1364315_dwg_13of18_PH2_V3_Structural.pdf
PDF 17 MB Posted
- Attached to
- P-678 Dry Dock 8 Saltwater System for CVN-78, Norfolk Naval Shipyard, Portsmouth, Virginia
- Solicitation number
- N40085-22-R-2598_Drawings
About this file
This document provides details on a federal contract opportunity for structural drawings in support of dry dock saltwater system construction for an aircraft carrier at Norfolk Naval Shipyard. The solicitation number is N40085-22-R-2598_Drawings and relates to structural drawings for P-678 Dry Dock 8 Saltwater System for CVN-78. Interested offerors are directed to review two separate notices for drawings and specifications. The opportunity is a special notice issued by the Department of the Navy, Naval Facilities Engineering Command. The structural drawings are needed for construction of a dry dock saltwater system for an aircraft carrier at Norfolk Naval Shipyard in Portsmouth, Virginia. No pricing, response dates, or other contract details are provided in this document.
View the file
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1. GENERAL:
A. THESE NOTES, AND OTHER DRAWING NOTES CONTAINED WITHIN, ARE PROVIDED TO MEET SPECIFIC REQUIREMENTS AND TO
SUPPLEMENT CONTRACT SPECIFICATIONS. THESE NOTES NEITHER REPLACE NOR OVERRIDE PROVISIONS AND REQUIREMENTS
OF CONTRACT SPECIFICATIONS.
B. COORDINATE ALL STRUCTURAL WORK WITH WORK SHOWN ON ALL OTHER DRAWINGS.
C. VERIFY ALL DIMENSIONS OF EXISTING CONSTRUCTION AND REPORT ANY DISCREPANCIES FROM CONTRACT DRAWINGS TO
CONTRACTING OFFICER'S REPRESENTATIVE PRIOR TO COMMENCING WITH WORK. SCALING OF WORKING DIMENSIONS FROM
STRUCTURAL DRAWINGS IS PROHIBITED.
D. CONTRACT DRAWINGS AND SPECIFICATIONS REPRESENT FINISHED STRUCTURE. CONTRACTOR IS RESPONSIBLE FOR MEANS AND METHODS OF CONSTRUCTION INCLUDING, BUT NOT LIMITED TO, SHORING AND TEMPORARY BRACING. UNDERTAKE ALL NECESSARY MEASURES TO ENSURE SAFETY OF ALL PERSONS AND STRUCTURES AT SITE AND ADJACENT TO SITE. VISITS TO THE SITE BY CONTRACTING OFFICER'S REPRESENTATIVE DO NOT RELIEVE CONTRACTOR OF SUCH RESPONSIBILITY.
E. IF CERTAIN FEATURES ARE NOT FULLY SHOWN OR CALLED FOR ON THE CONTRACT DRAWINGS OR SPECIFICATIONS, PROVIDE CONSTRUCTION OF THE SAME CHARACTER AS FOR SIMILAR CONDITIONS THAT ARE SHOWN OR CALLED FOR, WITH APPROVAL OF CONTRACTING OFFICER'S REPRESENTATIVE. WHERE SECTIONS VARY, PROVIDE FOR SMOOTH TRANSITIONS BETWEEN THEM, UNLESS NOTED OTHERWISE.
F. INSTALL ALL PRODUCTS IN ACCORDANCE WITH MANUFACTURERS' WRITTEN INSTRUCTIONS AND RECOMMENDATIONS, UNLESS
NOTED OTHERWISE.
G. FOR VERTICAL DATUM INFORMATION SEE SHEET 1-VF001.
H. 2-S-001, 2-S-002, 2-S-003, & 2-S-004 APPLY TO SHEETS NAMED 2-S-XXX & 2-SSXXX.
2. DESIGN STANDARDS:
A. PRINCIPAL CODE OF RECORD: INTERNATIONAL BUILDING CODE 2018 AS MODIFIED BY THE FOLLOWING UNIFIED FACILITIES
CRITERIA.
1. UFC1-200-01 (8 OCTOBER 2019 WITH CHANGE 1, 1 OCTOBER 2020) DoD BUILDING CODE
2. UFC 3-301-01 (1 OCTOBER 2019) STRUCTURAL ENGINEERING
3. UFC 4-010-01 (12 DECEMBER 2018 WITH CHANGE 1, 19 AUGUST 2020) DoD MINIMUM ANITITERRORISM STANDARDS FOR
BUILDINGS
4. UFC 4-150-07 (19 JUNE 2001 WITH CHANGE 1, 1 SEPTEMBER 2012) MAINTENANCE AND OPERATION: MAINTENANCE OF
WATERFRONT FACILITIES
5. UFC 4-151-10 (10 SEPTEMBER 2001 WITH CHANGE 1, 1 SEPTEMBER 2012) GENERAL CRITERIA FOR WATERFRONT
CONSTRUCTION
6. UFC 4-152-01 (24 JANUARY 2017) DESIGN: PIERS AND WHARVES
7. UFC 4-213-10 (18 MAY 2020) GRAVING DRY DOCKS
B. ASCE 7, MINIMUM DESIGN LOADS FOR BUILDINGS AND OTHER STRUCTURES, 2016.
C. ACI 318, AMERICAN SOCIETY OF CIVIL ENGINEERS, BUILDING CODE REQUIREMENTS FOR STRUCTURAL CONCRETE, 2014.
D. AISC 325, AMERICAN CONCRETE INSTITUTE, STEEL CONSTRUCTION MANUAL, 15th EDITION, 2017.
E. AISC 360, AMERICAN INSTITUTE OF STEEL CONSTRUCTION, SPECIFICATION FOR STRUCTURAL STEEL BUILDINGS, 2016.
F. AISI, AMERICAN IRON AND STEEL INSTITUTE,COLD-FORMED STEEL DESIGN MANUAL, 2017.
3. SPECIAL INSPECTIONS: SEE SECTION 01 45 35 WITH ATTACHMENTS.
4. DESIGN LOADS:
A. RISK CATEGORY: IV.
B. ROOF DEAD LOAD: 11 PSF.
C. COLLATERAL LOAD: 20 PSF ON ROOF AND ELEVATED FLOOR FRAMING TO ACCOUNT FOR, SUSPENDED CEILINGS, DUCTWORK, PIPING INCLUDING FIRE PROTECTION, LIGHTING, AND ELECTRICAL.
D. LIVE LOADS
1. FLOOR LIVE LOAD (FIRST FLOOR AND MEZZANINE): 300 PSF
2. ROOF LIVE LOAD: 20 PSF OR A CONCENTRATED LOAD OF 300 LBS UNIFORMLY DISTRIBUTED OVER AN AREA 2.5 FT SQUARE.
3. FLOOR AND ROOF LIVE LOAD REDUCTION IS NOT PERMITTED.
E. EQUIPMENT AND PIPING LOADS (OPERATING)
1. AS INDICATED FOR EQUIPMENT WEIGHING IN EXCESS OF 300 LBS. FRAMING AND FOUNDATIONS ARE DESIGNED FOR
EQUIPMENT THAT SATISFIES CONTRACT SPECIFICATIONS.
2. IF EQUIPMENT FURNISHED IS HEAVIER THAN WEIGHTS INDICATED OR REQUIRES STRUCTURAL CHANGES FOR ANY OTHER
REASON, PROVIDE ENGINEERING DESIGN CALCULATIONS AND ADDITIONAL WORK NECESSARY TO SUPPORT LOADS IN ACCORDANCE WITH DESIGN STANDARDS SPECIFIED ABOVE, AT NO ADDITIONAL COST TO OWNER AND WITH NO INCREASE
IN CONTRACT TIME.
3. PUMP STATION 6 AND 8 SURGE TANK: 13,400 LBF
4. PUMP STATION 6 AND 8 SWITCHGEAR (PS6-SWGR, PS8-SWGR): 25,000 LBF
5. PUMP STATION 6 AND 8 MOTOR CONTROL CENTER (PS6-MCC, PS8-MCC): 8,800 LBF
6. PUMP STATION 6 AND 8 TRANSFORMER 1 (PS6-XFMR-1, PS8-XMFR-1): 2,000 LBF
7. PUMP STATION 6 AND 8 TRANSFORMER 2 (PS6-XFMR-2, PS8-XMFR-2): 500 LBF
8. PUMP STATION 6 AND 8 GENERATORS (GEN-6, GEN-8): 170,000 LBF
9. PUMP STATION 6 AND 8 FUEL TANKS (FT-6, FT-8): 203,200 LBF
10. 30" HDPE RETURN PIPING: 310 PLF
11. 12" COMPONENT COOLING PIPING: 100 PLF
12. 10" HDPE SANITARY SEWER PIPING: 40 PLF
13. AUTO CLEAN STRAINER: 5,400 LBF
F. CRANE LOADS
1. MONORAIL
a. LIFT CAPACITY: 3 TONS
b. MINIMUM HOOK HEIGHT: 20 FT
c. MAXIMUM WHEEL LOADS (ASD) INCLUDING IMPACT: 7.9 KIPS VERTICAL, 1.2 KIPS LATERAL, 0.6 KIPS LONGITUDINAL.
2. PORTAL CRANE
a. REFER TO PORTAL CRANE LOADING DIAGRAM ON S-003.
G. RAIN LOAD
1. RAIN INTENSITY: 3.5 IN/HR.
H. SNOW LOADS
1. GROUND SNOW LOAD: 10 PSF.
2. PUMP STATION 6 AND 8 FLAT-ROOF SNOW LOAD: 12 PSF.
3. EXPOSURE FACTOR: 1.0.
4. IMPORTANCE FACTOR: 1.2.
5. THERMAL FACTOR: 1.2.
6. PUMP STATION 6 AND 8 SLOPE FACTOR: 1.0.
I. WIND LOADS
1. BASIC DESIGN WIND SPEED: 132 MPH 3-SECOND GUST.
2. ALLOWABLE STRESS DESIGN WIND SPEED: 103 MPH 3-SECOND GUST.
3. EXPOSURE: D.
4. BUILDING CONDITION: ENCLOSED, GCpi = +/-0.18.
5. TOPOGRAPHIC FACTOR: 1.0.
6. DESIGN PRESSURES FOR EXTERIOR COMPONENTS AND CLADDING ARE INDICATED ON DRAWING 2-S-004.
5. GEOTECHNICAL INFORMATION:
A. SOURCES:
1. "REPORT OF SUBSURFACE EXPLORATION AND GEOTECHNICAL ENGINEERING SERVICES, P-678 DRY DOCK 8 SALTWATER FOR
CVN-78, GET SOLUTIONS INC., DATED 23 JUNE 2021 (GET PROJECT NUMBER VB20-261G)
2. "GEOTECHNICAL MEMORANDUM FOR THE PROPOSED NEW PUMP STATIONS, NEW SUBSTATIONS, GENERATORS, FUEL TANKS, AND UPGRADES TO THE EXISTING PUMPWELL FOR P-678 DRY DOCK 8 SALTWATER SYSTEM FOR CVN-78 CLASS SHIPS, PORTSMOUTH, VIRGINIA" DATED 21 JUNE 2021. (EMI PROJECT NUMBER 20-143)
B. SITE PREPARATION
1. PROVIDE EXCAVATION, FILL, AND BACKFILL IN ACCORDANCE WITH CONTRACT DRAWINGS AND SPECIFICATIONS, DIVISION 31.
2. NOTIFY CONTRACTING OFFICER'S REPRESENTATIVE WHEN LOOSE OR SOFT SOILS ARE EXPOSED WHERE SLABS, MATS, OR
FOOTINGS ARE TO BE PLACED SO THAT A DETERMINATION MAY BE MADE REGARDING IMPROVEMENT OF THIS POTENTIALLY
UNDESIRABLE CONDITION.
C. SOIL CHARACTERISTICS
1. UNIT WEIGHT: 122 PCF MOIST.
2. FROST PENETRATION: 9"
3. WATER TABLE DEPTH: APPROXIMATELY 6 TO 8 FEET BELOW EXISTING GRADES.
D. LATERAL EARTH PRESSURE
1. PUMP STATION 6
a. UNCONTROLLED FILL (0' - 41.5' BELOW GRADE)
1. AT-REST CONDITION, Ko: 0.56
2. ACTIVE CONDITION, Ka: 0.39
3. PASSIVE CONDITION, Kp: 2.66
b. YORKTOWN FORMATION (41.5' - 100' BELOW GRADE)
1. AT-REST CONDITION, Ko: 0.44
2. ACTIVE CONDITION, Ka: 0.28
3. PASSIVE CONDITION, Kp: 3.54
2. PUMP STATION 8
a. UNCONTROLLED FILL (0' - 36.5' BELOW GRADE)
1. AT-REST CONDITION, Ko: 0.39
2. ACTIVE CONDITION, Ka: 0.56
3. PASSIVE CONDITION, Kp: 2.66
b. UNCONTROLLED FILL (36.5' - 46.5' BELOW GRADE)
1. AT-REST CONDITION, Ko: 0.91 (0.79 EFFECTIVE)
2. ACTIVE CONDITION, Ka: 0.84 (0.66 EFFECTIVE)
3. PASSIVE CONDITION, Kp: 1.19 (1.52 EFFECTIVE)
c. YORKTOWN FORMATION (46.5' - 100' BELOW GRADE)
1. AT-REST CONDITION, Ko: 0.44
2. ACTIVE CONDITION, Ka: 0.28
3. PASSIVE CONDITION, Kp: 3.54
E. SLAB, MAT, AND FOOTING DESIGN PARAMETERS
1. MODULUS OF SUBGRADE REACTION: 20 PCI.
2. ALLOWABLE BEARING CAPACITIES
a. GRAVITY LOADS: 320 PSF.
3. MINIMUM BEARING DEPTH: 12".
F. STEEL PIPE PILES
1. PROVIDE IN ACCORDANCE WITH CONTRACT DRAWINGS AND SPECIFICATIONS, SECTION 31 62 16.13.
2. MINIMUM DESIGN CAPACITIES (FS=2.5)
a. SEE FOUNDATION DRAWINGS FOR PILE CAPACITIES USED AND TIP ELEVATIONS.
3. PILE DRIVIING
a. PDA TEST PILE LOCATION AS SHOWN ON PLANS
b. ONE TEST PILE IS REQUIRED AT EACH SITE STRUCTURAL EQUIPMENT FOUNDATION.
c. TEST PILE MUST BE DRIVEN PRIOR TO PRODUCTION PILES.
d. TEST PILE MUST BE AT LEAST 10 FT LONGER THAN INDICATED PILE LENGTH.
e. TEST PILE MUST BE RESTRUCK AFTER 14 DAYS.
f. FOR PILE CAPACITY SEE 2-SS504.
6. MATERIALS: SEE CONTRACT SPECIFICATIONS FOR COMPLETE REQUIREMENTS AND COMPLY WITH APPLICABLE OSHA REGULATIONS.
A. REINFORCED CONCRETE: SECTIONS 03 30 00
1. PREPARE AND PLACE REINFORCED CONCRETE IN ACCORDANCE WITH ACI MANUAL OF CONCRETE PRACTICE AS MODIFIED BY
CONTRACT DOCUMENTS.
2. CONCRETE
a. UNLESS NOTED OTHERWISE: MINIMUM 28-DAY COMPRESSIVE STRENGTH f'c = 4,500 PSI, NORMAL WEIGHT.
3. FORMWORK
a. CONTRACTOR IS RESPONSIBLE FOR DESIGN, ENGINEERING, STRUCTURAL ADEQUACY, AND CONSTRUCTION OF
CONCRETE FORMWORK IN ACCORDANCE WITH CONTRACT SPECIFICATIONS.
b. COORDINATE CONCRETE WORK WITH PLACEMENT OF PIPING, INSERTS, FLOOR DRAINS, AND OTHER EMBEDDED ITEMS
INDICATED ON CONTRACT DRAWINGS OR IN CONTRACT SPECIFICATIONS.
c. SLEEVE OR EXISTING PIPING OR UTILITIES PASSING THROUGH CONCRETE, UNLESS NOTED OTHERWISE. SEE OTHER
DISCIPLINE DRAWINGS FOR SLEEVE DETAILS. PROVIDE MEASURES TO ENSURE THAT SLEEVES REMAIN FREE OF DEBRIS
AND WATER DURING CONSTRUCTION.
d. PROVIDE 3/4" CHAMFER STRIPS ON EDGES OF EXPOSED CONCRETE, UNLESS NOTED OTHERWISE.
4. REINFORCING STEEL
a. BARS: ASTM A706 GRADE 60; GALVANIZED PER ASTM A767 CLASS 1, OR ASTM A1094.
(1) ASTM 767 REQUIRES THAT BARS BENT COLD PRIOR TO HOT DIP GALVANIZING MUST BE FABRICATED TO A MINIMUM
BEND DIAMETER EQUAL TO 7 IN FOR #7 BAR AND 8 IN FOR #8 BAR.
b. REINFORCE ALL CONCRETE UNLESS SPECIFICALLY MARKED "NOT REINFORCED" OR "UNREINFORCED".
c. DETAIL AND PLACE REINFORCEMENT IN ACCORDANCE WITH ACI SP-66, ACI 301, ACI 318, AND CRSI MANUAL OF
STANDARD PRACTICE. DO NOT INSERT REINFORCEMENT INTO FRESH OR PARTIALLY HARDENED CONCRETE.
d. PROVIDE MINIMUM CONCRETE CLEAR COVER OVER REINFORCEMENT AS FOLLOWS, UNLESS NOTED OTHERWISE:
(1) CONCRETE CAST IN PLACE & WALLS: 3".
(2) PRECAST CONCRETE: 2".
(3) INTERIOR CONCRETE (NOT EXPOSED): 1 1/2" MIN.
e. CONFORM EMBEDMENT AND LAP SPLICE LENGTHS TO TABLES AND DETAILS ON CONTRACT DRAWINGS, UNLESS
NOTED OTHERWISE.
f. PROVIDE ADDITIONAL REINFORCEMENT AT OPENINGS AND CORNER BARS AT INTERSECTING GRADE BEAMS, WALLS, AND CURBS IN ACCORDANCE WITH TYPICAL DETAILS ON CONTRACT DRAWINGS, UNLESS NOTED OTHERWISE.
g. EPOXY GROUT: ASTM C881, TYPE IV, GRADE 2 OR 3, WITH EMBEDMENT TO DEVELOP YIELD STRENGTH OF BAR, UNLESS
NOTED OTHERWISE.
A. REINFORCED CONCRETE (CONTINUED): SECTIONS 03 30 00
5. JOINTS
a. LOCATE CONSTRUCTION, CONTRACTION, ISOLATION, EXPANSION, AND OTHER JOINTS AS INDICATED OR SPECIFIED, OR
AS OTHERWISE APPROVED BY CONTRACTING OFFICER'S REPRESENTATIVE.
b. CLEAN SURFACES OF HORIZONTAL AND VERTICAL CONSTRUCTION JOINTS OF LAITANCE TO EXPOSE CLEAN COARSE AGGREGATE SOLIDLY EMBEDDED IN MORTAR MIX. JUST PRIOR TO DEPOSITING CONCRETE, THOROUGHLY CLEAN AND WET SURFACE OF CONSTRUCTION JOINT. THESE PROVISIONS MUST ALSO APPLY WHEN CONCRETE IS PLACED
AGAINST EXISTING CONCRETE.
c. IN ADDITION, WHEN CONCRETE IS PLACED AGAINST EXISTING CONCRETE, ADEQUATELY PREPARE SURFACE BY
ROUGHENING TO 1/4" AMPLITUDE AND APPLYING BONDING AGENT.
d. PROVIDE WATERSTOPS AT ALL CONCRETE JOINTS BELOW ELEVATION 109'-0", UNLESS NOTED OTHERWISE.
6. CONCRETE FILL
a. SELF-CONSOLIDATING CONCRETE FOR FILLING EXISTING TUNNELS AND FLUMES MUST HAVE A COMPRESSIVE STRENGTH (f'c) OF 3000 PSI MINIMUM AT 28 DAYS.
B. STRUCTURAL STEEL: SECTION 05 12 00
1. FABRICATE AND ERECT STRUCTURAL STEEL IN ACCORDANCE WITH AISC STEEL CONSTRUCTION MANUAL, 15th EDITION AND
AISC 303-16 - CODE OF STANDARD PRACTICE FOR STEEL BUILDINGS AND BRIDGES, AS MODIFIED BY CONTRACT
DOCUMENTS.
2. DESIGN AND PROVIDE TEMPORARY ERECTION BRACING AS REQUIRED, AND DO NOT REMOVE IT UNTIL ALL PERMANENT
LATERAL-LOAD-RESISTING ELEMENTS AND CONNECTIONS ARE COMPLETELY INSTALLED.
3. WIDE FLANGE SHAPES AND TEES: ASTM A992, Fy = 50 KSI.
4. OTHER SHAPES, PLATES, AND THREADED RODS
a. ASTM A36, Fy = 36 KSI, UNLESS NOTED OTHERWISE.
b. ASTM A572 GRADE 50, Fy = 50 KSI, WHERE INDICATED AS "(50)".
5. SQUARE AND RECTANGULAR HOLLOW STRUCTURAL SECTIONS: ASTM A500 GRADE C, Fy = 50 KSI.
6. ROUND HOLLOW STRUCTURAL SECTIONS: ASTM A500 GRADE C, Fy = 46 KSI.
7. PIPE: ASTM A53 TYPE E OR S, GRADE B, Fy = 35 KSI.
8. BOLTS
a. 3/4" DIAMETER ASTM F3125 GRADE A325 HOT-DIP GALVANIZED WITH DIRECT TENSION WASHERS, UNLESS NOTED
OTHERWISE.
b. FRAMING CONNECTIONS: PRETENSIONED JOINTS WITH STANDARD HOLES, UNLESS NOTED OTHERWISE.
c. BRACING CONNECTIONS: PRETENSIONED JOINTS WITH STANDARD HOLES, UNLESS NOTED OTHERWISE.
d. DIRECT TENSION INDICATOR WASHERS: ASTM F959.
e. ON ONE SIDE OF EACH DOUBLE CONNECTION OF BEAMS TO COLUMN WEB OR GIRDER WEB DIRECTLY OVER COLUMN, PROVIDE TEMPORARY SEAT ANGLE ATTACHED TO COLUMN OR GIRDER WEB AND TO BOTTOM FLANGE OF BEAM, MINIMUM L4X3X3/8 LLH WITH TWO BOLTS EACH LEG. SINGLE AND DOUBLE STAGGERED CONNECTIONS ARE PROHIBITED
WITHOUT EXPLICIT PRIOR APPROVAL IN WRITING FROM STRUCTURAL ENGINEER OF RECORD.
9. WELDING: AWS D1.1 USING E70 ELECTRODE, WITH LOW HYDROGEN WHERE REQUIRED.
10. HEADED STUDS
a. ASTM A108, GRADE 1015 OR 1020
11. ANCHOR RODS
a. ASTM F1554 GRADE 55 HOT-DIP GALVANIZED UNLESS SPECIFICALLY NOTED AS GRADE 36 OR 105.
b. LOCATE ANCHOR RODS ACCURATELY, SET WITH TEMPLATES, AND SECURELY HOLD IN POSITION WHILE PLACING
CONCRETE. PROTECT IN-PLACE ANCHOR RODS FROM CONSTRUCTION ACTIVITY.
c. THE FOLLOWING ARE PROHIBITED WITHOUT EXPLICIT PRIOR APPROVAL IN WRITING FROM STRUCTURAL ENGINEER OF
RECORD:
A. INSERTING ANCHOR RODS INTO FRESH OR PARTIALLY HARDENED CONCRETE.
B. SUBSTITUTING POST-INSTALLED ANCHORS WHERE EMBEDDED ANCHOR RODS ARE INDICATED.
C. REPAIRING, REPLACING, OR MODIFYING INSTALLED ANCHOR RODS.
12. POST-INSTALLED MECHANICAL ANCHORS
a. CARBON STEEL GALVANIZED PER ASTM A153 MANUALLY EXPANDED WEDGE TYPE, UNLESS NOTED OTHERWISE.
b. PROVIDE ANCHORS THAT HAVE BEEN TESTED AND ASSESSED IN ACORDANCE WITH LATEST EDITION OF APPLICABLE
ACCEPTANCE CRITERIA AND SUBMIT CORRESPONDING ICC EVALUATION SERVICE REPORTS
(1) MECHANICAL ANCHORS IN CONCRETE: ICC-ES AC193.
(2) EXPANSION ANCHORS IN MASONRY: ICC-ES AC01.
(3) PREDRILLED FASTENERS (SCREW ANCHORS) IN MASONRY: ICC-ES AC106.
13. POST-INSTALLED ADHESIVE ANCHORS
a. ASTM F1554 GRADE 55 HOT-DIP GALVANIZED THREADED ROD WITH ASTM C881 TYPE IV GRADE 3 EPOXY OR HYBRID
RESIN ADHESIVE (HILTI HIT-HY 200 OR APPROVED EQUIVALENT), UNLESS NOTED OTHERWISE.
b. DO NOT USE BULK-MIXED ADHESIVES. PROVIDE THREADED ROD COMPATIBLE WITH ADHESIVE AND ACCEPTABLE TO
MANUFACTURER.
c. DESIGN BOND STRENGTH HAS BEEN BASED ON CRACKED CONCRETE. SEE SPECIFICATION SECTION 05 05 20.00 27
POST INSTALLED CONCRETE AND MASONRY ANCHORS.
d. PROVIDE ANCHORS AS ENTIRE SYSTEM INCLUDING, BUT NOT LIMITED TO, MANUFACTURER'S PRINTED INSTRUCTIONS
AS FURNISHED WITH ADHESIVE, ADHESIVE CARTRIDGE, MIXING NOZZLE, EXTENSION TUBE, DISPENSER, AND ALL
REQUIRED EQUIPMENT FOR PROPERLY CLEANING DRILLED HOLE.
e. PROVIDE ANCHOR SYSTEMS THAT HAVE BEEN TESTED AND ASSESSED IN ACORDANCE WITH LATEST EDITION OF APPLICABLE ACCEPTANCE CRITERIA AND SUBMIT CORRESPONDING ICC EVALUATION SERVICE REPORTS
(1) ADHESIVE ANCHORS IN CONCRETE: ICC-ES AC308.
(2) ADHESIVE ANCHORS IN MASONRY: ICC-ES AC58.
(3) ANCHORS IN UNREINFORCED MASONRY: ICC-ES AC60.REFER TO ARCHITECTURAL DRAWINGS FOR
MISCELLANEOUS STEEL NOT INCLUDED IN STRUCTURAL DRAWINGS. INCLUDE MISCELLANEOUS STEEL IN SHOP
DRAWINGS SUBMITTED FOR REVIEW AND APPROVAL.
e. ANCHORS INSTALLED HORIZONTALLY OR UPWARDLY INCLUDED MUST BE INSTALLED BY A CERTIFIED ADHESIVE
ANCHOR INSTALLER.
f. INSTALLATIONS REQUIRING CERTIFIED INSTALLERS MUST BE INSPECTED DURING INSTALLATION BY AN INSPECTOR
SPECIFCALLY APPROVED FOR THAT PURPOSE BY THE CONTRACTING OFFICER.
14. REFER TO ARCHITECTURAL DRAWINGS FOR MISCELLANEOUS STEEL NOT INCLUDED IN STRUCTURAL DRAWINGS. INCLUDE
MISCELLANEOUS STEEL IN SHOP DRAWINGS SUBMITTED FOR REVIEW AND APPROVAL.
15. GROUT: CEMENTITIOUS NONSHRINK
16. HOT-DIP GALVANIZE STRUCTURAL AND MISCELLANEOUS STEEL, INCLUDING ALL FASTENERS, WITH THE EXCEPTION OF
STAINLESS STEEL.
17. RESTORE GALVANIZING DAMAGED ACCIDENTALLY OR DUE TO FIELD WELDING WITH FIELD-APPLIED GALVANIZING
COMPOUND.
18. GALVANIZE AND FABRICATE STEEL IN ACCORDANCE WITH ASTM 123, A384 AND A385. GALVANIZED AFTER FABRICATION, UNLESS NOT RECOMMENDED BY ASTM STANDARDS SPECIFIED. THOROUGHLY CLEAN WELD SLAG, WELD SPLATTER, OIL, GREASE, DIRT AND OTHER FOREIGN MATTER FROM SURFACES FOR GALVANIZING. PROVIDE DRAIN HOLES AND BRACING
PER ASTM A384 AS REQUIRED.
19. (+/- X) INDICATES TOP OF STEEL OFFSET FROM PLAN TOP OF STEEL ELEVATION.
GENERAL NOTES
4. DESIGN LOADS (CONTINUED):
J. EARTHQUAKE LOADS
1. MAPPED SPECTRAL RESPONSE ACCELERATION PARAMETERS Ss = 0.086, S1 = 0.04.
2. SITE CLASS: E.
3. DESIGN SPECTRAL RESPONSE ACCELERATION PARAMETERS Sds = 0.138, Sd1 = 0.112.
4. SEISMIC DESIGN CATEGORY: C.
5. IMPORTANCE FACTOR: 1.5.
6. ANALYSIS PROCEDURE: EQUIVALENT LATERAL FORCE.
7. PUMP STATION 6 AND 8 BASIC SEISMIC FORCE-RESISTING SYSTEM (PUMP STATIONS): ORDINARY REINFORCED CONCRETE
SHEAR WALLS.
8. PUMP STATION 6 AND 8 RESPONSE MODIFICATION COEFFICIENT (PUMP STATIONS): R = 4.
9. PUMP STATION 6 AND 8 SEISMIC RESPONSE COEFFICIENT (PUMP STATIONS): Cs = 0.0516.
10. PUMP STATION 6 AND 8 DESIGN BASE SHEAR (PUMP STATIONS): 53 KIPS.
11. SERVICEABILITY CRITERIA
STRUCTURAL STEEL FLOOR AND ROOF FRAMING DEFLECTION LIMIT:
a. L/240: TOTAL LOAD VERTICAL DEFLECTION
MONORAIL BEAMS
a. L/450: WHEEL LOAD VERTICAL DEFLECTION
WIND DRIFT FOR STRUCTURE
a. H/480 BASED ON A WIND SPEED WITH A 10-YEAR MEAN RECURRANCE INTERVAL
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L
F A
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S
Y S
T E
M S
C O
M M
A N
D
DRAWFORM REVISION: 25 AUGUST 2020
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
Y S
T E
M S
C O
M M
A N
D
M
ID
-A T
LA
N
TI
C
N A
V A
L S
T A
T
IO
N
N O
R F
O L
K V
A
AS NOTED
F
IL
E N
A M
E
P
LO
T T
E D
C
R e v it P ro je c ts
\D R
Y D
P -1
-S
-P S m w ri d e r.
rv t
/2
/2
:0 :3
P
M
2-S-001
P D
R Y
D O
C K
S
A L T
W A
T E
R S
Y S
T E
M
F O
R C
V N
-7
G E
N E
R A
L N
O
TE
S
RCP
12857855
AJM MWR
02/02/2022
DEVIN POULIN,
C984 FACILITIES PLANNER, NNSY
JTL/TLH
1364315
N40085-22-R-2598
P O
R T
S M
O U
T H
, V
IR
G
IN
IA
N
O R
F O
LK
N
A V
A L
S H
IP
Y
A R
D
EJA
NEK
DSN
S Y
M D
E S
C R
IP
T
IO
N
D A
T E
A P
P R
IS
S U
E D
F O
R C
O N
S T
R U
C T
IO
N
/2
8/
IS
SU
ED
F
OR
B
ID
6. MATERIALS (CONTINUED):
C. STEEL DECK: SECTION 05 30 00
1. FABRICATE, AND INSTALL STEEL DECK, ATTACHMENTS, AND ACCESSORIES IN ACCORDANCE WITH AISI COLD- FORMED STEEL DESIGN MANUAL AND APPLICABLE SDI MANUALS AS MODIFIED BY CONTRACT DOCUMENTS.
2. ROOF DECK: 1 1/2", 18 GAGE, WIDE RIB WITH MINIMUM Fy = 33 KSI, Imin = 0.283 IN^4/FT, Smin = 0.287 IN^3/FT, GALVANIZED G90.
3. NON-COMPOSITE FLOOR DECK: 2", 16 GAGE, WITH MINIMUM Fy = 40 KSI, Imin = 0.704 IN^4/FT, Smin = 0.653 IN^3/FT, GALVANIZED G90.
4. PROVIDE ROOF DECK AND ATTACHMENTS CAPABLE OF RESISTING THE FOLLOWING DIAPHRAGM SHEAR
FORCES.
a. WIND: 635 PLF AT ULTIMATE LEVEL, 1.0W, SIMULTANEOUS WITH UPLIFT LOADS INDICATED ON CONTRACT
DRAWINGS.
b. EARTHQUAKE: 415 PLF AT ULTIMATE LEVEL, 1.0E.
5. PROVIDE FLOOR DECK AND ATTACHMENTS CAPABLE OF RESISTING THE FOLLOWING DIAPHRAGM SHEAR
FORCES.
a. WIND: 1145 PLF AT ULTIMATE LEVEL, 1.0W.
b. EARTHQUAKE: 700 PLF AT ULTIMATE LEVEL, 1.0E.
6. INSTALL DECK TO CROSS A MINIMUM OF TWO SPANS. PROVIDE 2" MINIMUM LENGTH OF END LAPS FOR ROOF
DECK AND BEARING AT ALL SUPPORTS.
7. SUPPORT DECK AT EDGES OF OPENINGS AND AROUND COLUMNS. PROVIDE ADDITIONAL FRAMING AS REQUIRED AND FABRICATE DECK TO RUN CONTINOUSLY OVER MINOR OPENINGS. DO NOT CUT SUCH
OPENINGS UNTIL NEEDED BY OTHER TRADES.
8. PROVIDE MINIMUM DECK ATTACHMENT AS FOLLOWS.
a. ROOF DECK: FASTEN AT EACH END AND AT INTERMEDIATE SUPPORTS BY HILTI (OR EQUIVALENT) POWER-
ACTUATED FASTENERS, 36/4 PATTERN, AND MAKE SIDELAP CONNECTIONS AT SEAMS USING #10
SCREWS, 4 PER SPAN.
b. FLOOR DECK: FASTEN AT EACH END AND AT INTERMEDIATE SUPPORTS BY HILTI (OR EQUIVALENT) POWER-ACTUATED FASTENERS, 36/4 PATTERN, AND MAKE SIDELAP CONNECTIONS AT SEAMS USING #10
SCREWS, 4 PER SPAN.
c. MAKE CONNECTIONS ALONG SIDE BOUNDARIES, RIDGE PLATES, AND ROOF SUB FRAMING AT 6" ON
CENTER MAXIMUM.
d. USE HILTI (OR EQUIVALENT) POWER-ACTUATED FASTENERS AT END ANGLES.
9. DO NOT SUSPEND ANYTHING DIRECTLY FROM ROOF DECK OR FROM CONCRETE SLAB ON FLOOR DECK.
PROVIDE ADDITIONAL FRAMING BETWEEN ROOF OR FLOOR MEMBERS AS REQUIRED.
D. COLD-FORMED STEEL FRAMING: SECTION 05 40 00
1. DESIGN, FABRICATE, AND ERECT COLD-FORMED STEEL FRAMING IN ACCORDANCE WITH AISI COLD-FORMED STEEL DESIGN MANUAL AND APPLICABLE SSMA PUBLICATIONS AS MODIFIED BY CONTRACT DOCUMENTS.
2. SHAPE DESIGNATIONS FOR STUDS, JOISTS, TRACK, CHANNELS, AND FURRING CHANNELS: PER SSMA PRODUCT TECHNICAL INFORMATION, INDICATING MEMBER DEPTH, STYLE, FLANGE WIDTH, AND MATERIAL
THICKNESS.
3. FRAMING MEMBERS
a. ASTM A653 GRADE 33, Fy = 33 KSI, UNLESS NOTED OTHERWISE.
b. ASTM A653 GRADE 50, Fy = 50 KSI, FOR MATERIAL THICKNESS 54 MILS OR GREATER AND WHERE
INDICATED AS "(50)".
4. FINISH: HOT-DIP GALVANIZE TO PROVIDE COATING CLASS G90.
5. MECHANICAL FASTENERS: CORROSION-RESISTANT-COATED, SELF-DRILLING, SELF-THREADING STEEL DRILL
SCREWS WITH LOW PROFILE HEADS BENEATH SHEATHING AND MANUFACTURER'S STANDARD HEADS
ELSEWHERE.
6. BOLTS: ASTM F3125, GRADE A325.
7. WELDING: IN ACCORDANCE WITH AWS D1.1 OR D1.3, AS APPLICABLE.
8. POWER-ACTUATED FASTENERS: TESTED AND ASSESSED IN ACCORDANCE WITH LATEST EDITION OF ICC-ES
AC70. SUBMIT CORRESPONDING ICC EVALUATION SERVICE REPORT.
E. STEEL BAR GRATING: SECTION 05 53 00
1. FABRICATE AND INSTALL STEEL BAR GRATING IN ACCORDANCE WITH NAAMM MANUALS AS MODIFIED BY
CONTRACT DOCUMENTS.
2. MATERIAL: ASTM A1011, GALVANIZED.
3. CONSTRUCTION: WELDED.
4. MAIN BEARING BARS: 1 1/2" X 3/16" 19-W-4.
5. CROSS BARS: AT 4" CENTERS.
6. SURFACE: SERRATED.
7. FABRICATE GRATING IN SECTIONS NOT GREATER THAN 5 FT WIDE.
7. DEMOLITION NOTES:
A. PLANS, SECTIONS, AND DETAILS OF EXISTING STRUCTURES ARE BASED ON ORIGINAL CONSTRUCTION DOCUMENTS.
DIMENSIONS OF EXISTING CONSTRUCTION ARE APPROXIMATE. THE CONTRACTOR MUST VERIFY EXISTING
CONSTRUCTION PRIOR TO BEGINNING WORK.
B. PLANS AND DETAILS SHOWN ON THESE DEMOLITION DRAWINGS ARE FOR REFERENCE ONLY. CONTRACTOR IS
DIRECTED TO REFERENCE EXISTING DRAWINGS FOR ADDITIONAL INFORMATION.
C. COORDINATE WITH CIVIL, ARCHITECTURAL, MECHANICAL, AND ELECTRICAL DEMOLITION SHEETS.
D. EXISTING REINFORCING MUST NOT BE DISTURBED UNLESS OTHERWISE NOTED. SIZE AND LOCATION OF EXISTING
REINFORCING IS NOT SHOWN FROM ORIGINAL DESIGN DRAWINGS. IN AREAS WHERE EXISTING REINFORCING IS TO REMAIN, CONTRACTOR MUST SCAN TO VERIFY LOCATION OF REINFORCING. PROVIDE NOTIFICATION OF ANY
DISCREPENCIES PRIOR TO DEMOLITION AND DRILLING.
8. LEAD BASE PAINT AND HAZARDOUS MATERIALS ABATEMENT:
A. HAZARDOUS MATERIALS: SEE SPECIFICATIONS APPENDIX, "HAZMAT INSPECTION DRAWINGS AND LABORATORY
REPORTS," FOR TYPICAL LOCATIONS AND TYPES OF HAZARDOUS MATERIALS THAT MAY BE ENCOUNTERED. SEE DIVISION 2 SPECIFICATIONS FOR REMEDIATION AND HANDLING OF HAZARDOUS MATERIALS. PRIOR TO BEGINNING WORK, NOTIFY THE CONTRACTING OFFICER OF ANY ADDITIONAL MATERIALS OBSERVED THAT MAY POTENTIALLY
CONTAIN HAZARDOUS MATERIALS.
GENERAL NOTES CONTINUED
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L
F A
C
IL
IT
IE
S E
N G
IN
E
E R
S
T E
M S
C O
M M
A N
D
DRAWFORM REVISION: 25 AUGUST 2020
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
Y S
T E
M S
C O
M M
A N
D
M
ID
-A T
LA
N
TI
C
N A
V A
L S
T A
T
IO
N
N O
R F
O L
K V
A
AS NOTED
F
IL
E N
A M
E
P
LO
T T
E D
C
R e v it P ro je c ts
\D R
Y D
P -1
-S
-P S m w ri d e r.
rv t
/2
/2
:0 :3
P
M
2-S-002
P D
R Y
D O
C K
S
A L T
W A
T E
R S
Y S
T E
M
F O
R C
V N
-7
G E
N E
R A
L N
O
TE
S
RCP
12857856
AJM MWR
02/02/2022
DEVIN POULIN,
C984 FACILITIES PLANNER, NNSY
JTL/TLH
1364315
N40085-22-R-2598
P O
R T
S M
O U
T H
, V
IR
G
IN
IA
N
O R
F O
LK
N
A V
A L
S H
IP
Y
A R
D
EJA
NEK
DSN
S Y
M D
E S
C R
IP
T
IO
N
D A
T E
A P
P R
IS
S U
E D
F O
R C
O N
S T
R U
C T
IO
N
/2
8/
IS
SU
ED
F
OR
LETTER-NUMBER DESIGNATOR
INDICATES SHEET COORDINATES
WHERE TITLE IS LOCATED
DRAWING SEQUENCE NUMBER INDICATES
WHERE TITLE IS LOCATED (MAY NOT BE
PRESENT IF CALLOUT AND TITLE ARE ON
THE SAME DRAWING)
S-003 A1
OH
A1
DETAIL TITLE
1/8" = 1'-0"
A1
A-101
SECTION/DETAIL CALLOUT EXAMPLE
SECTION/DETAIL SYMBOL IDENTIFIERS
ONE OR TWO CHARACTER
DISCIPLINE DESIGNATOR
(MAY NOT BE PRESENT IF
CALLOUT AND TITLE ARE
ON DRAWINGS WITHIN THE
SAME DISCIPLINE)
SECTION, DETAIL, OR ELEVATION TITLE EXAMPLE
A1
A-101
ELEVATION CALLOUT EXAMPLEDETAIL CALLOUT EXAMPLE
S-003 A1
OH
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L
F A
C
IL
IT
IE
S E
N G
IN
E
E R
S
T E
M S
C O
M M
A N
D
DRAWFORM REVISION: 25 AUGUST 2020
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
Y S
T E
M S
C O
M M
A N
D
M
ID
-A T
LA
N
TI
C
N A
V A
L S
T A
T
IO
N
N O
R F
O L
K V
A
AS NOTED
F
IL
E N
A M
E
P
LO
T T
E D
C
R e v it P ro je c ts
\D R
Y D
P -1
-S
-P S m w ri d e r.
rv t
/2
/2
:0 :3
P
M
2-S-003
P D
R Y
D O
C K
S
A L T
W A
T E
R S
Y S
T E
M
F O
R C
V N
-7
LE
G
E N
D A
N D
A B
B R
E V
IA
T
IO
N
S
RCP
12857857
AJM MWR
02/02/2022
DEVIN POULIN,
C984 FACILITIES PLANNER, NNSY
JTL/TLH
1364315
N40085-22-R-2598
P O
R T
S M
O U
T H
, V
IR
G
IN
IA
N
O R
F O
LK
N
A V
A L
S H
IP
Y
A R
D
EJA
NEK
DSN
SECT SECTION
SEI STRUCTURAL ENGINEERING INSTITUTE
SF SWAY FRAME
SHT SHEET
SIM SIMILAR
SJI STEEL JOIST INSTITUTE
SLNT SEALANT
SLO SHORT LEG OUTSTANDING
SLV SLEEVE
SP SPACE(S)
SPEC SPECIFICATION(S)
SQ SQUARE
SSL SHORT-SLOT HOLE(S)
SST STAINLESS STEEL
ST SNUG-TIGHT JOINT
STD STANDARD
STIF STIFFENER
STIR STIRRUP
STL STEEL
STR STRAIGHT
STRUCT STRUCTURAL
SUB SUBSTITUTE
SUPT SUPPORT
SW SOUTHWEST
SYMM SYMMETRICAL
T TON(S) OR TREAD(S)
T&B TOP AND BOTTOM
TB THROUGH BOLT
TD TRENCH DRAIN
TEMP TEMPORARY
THD THREAD(ED)
THK THICK(NESS)
THRU THROUGH
TMS THE MASONRY SOCIETY
TOC TOP OF CONCRETE
TOM TOP OF MASONRY
TOS TOP OF STEEL
TOW TOP OF WALL
TP TEST PILE
TYP TYPICAL
UNO UNLESS NOTED OTHERWISE
VAR VARIES
VB VAPOR BARRIER
VERT VERTICAL
VNR VENEER
VR VAPOR RETARDER
W WEST OR WIDE (WIDTH) OR WIDE FLANGE SHAPE
W/ WITH
W/O WITHOUT
WH WEEP HOLE
WL WIND LOAD
WLD WELD(ED)
WP WORKING POINT
WS WATERSTOP
WT WEIGHT OR WIDE FLANGE TEE SHAPE
WWR WELDED WIRE REINFORCEMENT
X EXTRA STRONG
XX DOUBLE EXTRA STRONG
± DIMENSION TO BE VERIFIED IN FIELD
NAAMM NATIONAL ASSOCIATION OF ARCHITECTURAL METAL
MANUFACTURERS
NAVD NORTH AMERICAN VERTICAL DATUM
NCMA NATIONAL CONCRETE MASONRY ASSOCIATION
NE NORTHEAST
NF NEAR FACE
NIC NOT IN CONTRACT
NO NUMBER
NOM NOMINAL
NS NEAR SIDE
NTS NOT TO SCALE
NW NORTHWEST
OC ON CENTER
OD OUTSIDE DIAMETER
OF OUTSIDE FACE
OPH OPPOSITE HAND
OPNG OPENING
OPP OPPOSITE
OR OUTSIDE RADIUS
OSHA OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION
OVS OVERSIZE HOLE(S)
PAR PARALLEL
PCA PORTLAND CEMENT ASSOCIATION
PCC PRECAST CONCRETE
PCF POUND(S) PER CUBIC FOOT
PCI POUND(S) PER CUBIC INCH OR PRECAST/PRESTRESSED
CONCRETE INSTITUTE
PED PEDESTAL
PERP PERPENDICULAR
PH PHASE
PL PLATE
PLBG PLUMBING
PLC PLACE(S)
PLF POUND(S) PER LINEAR FOOT
PREFAB PREFABRICATE(D)
PREP PREPARATION
PS PIPE SUPPORT
PSF POUND(S) PER SQUARE FOOT
PSI POUND(S) PER SQUARE INCH
PT PRETENSIONED JOINT
PUR PURLIN
PVC POLYVINYL CHLORIDE
QA QUALITY ASSURANCE
QC QUALITY CONTROL
R RADIUS OR RISER(S)
RD ROOF DRAIN
REBAR REINFORCING STEEL BAR(S)
REF REFERENCE
REINF REINFORCE(D)
REQD REQUIRED
REV REVISION
RF ROOF
RM ROOM
RST REINFORCING STEEL
S SECTION MODULUS OR SOUTH OR AMERICAN STANDARD
BEAM SHAPE
SB SHEAR BAR
SC SLIP-CRITICAL JOINT
SCHED SCHEDULE
SDI STEEL DECK INSTITUTE
SE SOUTHEAST
GEN GENERAL
GOVT GOVERNMENT
GR GRADE
GRTG GRATING
GT GROUT
H HIGH (HEIGHT)
HB HORIZONTAL BRACE
HC HOLLOW CORE
HGR HANGER
HORIZ HORIZONTAL
HP BEARING PILE SHAPE
HPT HIGH POINT
HS HIGH STRENGTH
HSS HOLLOW STRUCTURAL SECTION
I MOMENT OF INERTIA
IBC INTERNATIONAL BUILDING CODE
ID INSIDE DIAMETER
IF INSIDE FACE
IJ ISOLATION JOINT
IN INCH(ES)
INFO INFORMATION
INT INTERIOR
INV INVERT
IR INSIDE RADIUS
JST JOIST
JT JOINT
KB KNEE BRACE
KIP THOUSAND POUNDS
KLF KIP(S) PER LINEAR FOOT
KPL KICK PLATE
KSF KIP(S) PER SQUARE FOOT
KSI KIP(S) PER SQUARE INCH
L ANGLE SHAPE OR LENGTH
LAD LADDER
LBS POUND(S)
LD DEVELOPMENT LENGTH
LG LONG
LL LIVE LOAD
LLH LONG LEG HORIZONTAL
LLO LONG LEG OUTSTANDING
LLV LONG LEG VERTICAL
LONG LONGITUDINAL
LPT LOW POINT
LSL LONG-SLOT HOLE(S)
LTWT LIGHTWEIGHT
MATL MATERIAL
MAX MAXIMUM
MBMA METAL BUILDING MANUFACTURERS ASSOCIATION
MBS METAL BUILDING SYSTEM
MC MISCELLANEOUS CHANNEL SHAPE OR MOMENT
CONNECTION
MECH MECHANICAL
MEZZ MEZZANINE
MFR MANUFACTURER
MIN MINIMUM
MISC MISCELLANEOUS
MPS MISCELLANEOUS PIPE SUPPORT(S)
MSL MEAN SEA LEVEL
MTL METAL
N NORTH
NA NOT APPLICABLE
COTR CONTRACTING OFFICER'S TECHNICAL REPRESENTATIVE
CPRS COMPRESSIBLE
CRSI CONCRETE REINFORCING STEEL INSTITUTE
CTJ CONTRACTION JOINT
CTR CENTER(ED)
CY CUBIC YARD(S)
D DEEP (DEPTH)
DBL DOUBLE
DEG DEGREE(S)
DEMO DEMOLISH (DEMOLITION)
DET DETAIL
DIA DIAMETER
DIAG DIAGONAL
DIM DIMENSION
DIR DIRECTION
DIV DIVISION
DK DECK
DL DEAD LOAD
DWG DRAWING
DWL DOWEL
E EAST
EA EACH
EF EACH FACE
EJ EXPANSION JOINT
EL ELEVATION
EL EARTHQUAKE LOAD
ELEC ELECTRICAL
ELEV ELEVATOR
EMBED EMBEDMENT
ENGR ENGINEER
EOD EDGE OF DECK
EOG EDGE OF GRATING
EOS EDGE OF SLAB
EQ EQUAL
EQUIP EQUIPMENT
EQUIV EQUIVALENT
ETC AND SO FORTH
EW EACH WAY
EXP EXPANSION
EXST EXISTING
EXT EXTERIOR OR EXTERNAL
EXTN EXTENSION
FAB FABRICATE
FD FLOOR DRAIN
FDTN FOUNDATION
FF FAR FACE
FIN FINISH
FLG FLANGE
FLR FLOOR
FR FRAME
FRMG FRAMING
FRP FIBER-REINFORCED POLYMER
FS FAR SIDE
FT FOOT (FEET)
FTG FOOTING
FUT FUTURE
GA GAGE
GALV GALVANIZE(D)
GB GRADE BEAM
GC GENERAL CONTRACTOR
GDR GUARDRAIL
# NUMBER OR POUND(S)
% PERCENT
& AND
(+/-) DIMENSIONAL TOLERANCE
@ AT
AA ALUMINUM ASSOCIATION
AB ANCHOR BOLT
ACI AMERICAN CONCRETE INSTITUTE
ADDL ADDITIONAL
ADH ADHESIVE
ADJ ADJACENT
AFF ABOVE FINISH FLOOR
AGGR AGGREGATE
AHJ AUTHORITY HAVING JURISDICTION
AHR ANCHOR
AISC AMERICAN INSTITUTE OF STEEL CONSTRUCTION
AISI AMERICAN IRON AND STEEL INSTITUTE
ALT ALTERNATE
ALUM ALUMINUM
ANSI AMERICAN NATIONAL STANDARDS INSTITUTE
APPD APPROVED
APPROX APPROXIMATE
ARCH ARCHITECT(URAL)
ASCE AMERICAN SOCIETY OF CIVIL ENGINEERS
ASTM ASTM INTERNATIONAL
AWS AMERICAN WELDING SOCIETY
B/B BACK TO BACK
BC BOLT CIRCLE
BFF BELOW FINISH FLOOR
BLDG BUILDING
BLW BELOW
BM BEAM
BOS BOTTOM OF STEEL
BOT BOTTOM
BRCG BRACING
BRDG BRIDGING
BRG BEARING
BTWN BETWEEN
C CHANNEL SHAPE
C TO C CENTER TO CENTER
CAP CAPACITY
CFS COLD-FORMED STEEL
CHFR CHAMFER
CIP CAST-IN-PLACE
CIR CIRCLE
CJ CONSTRUCTION JOINT
CJP COMPLETE JOINT PENETRATION
CL CENTER LINE
CLJ CONTROL JOINT
CLL COLUMN LINE
CLR CLEAR
CMPST COMPOSITE
CMU CONCRETE MASONRY UNIT
CNR CORNER
COL COLUMN
CONC CONCRETE
CONN CONNECTION
CONSTR CONSTRUCTION
CONT CONTINUOUS
CONTR CONTRACTOR
COORD COORDINATE
CALLOUT IDENTIFICATION
ABBREVIATIONS
PORTAL CRANE LOADING DIAGRAM
S Y
M D
E S
C R
IP
T
IO
N
D A
T E
A P
P R
IS
S U
E D
F O
R C
O N
S T
R U
C T
IO
N
/2
8/
IS
SU
ED
F
OR
2a
2a 2a a
NOTE:
1. REFER TO WIND ISOMETRIC - SOUTHEAST CORNER FOR WIND ZONES NOT LABELED.
TYP, UNO
a
2a a
4a a
2a
4a
TYP UNO
a
4a
4a 2a
2a a
2a
2a
NOTE:
1. REFER TO WIND ISOMETRIC - NORTHWEST CORNER FOR WIND ZONES NOT LABELED.
2a
2a a
2P 3P4P 5P
SATISFACTORY TO DATE
APPROVED
ACTIVITY
FOR COMMANDER NAVFAC
SEAL
A/E INFO
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
DES DRW CHK
OF
EPROJECT NO.:
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y N
A V
A L
F A
C
IL
IT
IE
S E
N G
IN
E
E R
S
T E
M S
C O
M M
A N
D
DRAWFORM REVISION: 25 AUGUST 2020
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
Y S
T E
M S
C O
M M
A N
D
M
ID
-A T
LA
N
TI
C
N A
V A
L S
T A
T
IO
N
N O
R F
O L
K V
A
AS NOTED
F
IL
E N
A M
E
P
LO
T T
E D
C
R e v it P ro je c ts
\D R
Y D
P -1
-S
-P S m w ri d e r.
rv t
/2
/2
:0 :3
P
M
2-S-004
P D
R Y
D O
C K
S
A L T
W A
T E
R S
Y S
T E
M
F O
R C
V N
-7
P U
M P
S T
A T
IO
N
A
N D
W
IN
D
IS
O
M E
TR
IC
D
IA
G R
A M
S
RCP
12857858
AJM MWR
02/02/2022
DEVIN POULIN,
C984 FACILITIES PLANNER, NNSY
JTL/TLH
1364315
N40085-22-R-2598
P O
R T
S M
O U
T H
, V
IR
G
IN
IA
N
O R
F O
LK
N
A V
A L
S H
IP
Y
A R
D
EJA
NEK
DSN
1. REFER TO GENERAL NOTES SHEET 2-S-001 FOR WIND LOAD DESIGN CRITERIA.
2. WIND PRESSURES ARE AT ULTIMATE LEVEL AND APPLY NORMAL TO MEMBER SURFACE.
3. PLUS AND MINUS (+/-) SIGNS SIGNIFY PRESSURES ACTING TOWARD AND AWAY FROM
SURFACE RESPECTIVELY.
4. DESIGN EACH COMPONENT FOR MAXIMUM POSITIVE AND NEGATIVE PRESSURES.
5. COMBINE PARAPET PRESSURES IN ACCORDANCE WITH ASCE 7-16 FIGURE 30.8-1.
6. "a" = 3 FEET.
7. INTERPOLATION IS PERMITTED FOR WIND PRESSURES NOT LISTED BETWEEN 10FT2 AND
500FT2.
WIND LOAD NOTES:
NOT TO SCALE
A1
WIND ISOMETRIC - NORTHWEST CORNER
2'
3'
3'
2'
2'
5 5
NOT TO SCALE
B1
WIND ISOMETRIC - SOUTHEAST CORNER
5 5
3'
3'
2'
2'
2'
NOT TO SCALE
C4
WIND ISO PARAPET
5P' 174 158 138 121 117
5P 138 127 116 103 99
4P' 129 126 122 117 112
4P 115 111 108 103 99
5 49 -65 47 -61 45 -55 41 -51 36 -41
4 49 -53 47 -51 45 -49 41 -45 36 -41
3' 22 -125 19 -112 18 -94 17 -80 17 -80
3 22 -89 19 -80 18 -71 17 -62 17 -62
2' 22 -80 19 -79 18 -78 17 -76 17 -76
2 22 -67 19 -64 18 -63 17 -62 17 -62
1 22 -58 19 -58 18 -58 17 -58 17 -58
(MIN) (MAX) (MIN) (MAX) (MIN) (MAX) (MIN) (MAX) (MIN) (MAX)WIND ZONE
10 SF 20 SF 50 SF 100 SF 500 SF
DESIGN WIND PRESSURES (PSF)
S Y
M D
E S
C R
IP
T
IO
N
D A
T E
A P
P R
IS
S U
E D
F O
R C
O N
S T
R U
C T
IO
N
/2
8/
IS
SU
ED
F
OR
D E
P A
R
TM
E N
T O
F
TH
E N
A V
Y
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S Y
S
TE
M S
C O
M M
A N
D
DES DRW
S Y
M D
E S
C R
IP
TI
O N
D A
TE
A
P P
R
DRAWFORM REVISION: 25 AUG 2020
CHK
OF
EPROJECT NO.:
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
NA
VA
L
FA
CI
LI
TI
ES
E
NG
IN
EE
RI
NG
S
YS
TE
M
S
CO
M M
AN
D
M
ID
-A
TL
AN
TI
C
NA
VA
L
ST
AT
IO
N
- N
OR
FO
LK
, V
A
NO
RF
O
LK
N
AV
AL
S
HI
PY
AR
D
PO
RT
SM
O
UT
H, V
IR
G
IN
IA
P
D
R Y
D O
C K
S A
LT
W
A
TE
R S
Y S
TE
M
FO
R
C V
N -7
JTL/TLH
EJA
DSN
1364315
N40085-22-R-2598
DEVIN POULIN,
C984 FACILITIES PLANNER, NNSY
02/02/2022
IS
SU
ED
F
OR
B
ID
/2
8/
NORTH
PLAN
KEY PLAN
4 5
11 12
2 3
13 14
MATCH LINE
A1/2-SD115
SHEET NOTES
SCALE: 1" = 20'
WATERFRONT STRUCTURAL SITE DEMOLITION PLAN - AREA 10A1
PLAN
NORTH
40'10'0 20'
STAGE 2 DEMO2-SD402
A1
NORTH FLOOD FLUME
DEMO LIMITS 2-SD404
C1
PUMP STATION PS-6
STAGE1 DEMO LIMITS
STAGE 1 DEMO2-SD401
A1
PUMP STATION PS-6
STAGE 2 DEMO LIMITS
(INCLUDES STAGE 1 LIMITS)
17' -11
84' -4"
6'-9"±
8'-5"±
87'-9"±
7'-5"±
36' -0"
(E) PUMP HOUSE, DEMOLISH
TO (E) RELIEVING PLATFORM,
SEE NOTE 3
(E) INTAKE STRUCTURE,
SEE NOTE 4
1. SEE SHEET 1-VF001 FOR SURVEY NOTES, ABBREVIATIONS, AND
LEGEND.
2. SEE SHEETS 1-C-001 THROUGH 1-C-005 FOR CIVIL NOTES AND
LEGENDS.
3. REFER TO Y&D DRAWING NO. 165165, #515, AND N-SD75 FOR QUAY WALL
PILE PLANS (#515 DATED 8-21-1941 BY DRY DOCK ASSOCIATES).
4. REFER TO Y&D RECORD DRAWINGS NO. 958662, 958663 AND 958664
FOR INFORMATION OF EXISTING INTAKE STRUCTURE AND
PUMPHOUSE.
5. KTR SURVEYOR IS RESPONSIBLE FOR CONFIRMING WORK POINTS IN
FIELD PRIOR TO START OF DEMO.
7'-9"±
2-SD406
C1
45'-0"±
'-3
WP 2 (NORTH FLOOD
FLUME), SEE NOTE 5
N = 3462829.21 E = 12127745.46
WP (PUMP STATION PS-6)
AT TOP OF WHARF,
SEE NOTE 5
N = 3462938.41 E = 12127783.41
8'-5
2-SD406
C3
DLB
BA TNT2 WMS
12857859
ST
RU
CT
UR
AL
F
OU
ND
AT
IO
N
DE
M O
PL
AN
PU
M P
ST
AT
IO
N
PS
-6
AR
EA
2-SD110
AS NOTED
W x
W x
W x
W x Wx
Wx
Wx
Wx
SW
x
SW
x
SW
x
SW
x
SW
x
SW
x
SW
x
SW
x
SWx
SW
x
SWx
SD
x
SD
x
SD
x
SDx SDx
SSx
SDx
SD x
SD x
BASE ROADWAY
MCCAWLEY STREET
S D
S D
S D
S D
TL
TL
TL
TL
TL
D E
P A
R
TM
E N
T O
F
TH
E N
A V
Y
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S Y
S
TE
M S
C O
M M
A N
D
DES DRW
S Y
M D
E S
C R
IP
TI
O N
D A
TE
A
P P
R
DRAWFORM REVISION: 25 AUG 2020
CHK
OF
EPROJECT NO.:
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
NA
VA
L
FA
CI
LI
TI
ES
E
NG
IN
EE
RI
NG
S
YS
TE
M
S
CO
M M
AN
D
M
ID
-A
TL
AN
TI
C
NA
VA
L
ST
AT
IO
N
- N
OR
FO
LK
, V
A
NO
RF
O
LK
N
AV
AL
S
HI
PY
AR
D
PO
RT
SM
O
UT
H, V
IR
G
IN
IA
P
D
R Y
D O
C K
S A
LT
W
A
TE
R S
Y S
TE
M
FO
R
C V
N -7
JTL/TLH
EJA
DSN
1364315
N40085-22-R-2598
DEVIN POULIN,
C984 FACILITIES PLANNER, NNSY
02/02/2022
IS
SU
ED
F
OR
B
ID
/2
8/
SHEET NOTES
NORTH
PLAN
KEY PLAN
MATCH LINE
A1/2-SB110
4 5
11 12
2 3
13 14
PUMP STATION PS-8
DEMO LIMITS
1. SEE SHEET 1-VF001 FOR SURVEY NOTES, ABBREVIATIONS, AND
LEGEND.
2. SEE SHEETS 1-C-001 THROUGH 1-C-005 FOR CIVIL NOTES AND
LEGENDS.
3. REFER TO Y&D RECORD DRAWINGS NO. 958658, 958659 AND 958660
FOR INFORMATION OF EXISTING INTAKE STRUCTURE AND EXISTING
PUMP HOUSE.
4. KTR SURVEYOR IS RESPONSIBLE FOR CONFIRMING WORK POINTS IN
FIELD PRIOR TO START OF DEMO.
SCALE: 1" = 20'
WATERFRONT STRUCTURAL FOUNDATION DEMOLITION PLAN - AREA 15A1
PLAN
NORTH
40'10'0 20'
2-SD403
A1
SOUTH FLOOD FLUME
CONC PLUG AND OUTFALL
PIPES, SEE 1-SB115
CONC SLAB,
SEE 1-SB115
(E) PUMP HOUSE, SEE
DRAWINGS FOR DEMOLITION
ABANDON EXISTING
INTAKE STRUCTURE,
SEE NOTE 3
2-SD407
C1
PS-8 FOUNDATION AND
INTAKE STRUCTURES
(E) FLUME WALL
C1
2-SD303
B1
2-SD303
A1
2-SD303
WP, SEE NOTE 4
N = 3462571.46 E = 12127959.86
142'-0"±
'-2
DLB
BA TNT2 WMS
12857860
ST
RU
CT
UR
AL
F
OU
ND
AT
IO
N
DE
M O
PL
AN
PU
M P
ST
AT
IO
N
PS
-8
AR
EA
2-SD115
A
E
P A
R
TM
E N
T O
F
TH
E N
A V
Y
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S Y
S
TE
M S
C O
M M
A N
D
DES DRW
S Y
M D
E S
C R
IP
TI
O N
D A
TE
A
P P
R
DRAWFORM REVISION: 25 AUG 2020
CHK
OF
EPROJECT NO.:
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
NA
VA
L
FA
CI
LI
TI
ES
E
NG
IN
EE
RI
NG
S
YS
TE
M
S
CO
M M
AN
D
M
ID
-A
TL
AN
TI
C
NA
VA
L
ST
AT
IO
N
- N
OR
FO
LK
, V
A
NO
RF
O
LK
N
AV
AL
S
HI
PY
AR
D
PO
RT
SM
O
UT
H, V
IR
G
IN
IA
P
D
R Y
D O
C K
S A
LT
W
A
TE
R S
Y S
TE
M
FO
R
C V
N -7
JTL/TLH
EJA
DSN
1364315
N40085-22-R-2598
DEVIN POULIN,
C984 FACILITIES PLANNER, NNSY
02/02/2022
IS
SU
ED
F
OR
B
ID
/2
8/
(E) CONC SHEET
PILE BULKHEAD
(E) TIMBER PILE TYP
EL 103.0±
(E) GRAD
4' 8'0 2'SCALE: 1/4" = 1'-0"
DEMOLITION SECTIONA1 S-SD401
SHEET NOTES
1. SEE SHEET 1-SB001 THROUGH 1-SB004 FOR STRUCTURAL NOTES,
ABBREVIATIONS, LEGEND, AND TYPICAL DETAILS.
2. PUMP STATION PS-6 FOUNDATION DEMOLITION AND CONSTRUCTION
SEQUENCING SEPARATED INTO STAGES/PHASES AS SHOWN ON
SHEETS 2-SD401, 2-SD402, AND 2-SB401.
EL 94.3±
TOP OF (E) CONC
SHEET PILE AND
RELIEVING SLAB
EL 103.0±
(E) GRADE
EL 93.28
(MLLW)
EL 93.42
(MLW)
EL 96.18
(MHW)
EL 96.39
(MHHW)
SCALE: 1/4" = 1'-0"
DEMOLITION SECTIONA4 2-SD401 4' 8'0 2'
0 4' 8' 12'SCALE: 3/16" = 1'-0"
DEMOLITION SECTIONC1 2-SD401
TYP 12 TYP14
CLEAT 8BOLLARD8 (E) CLEAT TO REMAIN
TYP 11
TYP 15
(E) TIMBER PILE, TYP
(E) TIMBER BEAM, TYP
(E) TIMBER DECK, TYP
BOTTOM OF (E)
CONC CAP, TYP
TOP OF (E) CONC
CAP, TYP
(E) CONC SHEET
PILE BULKHEAD
OUTFALL
LOCATION 13
4'-0" 62'-11"± 2'-0"
1. EXCAVATE TO EXPOSE THE (E) RELIVING PLATFORM TO FIRST ROW
OF BATTER PILES.
2. DEMOLISH (E) RELIEVING PLATFORM DECK AND BEAMS FOR
INSTALLATION OF AZ SSP WALL.
3. DEMOLISH (E) DECK TO EXPOSE LOCATIONS OF BATTER
PILES.
4. CUT (E) TIMBER BATTER PILES WITH CHISEL BEAM FOR INSTALLATION
OF SSP WALL.
5. REMOVE INDICATED (E) TIMBER FENDER PILE SYSTEM AND (E) CURB.
6. CONSTRUCT SSP WALL PARALLEL TO THE EXISTING CONCRETE
SHEET PILING.
7. CONSTRUCT TEMPORARY STEEL COMBI-WALL COFFERDAM
OUTBOARD OF EXISTING CONCRETE SHEETS. SEE SHEET 2-SD405
FOR DETAILS.
8. REMOVE (E) MOORING HARDWARE, (1) DOUBLE BIT BOLLARD AND (1)
CLEAT.
9. NOT USED.
10. UNCOVER (E) UTILITY TUNNEL, CAP OFF AND DEMOLISH PIPED
UTILITIES. DISCONNECT AND DEMOLISH ELECTRICAL UTILITIES.
11. DEMOLISH (E) RELIEVING PLATFORM DECK FOR INSTALLATION
OF SSP WALL.
12. DEMOLISH (E) PILE CAP/TUNNEL FOR INSTALLATION OF SSP WALL.
13. CORE DRILL 18"Ø HOLE INLAND SIDE AND WATER SIDE WALLS OF (E)
TUNNEL FOR INSTALLATION OF 15"Ø OUTFALL. COORDINATE
LOCATION WITH CIVIL.
14. CLOSE (E) TUNNEL WITH REINFORCED CONCRETE PLUG (#9 @ 12" OC,
EW, T&B). SEE 2-SD401 FOR PLUG THICKNESS.
15. CONSTRUCT THE SSP PERPENDICULAR TO THE EXISTING CONCRETE
SHEET PILING. FINISH ENCLOSURE WITH CONC PLUG.
(E) TIMBER BATTER PILE, TYP
EL 103.0±
(E) GRADE
STAGE 1 SEQUENCE OF
DEMOLITION/CONSTRUCTION
EL 98.33
TOP OF SSP
EL 43.33
TIP OF SSP
(SEE SHEET 2-SD302 FOR STAGE 2 SEQUENCE OF DEMOLITION SECTIONS)
EL 32.0
TIP OF COMB-WALL
TYP 4
4'-
2" DLB
BA TNT2 WMS
12857861
PU
M
P
ST
AT
IO
N
PS
-6 F
OU
ND
AT
IO
N
DE
M
OL
IT
IO
N
SE
CT
IO
NS
ST
AG
E
2-SD301
rwhitsel Callout
(E) CONCRETE CAP
NOT SHOWN
P A
R
TM
E N
T O
F
TH
E N
A V
Y
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S Y
S
TE
M S
C O
M M
A N
D
DES DRW
S Y
M D
E S
C R
IP
TI
O N
D A
TE
A
P P
R
DRAWFORM REVISION: 25 AUG 2020
CHK
OF
EPROJECT NO.:
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
NA
VA
L
FA
CI
LI
TI
ES
E
NG
IN
EE
RI
NG
S
YS
TE
M
S
CO
M M
AN
D
M
ID
-A
TL
AN
TI
C
NA
VA
L
ST
AT
IO
N
- N
OR
FO
LK
, V
A
NO
RF
O
LK
N
AV
AL
S
HI
PY
AR
D
PO
RT
SM
O
UT
H, V
IR
G
IN
IA
P
D
R Y
D O
C K
S A
LT
W
A
TE
R S
Y S
TE
M
FO
R
C V
N -7
JTL/TLH
EJA
DSN
1364315
N40085-22-R-2598
DEVIN POULIN,
C984 FACILITIES PLANNER, NNSY
02/02/2022
IS
SU
ED
F
OR
B
ID
/2
8/
(E) CONC SHEET
PILE BULKHEAD
(E) TIMBER PILE, TYP
EL 103.0±
(E) GRAD
4' 8'0 2'SCALE: 1/4" = 1'-0"
DEMOLITION SECTIONA1 2-SD402
SHEET NOTES
EL 94.3±
TOP OF (E) CONC
SHEET PILE AND
RELIEVING SLAB
EL 103.0±
(E) GRADE
EL 93.28
(MLLW)
EL 93.42
(MLW)
EL 96.18
(MHW)
EL 96.39
(MHHW)
1. SEE SHEET 1-SB001 THROUGH 1-SB004 FOR STRUCTURAL NOTES,
ABBREVIATIONS, LEGEND, AND TYPICAL DETAILS.
2. PUMP STATION PS-6 FOUNDATION DEMOLITION AND CONSTRUCTION
SEQUENCING SEPARATED INTO STAGES/PHASES AS SHOWN ON
SHEETS 2-SD401, 2-SD402, AND 2-SB401.
STAGE 2 SEQUENCE OF
DEMOLITION/CONSTRUCTION
16. SEAL TEMPORARY COMBI-WALL COFFERDAM, PUMP DOWN SUCH
THAT WATER LEVEL IS BELOW DEPTH OF INTAKE STRUCTURE
EXCAVATION. SEE STAGE 1 SEQUENCE OF DEMOLITION NOTE 7 ON
SHEET 2-SD401.
17. DEMOLISH (E) RELIEVING PLATFORM DECK, TIMBER BEAMS
AND CUT TIMBER PILES FOR INSTALLATION OF PIPE PILES.
18. SELECTIVE DEMOLITION OF (E) CONCRETE PILE CAP, TIMBER BEAM
AND TIMBER PILES TO ACCESS STEEL PIPE PILE DRIVING LOCATIONS.
SEE SHEET 2-SB401 FOR STEEL PIPE PILE LOCATIONS.
19. DEMOLISH SECTION OF EXISTING CONCRETE PILE CAP FOR PHASE 1
CONCRETE CAP RECONSTRUCTION. SEE SHEET 2-SB401 FOR PHASE1
CONCRETE PILE CAP.
20. CONSTRUCT TIE BEAMS, CONNECT TO PHASE 1 CONCRETE PILE CAP
TO STABILIZING THE EXISTING SHEET PILING BEFORE THE BALANCE
OF THE RELIEVING PLATFORM IS DEMOLISHED. SEE SHEET 2-SB401.
21. DEMOLISH REMAINING (E) CONCRETE PILE CAP FOR CONSTRUCTION
OF INTAKE STRUCTURES.
22. CONSTRUCT INTAKE STRUCTURES. SEE SHEET 2-SB401.
23. CONTINUE RELIEVING PLATFORM EXCAVATION FOR PS-6 FOUNDATION
CONSTRUCTION.
24. SELECTIVELY DEMOLISH PORTIONS OF RELIEVING PLATFORM TO
DRIVE PILING. ADJUST STEEL PILING AS REQUIRED TO AVOID PULLING
TIMBER PILES. SEE SHEET 2-SB401.
25. DRIVE ALL FOUNDATION PILES. ADJUST STEEL PILING AS REQUIRED
TO AVOID PULLING (E) TIMBER PILES. SEE SHEET 2-SB401.
26. BACKFILL WITH #57 STONE BELOW MLLW AND #21A/B ABOVE MLLW.
27. FORM AND POUR PS-6 FOUNDATIONS, CONNECTING TIE BEAMS TO
PUMP STATION FOUNDATION. SEE SHEET 2-SB401.
EL 79.5±
(E) TIMBER PILE CUT OFF
(E) CONC SHEET
PILE BULKHEAD
(E) TIMBER PILE, TYP
4' 8'0 2'SCALE: 1/4" = 1'-0"
DEMOLITION SECTIONC1 2-SD402
EL 93.28
(MLLW)
EL 93.42
(MLW)
EL 96.18
(MHW)
EL 96.39
(MHHW)
EL 79.5±
(E) TIMBER PILE CUT OFF
EL 103.0±
(E) GRADE
(SEE SHEET 2-SD301 FOR STAGE 1 SEQUENCE OF DEMOLITION SECTIONS)
EL 98.33
TOP OF SSP
EL 43.33
TIP OF SSP
DLB
BA TNT2 WMS
12857862
PU
M
P
ST
AT
IO
N
PS
-6 F
OU
ND
AT
IO
N
DE
M
OL
IT
IO
N
SE
CT
IO
NS
ST
AG
E
2-SD302
AS NOTED
SEE "STAGE 1 SEQUENCE OF DEMOLITION/CONSTRUCTION"
NOTE 4 ON SHEET 2-SD301 FOR (E) BATTER PILE DEMOLITION
rwhitsel Callout
(E) CONCRETE CAP
NOT SHOWN
rwhitsel Callout
P A
R
TM
E N
T O
F
TH
E N
A V
Y
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S Y
S
TE
M S
C O
M M
A N
D
DES DRW
S Y
M D
E S
C R
IP
TI
O N
D A
TE
A
P P
R
DRAWFORM REVISION: 25 AUG 2020
CHK
OF
EPROJECT NO.:
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
NA
VA
L
FA
CI
LI
TI
ES
E
NG
IN
EE
RI
NG
S
YS
TE
M
S
CO
M M
AN
D
M
ID
-A
TL
AN
TI
C
NA
VA
L
ST
AT
IO
N
- N
OR
FO
LK
, V
A
NO
RF
O
LK
N
AV
AL
S
HI
PY
AR
D
PO
RT
SM
O
UT
H, V
IR
G
IN
IA
P
D
R Y
D O
C K
S A
LT
W
A
TE
R S
Y S
TE
M
FO
R
C V
N -7
JTL/TLH
EJA
DSN
1364315
N40085-22-R-2598
DEVIN POULIN,
C984 FACILITIES PLANNER, NNSY
02/02/2022
IS
SU
ED
F
OR
B
ID
/2
8/
EL 103.0±
(E) GRADE
EL 93.28
(MLLW)
4' 8'0 2'SCALE: 3/16" = 1'-0"
DEMOLITION SECTION - PUMP STATION PS-8 FOUNDATION AND INTAKE STRUCTUREA1 2-SD115, 2-SD403
SHEET NOTES
1. SEE SHEETS 1-SB001 TROUGH 1-SB004 FOR STRUCTURAL NOTES,
ABBREVIATIONS, LEGEND, AND TYPICAL DETAILS.
2. REFER TO SHEET 1-SB001 FOR PILE DRIVING NOTES.
3. REFER TO SHEET 2-SB602 FOR PILE SCHEDULE.
EL 93.28
(MLLW)
SCALE: 1/8" = 1'-0"
DEMOLITION SECTION - PUMP STATION PS-8 INTAKE STRUCTURESC1 2-SD115, 2-SD403
'-6
16'-0" 16'-0"
1. EXCAVATE FOR INSTALLATION OF INTAKE STRUCTURE. EXPOSE
SOUTH FACE (E) FLUME.
2. SAWCUT OPENING AND DEMOLISH (E) FLUME WALL.
3. CONSTRUCT INTAKE STRUCTURES. SEE SHEET 2-SB303.
4. BACKFILL WITH SELECT FILL.
5. EXCAVATE FOR CONSTRUCTION OF PS-8 FOUNDATION.
6. CONSTRUCT PS-8 FOUNDATION. SEE SHEET 2-SB303.
PROPOSED SEQUENCE OF
DEMOLITION/CONSTRUCTION
(E) FLUME
142'-0"±
3'-0"
TYP
11'-0"
TYP
1 4
TYP3
TYP2
41'-8"±
EL 103.0
(E) GRADE
EL 80.0
EL 80.0
3'-0"
2'-6" 1
1'-0"
TYP
EL 100.0
3'-0"
98'-2"± 1 4
TYP 2
EL 103.0
(E) GRADE
EL 80.0
93'-0"± 5
SCALE: 3/16" = 1'-0"
DEMOLITION SECTION - PUMP STATION PS-8 FOUNDATIONB1 2-SD115, 2-SD403 4' 8'0 2'
4' 8'0 2'
EL 103.0
(E) GRADE
(E) FLUME
6'-0"
DLB
BA TNT2 WMS
12857863
PU
M
P
ST
AT
IO
N
PS
-8 F
OU
ND
AT
IO
N
DE
M
OL
IT
IO
N
SE
CT
IO
NS
2-SD303
P A
R
TM
E N
T O
F
TH
E N
A V
Y
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S Y
S
TE
M S
C O
M M
A N
D
DES DRW
S Y
M D
E S
C R
IP
TI
O N
D A
TE
A
P P
R
DRAWFORM REVISION: 25 AUG 2020
CHK
OF
EPROJECT NO.:
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
NA
VA
L
FA
CI
LI
TI
ES
E
NG
IN
EE
RI
NG
S
YS
TE
M
S
CO
M M
AN
D
M
ID
-A
TL
AN
TI
C
NA
VA
L
ST
AT
IO
N
- N
OR
FO
LK
, V
A
NO
RF
O
LK
N
AV
AL
S
HI
PY
AR
D
PO
RT
SM
O
UT
H, V
IR
G
IN
IA
P
D
R Y
D O
C K
S A
LT
W
A
TE
R S
Y S
TE
M
FO
R
C V
N -7
JTL/TLH
EJA
DSN
1364315
N40085-22-R-2598
DEVIN POULIN,
C984 FACILITIES PLANNER, NNSY
02/02/2022
IS
SU
ED
F
OR
B
ID
/2
8/
NORTH
PLAN
KEY PLAN
4 5
11 12
2 3
13 14
SHEET NOTES
1. SEE SHEET 1-VF001 FOR SURVEY NOTES, ABBREVIATIONS, AND
LEGEND.
2. SEE SHEETS 1-C-001 THROUGH 1-C-005 FOR CIVIL NOTES AND
LEGENDS.
3. SEE SHEET 1-SB001 THROUGH 1-SB004 FOR STRUCTURAL NOTES,
ABBREVIATIONS, LEGEND, AND TYPICAL DETAILS.
4. PUMP STATION PS-6 FOUNDATION DEMOLITION AND CONSTRUCTION
SEQUENCING SEPARATED INTO STAGES/PHASES AS SHOWN ON
SHEETS 2-SD401, 2-SD402, AND 2-SB401.
SCALE: 1/4" = 1'-0"
ENLARGED DEMOLITION PLAN - PUMP STATION PS-6A1
PLAN
NORTH
0 4' 8' 12'
NOTE: PLAN ROTATED FOR CLARITY.
STAGE 1 SEQUENCE OF
DEMOLITION/CONSTRUCTION
PS-6 CONSTRUCTION SITE
1. EXCAVATE TO EXPOSE THE (E) RELIVING PLATFORM TO FIRST ROW
OF BATTER PILES.
2. DEMOLISH (E) RELIEVING PLATFORM DECK AND BEAMS FOR
INSTALLATION OF AZ SSP WALL.
3. PARTIALLY DEMOLISH (E) DECK TO EXPOSE LOCATIONS OF BATTER
PILES.
4. CUT (E) TIMBER BATTER PILE WITH CHISEL BEAM FOR INSTALLATION
OF AZ SSP WALL..
5. REMOVE INDICATED (E) TIMBER FENDER PILE SYSTEM AND (E) CURB.
6. CONSTRUCT THE AZ SHEET SHEET PILING WALL PARALLEL TO THE
EXISTING CONCRETE SHEET PILING.
7. CONSTRUCT TEMPORARY STEEL COMBI-WALL COFFERDAM
OUTBOARD OF EXISTING CONCRETE SHEETS.
8. REMOVE (E) MOORING HARDWARE, (1) DOUBLE BIT BOLLARD AND (1)
CLEAT.
9. NOT USED.
10. UNCOVER (E) UTILITY TUNNEL, CAP OFF AND DEMOLISH PIPED
UTILITIES. DISCONNECT AND DEMOLISH ELECTRICAL UTILITIES.
11. DEMOLISH (E) RELIEVING PLATFORM DECK FOR INSTALLATION
OF AZ SSP.
12. DEMOLISH (E) PILE CAP/TUNNEL FOR INSTALLATION OF AZ SSP.
13. CORE DRILL 18"Ø HOLE INLAND SIDE AND WATER SIDE WALLS OF (E)
TUNNEL FOR INSTALLATION OF 15"Ø OUTFALL. COORDINATE
LOCATION WITH CIVIL.
14. CLOSE (E) TUNNEL WITH REINFORCED CONCRETE PLUG (#9 @ 12" OC,
EW, T&B).
15. CONSTRUCT THE AZ SHEET SHEET PILING PERPENDICULAR TO THE
EXISTING CONCRETE SHEET PILING. FINISH ENCLOSURE WITH CONC
PLUG.
DOUBLE BIT
BOLLARD 8
(E) RELIEVING PLATFORM
(E) TIMBER PILE, TYP
AZ26-700 SSP OR
APPROVED EQUAL, TYP
TO
E
OF
S
LO
PE
: T
OP
O F
(E ) R
EL
IV
IN
G
PL
AT
FO
RM
TO
P
OF
S
LO
PE
E)
G
RA
DE
TOE OF SLOPE: TOP OF (E) RELIVING PLATFORM
TOP OF SLOPE: (E) GRADE
'-1
1/
2"
103'-11"±
17'-6"± 68'-11"±
'-6
'-0
'-6
TYP5
TYP12
TYP11
TYP14
TYP 15
TO
E
OF
S
LO
PE
: T
OP
O F
(E ) R
EL
IV
IN
G
PL
AT
FO
RM
TO
P
OF
S
LO
PE
E)
G
RA
DE
62'-11"±
A1
2-SD301
C1
2-SD301
(E) TIMBER BEAM, TYP
(E) TIMBER BATTER PILE, TYP
(E) TIMBER BEAM, TYP
A4
2-SD301
FACE OF (E) CONC
PILE CAP/TUNNEL
OUTFALL
LOCATION 13
INBOARD FACE OF (E)
CONC SHEET PILE WALL
CLEAT 8
TEMP COMBI-WALL
COFFERDAM PLAN2-SD405
C1
TEMP COMBI-WALL
COFFERDAM SYTEM 7
OUTBOARD FACE OF (E)
CONC SHEET PILE WALL
FACE OF (E) CONC
PILE CAP/TUNNEL WP (PUMP STATION PS-6)
N = 3462938.41 E = 12127783.41
PROVIDE SHORING AT RAIL
DLB
BA TNT2 WMS
12857864
PU
M
P
ST
AT
IO
N
PS
-6 E
NL
AR
GE
D
FO
UN
DA
TI
ON
D
EM
OL
IT
IO
N
PL
AN
- S
TA
GE
2-SD401
AS NOTED
INFILLED (E) INTAKE,
SEE A3/2-SD406. DEMOLITION WORK OF
(E) INTAKE STRUCTURE MUST BE
COMPLETED BEFORE COMMENCEMENT
OF DEMOLITION WORK FOR PS-6.
P A
R
TM
E N
T O
F
TH
E N
A V
Y
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR. NO.
SHEET
NAVFAC DRAWING NO.
N A
V A
L
FA
C
IL
IT
IE
S E
N G
IN
E
E R
IN
G
S Y
S
TE
M S
C O
M M
A N
D
DES DRW
S Y
M D
E S
C R
IP
TI
O N
D A
TE
A
P P
R
DRAWFORM REVISION: 25 AUG 2020
CHK
OF
EPROJECT NO.:
PM/DM
BRANCH MANAGER
CHIEF ENG/ARCH
FIRE PROTECTION
NA
VA
L
FA
CI
LI
TI
ES
E
NG
IN
EE
RI
NG
S
YS
TE
M
S
CO
M M
AN
D
M
ID
-A
TL
AN
TI
C
NA
VA
L
ST
AT
IO
N
- N
OR
FO
LK
, V
A
NO
RF
O
LK
N
AV
AL
S
HI
PY
AR
D
PO
RT
SM
O
UT
H, V
IR
G
IN
IA
P
D
R Y
D O
C K
S A
LT
W
A
TE
R S
Y S
TE
M
FO
R
C V
N -7
JTL/TLH
EJA
DSN
1364315
N40085-22-R-2598
DEVIN POULIN,
C984 FACILITIES PLANNER, NNSY
02/02/2022
IS
SU
ED
F
OR
B
ID
/2
8/
NORTH
PLAN
KEY PLAN
4 5
11 12
2 3
13 14
SHEET NOTES
PLAN
NORTH
0 4' 8' 12'
NOTE: PLAN ROTATED FOR CLARITY.
(E) RELIEVING PLATFORM
(E) TIMBER PILE, TYP
TO
E
OF
S
LO
PE
: T
OP
O F
(E ) R
EL
IV
IN
G
PL
AT
FO
RM
TO
P
OF
S
LO
PE
E)
G
RA
DE
TOE OF SLOPE: TOP OF (E) RELIVING PLATFORM
TOP OF SLOPE: (E) GRADE
OTBD FACE OF (E) CONC
SHEET PILE WALL
TO
E
OF
S
LO
PE
: T
OP
O F
(E ) R
EL
IV
IN
G
PL
AT
FO
RM
TO
P
OF
S
LO
PE
E)
G
RA
DE
A1
2-SD302
(E) TIMBER BEAM, TYP
(E) TIMBER BATTER PILE, TYP
(E) TIMBER BEAM, TYP
FACE OF (E) CONC
PILE CAP/TUNNEL
FACE OF (E) CONC
PILE CAP/TUNNEL
1. SEE SHEET 1-VF001 FOR SURVEY NOTES, ABBREVIATIONS, AND
LEGEND.
2. SEE SHEETS 1-C-001 THROUGH 1-C-005 FOR CIVIL NOTES AND
LEGENDS.
3. SEE SHEET 1-SB001 THROUGH 1-SB004 FOR STRUCTURAL NOTES,
ABBREVIATIONS, LEGEND, AND TYPICAL DETAILS.
4. PUMP STATION PS-6 FOUNDATION DEMOLITION AND CONSTRUCTION
SEQUENCING SEPARATED INTO STAGES/PHASES AS SHOWN ON
SHEETS 2-SD401, 2-SD402, AND 2-SB401.
STAGE 2 SEQUENCE OF
DEMOLITION/CONSTRUCTION
PS-6 CONSTRUCTION SITE
16. SEAL TEMPORARY COFFERDAM, PUMP DOWN SUCH THAT WATER
LEVEL IS BELOW DEPTH OF INTAKE STRUCTURE EXCAVATION. SEE
STAGE 1 SEQUENCE OF DEMOLITION NOTE 7 ON SHEET 2-SD401.
17. DEMO (E) CONCRETE PLATFORM, TIMBER DECK, TIMBER BEAMS
AND CUT TIMBER PILES FOR INSTALLATION OF PIPE PILES.
18. SELECTIVE DEMOLITION OF (E) CONCRETE PILE CAP, TIMBER BEAM
AND TIMBER PILES TO ACCESS STEEL PIPE PILE DRIVING LOCATIONS.
SEE SHEET 2-SB401 FOR STEEL PIPE PILE LOCATIONS.
19. DEMOLISH SECTION OF EXISTING CONCRETE PILE CAP, CUT TIE ROD,
AND SELECTIVE DEMOLITION OF HP WALE FOR PHASE 1 CONCRETE
CAP RECONSTRUCTION. SEE SHEET 2-SB401 FOR PHASE1 CONCRETE
PILE CAP.
20. CONSTRUCT FIVE TIE BEAMS, CONNECT TO PHASE 1 CONCRETE
PILE CAP TO STABILIZING THE EXISTING SHEET PILING BEFORE THE
BALANCE OF THE RELIEVING PLATFORM IS DEMOLISHED. SEE SHEET
2-SB401.
21. DEMOLISH REMAINING (E) CONCRETE PILE CAP FOR CONSTRUCTION
OF INTAKE STRUCTURES.
22. BUILD INTAKE STRUCTURES. SEE SHEET 2-SB401.
23. CONTINUE EXPOSING RELIEVING PLATFORM FOR PS-6 FOUNDATION.
24. SELECTIVELY DEMOLISH PORTIONS OF RELIEVING PLATFORM TO
DRIVE PILING. ADJUST STEEL PILING AS REQUIRED TO AVOID PULLING
TIMBER PILES. SEE SHEET 2-SB401.
25. DRIVE ALL FOUNDATION PILES. ADJUST STEEL PILING AS REQUIRED
TO AVOID PULLING (E) TIMBER PILES. SEE SHEET 2-SB401.
26. BACKFILL WITH #57 STONE BELOW MLLW AND
#21A/B ABOVE MLLW.
27. FORM AND POUR PS-6 FOUNDATIONS, CONNECTING TIE BEAMS TO
PUMP STATION FOUNDATION. SEE SHEET 2-SB401.
18 18 18
19 19 19
21 21 21
22 22 22
TYP 24
TYP 25
C1
2-SD302
'-4
'-1
1"
118'-0"±
'-5
'-4
83'-0"±
INBD FACE OF (E) CONC
SHEET PILE WALL
3'- 0"
TY
P
3'-0"
TYP
15'-1"± 8'-0" 8'-0" 8'-0" 8'-0" 8'-0"
PS-6 FOUNDATION OUTLINE
SCALE: 3/16" = 1'-0"
ENLARGED DEMOLITION PLAN - PUMP STATION PS-6A1
16 16
AZ26-700 SSP OR
APPROVED EQUAL, TYP
PROVIDE SHORING AT RAILPROVIDE SHORING AT RAIL
(E) RAIL (E) RAIL
INFILLED (E) INTAKE,
SEE A3/2-SD406. DEMOLITION WORK OF
(E) INTAKE STRUCTURE MUST BE
COMPLETED BEFORE COMMENCEMENT
OF DEMOLITION WORK FOR PS-6.
DLB
BA TNT2 WMS
12857865
PU
M
P
ST
AT
IO
N
PS
-6 E
NL
AR
GE
D
FO
UN
DA
TI
ON
D
EM
OL
IT
IO
N
PL
AN
- S
TA
GE
2-SD402
AS NOTED
15"° OUTFALL PIPE,
COORDINATE WITH CIVIL
P A
R
TM
E N
T O
F
TH
E N
A V
Y
A
B
C
D
1 2 3 4 5
1 2 3 4 5
A
B
C
D
SCALE:
CONSTR. CONTR.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .