1364315_dwg_10of18_PH1_V2_Electrical.pdf

PDF 11 MB Posted

Attached to
P-678 Dry Dock 8 Saltwater System for CVN-78, Norfolk Naval Shipyard, Portsmouth, Virginia
Solicitation number
N40085-22-R-2598_Drawings
Issued by

About this file

This document provides details for a federal contract opportunity to design and install a saltwater system for Dry Dock 8 at Norfolk Naval Shipyard in Portsmouth, Virginia. The solicitation number is N40085-22-R-2598 and related drawings and specifications can be accessed through Notice IDs N40085-22-R-2598_Drawings and N40085-22-R-2598_Specifications. The opportunity type is a special notice and the Naval Facilities Engineering Command is the contracting agency. Offerors will be required to provide engineering and construction services to design and install a new saltwater system for Dry Dock 8 to support maintenance on the aircraft carrier CVN-78. Response is due by the date specified in the notices.

View the file

Other files

Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PANEL LP1A

100A, 208Y/120V-30, 4W

FEEDS FROM PANEL MDP

DEVICE ID

DEVICE RATING

POWER SOURCE

LIGHTING

120/277V TOGGLE SWITCH. SINGLE POLE, SUBSCRIPTS (A - E) WHEN

USED, DENOTES FIXTURES CONTROLLED.

LED LUMINAIRE

LED EMERGENCY LUMINAIRE. EMERGENCY BATTERY DRIVER, 1400

LUMENS MINIMUM FOR 90 MINUTES, UON (NOTE: ALL FIXTURES

NOTED ON PLAN WITH HATCH AND/OR LABELED WITH AN 'E' AFTER

THE FIXTURE TYPE INDICATES EMERGENCY)

'E' DENOTES EMERGENCY F1E

MOUNTING HEIGHT

MUST BE SAME AS CEILING UON.

LOWER CASE LETTER DENOTES SWITCH

'LEG'. THE SWITCH WITH THE SAME

LETTER OPERATES THIS FIXTURE.

LUMINAIRE TYPE

8'-0" a

PA-1,3,5 PANEL - CIRCUIT NUMBER

GROUNDING

GROUND RING COUNTERPOISE.

T

GROUND ROD, SUBSCRIPT INDICATES TYPE.

T: TEST WELL; SEE 1-ES516/C1.

POWER

SURFACE MOUNTED DUPLEX CONVENIENCE RECEPTACLE. 20A,

120V. GFI DENOTES GROUND FAULT INTERRUPTER, WPIU DENOTES

WEATHER PROOF ENCLOSURE AND C DENOTES CEILING MOUNT

(FLUSH).

SURFACE MOUNTED QUAD CONVENIENCE RECEPTACLE. 20A, 120V.

GFI DENOTES GROUND FAULT INTERRUPTER, WPIU DENOTES

WEATHER PROOF ENCLOSURE AND C DENOTES CEILING MOUNT

(FLUSH).

MOTOR RATED SWITCH OR MANUAL MOTOR STARTER WITH

OVERLOADS. M

M MOTOR / EQUIPMENT CONNECTION

HOMERUN TO PANEL. PANEL & CIRCUIT DESIGNATIONS AS

INDICATED.

MOTOR CONTROL / SAFETY SWITCH. 600V, 30A, IN NEMA 1

ENCLOSURE, UON. CROSS INDICATES COMINATION STARTER /

SAFETY SWITCH, SLASH INDICATES COMBINATION VFD / SAFETY

SWITCH.

480Y/277V PANELBOARD.

208Y/120V PANELBOARD.

BRANCH CIRCUIT OR FEEDER WIRING IN CONDUIT. CONDUIT

LARGER THAN 1/2" & WIRE LARGER THAN #12 MUST BE INDICATED.

FUSE SIZE IF INDICATED

DS30/F30

AMPACITY

D = SAFETY SWITCH

DS = COMBINATION STARTER / SAFETY SWITCH

V = VFD

ENCLOSED CIRCUIT BREAKER.

GROUNDING BUS BAR, MOUNT AT 7'-0" AFF UON.

SPD SURGE PROTECTIVE DEVICE

M DIGITAL METER

PLC PROGRAMABLE LOGIC CONTROLLER

MEDIUM VOLTAGE CIRCUIT BREAKER

MEDIUM VOLTAGE DRAW OUT CIRCUIT BREAKER

CURRENT TRANSFORMER

TRANSFORMER

LOW VOLTAGE CIRCUIT BREAKER

XXX - Y

ONE LINE DIAGRAM LOW VOLTAGE WIRE SIZE TAG; SEE 1-EP501/B1

XXX: AMPERAGE RATING OF THE CONDUCTORS

Y: NUMBER OF CONDUCTORS

ABBREVIATIONS

Ø PHASE

1/C ONE CONDUCTOR

A AMPERAGE OR AMPS

AFF ABOVE FINISHED FLOOR

ARF ABOVE RAISED FLOOR

AHU AIR HANDLING UNIT

BKR BREAKER

CONDUIT

CIRCUIT BREAKER

CIRCUIT

DRAWING

EACH

EMPTY CONDUIT

ELECTRICAL

ELECTRICAL METALLIC TUBING

ENCLOSURE

EQUIPMENT

ELECTRIC WATER COOLER

ELECTRIC WATER HEATER

EXISTING TO REMAIN

EXPLOSION PROOF EQUIPMENT

FAN COIL UNIT

FEET

GOVERNMENT FURNISHED CONTRACTOR INSTALLED

GOVERNMENT FURNISHED EQUIPMENT

GOVERNMENT FURNISHED GOVERNMENT INSTALLED

GROUND FAULT INTERRUPTER

GROUND

HEIGHT

HIGH INTENSITY DISCHARGE

HORSEPOWER

COMPUTER DISTRIBUTION HUB

LIGHT EMITTING DIODE

LUMINAIRE

MAIN CIRCUIT BREAKER

MAIN DISTRIBUTION PANEL

MECHANICAL

MAIN LUGS ONLY

MOUNTED

MOUNTING HEIGHT

NATIONAL ELECTRICAL CODE

NON FUSIBLE

NOT IN CONTRACT

NIGHT LIGHT

NOT TO SCALE

OUTLET BASE INFEED

OCCUPANCY SENSOR

PANEL

PANELBOARD

POLYVINYL CHLORIDE CONDUIT

QUANTITY

RECEPTACLE

REQUIRED

RIGID GALVANIZED STEEL

ROOM

SHEET

SUBSTATION

SWITCHBOARD

TELEPHONE

TYPICAL

UNLESS OTHERWISE NOTED

VOLTAGE OR VOLTS

WIRE

WEATHERPROOF WHILE IN USE

WIREWAY (TROUGH)

IN SCHEDULES, ITEM NOT APPLICABLE

VARIABLE REFRIGERANT FLOW UNIT

BH BASEBOARD HEATER

C

CB

CKT

DWG

EA

EC

ELEC

EMT

ENCL

EQUIP

EWC

EWH

ETR

EXP

FCU

FT

GFCI

GFE

GFGI

GFI

GND

HGT

HID

HP

HUB

LED

LTS

MCB

MDP

MECH

MLO

MTD

MTG HT

NEC

NF

NIC

NL

NTS

OBI

OC

PNL

PNLBD

PVC

QU

REC

REQ'D

RGS

RM

SHT

SUB

SWBD

T

TYP

UON

V

VRF

W

WPIU

WW

X

TRANSFORMERXFMR

VARIABLE FREQUENCY DRIVEVFD

SWITCHGEARSWGR

PROGRAMABLE LOGIC CONTROLLERPLC

NORMALLY OPENN.O.

CONTRACT LINE ITEMCLIN

GENERAL

KEYNOTE TAG - REFER TO SHEET KEYNOTES ON EACH SHEET.?

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT NO.:

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y N

A V

A L

F A

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

S

Y S

T E

M S

C O

M M

A N

D

DRAWFORM REVISION: 25 AUGUST 2020

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

Y S

T E

M S

C O

M M

A N

D

M

ID

-A T

LA

N

TI

C

N A

V A

L S

T A

T

IO

N

N O

R F

O L

K V

A

AS NOTED

F

IL

E N

A M

E

P

LO

T T

E D

C

R e v it P ro je c ts

\D R

Y D

P -1

-E

-D R

Y D ra k e m p .r v t

/2

/2

:3

:3

P

M

1-E-001

P D

R Y

D O

C K

S

A L T

W A

T E

R S

Y S

T E

M

F O

R C

V N

-7

LE

G

E N

D , A

B B

R E

V

IA

TI

O

N S

A N

D G

E N

E R

A L

N O

TE

S

RHS

12857703

JCC RAK

02/02/2022

DEVIN POULIN,

C984 FACILITIES PLANNER, NNSY

JTL/TLH

1364315

N40085-22-R-2598

P O

R T

S M

O U

T H

, V

IR

G

IN

IA

N

O R

F O

LK

N

A V

A L

S H

IP

Y

A R

D

EJA

JAS

DSN

GENERAL NOTES

1. ALL 1-E-001 SYMBOLS, ABBREVIATIONS, AND NOTES APPLY ONLY TO ED, EG,

EL, AND EP SERIES SHEETS. FOR ALL SITE ELECTRICAL SYMBOLS,

ABBREVIATIONS, AND NOTES SEE 1-E-011 AND 1-E-012.

2. PROVIDE EQUIPMENT GROUND WIRE(S) WITH FEEDERS AND BRANCH

CIRCUITS.

3. PROVIDE WIRING PER NATIONAL ELECTRICAL CODE (NEC).

4. LABEL AND IDENTIFY ELECTRICAL EQUIPMENT.

5. IDENTIFY FEEDERS/CIRCUITS AT EACH END OF THE WIRE AND AT EVERY

SPLICE OR JUNCTION/PULL BOX.

6. PROVIDE NAMEPLATES ON THE EXTERIOR OF ELECTRICAL PANELS AND

ENCLOSURES AS FOLLOWS:

FOR SAFETY SWITCHES, MOTOR STARTERS & VFDs, INSCRIBE THE TOP

LINE WITH THE NAME/DESIGNATION OF EQUIPMENT BEING FED BY SAME.

7. PROVIDE TYPED DIRECTORIES FOR PANELS (NEW OR EXISTING).

INCLUDED IN THIS PROJECT.

8. INTERIOR WIRING SYSTEMS MUST BE CONCEALED WITH FLUSH MOUNTED

BOXES/DEVICES, UON.

9. DRAWINGS ARE BASED ON EXISTING BUILDING PLANS AND FIELD

INVESTIGATIONS. VISIT THE EXISTING BUILDING AND ACQUAINT

HIMSELF/HERSELF WITH THE EXISTING CONDITIONS. EXAMINE EXISTING

DRAWINGS TO AVOID CONFLICTS.

10. COORDINATE LOCATION AND POWER REQUIREMENTS OF ELECTRICAL

DEVICES WITH MECHANICAL, PLUMBING, ARCHITECTURAL AND FIRE

PROTECTION DRAWINGS.

11. ELECTRICAL DEVICES SHOWN BUT NOT CIRCUITED MUST REMAIN ON THEIR

EXISTING CIRCUIT.

12. PROVIDE ARC-FLASH LABELS ON ALL SWITCHBOARDS / SWITCHGEAR /

PANELS / SAFETY SWITCHES / MOTOR STARTS / VFDs PER UFC 3-560-01

AND NFPA 70E. SEE DETAIL PLATE ON SHEET 1-EP501.

13. SINGLE PHASE (120/208V) BRANCH CIRCUITS MUST CONSIST OF 2 #12, #12 G

IN 1/2" C, UON. THREE PHASE BRANCH CIRCUITS CONSIST OF 3 #12, #12 G IN

1/2" C, UON.

14. REFER TO PLANS FOR CONDUCTOR SIZING. COMPLY WITH THE

FOLLOWING GUIDELINES FOR CONDUCTOR RUN LENGTHS:

20A,120V CIRCUITS LONGER THAN 100' - USE #10 AWG TO LIMIT VOLTAGE

DROP ON BRANCH CIRCUITS TO 3%

20A, 120V CIRCUITS LONGER THAN 150' - USE #8 AWG TO LIMIT VOLTAGE

DROP ON BRANCH CIRCUITS TO 3%

20A, 277V CIRCUITS LONGER THAN 150' - USE #10 AWG TO

LIMIT VOLTAGE DROP ON BRANCH CIRCUITS TO 3%

15. COORDINATE ELECTRICAL WORK WITH ARCHITECTURAL, MECHANICAL AND

FIRE PROTECTION WORK PRIOR TO FABRICATION AND INSTALLATION TO

PREVENT CONFLICTS. NOTIFY THE CONTRACTING OFFICER WHERE

CONFLICTS ARE DISCOVERED PRIOR TO CONSTRUCTION AND BEFORE

BEGINNING WORK IN THOSE AREAS. ALL CONFLICTS THAT ARISE DUE TO

LACK OF COORDINATION MUST BE RECTIFIED AT NO COST TO THE

GOVERNMENT

16. SEE SECTION 26 05 48.00 10 SEISMIC PROTECTION FOR ELECTRICAL

EQUIPMENT FOR ALL SYSTEMS REQUIRING SEISMIC BRACING AND

SEISMICALLY RATED EQUIPMENT.

17. CLIN EQUIPMENT IS ONLY INDICATED ON 1-ED1** AND 1-EP1** SERIES

SHEETS.

GENERAL DEMOLITION NOTES

1. ON "ED" SERIES SHEETS ONLY, EQUIPMENT SHOWN WITH DASHED LINE

MUST BE REMOVED, UON.

2. CONDUIT CONCEALED IN WALLS AND SLABS MUST BE BLANKED OFF AND

ABANDONED IN PLACE. PATCH WALLS AND SLABS AFTER DEMOLITION IS

COMPLETE.

3. EXISTING ELECTRICAL EQUIPMENT NOT INDICATED ON DEMOLITION PLAN OR

DEMOLITION ONE LINE MUST REMAIN CONNECTED FOR CONTINUED USE,

UON.

4. RECONNECT EXISTING CIRCUIT(S) (INTERRUPTED BY REMOVAL OF EXISTING

DEVICE) TO THE REMAINING ELECTRICAL EQUIPMENT LOCATED

DOWNSTREAM FROM THE POINT OF INTERRUPTION.

CONSTRUCTION NOTES

1. PROVIDE WRITTEN REQUESTS TO THE CONTRACTING OFFICER A MINIMUM

OF 14 CALENDAR DAYS PRIOR TO ANY POWER OUTAGES.

S Y

M D

E S

C R

IP

TI

O N

D A

TE

A

P P

R

IS

S U

E D

F O

R C

O N

S

TR

U C

T

IO

N

/2 8/

IS

SU

ED

F

OR

B

ID

D E

P A

R T

M E

N T

O

F

T

H

A V

Y

A

B

C

D

2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

N A

V A

L

F

A C

I L I T

I E

S

E

N G

I N

E E

R I N

G

S

Y S

T E

M

C

M

M A

N D

DES DRW

S Y

M D

E S

C R

I P

T I O

N D

A T

E A

P P

R

DRAWFORM REVISION: 25 AUG 2020

CHK

OF

EPROJECT NO.:

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

NA

VA

L

FA

CI

LI

TI

ES

E

NG

IN

EE

RI

NG

S

YS

TE

M

S

CO

M M

AN

D

M

ID

-A

TL

AN

TI

C

N A

V A

L

S

T A

T I O

N

N

O R

F O

L K

V

A

N O

R F

O L

K

N

A V

L

I P

Y A

R D

P O

R T

S M

O U

T H

V

I R

G I N

I A

P

D

R Y

D O

C K

S A

LT

W

A

TE

R S

Y S

TE

M

FO

R

C V

N -7

JTL/TLH

EJA

DSN

1364315

N40085-22-R-2598

DLB

DEVIN POULIN,

C984 FACILITIES PLANNER, NNSY

02/02/2022

I S

S U

R

I D

ELECTRICAL LEGEND-(EXTERIOR UNDERGROUND)

UNDERGROUND DUCTBANK, CONCRETE ENCASED UON. DESCRIPTION AS INDICATED

EXISTING UNDERGROUND DUCTBANK, CONCRETE ENCASED UON. DESCRIPTION AS INDICATED

REMOVE EXISTING UNDERGROUND DUCTBANK, CONCRETE ENCASED UON DESCRIPTION AS INDICATED

UNDERGROUND CONDUIT DESCRIPTION AS INDICATED

EXISTING UNDERGROUND CONDUIT DESCRIPTION AS INDICATED

SYMBOL REFERS TO DEPTH OF DUCTBANK SECTION. SEE DUCTBANK DETAILS

UNDERGROUND ELECTRICAL DISTRIBUTION CONCRETE ENCASED DUCTBANK SECTION LOOKING IN DIRECTION OF

ARROWS

SPARE DUCT (TYPICAL). DESCRIPTION PER CABLE AND CONDUIT SCHEDULES ON SHEET 1-ES603

HEAVY LINE INDICATES BOTTOM OF DUCT

EXISTING CABLE DESIGNATION WITH CIRCLE (TYPICAL) DESCRIPTION PER CABLE AND CONDUIT SCHEDULES

ON SHEET 1-ES603

OCCUPIED CONDUIT, UNIDENTIFIED EXISTING CABLE

CABLE DESIGNATION (TYPICAL)

DESCRIPTION PER CABLE AND CONDUIT SCHEDULES ON SHEET 1-ES603

GROUNDING CONDUCTOR

EXOTHERMIC CONNECTION

GROUND ROD

MANHOLE OR HANDHOLE AS NOTED

EQUIPMENT CODE CLEARANCE

EQUIPMENT MAINTENANCE/VENTILATION CLEARANCE

EQUIPMENT MAINTENANCE/VENTILATION AND EGRESS CLEARANCE

JUNCTION BOX

LIGHT POLE

SPEAKER

EQUIPMENT CONNECTION

MOTOR CONNECTION, HP INDICATED

GENERATOR AS NOTED

DISCONNECT SWITCH, 600V IN NEMA 4X ENCLOSURE UON

3P = NO. OF POLES, 60 = SWITCH RATING, 40 = FUSE RATING

(NF INDICATES NON-FUSIBLE)

MOTOR CONTROLLER BY DIVISION 21 CONTRACTOR

EQUIPMENT AS NOTED

ELECTRICAL PANELBOARD (208Y/120 VOLT)

ELECTRICAL PANELBOARD (480Y/277 VOLT)

REMOVE EXISTING EQUIPMENT INDICATED

LIMIT OF DEMOLITION

NEW TO EXISTING CONNECTION

LIGHTING FIXTURE TYPE

COPING WALL JUNCTION CHAMBER

L - LIGHTING

F

P - PUBLIC ADDRESS

2 S1

X N1

J

M

3P

ELECTRICAL LEGEND (ONE-LINE & RISER DIAGRAMS)

POWER TRANSFORMER

POTENTIAL TRANSFORMER

CONTROL POWER TRANSFORMER

SURGE ARRESTOR

FUSED SWITCH

SWITCH

TRANSFER SWITCH

MOLDED CASE CIRCUIT BREAKER

LOW VOLTAGE DRAW-OUT POWER CIRCUIT BREAKER

MEDIUM VOLTAGE POWER CIRCUIT BREAKER

POWER DRAW OUT CIRCUIT BREAKER

GROUNDED WYE CONNECTION

UNGROUNDED WYE CONNECTION

CURRENT TRANSFORMER - SINGLE RATIO AS SHOWN

SURGE PROTECTIVE DEVICE

CURRENT TRANSFORMER

POTENTIAL TRANSFORMER

CONTROL SWITCH

CABLE TERMINATIONS

GROUNDING ELECTRODE CONNECTION

CABLE OR BUS, TYPE AND CHARACTERISTICS AS INDICATED

EXISTING CABLE OR BUS, TYPE AND CHARACTERISTICS AS INDICATED

NEW TO EXISTING CABLE SPLICE OR TAP

HOMERUN TO PANELBOARD. NO. OF ARROWS INDICATE NO. OF CIRCUITS.

TICKMARKS INDICATE NO. OF AWG CONDUCTORS.

REMOVE CABLE OR BUS, TYPE AND CHARACTERISTICS AS INDICATED

RELAY AND ANSI CONTROL FUNCTION SYMBOL.

CONTACTS - NORMALLY OPEN

CONTACTS - NORMALLY CLOSED

FUSE

GROUND

PUSHBUTTON

WHD METER

ASTRONOMICAL TIME CLOCK

ELECTRICAL METERING

PT

CPT

CT

600/S

ABBREVIATIONS

ELECTRICAL LEGEND (MISCELLANEOUS)

KEYNOTE SYMBOL

SPD

PT

CS

1/C SINGLE CONDUCTOR

3/C THREE CONDUCTOR

A AMP/AMPERE

AC ALTERNATING CURRENT

AF AMPERE FRAME

AFF ABOVE FINISHED FLOOR

AIC AMPS INTERRUPTING CAPACITY

AMI ADVANCED METERING INFRASTRUCTURE

AS AIR SWITCH

AT AMPERE TRIP

ATS AUTOMATIC TRANSFER SWITCH

AWG AMERICAN WIRE GAGE

BFG BELOW FINISHED GRADE

BLDG. BUILDING

BOD BASIS OF DESIGN

BRKR BREAKER

C CONDUIT

CAP CAPSTAN

CB CIRCUIT BREAKER

CFM CUBIC FEET/MINUTE

CHP CRANE HOTEL POWER

CKT CIRCUIT

CLR CLEAR

CONT CONTINUOUS

CPT CURRENT POTENTIAL TRANSFORMER

CST COMMUNICATIONS SHORE TIE

CT CURRENT TRANSFORMER

CU COPPER

D DEPTH

DDC DIRECT DIGITAL CONTROL

DIST DISTRIBUTION

DPDT DOUBLE POLE DOUBLE THROW

ECB ENCLOSED CIRCUIT BREAKER

EDC ENVIRONMENTAL DISTRIBUTION CENTER

EMH ELECTRIC MANHOLE

EPR ETHYLENE PROPYLENE RUBBER

EQ EQUAL

EQUIP EQUIPMENT

EX,EXIST EXISTING

FA FIRE ALARM

FLA FULL LOAD AMPS

FO FIBER OPTIC CABLE

FPMT FUTURE PAD-MOUNTED TRANSFORMER

GFI/GFCI GROUND FAULT CURRENT INTERRUPTER

GND GROUND

GOVT GOVERNMENT

GS GAS SWITCH

H HEIGHT

HMI HUMAN MACHINE INTERFACE

HOA HAND-OFF-AUTOMATIC

HP HORSE POWER

HPS HIGH PRESSURE SODIUM

JBOX JUNCTION BOX

KAIC THOUSAND AMPERE INTERRUPTING CAPACITY

KCMIL/MCM THOUSAND CIRCULAR MILS

KV KILOVOLT

KVA KILOVOLT AMPERE

KW KILOWATT

L LENGTH, ANGLE

LAN LOCAL AREA NETWORK

LTS LIGHTS

LV LOW VOLTAGE

LVCB LOW VOLTAGE CONNECTION BOX

LVST LOW VOLTAGE SHORE TIE STATION

MCB MAIN CIRCUIT BREAKER

MAX MAXIMUM

MESG METAL ENCLOSED INTERRUPTER SWITCHGEAR

MH MANHOLE

MIN MINIMUM

MM MULTIMODE

MT MOUNT

MTG HT MOUNTING HEIGHT

MV MEDIUM VOLTAGE

MVA THOUSAND KILOVOLT VOLT AMPERES

N.C. NORMALLY CLOSED

NEC NATIONAL ELECTRICAL CODE

NEMA NATIONAL ELECTRICAL MANUFACTURERS

ASSOCIATION

NESC NATIONAL ELECTRICAL SAFETY CODE

NF NON FUSED

NNSY NORFOLK NAVAL SHIPYARD

N.O. NORMALLY OPEN

NO. NUMBER

NTS NOT TO SCALE

NU NAVFAC UTILITIES

O/C ON CENTER

OSP OUTSIDE PLANT

P POLE

PA PUBLIC ADDRESS

PLC PROGRAMMABLE LOGIC CONTROL

PMS PAD-MOUNTED SWITCH

PMT PAD-MOUNTED TRANSFORMER

PT POTENTIAL TRANSFORMER

PW PUMPWELL

PVC POLYVINYL CHLORIDE

REC RECEPTACLE

REOL REMOVABLE END OF LINE RESISTOR

REQ'D. REQUIRED

RSC RIGID STEEL CONDUIT

RTU REMOTE TERMINAL UNIT (SCADA)

SCADA SUPERVISORY CONTROL AND DATA AQUISITION

SCH SCHEDULE

SE SERVICE ENTRANCE

SER SERVICE ENTRANCE RATED (UL LISTED)

SM SINGLE-MODE

SMFO SINGLE MODE FIBER OPTIC

SPA SPACE, SPACING

SMH SIGNAL MANHOLE

SS STAINLESS STEEL

SUB SUBSTATION

T TRANSFORMER

TB TURTLEBACK

TOD TOP OF DUCTBANK ELEVATION

TOM TOP OF MANHOLE ELEVATION

TYP TYPICAL

UON UNLESS OTHERWISE NOTED

UL UNDERWRITERS LABORATORIES

V VOLT, VOLTAGE

VAC VOLTS ALTERNATING CURRENT

VFI VACUUM FAULT INTERRUPTER

W WATT, WIRE, WIDTH

WI WEATHERPROOF IN-USE

WP WEATHERPROOF

XFMR TRANSFORMER

E

G

WHD

ATC

S

A

J

FEEDER DESIGNATION. SEE SCHEDULES

FIRE ALARM PULL BOX, 18" X 12" X 18"

J

GROUND TEST PIT

EM

DZ RAD WAS

12857704

L E

G E

N D

A

B B

R E

V I A

T I O

M

B O

L S

1-E-011

AS NOTED

P A

R T

M E

T

V

Y

A

B

C

D

2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

N A

V A

L

F

A C

I L I T

I E

S

E

N G

I N

E E

R I N

G

S

Y S

T E

M

M A

N D

DES DRW

S Y

M D

E S

C R

I P

T I O

N D

A T

E A

P P

R

DRAWFORM REVISION: 25 AUG 2020

CHK

OF

EPROJECT NO.:

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

NA

VA

L

FA

CI

LI

TI

ES

E

NG

IN

EE

RI

NG

S

YS

TE

M

S

CO

M M

AN

D

M

ID

-A

TL

AN

TI

C

N A

V A

L

S

T A

T I O

N

N

O R

F O

L K

V

A

N O

R F

O L

K

N

A V

I P

Y A

R D

P O

R T

S M

O U

T H

V

I R

G I N

I A

P

D

R Y

D O

C K

S A

LT

W

A

TE

R S

Y S

TE

M

FO

R

C V

N -7

JTL/TLH

EJA

DSN

1364315

N40085-22-R-2598

DLB

DEVIN POULIN,

C984 FACILITIES PLANNER, NNSY

02/02/2022

I S

S U

D

1. ALL 1-E-011 AND 1-E-012 SYMBOLS, ABBREVIATIONS AND NOTES APPLY ONLY TO ED AND ES

SERIES SHEETS.

2. CONDUIT AND DUCT ROUTINGS SHALL NOT INTERFERE WITH NEW OR EXISTING EQUIPMENT,

PIPING, OR CONDUIT AND SHALL NOT OBSTRUCT ACCESS TO ANY EQUIPMENT.

3. THE EQUIPMENT GROUND CONDUCTOR SHALL BE CONNECTED TO ALL DEVICES SUCH THAT

REMOVAL OF ANY DEVICE CANNOT INTERRUPT THE CONTINUITY OF THE EQUIPMENT

GROUNDING CONDUCTOR TO AND FROM OTHER DEVICES OR EQUIPMENT.

4. WIRE AND CONDUIT FOR EQUIPMENT AND MOTOR LOADS SHALL BE CONTINUOUS IN SIZE AND

COUNT FROM THE SOURCE TO THE FINAL CONNECTION. SIZE AND COUNT SHALL BE AS

INDICATED ON THE CIRCUIT HOMERUN OR FEEDER SCHEDULE, UNLESS OTHERWISE NOTED.

5. CONTRACTOR SHALL PERFORM A FEEDER, MANHOLE AND DUCT-ROUTE SURVEY PRIOR TO

BEGINNING CONSTRUCTION TO VERIFY THE ROUTING OF THE EXISTING FEEDERS,

AVAILABILITY OF EXISTING MANHOLES AND DUCTS INTENDED TO BE USED. PROVIDE THE

CONTRACTING OFFICER WITH RESULTS OF THIS SURVEY AND SKETCH OF DUCTBANK

SECTIONS SHOWING LOCATIONS OF OCCUPIED DUCTS AND CABLES TO BE INSTALLED.

6. THE CONTRACTOR SHALL DE-WATER MANHOLES AND HANDHOLES BEFORE COMMENCING

WORK. THE CONTRACTORS DE-WATERING PUMPS SHALL BE AVAILABLE IN CASE WATER

SEEPAGE DOES NOT SUBSIDE. UNDER NO CIRCUMSTANCES SHALL OPEN CABLE SPLICES OR

CUT TERMINATIONS EVER COME IN CONTACT WITH WATER.

7. UNLESS SPECIFICALLY NOTED TO BE EXISTING, ALL WORK AND MATERIAL SHALL BE

PROVIDED BY THE CONTRACTOR. WHEREVER AN EXISTING TO PROPOSED CONNECTION IS

REQUIRED, PROVIDE EXTENSION RINGS, SPLICES, WIRE, CONDUIT FITTINGS, AND

ASSOCIATED APPURTENANCES. PERFORM ALL CUTTING AND PATCHING AS REQUIRED TO

MAKE THE CONNECTIONS.

8. THE CONTRACTOR SHALL COORDINATE INSTALLATION OF ALL COMMUNICATIONS (NAVFAC

UTILITIES, SCADA, ETC.) CABLES AND EQUIPMENT INTO EXISTING FACILITIES AND BUILDINGS

WITH CONTRACTING OFFICER AND NNSY PRIOR TO COMMENCING THIS WORK.

COORDINATION AND DISCUSSION BETWEEN ALL PARTIES INVOLVED WITH THIS WORK SHALL

TAKE PLACE IN WEEKLY MEETING AND ADDITIONAL MEETINGS AS REQUIRED ESPECIALLY

FOR THIS PURPOSE.

9. THE CONTRACTOR SHALL CLOSELY STUDY THE CONSTRUCTION PLANS AND NOTES AS

OUTLINED. SLIGHT DEVIATIONS FROM CONFINED WORK SPACES MAY BE NECESSARY TO

FULLY COMPLETE A CONSTRUCTION AREA AS OUTLINED ON THOSE SHEETS. THE DEVIATIONS

SHALL BE HELD TO A MINIMUM AND SHALL BE FULLY COORDINATED WITH THE CONTRACTING

OFFICER. ALL SUCH DEVIATIONS SHALL BE MADE WITH NO ADDITIONAL COST TO THE

GOVERNMENT.

10. DURING THE EXECUTION OF THIS WORK, THE GOVERNMENT WILL CONTINUE TO OCCUPY AND

OPERATE ALL ADJACENT FACILITIES, PIERS, BERTHS, WHARFS, BUILDINGS AND UTILITIES,

AND, THEREFORE, WILL REQUIRE CONTINUOUS OPERATION OF ALL EXISTING ELECTRIC AND

TELECOMMUNICATIONS SERVICES. OUTAGES REQUIRED FOR CONSTRUCTION PURPOSES

SHALL BE SCHEDULED FOR THE SHORTEST PRACTICAL PERIODS OF TIME, AND THEN ONLY

BY PRE-ARRANGEMENT WITH THE CONTRACTING OFFICER FOR MUTUALLY AGREEABLE

PERIODS. AFTER EACH OF WHICH THE INTERRUPTION SHALL CEASE AND SERVICE SHALL BE

RESTORED.

11. THE CONTRACTOR SHALL PERFORM WORK ON UNENERGIZED CABLES WITH ENERGIZED

CABLES IN MANHOLE.

12. SPLICING OF FEEDERS WITHIN MANHOLES OR UNDERGROUND IS DISCOURAGED.

13. PLATFORM MOUNTED EQUIPMENT (SUBSTATIONS, MV SWITCVHES, SWITCHGEAR,

GENERATORS, FUEL STORAGE SYSTEMS, ETC.) LAYOUT IS PARTIALLY DIAGRAMMATIC.

CONTRACTOR SHALL VERIFY THE CODE REQUIRED CLEARANCES FOR APPROVED

EQUIPMENT AND ADJUST THE EQUIPMENT LAYOUT, DUCTBANK AND CONDUIT ROUTING, AND

SUPPORTING STRUCTURES AS NECESSARY.

1. COORDINATE ALL DUCTBANK ROUTING WITH EXISTING AND NEW STRUCTURES, INCLUDING

PLATFORM PILES. ROUTE DUCTBANKS TO AVOID CONFLICTS.

2. LOCATIONS AND ROUTING OF CONDUITS, DUCTBANKS AND ELECTRICAL STRUCTURES SHOWN

ON THE DRAWINGS ARE APPROXIMATE. PRIOR TO EXCAVATION AND INSTALLATION, THE

CONTRACTOR SHALL COORDINATE AND VERIFY LOCATIONS, ROUTING AND DEPTHS OF ALL

CONDUITS, DUCTS AND STRUCTURES WITH ALL OTHER TRADES TO AVOID CONFLICTS WITH ALL

NEW AND EXISTING UTILITIES AND STRUCTURAL FEATURES.

3. THE CONTRACTOR SHALL COORDINATE THE ROUTING OF THE DUCTBANKS AND MAKE ANY

ADJUSTMENTS REQUIRED IN HORIZONTAL AND VERTICAL DIRECTIONS OF THE ENTIRE

DUCTBANK RUN TO MISS ANY UTILITIES INCLUDING OTHER DUCTBANKS. THE ADJUSTMENTS

SHALL CONSIDER THE ENTIRE CABLING RUN SHALL NOT EXCEED 360 DEGREES WORTH OF

BENDS BETWEEN PULLING POINTS IN A SINGLE RUN PER THE NEC.

4. PROVIDE 20 MIL PLASTIC SHEETING IN BETWEEN DUCTBANKS WHERE DUCTBANKS COME IN

CONTACT.

5. PROVIDE PULL STRING IN EVERY DUCT WHERE EXISTING CABLING IS REMOVED PER

DEMOLITION DRAWINGS.

GENERAL DEMOLITION NOTES:

1. SEE DEMOLITION ONE-LINE DIAGRAMS AND CABLE SCHEDULES ON ES600 SERIES SHEETS.

2. REMOVE CONDUCTORS FROM CONDUITS AND DUCTS AND DISCONNECT FROM ALL POWER

SOURCES AS REQUIRED TO ACCOMPLISH THE WORK OF THIS CONTRACT. REFER TO SHEETS ED

SERIES DRAWINGS FOR DEMOLITION, INCLUDING UTILITIES, DUCTBANKS AND OTHER

STRUCTURES.

3. DEMOLITION OF DUCTBANKS SHALL INCLUDE REMOVAL OF SECTIONS INDICATED IN ED100

SERIES DRAWINGS. ALL MANHOLES ARE EXISTING TO REMAIN, UON.

4. EXCEPT AS NOTED ELSEWHERE AND AS REQUIRED BY CONSTRUCTION PHASING, ALL EXISTING

SERVICES (ELECTRIC, TELEPHONE, LAN, NAVFAC UTILITIES, CATV, PA, NAVFAC UTILITIES

SECURITY, ETC.) SHALL REMAIN ACTIVE.

5. THE ENTIRE RUN OF ABANDONED CONDUITS WITHIN DUCTBANKS SHALL BE GROUTED

COMPLETE. GROUT ABANDONED CONDUITS WITHIN DUCTBANKS FLUSH WITH THE INTERIOR OF

MANHOLES AND FLUSH WITH THE ENDS OF THE CONDUITS.

6. SEE ELECTRICAL GENERAL NOTES FOR ADDITIONAL DEMOLITION AND REDISTRIBUTION

REQUIREMENTS.

ELECTRICAL GENERAL NOTES (APPLICABLE TO ALL SHEETS)ELECTRICAL GENERAL DUCTBANK NOTES

GENERAL CONSTRUCTION NOTES:

1. THE CONTRACTOR SHALL COORDINATE WITH THE CONTRACTING OFFICER FOR OTHER WORK

AROUND DRY DOCK 8.

2. SCHEDULE WORK AROUND ALL TEMPORARY AND PERMANENT EQUIPMENT ASSOCIATED WITH

THE GOVERNMENT WORK IN DRY DOCK 8.

3. ALL OUTAGES REQUIRED WILL BE SCHEDULED WITH THE GOVERNMENT AT LEAST 30 DAYS

PRIOR. THE CONTRACTOR SHALL WORK AROUND THE SCHEDULE OF THE GOVERNMENT WITHIN

DRY DOCK 8.

DZ RAD WAS

12857705

G E

N E

R A

L

N

O T

E S

1-E-012

(E) 2300V

SWGR

(E) MDP-2

MCC

(E) MDP-3

MCC

(E) MDP-4

MCC

(E) DP-1 MCC

(E) DP-2 MCC

(E) DP-3

MCC(E) 480V

SWITCHBOARD (ETR) PANEL LP-3

(E) MDP-1

MCC

(E) MDP-1 (E) MDP-2 (E) MDP-3 (E) MDP-4

(E) DP-1

(E) DP-2

480V PANEL

222 2

(ETR) PANEL LP-1

(ETR) PANEL LP-2

(E) PULL BOX

12 12 12

13131313

(E) PW8-V-56

(E) PW8-V-29

X1

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT NO.:

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y N

A V

A L

F A

C

IL

IT

IE

S E

N G

IN

E

E R

S

T E

M S

C O

M M

A N

D

DRAWFORM REVISION: 25 AUGUST 2020

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

Y S

T E

M S

C O

M M

A N

D

M

ID

-A T

LA

N

TI

C

N A

V A

L S

T A

T

IO

N

N O

R F

O L

K V

A

AS NOTED

F

IL

E N

A M

E

P

LO

T T

E D

C

R e v it P ro je c ts

\D R

Y D

P -1

-E

-D R

Y D ra k e m p .r v t

/2

/2

:3

:3

P

M

1-ED101

P D

R Y

D O

C K

S

A L T

W A

T E

R S

Y S

T E

M

F O

R C

V N

-7

P U

M P

W E

LL

E

LE

C

T R

IC

A

L D

E M

O

LI

T

IO

N P

LA

N

RHS

12857706

JCC RAK

02/02/2022

DEVIN POULIN,

C984 FACILITIES PLANNER, NNSY

JTL/TLH

1364315

N40085-22-R-2598

P O

R T

S M

O U

T H

, V

IR

G

IN

IA

N

O R

F O

LK

N

A V

A L

S H

IP

Y

A R

D

EJA

JAS

DSN

SHEET NOTES

1. BOLD, DASHED LINES INDICATE EQUIPMENT TO BE DEMOLISHED.

2. DE-ENERGIZE, DISCONNECT AND DEMOLISH ALL CONDUIT AND CONDUCTORS

FEEDING EQUIPMENT TO BE DEMOLISHED. INFILL ALL ABANDONED CONDUIT

PENETRATIONS WITH NONSHRINK GROUT.

3/16" = 1'-0" B1

PUMPWELL 8 - ELECTRICAL DEMOLITION PLAN - MOTOR

0' 4' 8' 12'

PLAN

NORTH

KEY PLAN

MOTOR

83'-0"

INTERMED.

68'-0"

MAIN PUMP

46'-0"

DRAINAGE

28'-3 1/4"

COPING

103'-0"

SUC. CHAM.

32'-3"

SHEET KEYNOTES

1. DISCONNECT AND REMOVE EXISTING VALVE'S ELECTRICAL CONDUIT AND

CONDUCTORS BACK TO SOURCE.

2. 30A SAFETY SWITCH FOR MDP. DE-ENERGIZE, DISCONNECT, AND DEMOLISH

CONDUIT AND CONDUCTORS BACK TO SOURCE. FED FROM THE 480V

SWITCHBOARD.

3. DISCONNECT AND REMOVE EXISTING AIR COMPRESSOR'S ELECTRICAL

CONDUIT AND CONDUCTORS BACK TO SOURCE.

4. DISCONNECT AND REMOVE EXISTING BUBBLER PANEL'S ELECTRICAL

CONDUIT AND CONDUCTORS BACK TO SOURCE.

5. DISCONNECT AND REMOVE EXISTING PTU'S ELECTRICAL CONDUIT AND

CONDUCTORS BACK TO SOURCE.

6. EXISTING TO REMAIN TRANSFORMER 1 AND TRANSFORMER 2 ARE CEILING

MOUNTED ABOVE EXISTING PANELS LP-1 AND LP-2.

7. DISCONNECT AND REMOVE MOTOR STARTER PANEL. DEMOLISH ALL LOAD

SIDE CONDUIT AND CONDUCTORS BACK TO THE CONNECTED EQUIPMENT.

DEMOLISH ALL LINE SIDE CONDUIT AND CONDUCTORS BACK TO SOURCE.

8. DISCONNECT AND REMOVE SWITCHGEAR / SWITCHBOARD. DISCONNECT AND

REMOVE LINE SIDE CONDUIT BACK TO THE INCOMING PENETRATION AT THE

EXISTING PULLBOX, SEE SHEET KEYNOTE 9. DISCONNECT AND REMOVE LINE

SIDE CONDUCTORS BACK TO SOURCE.

9. SEAL ALL CONDUIT VOIDS WITH NON-SHRINK GROUT.

10. DISCONNECT AND REMOVE ALL LIGHTING AND POWER CIRCUITS

ASSOCIATED WITH THE CONTROL BOOTH. DISCONNECT AND REMOVEALL

CONDUIT AND CONDUCTORS BACK TO SOURCE.

11. DISCONNECT AND REMOVE CONTROL PANEL'S ELECTRICAL CONDUIT AND

CONDUCTORS BACK TO SOURCE.

12. DISCONNECT AND REMOVE MCC'S LINE SIDE CONDUIT AND CONDUCTORS

BACK TO SOURCE. DISCONNECT AND REMOVE LOAD SIDE CONDUIT AND

CONDUCTORS BACK TO LOAD.

13. DISCONNECT AND REMOVE MDP'S ELECTRICAL CONDUIT AND CONDUCTORS

BACK TO SOURCE.

X1. CLIN 0002.

S Y

M D

E S

C R

IP

TI

O N

D A

TE

A

P P

R

IS

S U

E D

F O

R C

O N

S

TR

U C

T

IO

N

/2 8/

IS

SU

ED

F

OR

1 1

(E) PW8-ACT-10

(E) PW8-ACT-7

(E) PW8-ACT-53

(E) PW8-ACT-3

X1

(E)SP-1

(E)SP-2

X1

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT NO.:

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y N

A V

A L

F A

C

IL

IT

IE

S E

N G

IN

E

E R

S

T E

M S

C O

M M

A N

D

DRAWFORM REVISION: 25 AUGUST 2020

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

Y S

T E

M S

C O

M M

A N

D

M

ID

-A T

LA

N

TI

C

N A

V A

L S

T A

T

IO

N

N O

R F

O L

K V

A

AS NOTED

F

IL

E N

A M

E

P

LO

T T

E D

C

R e v it P ro je c ts

\D R

Y D

P -1

-E

-D R

Y D ra k e m p .r v t

/2

/2

:3

:4

P

M

1-ED102

P D

R Y

D O

C K

S

A L T

W A

T E

R S

Y S

T E

M

F O

R C

V N

-7

P U

M P

W E

LL

E

LE

C

T R

IC

A

L D

E M

O

LI

T

IO

N P

LA

N

RHS

12857707

JCC RAK

02/02/2022

DEVIN POULIN,

C984 FACILITIES PLANNER, NNSY

JTL/TLH

1364315

N40085-22-R-2598

P O

R T

S M

O U

T H

, V

IR

G

IN

IA

N

O R

F O

LK

N

A V

A L

S H

IP

Y

A R

D

EJA

JAS

DSN

3/16" = 1'-0" C1

PUMPWELL 8 - ELECTRICAL DEMOLITION PLAN - INTERMEDIATE

SHEET KEYNOTES

1. 30A SAFETY SWITCH FOR MDP DISCHARGE VALVE. DE-ENERGIZE,

DISCONNECT, AND DEMOLISH CONDUITS AND CONDUCTORS BACK TO

SOURCE. FED FROM THE 480V SWITCHBOARD.

2. DISCONNECT AND REMOVE EXISTING ACT'S ELECTRICAL CONDUIT AND

CONDUCTORS BACK TO SOURCE.

3. DISCONNECT AND REMOVE EXISTING SUMP PUMP'S ELECTRICAL CONDUIT

AND CONDUCTORS BACK TO SOURCE.

4. DISCONNECT AND REMOVE EXISTING HIGH WATER ALARM'S ELECTRICAL

CONDUIT AND CONDUCTORS BACK TO SOURCE.

X1. CLIN 0002.

0' 4' 8' 12'

PLAN

NORTH

KEY PLAN

MOTOR

83'-0"

INTERMED.

68'-0"

MAIN PUMP

46'-0"

DRAINAGE

28'-3 1/4"

COPING

103'-0"

SUC. CHAM.

32'-3"

SHEET NOTES

1. BOLD, DASHED LINES INDICATE EQUIPMENT TO BE DEMOLISHED.

2. DE-ENERGIZE, DISCONNECT AND DEMOLISH ALL CONDUIT AND CONDUCTORS

FEEDING EQUIPMENT TO BE DEMOLISHED.

3/16" = 1'-0" A1

PUMPWELL 8 - ELECTRICAL DEMOLITION PLAN - MAIN PUMP & DRAINAGE PUMP

0' 4' 8' 12'

PLAN

NORTH

S Y

M D

E S

C R

IP

TI

O N

D A

TE

A

P P

R

IS

S U

E D

F O

R C

O N

S

TR

U C

T

IO

N

/2 8/

IS

SU

ED

F

OR

EMH-N12

MV SWITCH

DD8-G/S-1N

MV SWITCH

DD8-G/S-2N

06 06

06 06

06 06

06 X

06 06

06 06

06 06

06 X

X

X

X

060606

D E

P A

R T

M E

T

V

Y

A

B

C

D

2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

N A

V A

L

F

A C

I L I T

I E

S

E

N G

I N

E E

R I N

G

S

Y S

T E

M

M A

N D

DES DRW

S Y

M D

E S

C R

I P

T I O

N D

A T

E A

P P

R

DRAWFORM REVISION: 25 AUG 2020

CHK

OF

EPROJECT NO.:

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

NA

VA

L

FA

CI

LI

TI

ES

E

NG

IN

EE

RI

NG

S

YS

TE

M

S

CO

M M

AN

D

M

ID

-A

TL

AN

TI

C

N A

V A

L

S

T A

T I O

N

N

O R

F O

L K

V

A

N O

R F

O L

K

N

A V

I P

Y A

R D

P O

R T

S M

O U

T H

V

I R

G I N

I A

P

D

R Y

D O

C K

S A

LT

W

A

TE

R S

Y S

TE

M

FO

R

C V

N -7

JTL/TLH

EJA

DSN

1364315

N40085-22-R-2598

DLB

DEVIN POULIN,

C984 FACILITIES PLANNER, NNSY

02/02/2022

I S

S U

D

SHEET NOTES

NORTH

PLAN

KEY PLAN

4 5

11 12

2 3

13 14

SHEET KEYNOTES

SCALE: 1" = 20'

PHASE I - ELECTRICAL DEMOLITION PLAN - AREA 9

A1

PLAN

NORTH

40'10'0 20'

1. REFER TO SHEET 1-ES603 FOR CABLE AND CONDUIT SCHEDULE.

2. REFER TO SHEET 1-E-011 FOR ELECTRICAL LEGEND AND

ABBREVIATIONS.

1. DISCONNECT MV FEEDER 18 BETWEEN MV SWITCH DD8-G/S-1N

AND MV SWITCH DD8-G/S-2N.

2. DISCONNECT AND REMOVE FEEDER 18 FROM DUCTBANK.

MATCH LINE

A1/1-ED134

DZ RAD WAS

12857708

E L

E C

T R

I C

T

E

D

E M

O L

I T

I O

N

P

L A

N

A

R E

A

1-ED129

EMH-631

EMH-S631

MV SWITCH

DD8-G/S-1S

BUILDING 272

EMH-878

EMH-632

EMH-S632

EMH-881

MV SWITCH G/S-4

MV SWITCH G/S-3

EMH-1490

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

XXX

X

X

X

X

X

X

XXX

10X

10X

X06

X X X

X

X

X

X

X

X

X X X

D E

P A

R T

M E

T

V

Y

A

B

C

D

2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

N A

V A

L

F

A C

I L I T

I E

S

E

N G

I N

E E

R I N

G

S

Y S

T E

M

M A

N D

DES DRW

S Y

M D

E S

C R

I P

T I O

N D

A T

E A

P P

R

DRAWFORM REVISION: 25 AUG 2020

CHK

OF

EPROJECT NO.:

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

NA

VA

L

FA

CI

LI

TI

ES

E

NG

IN

EE

RI

NG

S

YS

TE

M

S

CO

M M

AN

D

M

ID

-A

TL

AN

TI

C

N A

V A

L

S

T A

T I O

N

N

O R

F O

L K

V

A

N O

R F

O L

K

N

A V

I P

Y A

R D

P O

R T

S M

O U

T H

V

I R

G I N

I A

P

D

R Y

D O

C K

S A

LT

W

A

TE

R S

Y S

TE

M

FO

R

C V

N -7

JTL/TLH

EJA

DSN

1364315

N40085-22-R-2598

DLB

DEVIN POULIN,

C984 FACILITIES PLANNER, NNSY

02/02/2022

I S

S U

D

NORTH

PLAN

KEY PLAN

4 5

11 12

2 3

13 14

M A

T C

H

L I N

E

A E

D

SHEET NOTES

SHEET KEYNOTES

1. DISCONNECT FEEDERS 33 FROM DISTRIBUTION VI 2.3KV BUS

INSIDE BUILDING 272.

2. REMOVE FEEDERS 33 CONDUCTORS FROM DUCTBANK.

3. DISCONNECT FEEDER 10 FROM SWITCH DD8-G/S-1S.

4. REMOVE FEEDER 10 CONDUCTORS FROM DUCTBANK.

SCALE: 1" = 20'

PHASE I - ELECTRICAL DEMOLITION PLAN - AREA 12

A1

PLAN

NORTH

40'10'0 20'

1. REFER TO SHEET 1-ES603 FOR CABLE AND CONDUIT SCHEDULE.

2. REFER TO SHEET 1-E-011 FOR ELECTRICAL LEGEND AND

ABBREVIATIONS.

DZ RAD WAS

12857709

E L

E C

T R

I C

T

E

D

E M

O L

I T

I O

N

P

L A

N

A

R E

A

1-ED132

EMH-S640

BUILDING 274

EMH-885

EMH-888

EMH-640

EMH-1487

UNIT SUBSTATIONS

10X

X06

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

XXX

X

X

X

X

X

X

XXX

10X

X06

X

X

XX

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

D E

P A

R T

M E

T

V

Y

A

B

C

D

2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

N A

V A

L

F

A C

I L I T

I E

S

E

N G

I N

E E

R I N

G

S

Y S

T E

M

M A

N D

DES DRW

S Y

M D

E S

C R

I P

T I O

N D

A T

E A

P P

R

DRAWFORM REVISION: 25 AUG 2020

CHK

OF

EPROJECT NO.:

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

NA

VA

L

FA

CI

LI

TI

ES

E

NG

IN

EE

RI

NG

S

YS

TE

M

S

CO

M M

AN

D

M

ID

-A

TL

AN

TI

C

N A

V A

L

S

T A

T I O

N

N

O R

F O

L K

V

A

N O

R F

O L

K

N

A V

I P

Y A

R D

P O

R T

S M

O U

T H

V

I R

G I N

I A

P

D

R Y

D O

C K

S A

LT

W

A

TE

R S

Y S

TE

M

FO

R

C V

N -7

JTL/TLH

EJA

DSN

1364315

N40085-22-R-2598

DLB

DEVIN POULIN,

C984 FACILITIES PLANNER, NNSY

02/02/2022

I S

S U

D

NORTH

PLAN

KEY PLAN

4 5

11 12

2 3

13 14

M A

T C

H

L I N

E

A E

D

M A

T C

H

L I N

E

A E

D

SHEET NOTES

SHEET KEYNOTES

SCALE: 1" = 20'

PHASE I - ELECTRICAL DEMOLITION PLAN - AREA 13

A1

PLAN

NORTH

40'10'0 20'

1. REMOVE FEEDERS 33 CONDUCTORS FROM DUCTBANK.

2. REMOVE FEEDER 10 CONDUCTORS FROM DUCTBANK.

1. REFER TO SHEET 1-ES603 FOR CABLE AND CONDUIT SCHEDULE.

2. REFER TO SHEET 1-E-011 FOR ELECTRICAL LEGEND AND

ABBREVIATIONS.

DZ RAD WAS

12857710

E L

E C

T R

I C

T

E

D

E M

O L

I T

I O

N

P

L A

N

A

R E

A

1-ED133

EMH-S634

DD8-G/S-2S

SUBSTATION Z4-E

SUBSTATION

Z4-F

BUILDING 274

EMH-S635

EMH-635

EMH-S5EMH-634

PUMPWELL

EMH-891

EMH-892

EMH-893

EMH-890

M14

EMH-895 EMH-896

M14

M14

M14

10987

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

C3

X

X

C2

C4

X

X

X

X

X X

X

X

X

X X

X X

X X

X X

X X

X

X

X

X

X

X

C3

C4

C2

X

X

XX

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X X

10X

X06

10X

X06

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

C3

C2

C4

04 04

C3

C2

C4

04 04

D E

P A

R T

M E

T

V

Y

A

B

C

D

2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

N A

V A

L

F

A C

I L I T

I E

S

E

N G

I N

E E

R I N

G

S

Y S

T E

M

M A

N D

DES DRW

S Y

M D

E S

C R

I P

T I O

N D

A T

E A

P P

R

DRAWFORM REVISION: 25 AUG 2020

CHK

OF

EPROJECT NO.:

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

NA

VA

L

FA

CI

LI

TI

ES

E

NG

IN

EE

RI

NG

S

YS

TE

M

S

CO

M M

AN

D

M

ID

-A

TL

AN

TI

C

N A

V A

L

S

T A

T I O

N

N

O R

F O

L K

V

A

N O

R F

O L

K

N

A V

I P

Y A

R D

P O

R T

S M

O U

T H

V

I R

G I N

I A

P

D

R Y

D O

C K

S A

LT

W

A

TE

R S

Y S

TE

M

FO

R

C V

N -7

JTL/TLH

EJA

DSN

1364315

N40085-22-R-2598

DLB

DEVIN POULIN,

C984 FACILITIES PLANNER, NNSY

02/02/2022

I S

S U

D

NORTH

PLAN

KEY PLAN

4 5

11 12

2 3

13 14

MATCH LINE

A1/1-ED129

M A

T C

H

L I N

E

A E

D

M A

T C

H

L I N

E

A E

D

SHEET NOTES

SHEET KEYNOTES

SCALE: 1" = 20'

PHASE I - ELECTRICAL DEMOLITION PLAN - AREA 14

A1

PLAN

NORTH

40'10'0 20'

1. DISCONNECT FEEDERS 34 FROM SUBSTATION Z4-E AND Z4-F.

2. REMOVE FEEDERS 34 CONDUCTORS FROM DUCTBANK.

3. REMOVE FEEDERS 33 CONDUCTORS FROM DUCTBANK.

4. REMOVE FEEDER 10 CONDUCTORS FROM DUCTBANK.

5. DISCONNECT AND REMOVE FEEDERS 33 AND 34

CONDUCTORS INSIDE THE PUMPWELL.

6. DISCONNECT FEEDER 10 FROM SWITCH DD8-G/S-2S.

7. REMOVE POWER FEEDER M14 FROM EMH-897 BACK EMH-896.

PROVIDE PULL WIRE IN VACATED CONDUIT. PROTECT THE

REMAINING FEEDER M14 CONDUCTORS INSIDE EMH-896 FOR

FUTURE RECONNECTION.

8. REMOVE SLUICE GATE CONTROL CABLE C2 BACK TO ITS

SOURCE IN BUILDING 274.

9. REMOVE TIDE WATER LEVEL GAUGE CABLE C4 BACK TO

EMH-896. PROVIDE PULL WIRE IN VACATED CONDUIT.

PROTECT THE REMAINING CABLE C4 INSIDE EMH-896 FOR

FUTURE RECONNECTION.

10. REMOVE DOCK WATER LEVEL GAUGE CABLE C3 BACK TO

EMH-896. PROVIDE PULL WIRE IN VACATED CONDUIT.

PROTECT THE REMAINING CABLE C3 INSIDE EMH-896 FOR

FUTURE RECONNECTION.

X1 CLIN 0002

1. REFER TO SHEET 1-ES603 FOR CABLE AND CONDUIT SCHEDULE.

2. REFER TO SHEET 1-E-011 FOR ELECTRICAL LEGEND AND

ABBREVIATIONS.

DZ RAD WAS

12857711

E L

E C

T R

I C

T

E

D

E M

O L

I T

I O

N

P

L A

N

A

R E

A

1-ED134

AS NOTED

X1

X1

X1

EMH-636

EMH-S636

EMH-913

M14

EMH-897

DOCK WATER

LEVEL GAUGE

CAISSON POWER

PEDESTAL

SLUICE GATE VALVE

2 5

M16

EMH-898

M153

CAPSTAN 42

TIDE WATER

LEVEL GAUGE 6

M15 3

C4

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

XX31

C3

C2

C4

04 04

C3

C2

P2

D E

P A

R T

M E

T

V

Y

A

B

C

D

2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

N A

V A

L

F

A C

I L I T

I E

S

E

N G

I N

E E

R I N

G

S

Y S

T E

M

M A

N D

DES DRW

S Y

M D

E S

C R

I P

T I O

N D

A T

E A

P P

R

DRAWFORM REVISION: 25 AUG 2020

CHK

OF

EPROJECT NO.:

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

NA

VA

L

FA

CI

LI

TI

ES

E

NG

IN

EE

RI

NG

S

YS

TE

M

S

CO

M M

AN

D

M

ID

-A

TL

AN

TI

C

N A

V A

L

S

T A

T I O

N

N

O R

F O

L K

V

A

N O

R F

O L

K

N

A V

I P

Y A

R D

P O

R T

S M

O U

T H

V

I R

G I N

I A

P

D

R Y

D O

C K

S A

LT

W

A

TE

R S

Y S

TE

M

FO

R

C V

N -7

JTL/TLH

EJA

DSN

1364315

N40085-22-R-2598

DLB

DEVIN POULIN,

C984 FACILITIES PLANNER, NNSY

02/02/2022

I S

S U

D

SHEET NOTES

NORTH

PLAN

KEY PLAN

M A

T C

H

L I N

E

A E

D

4 5

11 12

2 3

13 14

SCALE: 1" = 20'

PHASE I - ELECTRICAL DEMOLITION PLAN - AREA 15

A1

PLAN

NORTH

40'10'0 20'

1. REFER TO SHEET 1-ES603 FOR CABLE AND CONDUIT SCHEDULE.

2. REFER TO SHEET 1-E-011 FOR ELECTRICAL LEGEND AND

ABBREVIATIONS.

SHEET KEYNOTES

1. DISCONNECT SLUICE GATE VALVE POWER FEEDER M16 AND

CONTROL CABLE C2. REMOVE FEEDER M16 BACK TO A SPLICE

INSIDE EMH-897.

2. DISCONNECT CAISSON POWER PEDESTAL FEEDER P2. REMOVE

CONDUCTORS BACK TO A SPLICE INSIDE EMH-897.

3. REMOVE CAPSTAN 42 FEEDER M15 BETWEEN EMH-798 AND

EMH-898. PROVIDE PULL WIRE IN VACATED CONDUIT. PROTECT

FEEDER M15 BETWEEN EMH-898 AND CAPSTAN 42 FOR FUTURE

RECONNECTION.

4. REMOVE POWER FEEDER M14 FROM EMH-897 BACK EMH-896.

PROVIDE PULL WIRE IN VACATED CONDUIT. PROTECT THE

REMAINING FEEDER M14 CONDUCTORS INSIDE EMH-896 FOR

FUTURE RECONNECTION.

5. REMOVE SLUICE GATE CONTROL CABLE C2 BACK TO ITS

SOURCE IN BUILDING 274.

6. DISCONNECT AND REMOVE TIDE WATER LEVEL GAUGE CABLE

C4 BACK TO EMH-896. PROVIDE PULL WIRE IN VACATED

CONDUIT. PROTECT THE REMAINING CABLE C4 INSIDE

EMH-896 FOR FUTURE RECONNECTION.

7. DISCONNECT AND REMOVE DOCK WATER LEVEL GAUGE CABLE

C3 BACK TO EMH-896. PROVIDE PULL WIRE IN VACATED

CONDUIT. PROTECT THE REMAINING CABLE C3 INSIDE

EMH-896 FOR FUTURE RECONNECTION.

X1 CLIN 0002

DZ RAD WAS

12857712

E L

E C

T R

I C

T

E

D

E M

O L

I T

I O

N

P

L A

N

A

R E

A

1-ED135

AS NOTED

15kVA 2300V to 120/240V

BREAKER

CONTROL

TRANSFORMER

2300V SWITCHBOARD

480V SWITCHBOARD

SIDE A

MCC

MDP-1

MCC

MDP-2

MCC

MDP-3

MCC

MDP-4

2300V FEEDER #1 2300V FEEDER #2 2300V FEEDER #3

480V FEEDER A 480V FEEDER B

DP-1

MCC MCC

DP-2

CKT #1 CKT #2 CKT #3 CKT #4 CKT #5 CKT #6CKT #1 CKT #2 CKT #3 CKT #4 CKT #5 CKT #6

480V SWITCHBOARD

SIDE B

1 1

MCC

DP-3

3 3 3

3 3

XFMR #2

37.5KVA

480V - 240V

1 PHASE1

45KVA

480V - 208Y/120V

3 PHASE

BILGE SUMP

PUMP

MDP DISCH.

VALVE

MDP DISCH.

VALVE

MOTOR

HEATERS

SUCTION

CHAMBER

DEWATERING

PUMP

AHU

XFMR #1

37.5KVA

480V - 240V

1 PHASE

BILGE SUMP

PUMP

MDP DISCH.

VALVE

SEWAGE PUMP

STATION

HOIST

RECEPTACLES

SUCTION

TO

BILDGE

MDP DISCH.

VALVE

MDP DISCH.

VALVE

DP

SUCTION

VALVEMOTOR

HEATERS

MDP 1, 2, 3, 4

DP

SUCTION

VALVE

DP

SUCTION

VALVE

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT NO.:

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y N

A V

A L

F A

C

IL

IT

IE

S E

N G

IN

E

E R

S

T E

M S

C O

M M

A N

D

DRAWFORM REVISION: 25 AUGUST 2020

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

Y S

T E

M S

C O

M M

A N

D

M

ID

-A T

LA

N

TI

C

N A

V A

L S

T A

T

IO

N

N O

R F

O L

K V

A

AS NOTED

F

IL

E N

A M

E

P

LO

T T

E D

C

R e v it P ro je c ts

\D R

Y D

P -1

-E

-D R

Y D ra k e m p .r v t

/2

/2

:3

:4

P

M

1-ED700

P D

R Y

D O

C K

S

A L T

W A

T E

R S

Y S

T E

M

F O

R C

V N

-7

P U

M P

W E

LL

D

E M

O

LI

T

IO

N O

N E

-L

IN

E D

IA

G

R A

M

RHS

12857713

JCC RAK

02/02/2022

DEVIN POULIN,

C984 FACILITIES PLANNER, NNSY

JTL/TLH

1364315

N40085-22-R-2598

P O

R T

S M

O U

T H

, V

IR

G

IN

IA

N

O R

F O

LK

N

A V

A L

S H

IP

Y

A R

D

EJA

JAS

DSN

SHEET KEYNOTES

1. DEMOLISH CIRCUIT BREAKER FOR EXISTING LOAD. EXISTING CONDUIT,

CONDUCTORS, AND LOAD TO REMAIN AND ARE TO BE EXTENDED TO THE

PROVIDED 480V PANELBOARD.

2. DEMOLISH EXISTING CIRCUIT BREAKER, CONDUIT, CONDUCTOR, AND ANY

ASSOCIATED SAFETY SWITCHES.

3. SEE 1-ED101 FOR EXTENTS OF PRIMARY FEEDER'S CONDUIT AND CONDUCTOR

DEMOLITION.

NOT TO SCALE

A1

PUMPWELL 8 - ELECTRICAL DEMOLITION ONE LINE DIAGRAM

S Y

M D

E S

C R

IP

TI

O N

D A

TE

A

P P

R

IS

S U

E D

F O

R C

O N

S

TR

U C

T

IO

N

/2 8/

IS

SU

ED

F

OR

GROUND ROD

GROUND ROD

EXOTHERMIC

WELD

COPPER

GROUND

CABLE

BUTT WELD

TEE WELD

WELD TO ROD

WELD RING TO ROD

EITHER BUTT WELD

CONDUCTOR OR 'THRU WELD'

CONNECTION

JUNCTION WELD

PARALLEL

CABLE TO STRAP

CABLE TO BUSBAR

CABLE TO STRAP

STRAP TO MESH

GROUNDING BUSHING

INCOMING

CONDUIT LOCKNUT

GROUNDING LUG

BONDING JUMPER

GROUNDING

TERMINAL STRIP

PANEL

CABINET

BONDING JUMPER

GROUNDING LUG

NOTES:

CONDUIT

GROUNDING

BUSHING

CONDUIT

LOCKNUTS

EQUIPMENT GROUNDING

CONDUCTOR

NEUTRAL

TERMINAL STRIP

1. ALL WIRES MUST BE NEATLY LACED.

2. AT THE POINT OF ATTACHMENT OF THE GROUNDING TERMINAL STRIP

TO THE CABINET, THE SURFACES MUST BE SCRAPPED FREE OF PAINT

AND THOROUGHLY CLEANED TO INSURE PROPER BONDING.

3. NEUTRAL CONDUCTOR NOT SHOWN FOR CLARITY.

NOTES:

1. THIS DETAIL DOES NOT PRECLUDE THE REQUIREMENTS OF NEC

ART. 250 OR NFPA 780. MUST STRICTLY ADHERE TO NEC ART. 250,

WHICH SUPERCEDES THIS DETAIL.

N

GMAIN GND BUS

(MGB)

PUMPWELL

TYP OF ALL

MAJOR ELEC/MECH

EQUIPMENT

SWGR/PANEL BOARD

TYP.

GRADE LEVEL

GROUNDING

ELECTRODE

CONDUCTOR

COUNTERPOISE

SYSTEM

GENERATOR

EXOTHERMIC WELD

TYP.

BONDING CONDUCTOR

TYP.

PW8-SWGR PW8-LOAD

BANK

3' -0

A B

O V

E F

LO

O

R

GROUND CONDUCTOR

GREEN STRANDED

IRREVERSIBLE CRIMP

COORDINATE MOUNTING HARDWARE

BUILDING WALL

NOTES:

2 HOLE LUG

LOCKWASHER

GROUNDING CONNECTION

EXTERIOR TOOTH

HEX NUT

FLAT WASHER

HEX BOLT DIA AS REQD

TOP VIEW

HEX HEAD BOLT WITH NUT AND

LOCK WASHERS SIZE AS

REQUIRED.

LUGS TO BE 2-HOLE TYPE.

GROUND BAR OR

METAL ENCLOSURE

GREEN STRANDED

GROUND CONDUCTOR

1. PROVIDE NUMBER AND SIZE OF CONNECTORS AND GROUND CONDUCTORS AND LENGTH OF GROUND BAR AS

REQUIRED FOR EACH GROUND BAR LOCATION.

2. PROVIDE GROUND BUS IN ACCORDANCE WITH EIA/TIA-607 GROUNDING STANDARDS.

3. DETAIL IS USED AN EXAMPLE. HOLE SIZE, SPACING AND PATTERN MUST BE IN ACCORDANCE WITH TIA-607.

4. PROVIDE UL LISTED GROUND BUS.

GREEN STRANDED

COPPER WIRE TO GROUND

MAIN GROUND

COUNTERPOISE

GROUND BAR MINIMUM SIZE

2' LONG X 4" WIDE X 1/4" THICK SOLID

COPPER, SEE NOTE 1

HEX HEAD BOLTS LENGTH AND DIA

AS REQUIRED WITH LOCK

WASHERS

INSULATED MOUNT, 2" DEEP

EXOTHERMIC WELD

P W

8- S

W G

R

PW8-FOT-1

PW8-GENERATOR

PW8-LOAD

BANK

T

T

1 1

NOTES:

1. THIS DETAIL DOES NOT PRECLUDE THE

REQUIREMENTS OF NEC ART. 250 OR NFPA 780.

MUST STRICTLY ADHERE TO NEC ART. 250,

WHICH SUPERCEDES THIS DETAIL.

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT NO.:

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y N

A V

A L

F A

C

IL

IT

IE

S E

N G

IN

E

E R

S

T E

M S

C O

M M

A N

D

DRAWFORM REVISION: 25 AUGUST 2020

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

Y S

T E

M S

C O

M M

A N

D

M

ID

-A T

LA

N

TI

C

N A

V A

L S

T A

T

IO

N

N O

R F

O L

K V

A

AS NOTED

F

IL

E N

A M

E

P

LO

T T

E D

C

R e v it P ro je c ts

\D R

Y D

P -1

-E

-D R

Y D ra k e m p .r v t

/2

/2

:3

:4

P

M

1-EG501

P D

R Y

D O

C K

S

A L T

W A

T E

R S

Y S

T E

M

F O

R C

V N

-7

G R

O U

N D

IN

G

D E

T A

IL

S

RHS

12857714

JCC RAK

02/02/2022

DEVIN POULIN,

C984 FACILITIES PLANNER, NNSY

JTL/TLH

1364315

N40085-22-R-2598

P O

R T

S M

O U

T H

, V

IR

G

IN

IA

N

O R

F O

LK

N

A V

A L

S H

IP

Y

A R

D

EJA

JAS

DSN

NOT TO SCALE

A1

TYPICAL EXOTHERMIC WELDS

NOT TO SCALE

A2

PANELBOARD BONDING DETAIL

NOT TO SCALE

A3

TYPICAL GROUNDING RISER SCHEMATIC

NOT TO SCALE

B1

MAIN GROUND BUS DETAIL (MGB)

NOT TO SCALE

B3

PUMPWELL 8 SITE EQUIPMENT GROUNDING DETAIL

SHEET NOTES

1. SEE 1-E-001 FOR GROUNDING LINETYPES.

SHEET KEYNOTES

1. PROVIDE GROUND CONNECTION TO PLATFORM REBAR AND FOUNDATION

PILE.

2. PROVIDE GROUND CONNECTION TO EQUIPMENT AND ENCLOSURE.

3. PROVIDE GROUND ROD TEST WELL; SEE1-ES516/C1.

4. PROVIDE GROUND CONNECTION TO PLATFORM HANDRAIL. IF HANDRAIL IS

NOT CONTINUOUS, BOND ALL NONCONTINOUS SECTIONS TOGETHER.

S Y

M D

E S

C R

IP

TI

O N

D A

TE

A

P P

R

IS

S U

E D

F O

R C

O N

S

TR

U C

T

IO

N

/2 8/

IS

SU

ED

F

OR

REVISED: SEPTEMBER 2020 TYPE: A1LIGHTING PLATE:

LUMINAIRE REQUIREMENTS:

HOUSING - LOW PROFILE, ONE-PIECE, FIBERGLASS HOUSING WITH INTEGRAL

PERIMETER CHANNEL.

LENS - INJECTION MOLDED, HIGH IMPACT-RESISTANCE ACRYLIC LENS.

LIGHT SOURCE - HIGH-EFFICIENCY LEDS WITH MINIMUM 50K HOURS RATED LIFE AT L70,

3500K CCT UON, MINIMUM 80 CRI.

MOUNTING - SURFACE, WALL.6.

5.

4.

3.

2.

1.

7. THIS SKETCH IS A NON-PROPRIETARY GRAPHIC REPRESENTATION OF A LUMINAIRE

THAT MAY MEET THE SPECIFICATION REQUIREMENTS. IT IS NOT INTENDED TO INDICATE

A CERTAIN MANUFACTURER OR PREFERENCE.

CERTIFICATION - UL 1598, DAMP LOCATION, DLC QUALIFIED, AND ROHS COMPLIANT.

COMPLIES WITH LM79, LM80, AND TM21 TESTING STANDARDS. UL 924 WHEN EQUIPPED

WITH EMERGENCY BATTERY BACK-UP.

DRIVER - INTEGRAL, HIGH-EFFICIENCY DRIVER WITH MINIMUM 0.9 PF, OPERATING

VOLTAGE OF 120-277V, THERMAL MANAGEMENT, <20% TOTAL HARMONIC DISTORTION.

ON-OFF CONTROL, STEP-DIMMABLE OR FULLY DIMMABLE AS INDICATED.

LED ENCLOSED AND GASKETED

4' NOMINAL

4 0.69

RCR

1.03

0.78 0.89

CU

NOMINAL 25W INPUT/

4000 LUMENS

TYPE A1

LPW - 160

MINIMUM

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT NO.:

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y N

A V

A L

F A

C

IL

IT

IE

S E

N G

IN

E

E R

S

T E

M S

C O

M M

A N

D

DRAWFORM REVISION: 25 AUGUST 2020

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

Y S

T E

M S

C O

M M

A N

D

M

ID

-A T

LA

N

TI

C

N A

V A

L S

T A

T

IO

N

N O

R F

O L

K V

A

AS NOTED

F

IL

E N

A M

E

P

LO

T T

E D

C

R e v it P ro je c ts

\D R

Y D

P -1

-E

-D R

Y D ra k e m p .r v t

/2

/2

:3

:4

P

M

1-EL501

P D

R Y

D O

C K

S

A L T

W A

T E

R S

Y S

T E

M

F O

R C

V N

-7

LI

G

H

TI

N G

S C

H E

D U

LE

A

N D

D E

TA

IL

S

RHS

12857715

JCC RAK

02/02/2022

DEVIN POULIN,

C984 FACILITIES PLANNER, NNSY

JTL/TLH

1364315

N40085-22-R-2598

P O

R T

S M

O U

T H

, V

IR

G

IN

IA

N

O R

F O

LK

N

A V

A L

S H

IP

Y

A R

D

EJA

JAS

DSN

LIGHT FIXTURES SCHEDULE

FIXTURE LAMP INFORMATION FIXTURE INFORMATION

TYPE TYPE COLOR TEMP

FIXTURE

LUMENS VOLTAGE WATTAGE DESCRIPTION MOUNTING

A1 LED 3500 K 4000 lm 277 V 25 W 4' ENCLOSED & GASKETED LED LUMINAIRE WITH SHALLOW ACRYLIC LINEAL

RIBBED FROSTED LENS

CEILING, SURFACE, PENDANT

LIGHTING CONTROL SCHEDULE

NAME CONTROLS

CONTROL BOOTH SW

SHEET NOTES

1. LIGHTING FIXTURE LAYOUT IS SHOWN ON SHEET 1-EP101.

LIGHTING SEQUENCE OF OPERATIONS:

1. SPACES INDICATED WITH "SW" MUST HAVE THE FOLLOWING

FEATURES AND FUNCTIONS:

A. STANDARD LOCAL SNAP SWITCH FOR COMPLETE MANUAL

ON-OFF CONTROLL BY THE USER

S Y

M D

E S

C R

IP

TI

O N

D A

TE

A

P P

R

IS

S U

E D

F O

R C

O N

S

TR

U C

T

IO

N

/2 8/

IS

SU

ED

F

OR

M M M

M

M

M

M

M

M

M

M

MM M

M M

M

M M M

M

M M

M

MMM

M

MM

M M

M

M

M

MM

M

PW8-DSS-01

FACP

PW8-MDP-2

PW8-MDP-3

PW8-MDP-4

D30

PANEL PW8-1

PANEL PW8-4

PW8-XFMR-3PW8-XFMR-4

A1

PW8-2-1

8' - 0" AFF

RT

PW8-AC-1

LEVEL MONITORING

BUBBLE PANEL

PW8-4-4

PW8-4-6

PW8-MCC-MDP-6

PW8-MCC-MDP-4

1-EP201 1

(E) PANEL LP-2

(E) PANEL LP-1

PW8-MCC-DP

1-EP201

A3

PW8-ACT-56

PW8-ACT-29

PW8-2-8,10,12

PW8-2-9,11,13

D30

D30

12 PW8-1-20,22,24

PW8-1-19,21,2313

PW8-3-11,13,158

PW8-3-6,8,107

C3

PANEL PW8-2

(E)PANEL LP-3

PW8-4-3

PW8-4-25

CONTROL BOOTH

PW8-4-9

CONTROL BOOTH

PW8-MCC-MDP

D30 D30

PW8-4-1

PW8-4-20

PANEL PW8-3

MGB

PW8-4-19,21

PW8-4-17

PW8-MDP-2-HEATER

PW8-4-18

PW8-MDP-3-HEATER

PW8-4-22

PW8-MDP-4-HEATERPW8-3-5,7,915

PW8-1-14,16,18

PW8-1-13,15,17

PW8-3-12,14,16

PW8-1-8,10,12(E) AHU

PW8-1-25,27,29

D200

PW8-MCC-MDP-5

PW8-1-26,28,30

PW8-3-2,4

PW8-3-1,3

GENERATOR

ANNUNCIATOR PANEL

5PW8-2-20,22,24

(E) HOIST RECEPTACLE

PW8-2-20,22,24

(E) HOIST RECEPTACLE

PW8-4-30

MCC HEATER

PW8-4-31

MCC HEATER

X1

X1

PW8-4-19,21

PW8-DSS-CU-01

D30

PW8-SWGR

PW8-4-5

ALTERNATOR HEATER

PW8-2-2,4,6

JACKET WATER HEATER

PW8-4-7

OIL COOLER/HEATER

PW8-4-2

BATTERY BLANKET

PW8-4-27

HEATER

PW8-4-24

CONTROL PANEL

PW8-4-11

BATTERY CHARGER

PW8-FPU-1

PW8-4-12,14

PW8-4-8,10

PW8-FTP-1

PW8-4-13,15

PW8-FTP-2

PW8-4-26

CONTROL PANEL

PW8-FOT-1

D30

D30 D30

2 2

PW8-GENERATOR

D30 2

D602

D302

PW8-LOAD

BANK

D60 D30 D30 D30 D30

18 18 18 18 18

PW8-4-29

COOLANT HEATER

PW8-4-28

CONTROL PANEL

PW8-4-33

SWITCHGEAR HEATER

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT NO.:

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y N

A V

A L

F A

C

IL

IT

IE

S E

N G

IN

E

E R

S

T E

M S

C O

M M

A N

D

DRAWFORM REVISION: 25 AUGUST 2020

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

Y S

T E

M S

C O

M M

A N

D

M

ID

-A T

LA

N

TI

C

N A

V A

L S

T A

T

IO

N

N O

R F

O L

K V

A

AS NOTED

F

IL

E N

A M

E

P

LO

T T

E D

C

R e v it P ro je c ts

\D R

Y D

P -1

-E

-D R

Y D ra k e m p .r v t

/2

/2

:3

:4

P

M

1-EP101

P D

R Y

D O

C K

S

A L T

W A

T E

R S

Y S

T E

M

F O

R C

V N

-7

P U

M P

W E

LL

E

LE

C

TR

IC

A L

P O

W E

R P

LA

N

RHS

12857716

JCC RAK

02/02/2022

DEVIN POULIN,

C984 FACILITIES PLANNER, NNSY

JTL/TLH

1364315

N40085-22-R-2598

P O

R T

S M

O U

T H

, V

IR

G

IN

IA

N

O R

F O

LK

N

A V

A L

S H

IP

Y

A R

D

EJA

JAS

DSN

3/16" = 1'-0" B1

PUMPWELL 8 - ELECTRICAL POWER PLAN - MOTOR

SHEET NOTES

1. SEE SHEET 1-EL501 FOR LIGHTING FIXTURE SCHEDULE AND DETAILS.

2. SEE PHASE 1 ELECTRICAL SITE SHEETS FOR GENERATOR, SWITCHGEAR, AND

ACCESSORY CIRCUIT ROUTING.

3. SEE STRUCTURAL SHEETS FOR EQUIPMENT PAD INFORMATION.

4. ALL ELECTRICAL EQUIPMENT MUST BE PLACED SUCH THAT IT DOES NOT

INTERFERE WITH THE ROOFHATCH ENVELOPE.

5. PROVIDE ALL SAFETY SWITCHES AND MOTOR STARTERS IN NEMA-3R

ENCLOSURES, UON.

0' 4' 8' 12'

PLAN

NORTH

SHEET KEYNOTES

1. SEE STRUCTURAL DRAWINGS FOR PROVIDED FLOOR HATCH.

2. PROVIDE 30A SAFETY SWITCH IN NEMA-4X ENCLOSURE.

3. ELECTRICAL DUCTBANK PENETRATION. SEE SHEETS 1-ES134 AND 1-ES603

FOR CONDUIT AND CONDUCTOR INFORMATION. PROVIDE PULLBOX AND

ROUTE CONDUIT TO PW8-MCC-DP, PW8-MCC-MDP, PANEL PW8-2, AND PANEL

PW8-3.

4. EXISTING TRANSFORMERS ARE CEILING MOUNTED ABOVE EXISTING PANELS

LP-1, LP-2, AND LP-3.

5. PROVIDE ELECTRICAL CONNECTION FROM OUTDOOR UNIT TO INDOOR UNIT

PER MANUFACTURER'S INSTRUCTIONS.

6. 60A SAFETY SWITCH FOR CONNECTION WITH "PW8-MONORAIL" LOCATED IN

THE MAIN PUMP/DRAINAGE PUMP AREA; SEE 1-EP103. SAFETY SWITCH MUST

BE CAPABLE OF BEING LOCKED IN THE OPEN POSITION.

7. 30A SAFETY SWITCH FOR CONNECTION WITH "PW8-ACT-61" LOCATED IN THE

MAIN PUMP/DRAINAGE PUMP AREA; SEE 1-EP103. SAFETY SWITCH MUST BE

CAPABLE OF BEING LOCKED IN THE OPEN POSITION.

8. 30A SAFETY SWITCH FOR CONNECTION WITH "PW8-ACT-63" LOCATED IN THE

MAIN PUMP/DRAINAGE PUMP AREA; SEE 1-EP103. SAFETY SWITCH MUST BE

CAPABLE OF BEING LOCKED IN THE OPEN POSITION.

9. 30A SAFETY SWITCH FOR CONNECTION WITH "PW8-ACT-53" LOCATED IN THE

MAIN PUMP/DRAINAGE PUMP AREA; SEE 1-EP103. SAFETY SWITCH MUST BE

CAPABLE OF BEING LOCKED IN THE OPEN POSITION.

10. 100A SAFETY SWITCH/STARTER COMBINATION FOR CONNECTION WITH "PW8-

SP-1" LOCATED IN THE MAIN PUMP/DRAINAGE PUMP AREA; SEE 1-EP103.

SAFETY SWITCH MUST BE CAPABLE OF BEING LOCKED IN THE OPEN

POSITION.

11. 100A SAFETY SWITCH/STARTER COMBINATION FOR CONNECTION WITH "PW8-

SP-2" LOCATED IN THE MAIN PUMP/DRAINAGE PUMP AREA; SEE 1-EP103.

SAFETY SWITCH MUST BE CAPABLE OF BEING LOCKED IN THE OPEN

POSITION.

12. 100A SAFETY SWITCH/STARTER COMBINATION FOR CONNECTION WITH "PW8-

SP-3" LOCATED IN THE MAIN PUMP/DRAINAGE PUMP AREA; SEE 1-EP103.

SAFETY SWITCH MUST BE CAPABLE OF BEING LOCKED IN THE OPEN

POSITION.

13. 100A SAFETY SWITCH/STARTER COMBINATION FOR CONNECTION WITH "PW8-

SP-4" LOCATED IN THE MAIN PUMP/DRAINAGE PUMP AREA; SEE 1-EP103.

SAFETY SWITCH MUST BE CAPABLE OF BEING LOCKED IN THE OPEN

POSITION.

14. CIRCUIT BREAKERS MUST BE CAPABLE OF BEING LOCKED IN THE OPEN

POSITION.

15. 30A SAFETY SWITCH FOR CONNECTION WITH "PW8-ACT-62" LOCATED IN THE

MAIN PUMP/DRAINAGE PUMP AREA; SEE 1-EP103. SAFETY SWITCH MUST BE

CAPABLE OF BEING LOCKED IN THE OPEN POSITION.

16. SCADA DUCTBANK PENETRATION. SEE SHEETS 1-ES134 AND 1-ES603 FOR

CONDUIT AND CONDUCTOR INFORMATION. PROVIDE PULLBOX AND ROUTE

CONDUIT TO WALL-MOUTNED SCADA CABINET; SEE 1-EP501/A2.

17. DEDICATED RECEPTACLE FOR USE WITH RACK MOUNTED UPS.

18. PROVIDE SAFETY SWITCHES INSIDE OF THE GENERATOR ENCLOSURE.

19. PROVIDE A HEATER FOR EACH CUBICLE. ALL HEATERS ARE POWERED FROM

THE INDICATED CIRCUIT.

X1. CLIN 0002.

KEY PLAN

MOTOR

83'-0"

INTERMED.

68'-0"

MAIN PUMP

46'-0"

DRAINAGE

28'-3 1/4"

COPING

103'-0"

SUC. CHAM.

32'-3"1/16" = 1'-0" A3

PUMPWELL 8 - ELECTRICAL POWER PLAN - COPING

8' 16' 32'0'

PLAN

NORTH

S Y

M D

E S

C R

IP

TI

O N

D A

TE

A

P P

R

IS

S U

E D

F O

R C

O N

S

TR

U C

T

IO

N

/2 8/

IS

SU

ED

F

OR

M

M

PW8-ACT-10

PW8-ACT-8

D30

D30

PW8-2-14,16,18

PW8-2-3,5,7

D30

PW8-2-15,17,19

PW8-ACT-9

D30

PW8-2-21,23,25

(E) SEWAGE PUMP STATION

X2

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT NO.:

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y N

A V

A L

F A

C

IL

IT

IE

S E

N G

IN

E

E R

S

T E

M S

C O

M M

A N

D

DRAWFORM REVISION: 25 AUGUST 2020

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

Y S

T E

M S

C O

M M

A N

D

M

ID

-A T

LA

N

TI

C

N A

V A

L S

T A

T

IO

N

N O

R F

O L

K V

A

AS NOTED

F

IL

E N

A M

E

P

LO

T T

E D

C

R e v it P ro je c ts

\D R

Y D

P -1

-E

-D R

Y D ra k e m p .r v t

/2

/2

:3

:4

P

M

1-EP102

P D

R Y

D O

C K

S

A L T

W A

T E

R S

Y S

T E

M

F O

R C

V N

-7

P U

M P

W E

LL

E

LE

C

TR

IC

A L

P O

W E

R P

LA

N

RHS

12857717

JCC RAK

02/02/2022

DEVIN POULIN,

C984 FACILITIES PLANNER, NNSY

JTL/TLH

1364315

N40085-22-R-2598

P O

R T

S M

O U

T H

, V

IR

G

IN

IA

N

O R

F O

LK

N

A V

A L

S H

IP

Y

A R

D

EJA

JAS

DSN

3/16" = 1'-0" B1

PUMPWELL 8 - ELECTRICAL POWER PLAN - INTERMEDIATE

0' 4' 8' 12'

PLAN

NORTH

KEY PLAN

MOTOR

83'-0"

INTERMED.

68'-0"

MAIN PUMP

46'-0"

DRAINAGE

28'-3 1/4"

COPING

103'-0"

SUC. CHAM.

32'-3"

SHEET NOTES

1. COORDINATE SAFETY SWITCH LOCATIONS WITH EXISTING WALL MOUNTED

EQUIPMENT.

2. PROVIDE ALL SAFETY SWITCHES AND MOTOR STARTERS IN NEMA-4X

ENCLOSURES, UON.

SHEET KEYNOTES

X2. CLIN 0004.

S Y

M D

E S

C R

IP

TI

O N

D A

TE

A

P P

R

IS

S U

E D

F O

R C

O N

S

TR

U C

T

IO

N

/2 8/

IS

SU

ED

F

OR

M

M

M M

M M

M

M

M

M

M

M

M

(E) DP-3

PW8-DP-2

PW8-DP-1

PW8-SP-1

PW8-SP-2

PW8-ACT-53

PW8-DP-4

PW8-SP-4

PW8-SP-3

PW8-MONORAIL

TROLLEY

PW8-ACT-63

PW8-MCC-DP-7

PW8-MCC-DP-4

PW8-MCC-DP-5

PW8-MCC-DP-6

PW8-1-13,15,17

PW8-1-14,16,18

PW8-3-12,14,16

PW8-3-11,13,15

PW8-3-6,8,10

PW8-1-19,21,23

PW8-1-20,22,24

PW8-1-8,10,12

PW8-MCC-DP-8

PW8-DP-5

PW8-3-5,7,9

PW8-ACT-62

PW8-ACT-61

PW8-4-23

PW8-HIGH WATER ALARM

X1

X4

X2

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT NO.:

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y N

A V

A L

F A

C

IL

IT

IE

S E

N G

IN

E

E R

S

T E

M S

C O

M M

A N

D

DRAWFORM REVISION: 25 AUGUST 2020

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

Y S

T E

M S

C O

M M

A N

D

M

ID

-A T

LA

N

TI

C

N A

V A

L S

T A

T

IO

N

N O

R F

O L

K V

A

AS NOTED

F

IL

E N

A M

E

P

LO

T T

E D

C

R e v it P ro je c ts

\D R

Y D

P -1

-E

-D R

Y D ra k e m p .r v t

/2

/2

:3

:4

P

M

1-EP103

P D

R Y

D O

C K

S

A L T

W A

T E

R S

Y S

T E

M

F O

R C

V N

-7

P U

M P

W E

LL

E

LE

C

TR

IC

A L

P O

W E

R P

LA

N

RHS

12857718

JCC RAK

02/02/2022

DEVIN POULIN,

C984 FACILITIES PLANNER, NNSY

JTL/TLH

1364315

N40085-22-R-2598

P O

R T

S M

O U

T H

, V

IR

G

IN

IA

N

O R

F O

LK

N

A V

A L

S H

IP

Y

A R

D

EJA

JAS

DSN

0' 4' 8' 12'

PLAN

NORTH

KEY PLAN

MOTOR

83'-0"

INTERMED.

68'-0"

MAIN PUMP

46'-0"

DRAINAGE

28'-3 1/4"

COPING

103'-0"

SUC. CHAM.

32'-3"

3/16" = 1'-0" B1

PUMPWELL 8 - ELECTRICAL POWER PLAN - MAIN PUMP & DRAINAGE PUMP

SHEET NOTES

1. SEE 1-EP101 FOR MEANS OF DISCONNECT FOR ALL ELECTRICAL EQUIPMENT

CONNECTIONS SHOWN ON THIS SHEET.

SHEET KEYNOTES

1. COORDINATE SAFETY SWITCH AND EQUIPMENT CONNECTION WITH THE

MONORAIL EQUIPMENT LAYOUT.

X1. CLIN 0002.

X2. CLIN 0004.

X4. CLIN 0006.

S Y

M D

E S

C R

IP

TI

O N

D A

TE

A

P P

R

IS

S U

E D

F O

R C

O N

S

TR

U C

T

IO

N

/2 8/

IS

SU

ED

F

OR

FPP6

WM1

UPS

BATTERY

SBP

SW1

WM2

PW8-XFMR-3

PW8-XFMR-4

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT NO.:

D E

P A

R T

M E

N T

O F

T H

E N

A V

Y N

A V

A L

F A

C

IL

IT

IE

S E

N G

IN

E

E R

S

T E

M S

C O

M M

A N

D

DRAWFORM REVISION: 25 AUGUST 2020

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

N A

V A

L F

A C

IL

IT

IE

S

E N

G

IN

E E

R

IN

G S

Y S

T E

M S

C O

M M

A N

D

M

ID

-A T

LA

N

TI

C

N A

V A

L S

T A

T

IO

N

N O

R F

O L

K V

A

AS NOTED

F

IL

E N

A M

E

P

LO

T T

E D

C

R e v it P ro je c ts

\D R

Y D

P -1

-E

-D R

Y D ra k e m p .r v t

/2

/2

:3

:4

P

M

1-EP201

P D

R Y

D O

C K

S

A L T

W A

T E

R S

Y S

T E

M

F O

R C

V N

-7

P U

M P

W E

LL

E

Q U

IP

M

E N

T E

LE

V

A T

IO

N

S

RHS

12857719

JCC RAK

02/02/2022

DEVIN POULIN,

C984 FACILITIES PLANNER, NNSY

JTL/TLH

1364315

N40085-22-R-2598

P O

R T

S M

O U

T H

, V

IR

G

IN

IA

N

O R

F O

LK

N

A V

A L

S H

IP

Y

A R

D

EJA

JAS

DSN

SHEET KEYNOTES

1. WALL-MOUNTED TRANSFORMER; SEE 1-EP501/A1.

2. MOUNT SCADA CABINET SUCH THAT THE TOP OF THE ENCLOSURE DOES NOT

EXCEED 7'-0". COORDINATE WITH EXISTING TO REMAIN OVERHEAD

DUCTWORK.

3. PROVIDE A MINIMUM OF 54 AMPERE HOURS FOR 60 MINUTES…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .