISH CONCRETE TO
THE EXTENT NECESSARY TO REMOVE THE THIMBLE FRAME AND COVER.
ALIGN CONCRETE DEMOLITION WITH EXISTING-TO-REMAIN REINFORCED
CONCRETE WALLS BELOW AND DO NOT DAMAGE.
D17 DEMOLISH EXISTING PLATFORM BEAMS, GRATING, AND HANDRAIL OVER
MDP-1 AS INDICATED.
X1 CLIN 0002
0' 4' 8' 12' 3/16" = 1'-0"
A1
PUMPWELL 8 DEMOLITION INTERIOR ELEVATION
S Y
M D
E S
C R
IP
T
IO
N
D A
T E
A P
P R
IS
S U
E D
F O
R C
O N
S T
R U
C T
IO
N
/2
8/
IS
SU
ED
F
OR
MAIN PUMP
46' - 0"
MOTOR
83' - 0"
SUCTION CHAMBER
32' - 3 1/4"
DRAINAGE PUMP
28' - 3 1/4"
INTERMEDIATE
68' - 0"
4' - 6 1/2" 10' - 0 1/2" 8' - 2" 4' - 4"
CL MDP
6" 6"
D9D13
D5
D1
D13
D17
X1
X1
COPING
103' - 0"
MAIN PUMP
46' - 0"
MOTOR
83' - 0"
SUCTION CHAMBER
32' - 3 1/4"
DRAINAGE PUMP
28' - 3 1/4"
INTERMEDIATE
68' - 0"
D3 D3
D3
D7
D6
D2D2
D3
D2
D2
D18
1. REFER TO SHEETS 1-S-001 AND 1-S-002 FOR GENERAL NOTES,
ABBREVIATIONS, PLAN LEGEND AND CALLOUT IDENTIFICATION.
2. ALL EXISTING DIMENSIONS MUST BE FIELD VERIFIED PRIOR TO
COMMENCEMENT OF WORK.
3. COORDINATE ALL EQUIPMENT DIMENSIONS AND LOCATIONS WITH
MECHANICAL AND EQUIPMENT SUPPLIERS PRIOR TO COMMENCEMENT OF
WORK.
SHEET NOTES
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L
F A
C
IL
IT
IE
S E
N G
IN
E
E R
S
T E
M S
C O
M M
A N
D
DRAWFORM REVISION: 25 AUGUST 2020
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
Y S
T E
M S
C O
M M
A N
D
M
ID
-A T
LA
N
TI
C
N A
V A
L S
T A
T
IO
N
N O
R F
O L
K V
A
AS NOTED
F
IL
E N
A M
E
P
LO
T T
E D
C
R e v it P ro je c ts
\D R
Y D
P -1
-S
-D R
Y D m w ri d e r.
rv t
/2
/2
:3 :2
P
M
1-SD202
P D
R Y
D O
C K
S
A L T
W A
T E
R S
Y S
T E
M
F O
R C
V N
-7
P U
M P
W E
LL
D E
M O
LI
TI
O N
IN
TE
R
IO
R
E
LE
V A
T
IO
N S
RCP
12857614
AJM MWR
02/02/2022
DEVIN POULIN,
C984 FACILITIES PLANNER, NNSY
JTL/TLH
1364315
N40085-22-R-2598
P O
R T
S M
O U
T H
, V
IR
G
IN
IA
N
O R
F O
LK
N
A V
A L
S H
IP
Y
A R
D
EJA
NEK
DSN
0' 4' 8' 12'3/16" = 1'-0" A1
MDP-1 CHAMBER
DEMOLITION INTERIOR ELEVATION
0' 4' 8' 12'3/16" = 1'-0"
A3
DRAINAGE PUMP CHAMBER
DEMOLITION INTERIOR ELEVATION
SHEET KEYNOTES
D1 DEMOLISH REINFORCED CONCRETE. EXISTING CONCRETE REINFORCED
WITH #7@12" OC LONGITUDINAL (TOP AND BOTTOM) AND #8@12"
TRANSVERSE TOP, #10@6" OC TRANSVERSE BOTTOM.
D2 DEMOLISH PLATFORMS AND ASSOCIATED GUARDRAILS. NOTE THAT
ONLY PRIMARY FRAMING IS SHOWN. VERIFY QUANTITY OF STEEL PRIOR
TO DEMOLITION.
D3 DEMOLISH STEEL COLUMNS. NOTE THAT ONLY PRIMARY FRAMING IS
SHOWN. VERIFY QUANTITY OF STEEL PRIOR TO DEMOLITION.
D5 DEMOLISH UNREINFORCED LEAN CONCRETE FILL.
D6 DEMOLISH SECTION OF SUCTION CHAMBER FLOOR AND WALL FOR
DRAINAGE PIPE INSTALLATION. EXISTING FLOOR REINFORCED WITH
#7@12" OC LONGITUDINAL AND #8@12" OC TRANSVERSE. EXISTING
WALL EXTERIOR FACE REINFORCED WITH #6@12" OC HORIZONTAL AND
#7@12" OC VERTICAL. EXISTING WALL INTERIOR FACE REINFORCED
WITH #6@12" OC HORIZONTAL AND #7@12" OC VERTICAL.
D7 DEMOLISH SHIPS LADDER AND MISCELLANEOUS DRAINAGE PUMP
SUPPORT PLATFORMS.
D9 DEMOLISH REINFORCED CONCRETE. EXISTING CONCRETE REINFORCED
WITH #7@12" OC LONGITUDINAL AND #8@12" OC TRANSVERSE, EACH
FACE. AT THE EMBEDDED STEEL THIMBLES, DEMOLISH CONCRETE TO
THE EXTENT NECESSARY TO REMOVE THE THIMBLE FRAME AND COVER.
ALIGN CONCRETE DEMOLITION WITH EXISTING-TO-REMAIN REINFORCED
CONCRETE WALLS BELOW AND DO NOT DAMAGE.
D13 DEMOLISH EXISTING EMBEDDED STEEL THIMBLES.
D17 DEMOLISH EXISTING PLATFORM BEAMS, GRATING, AND HANDRAIL OVER
MDP-1 AS INDICATED.
D18 DEMOLISH W8 BEAM BELOW INTERMEDIATE LEVEL. ENSURE W10
REINFORCEMENT BEAMS ARE IN PLACE PRIOR TO W8 REMOVAL. SEE
1-S-103 FOR ADDITIONAL INFORMATION.
X1 CLIN 0002
S Y
M D
E S
C R
IP
T
IO
N
D A
T E
A P
P R
IS
S U
E D
F O
R C
O N
S T
R U
C T
IO
N
/2
8/
IS
SU
ED
F
OR
(E) CONC FILLED
STEEL PIPE PILE, TYP
(E) HP, TYP
~ DRY DOCK 8 ~ 46'-7"± (LIMITS OF DEMOLITION)
COFFERDAM1
(E) CONC (BELOW SLAB
DEMOLITION) TO REMAIN
CRANE RAIL DEMOLITION
PER SITE STRUCTURAL
(E) EMH 897 DEMOLITION
PER ELECTRICAL
(E) CRANE RAIL, TYP
7'- 2"
(E) DOCK WATER
LEVEL GAUGE
3'- 9"
'-3
3'- 2"
TY
P
3'-8"±
5'-6"±
4'- 0"
(E) DD8 COPING WALL
LIM
IT
S
OF
(E ) F
LU
ME
4'- 0"
(E) SLUICE
GATE SLOT
(E) SECONDARY STOP
LOG/TRASH RACK SLOT
(E) STOP LOG SLOT
(E) SLUICE GATE MOTOR
TO BE DEMOLISHED,
SEE MECH DRAWINGS
(E) CAISSON POWER
PEDESTAL
8'-0"±
4'- 0"
(E) CONC FILLED
STEEL PIPE PILE, TYP
EL 65.89
EL 61.47
EL 93.0
EL 103.0
(E) STOP LOG SLOT
(E) SECONDARY STOP
LOG/TRASH RACK SLOT
46'-7"± (LIMITS OF DEMOLITION)
3'- 0"
30'-8"± 2'-0"
COFFERDAM1
EL 93.28
MLLW
FACE OF CONC
1'-6"
(E) CONC TO REMAIN
(E ) S
LU
IC
E
GA
TE
S
LO
T
(E ) M
AN
HO
LE
1'- 6"
M
IN
T
OP
O F
PL
UG
AT
S
TO
P
LO
G
SL
OT
(E ) V
EN
T8'-
7"
3"
TY
P
3'-6"
2" GROOVE
ALL AROUND 2
3'-2"± 12'-3"
(E) FLOOD FLUME
3'- 0" 8
(E) EMH 897
8'-0"±
(E) CRANE RAIL
DD8
DR
Y
DO
CK
W
AL
L
LC FLOOD FLUME
10'-0"±
7'-2"± 12'-3"
(E) FLOOD FLUME
3'- 0" 8
8'-0"±
(E) DOCK WATER
LEVEL GAUGE
DD8
DR
Y
DO
CK
W
AL
L TYP 9
A
DLB
BA TNT2 WMS
12857615
DE
M
OL
IT
IO
N
DE
TA
IL
S
- S
OU
TH
F
LO
OD
F
LU
M E
OU
TF
AL
L
1-SD401
AS NOTED
D E
P A
R
TM
E N
T O
F
TH
E N
A V
Y
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S Y
S
TE
M S
C O
M M
A N
D
DES DRW
S Y
M D
E S
C R
IP
TI
O N
D A
TE
A
P P
R
DRAWFORM REVISION: 25 AUG 2020
CHK
OF
EPROJECT NO.:
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
NA
VA
L
FA
CI
LI
TI
ES
E
NG
IN
EE
RI
NG
S
YS
TE
M
S
CO
M M
AN
D
M
ID
-A
TL
AN
TI
C
NA
VA
L
ST
AT
IO
N
- N
OR
FO
LK
, V
A
NO
RF
O
LK
N
AV
AL
S
HI
PY
AR
D
PO
RT
SM
O
UT
H, V
IR
G
IN
IA
P
D
R Y
D O
C K
S A
LT
W
A
TE
R S
Y S
TE
M
FO
R
C V
N -7
JTL/TLH
EJA
DSN
1364315
N40085-22-R-2598
DEVIN POULIN,
C984 FACILITIES PLANNER, NNSY
02/02/2022
IS
SU
ED
F
OR
B
ID
/2
8/
A1
1-SD401
SCALE: 3/16" = 1'-0"
PARTIAL DEMOLITION PLAN AT SOUTH FLOOD FLUMEC1 1-SD115 0 4' 8' 12'
SCALE: 3/16" = 1'-0"
SECTIONA1 0 4' 8' 12'
PLAN
NORTH
SHEET NOTES
1. SEE SHEET 1-SB001 THROUGH 1-SB004 FOR STRUCTURAL
WATERFRONT NOTES, ABBREVIATIONS, LEGEND, AND TYPICAL
DETAILS.
PROPOSED SEQUENCE OF
CONSTRUCTION
1. INSTALL GOV'T FURNISHED COFFERDAM. SEE "DRY DOCK 8 STOP LOG
SEAT REPAIR" NAVFAC DWG NOs. 12715118 TO 1215125 FOR
COFFERDAM DETAILS. COFFERDAM TO REMAIN IN PLACE UNTIL SELF
CONSOLIDATING CONCRETE HAS FULLY CURED FOR A MIN OF 28
DAYS.
2. REMOVE 3" OF (E) CONCRETE ALL AROUND, PRESERVE (E)
REINFORCING. CHIP 2" GROOVE INTO (E) CONCRETE ALL AROUND
AND PROVIDE HYDROPHILIC WATER STOP.
3. PLACE PLUG WITH BLIND FLANGE PIPE PENETRATIONS. SEE SHEET
1-SB401 FOR PLUG AND PIPE PENETRATION DETAILS.
4. DEMOLISH EXISTING SLUICE GATE AND STOP LOGS. PROVIDE
ACCESS TO PLACE PIPING.
5. CORE VENT HOLES AT 20'-0" OC.
6. PLACE OUTFALL PIPING. SEE MECHANICAL DRAWINGS.
7. FILL STOP LOG SLOT WITH SELF CONSOLIDATING CONCRETE. SEE
SHEET 1-SB401 FOR DETAILS.
8. SAWCUT PERIMETER FOR REINFORCED CONCRETE SLAB. DEMO
EXISTING CONCRETE TO LIMITS SHOWN FOR INSTALLATION OF
REINFORCED CONC SLAB.
9. REMOVE ALL MARINE GROWTH FROM INSIDE INTAKE OF FLUME 30
DAYS PRIOR TO SCC PLACEMENT.
10. FILL FLOOD FLUME WITH SCC. SEE SHEET 1-SB401.
11. CONSTRUCT REINFORCED CONCRETE SLAB. SEE SHEET 1-SB501.
A4
1-SD401
SCALE: 3/16" = 1'-0"
SECTIONA4 0 4' 8' 12'
A5
1-SD401
SCALE: 3/16" = 1'-0"
SECTIONA5 0 4' 8' 12'
WP
N = 3462673.32 E = 12127790.58
MAIN PUMP
46' - 0"
MOTOR
83' - 0"
SUCTION CHAMBER
32' - 3 1/4"
DRAINAGE PUMP
28' - 3 1/4"
INTERMEDIATE
68' - 0"
DRAINAGE
PUMP
CHAMBER
MDP-4
CHAMBER
MDP-3
CHAMBER
MDP-2
CHAMBER
DP-4/ DP-5
CHAMBER
SUCTION CHAMBER
MOTOR LEVEL
CL DEMO
MDP-1
CL MDP-2 CL MDP-3 CL MDP-4
CL DP-4/ DP-5
CHAMBER CEILING
40' - 3 1/4"
BOT/EXIST CONCRETE
25' - 9 1/4"
X1
1. REFER TO SHEETS 1-S-001 AND 1-S-002 FOR GENERAL NOTES,
ABBREVIATIONS, PLAN LEGEND AND CALLOUT IDENTIFICATION.
2. ALL EXISTING DIMENSIONS MUST BE FIELD VERIFIED PRIOR TO
COMMENCEMENT OF WORK.
3. COORDINATE ALL EQUIPMENT DIMENSIONS AND LOCATIONS WITH
MECHANICAL AND EQUIPMENT SUPPLIERS PRIOR TO COMMENCEMENT OF
WORK.
SHEET NOTES
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L
F A
C
IL
IT
IE
S E
N G
IN
E
E R
S
T E
M S
C O
M M
A N
D
DRAWFORM REVISION: 25 AUGUST 2020
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
Y S
T E
M S
C O
M M
A N
D
M
ID
-A T
LA
N
TI
C
N A
V A
L S
T A
T
IO
N
N O
R F
O L
K V
A
AS NOTED
F
IL
E N
A M
E
P
LO
T T
E D
C
R e v it P ro je c ts
\D R
Y D
P -1
-S
-D R
Y D m w ri d e r.
rv t
/2
/2
:3 :1
P
M
1-S-100
P D
R Y
D O
C K
S
A L T
W A
T E
R S
Y S
T E
M
F O
R C
V N
-7
P U
M P
W E
LL
K E
Y P
LA
N
RCP
12857616
AJM MWR
02/02/2022
DEVIN POULIN,
C984 FACILITIES PLANNER, NNSY
JTL/TLH
1364315
N40085-22-R-2598
P O
R T
S M
O U
T H
, V
IR
G
IN
IA
N
O R
F O
LK
N
A V
A L
S H
IP
Y
A R
D
EJA
NEK
DSN
3/16" = 1'-0" A1
PUMPWELL 8 KEYPLAN SECTION
0 4' 8' 12'
S Y
M D
E S
C R
IP
T
IO
N
D A
T E
A P
P R
IS
S U
E D
F O
R C
O N
S T
R U
C T
IO
N
/2
8/
SHEET KEYNOTES
X1 CLIN 0002
IS
SU
ED
F
OR
A1
1-S-100
A3
1-S-202 A1
1-S-202
A1
1-S-421
CL DEMO
MDP-1
C L M
D P
CL MDP-2 CL MDP-3 CL MDP-4
12' - 6" 24' - 0" 24' - 0" 24' - 0"
115' - 0"
1-S-421
C1
(E) FLOOR OPNG,
GRATED, TYP OF 2
(E) CONC FLOOR
BEAMS, TYP
(E) MDP FLOOR
OPNG, TYP OF 4
(E) SHIPS LADDER
OPNG, TYP OF 2
OPEN OPEN OPEN
A1
1-S-201
C1
1-S-203
TYP
C3
1-S-203
(E) PUMPWELL 8
ENTRY
8 57
TYP OF 3
D N
D N
UP
1. REFER TO SHEETS 1-S-001 AND 1-S-002 FOR GENERAL NOTES,
ABBREVIATIONS, PLAN LEGEND AND CALLOUT IDENTIFICATION.
2. ALL EXISTING DIMENSIONS MUST BE FIELD VERIFIED PRIOR TO
COMMENCEMENT OF WORK.
3. COORDINATE ALL EQUIPMENT DIMENSIONS AND LOCATIONS WITH
MECHANICAL AND EQUIPMENT SUPPLIERS PRIOR TO COMMENCEMENT OF
WORK.
SHEET NOTES
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L
F A
C
IL
IT
IE
S E
N G
IN
E
E R
S
T E
M S
C O
M M
A N
D
DRAWFORM REVISION: 25 AUGUST 2020
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
Y S
T E
M S
C O
M M
A N
D
M
ID
-A T
LA
N
TI
C
N A
V A
L S
T A
T
IO
N
N O
R F
O L
K V
A
AS NOTED
F
IL
E N
A M
E
P
LO
T T
E D
C
R e v it P ro je c ts
\D R
Y D
P -1
-S
-D R
Y D m w ri d e r.
rv t
/2
/2
:3 :1
P
M
1-S-102
P D
R Y
D O
C K
S
A L T
W A
T E
R S
Y S
T E
M
F O
R C
V N
-7
P U
M P
W E
LL
M
O
TO
R L
E V
E L
P
LA
N
RCP
12857617
AJM MWR
02/02/2022
DEVIN POULIN,
C984 FACILITIES PLANNER, NNSY
JTL/TLH
1364315
N40085-22-R-2598
P O
R T
S M
O U
T H
, V
IR
G
IN
IA
N
O R
F O
LK
N
A V
A L
S H
IP
Y
A R
D
EJA
NEK
DSN
3/16" = 1'-0" C1
PUMPWELL 8 MOTOR LEVEL PLAN (TOC = 83'-0")
KEY PLAN
MOTOR
83'-0"
INTERMED.
68'-0"
MAIN PUMP
46'-0"
DRAINAGE
28'-3 1/4"
COPING
103'-0"
SUC. CHAM.
32'-3"
0' 4' 8' 12'
PLAN
NORTH
SHEET KEYNOTES
8 DUCTBANK OPENINGS, REFER TO C3/1-S-203 FOR PENETRATION
LOCATION. COORDINATE LOCATIONS WITH ELECTRICAL.
24 COVER PLATE OVER EXISTING OPENING. REFER TO A1/1-S-421 FOR
DETAIL, APPROX 2'-2" DIA ±, TYP.
28 EXISTING PIPE OPENING TO REMAIN, REFER TO MECHANICAL DRAWINGS
FOR SIZE AND LOCATION.
38 EXISTING PIPE OPENING TO REMAIN, REFER TO C1/1-S-203 FOR CENTER
OF PIPE LOCATION AND MECHANICAL DRAWINGS FOR PENETRATION
DETAILS.
48 PIPE PENETRATION, REFER TO C1/1-S-203 FOR CENTER OF PIPE
LOCATION AND MECHANICAL DRAWINGS FOR PENETRATION DETAILS.
57 4" CONCRETE EQUIPMENT PAD PER EP-1. COORDINATE WITH
ELECTRICAL DRAWINGS FOR SIZE AND LOCATION. REFER TO 1-S-502
FOR DETAIL, AND PROVIDE EXPANSION JOINT WHERE PLACING NEW
EP-1 AGAINST WALL PANELING.
S Y
M D
E S
C R
IP
T
IO
N
D A
T E
A P
P R
IS
S U
E D
F O
R C
O N
S T
R U
C T
IO
N
/2
8/
IS
SU
ED
F
OR
CL DEMO
MDP-1
C L M
D P
CL MDP-2 CL MDP-3 CL MDP-4OPEN TO
BELOW, TYP
OPEN TO
BELOW, TYP
4'
0"
4'
0"
4' - 0" 14' - 7" 3' - 0" 21' - 0" 3' - 0" 21' - 0" 3' - 0" 21' - 0" 3' - 0" 17' - 5" 4' - 0"
115' - 0"
UP
DN
DN
UP
SEE NOTE 6
W10X33 (-1' - 1")
W10X33 (-1' - 1")
W10X33 (-1' - 1")
4'
5" 4'
5'
5"
C3
1-S-301
1' - 1 3/8"
(E) BEAMS
TO REMAIN
TYP @
W10
COL
BELOW
SIM
SE-12 W/ GR-1
X1
1. REFER TO SHEETS 1-S-001 AND 1-S-002 FOR GENERAL NOTES,
ABBREVIATIONS, PLAN LEGEND AND CALLOUT IDENTIFICATION.
2. REFER TO 1-S-102 FOR DIMENSIONS NOT SHOWN.
3. REFER TO 1-S-500 SERIES FOR TYPICAL FRAMING DETAILS.
4. ALL EXISTING DIMENSIONS MUST BE FIELD VERIFIED PRIOR…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .