S0.1_(rev1).pdf

PDF 918 KB Posted

Attached to
INRC - Phase III
Solicitation number
12034318R0017
Issued by

About this file

This document includes a general notes sheet and federal contract opportunity notice for the construction of an office building.

The general notes sheet provides structural plans, details, schedules, and notes for the Interagency Natural Resource Center Phase III project. It identifies the project as construction of a 29,000 square foot main office portion to support employees from the U.S. Forest Service, Fish & Wildlife Service, and Bureau of Land Management. The magnitude of work is estimated between $5 million and $10 million. The solicitation for proposals is expected to be posted on or around June 5, 2018 with responses due 30 days after. The Forest Service Northern Region anticipates awarding the construction contract. Structural drawings and details are included to convey project requirements for the fixed-price design-bid-build contract.

Revised drawing S0.1

View the file

Other files

File Type Posted
7-12-18_Q&A.XLSX XLSX spreadsheet
INRC_Second_Floor.dwg DWG drawing
INRC_First_Floor.dwg DWG drawing
Amendment_0002.pdf PDF
Revised_B-1.pdf PDF
Questions_and_Answers_062918.pdf PDF
Amendment_0001.pdf PDF
CV_(rev1).pdf PDF
C1.3_(rev1).PDF PDF
L1.5_(rev1).pdf PDF
125900_SF_-_SYSTEMS_FURNITURE.pdf PDF
Prebid_Notes_6-19-18.pdf PDF
Prebid_Attendance.pdf PDF
Questions_and_Answers_061818.pdf PDF
Part_5_Project_Manual_2018_06_01.pdf PDF
Part_6_Project_Manual_2018_06_01.pdf PDF
Drawings_Part_8_2018_06-01.pdf PDF
J-1_Wage_Rate_Decision_ID180031_Mod_3_Dated_05112018.pdf PDF
Drawings_Part_10_2018_06-01.pdf PDF
Drawings_Part_14_2018_06-01.pdf PDF
Short_Set_Solicitation_12034318R0017_Final_06072018.pdf PDF
J-4_State_of_Idaho_Workers'_Insurance.pdf PDF
Part_3_Project_Manual_2018_06_01.pdf PDF
Drawings_Part_7_2018_06-01.pdf PDF
Solicitation_12034318R0017_Final_06072018.pdf PDF
Part_7_Project_Manual_2018_06_01.pdf PDF
Part_1_Project_Manual_2018_06_01.pdf PDF
Part_2_Project_Manual_2018_06_01.pdf PDF
Drawings_Part_1_2018_06-01.pdf PDF
Drawings_Part_13_2018_06-01.pdf PDF
Drawings_Part_6_2018_06-01.pdf PDF
Drawings_Part_9_2018_06-01.pdf PDF
Drawings_Part_3_2018_06-01.pdf PDF
Drawings_Part_12_2018_06-01.pdf PDF
J-5_Past_Performance_Questionnaire.pdf PDF
Part_4_Project_Manual_2018_06_01.pdf PDF
Drawings_Part_4_2018_06-01.pdf PDF
Drawings_Part_5_2018_06-01.pdf PDF
Drawings_Part_2_2018_06-01.pdf PDF
Drawings_Part_11_2018_06-01.pdf PDF
Show all 40

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

S

S

P L A

N N

O R

T H

1/2" 1"0" 2"SCALE: FULL

X

XN

X

MATCH LINE

SEE XN/XXNNN

X

XC1

TO

XX'-XX"

P1 R1

XX" ∅ X

XX'-X" XX'-X"

X

WSCONT

XN

XXNNN

XN

XXNNN

F1

AX

H S

S

_x x_

B1

20GA TYPE 'W3'

MTL DECK

PC S

PAN

Hx R1 5:12 12

B

B

XN

XXNNN

INDEX TO

STRUCTURAL SHTS

SYMBOLS LEGEND

STRUCTURAL HATCH

PATTERNS

W --x

(X

XX'-X

X")

SJ

ELEVATION

INDICATOR

CUT SECTION

INDICATOR

WALL

REINFORCING

INDICATOR

PC SPAN

IDENTIFIER

STEP TOP OF

WALL

INDICATOR

PIER TAG CALLOUT INDICATOR

ROOF SLOPE

INDICATOR

STEP TOP OF

FOOTING

IDENTIFIER

MASONRY PIER

INDICATOR

CORNER REINF

INDICATOR

CONTINUOUS

BEAM

INDICATOR

MATCH LINE INDICATOR

PLAN NORTH ORIENTED 90°

TO THE SHEET W/ MAGNETIC

NORTH (OPTIONAL)

DETAIL BUBBLE

INDICATOR

ELEVATION INDICATOR

DETAIL/SECTION/PLAN

BLOCK TITLE INDICATOR

EXT ELEVATION

INDICATOR

SECTION

INDICATOR

COLUMN

INDICATOR(S)

KEYNOTE

IDENTIFIER

COLUMN/FND

GRID INDICATOR

REVISION

SYMBOL

GENERAL SHEETS

S0.1 STRUCTURAL GENERAL TITLE SHEET (GENERAL

NOTES, INDEX TO DRAWINGS, SYMBOLS

LEGEND, ABBREVIATIONS)

STRUCTURAL PLANS

S1.1 FOUNDATION PLAN

S2.1 MAIN FLOOR PLAN

S2.2 UPPER FLOOR FRAMING PLAN

S2.3 ROOF PLAN

S2.5 SMOKING STRUCTURE PLANS & DETAILS

S2.3 PAVILION PLANS & DETAILS

LATERAL

S3.1 SHEAR WALL PLANS

DETAILS SHEETS

S9.1 DETAILS

S9.2 DETAILS

S9.3 DETAILS

S9.4 DETAILS

FOOTING/PIER

IDENTIFIER

SLAB JOINT

INDICATOR

STEP

INDICATOR

HOLDOWN

INDICATOR

BEAM

INDICATOR(S)

MOMENT

INDICATOR

DECK INDICATOR

SHEAR WALL

INDICATOR

HEADER

INDICATOR

RAFTER

INDICATOR

ASTERISK

INDICATOR

SLOPE

INDICATOR

WORK POINT

INDICATOR

MORTAR

GYPSUM

BOARD

ROUGH LOG

WALL

WOOD

STUD

BRG WALL

METAL

FLOOR

GRATING

WOOD-

CONTINUOUS

FRAMING

WD- BLKG

OR SHIM

BRICK

CONCRETE

CMU

GROUT

NATIVE

UNDISTURBED

SOIL

BACKFILL/FILL

ENGINEERED FILL

DRAINAGE

COURSE

RIGID

INSUL/ICF/SIP

/EIFS SYSTEMS

INSUL/FIRE

SAFING

PLYWOOD/OSB

/PARTICLE BD

METALS

WD- GLUED

/LAMINATED

CONC WALL

HOLDOWN

(BLOCKOUT)

STONE/

ROCK

WALL

© Copyright D'Amato Conversano Inc. All Rights Reserved This document, and the ideas and designs may not be reused, in whole or in part, without written permission from D'Amato Conversano Inc.

D'Amato Conversano Inc. disclaims any responsibility for its unauthorized use.

www.dci-engineers.com

CIVIL / STRUCTURAL

BILLINGS | BOZEMAN | MISSOULA

0 1 2 3 4 5 6 7 8 9 1 inches

DRAWING NO.

PKG

NO.

SHEET

OF

PROJECT NO.:

REVISIONS:

DESIGNED

TECH. REVIEW

CADD

DESIGNED SUB SHEET NO. TITLE OF SHEET

05/2018

1 06.28.2018

6/

/2

:3 0:

A

M

S0.1

06.01.18C O

N S

T R

U C

T

IO

N D

O C

U M

E N

T S

GENERAL NOTES

13083

INRC OFFICE BUILDING - PHASE 3

USDA FOREST SERVICE

Checker

Author

Designer

Sheets
S0.1 - GENERAL NOTES

File details come from the government source that posted it. Updated .