Drawings_Part_3_2018_06-01.pdf

PDF 7 MB Posted

Attached to
INRC - Phase III
Solicitation number
12034318R0017
Issued by

About this file

This notice provides details for a construction contract opportunity for Phase III of the Interagency Natural Resource Center project in Coeur d'Alene, Idaho. The U.S. Forest Service anticipates awarding a contract between $5 million and $10 million to support office space for 173 employees from the Forest Service, Fish & Wildlife Service, and Bureau of Land Management. The 29,000 square foot main office portion is expected to be posted for bids on June 5, 2018, with responses due 30 days later. Phase III will complete construction of the multi-phased Interagency Natural Resource Center to house interagency staff in a new facility.

13 - J-3 Drawings Part 3

View the file

Other files

File Type Posted
7-12-18_Q&A.XLSX XLSX spreadsheet
INRC_First_Floor.dwg DWG drawing
INRC_Second_Floor.dwg DWG drawing
Amendment_0002.pdf PDF
Revised_B-1.pdf PDF
Questions_and_Answers_062918.pdf PDF
Amendment_0001.pdf PDF
CV_(rev1).pdf PDF
125900_SF_-_SYSTEMS_FURNITURE.pdf PDF
S0.1_(rev1).pdf PDF
C1.3_(rev1).PDF PDF
L1.5_(rev1).pdf PDF
Prebid_Notes_6-19-18.pdf PDF
Prebid_Attendance.pdf PDF
Questions_and_Answers_061818.pdf PDF
Part_5_Project_Manual_2018_06_01.pdf PDF
Part_6_Project_Manual_2018_06_01.pdf PDF
Drawings_Part_8_2018_06-01.pdf PDF
J-1_Wage_Rate_Decision_ID180031_Mod_3_Dated_05112018.pdf PDF
Drawings_Part_10_2018_06-01.pdf PDF
Drawings_Part_14_2018_06-01.pdf PDF
Drawings_Part_12_2018_06-01.pdf PDF
J-5_Past_Performance_Questionnaire.pdf PDF
Part_4_Project_Manual_2018_06_01.pdf PDF
Drawings_Part_4_2018_06-01.pdf PDF
Drawings_Part_5_2018_06-01.pdf PDF
Drawings_Part_2_2018_06-01.pdf PDF
Drawings_Part_11_2018_06-01.pdf PDF
Short_Set_Solicitation_12034318R0017_Final_06072018.pdf PDF
J-4_State_of_Idaho_Workers'_Insurance.pdf PDF
Part_3_Project_Manual_2018_06_01.pdf PDF
Drawings_Part_7_2018_06-01.pdf PDF
Solicitation_12034318R0017_Final_06072018.pdf PDF
Part_7_Project_Manual_2018_06_01.pdf PDF
Part_1_Project_Manual_2018_06_01.pdf PDF
Part_2_Project_Manual_2018_06_01.pdf PDF
Drawings_Part_1_2018_06-01.pdf PDF
Drawings_Part_13_2018_06-01.pdf PDF
Drawings_Part_6_2018_06-01.pdf PDF
Drawings_Part_9_2018_06-01.pdf PDF
Show all 40

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SIDEWALK POINT TABLE

POINT NUMBER

RAW DESCRIPTION

TBC

PC

PT

PC

PT

PC

PT

PC

PT

PC

PT

SW

SW

SW

SW

TBC

PC

PT

PC

PT

PC

PT

PC

PT

PC

PT

SW

SW

PC

PT

PC

PT

SW

SW

SW

PC

PT

PC

PRC

PT

PC

PCC

PRC

PCC

SW

PC

PT

NORTHING

20523.35

20490.40

20487.27

20472.10

20470.20

20465.39

20462.15

20454.43

20451.30

20447.57

20443.66

20415.75

20413.16

20385.25

20351.55

20405.51

20284.36

20282.99

20274.62

20270.60

20240.91

20239.57

20245.86

20249.87

20251.67

20253.04

20249.80

20264.53

20267.41

20271.40

20275.84

20278.96

20075.73

20196.66

20201.15

20230.33

20234.35

20240.65

20239.93

20239.21

20255.70

20262.87

20246.59

20231.69

20240.11

20256.94

20252.93

EASTING

40749.22

40739.62

40740.00

40748.78

40751.38

40773.33

40776.41

40777.73

40776.94

40774.05

40773.48

40784.39

40789.68

40846.66

40915.45

40991.02

40931.72

40927.71

40923.59

40924.98

40910.50

40906.87

40894.04

40892.66

40893.54

40897.55

40904.17

40911.39

40905.48

40904.09

40906.20

40914.60

40829.58

40888.78

40890.98

40905.27

40903.90

40891.02

40887.44

40883.86

40850.19

40823.49

40798.31

40783.23

40739.82

40885.40

40886.77

SIDEWALK POINT TABLE

POINT NUMBER

RAW DESCRIPTION

PC

PT

PC

PRC

PCC

PT

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

SW

PRC

PRC

PCC

PRC

PCC

PRC

PT

PC

PRC

SW

SW

PRC

PRC

PT

PC

PT

PC

PCC

PCC

PCC

PT

PC

PT

NORTHING

20251.16

20249.79

20263.73

20271.89

20280.21

20293.82

20277.75

20271.46

20266.38

20244.57

20251.53

20274.82

20278.19

20279.70

20285.02

20295.70

20300.46

20306.71

20308.66

20307.71

20304.88

20298.64

20273.47

20273.77

20285.52

20291.82

20307.67

20312.65

20329.58

20344.63

20355.93

20363.09

20363.99

20373.61

20377.81

20382.50

20378.59

20370.85

20373.08

20356.32

20356.00

20353.16

20342.37

20332.13

20328.16

20317.85

20306.85

20309.27

EASTING

40885.90

40881.89

40853.42

40818.80

40797.31

40794.67

40787.48

40793.27

40794.90

40782.41

40762.39

40767.79

40772.91

40782.03

40751.79

40750.16

40747.41

40739.97

40734.51

40722.06

40716.87

40711.13

40680.41

40673.03

40673.03

40681.26

40702.51

40710.90

40715.90

40716.57

40722.80

40721.39

40719.94

40690.98

40671.78

40673.52

40691.40

40718.01

40724.82

40737.14

40733.98

40730.31

40722.13

40721.42

40723.44

40737.48

40764.05

40770.45

W

W

W

W

O

TRAILHEAD PARKING AREA POINT TABLE

POINT NUMBER

RAW DESCRIPTION

SIDEWALK

PT

PC

PT

PC

PT

PC

PT

PC

PT

PC

PT

PC

PT

PC

SIDEWALK

NORTHING

20540.31

20539.25

20536.73

20538.10

20550.67

20552.05

20523.02

20519.00

20506.43

20502.42

20501.10

20497.08

20480.92

20479.54

20516.82

20517.96

EASTING

40922.90

40924.60

40929.76

40933.77

40939.93

40943.95

41003.22

41004.59

40998.43

40999.81

41002.50

41003.88

40995.96

40991.94

40915.85

40911.95

SCALE

20 10 0 40

IN FEET

20 BILLINGS | BOZEMAN | MISSOULA

0 1 2 3 4 5 6 7 8 9 10 inches

DRAWING NO.

PKG

NO.

SHEET

OF

PROJECT NO.:

REVISIONS:

DESIGNED

TECH. REVIEW

CADD

DESIGNED SUB SHEET NO. TITLE OF SHEET

INRC OFFICE BUILDING

- PHASE 3

13083

IPNF - IDAHO PANHANDLE NATIONAL FOREST

COPYRIGHT © MORRISON-MAIERLE, INC., 2018

engineers surveyors planners scientists

Morrison

Maierle

06.01.18CO

NS

TR

UC

TI

ON

D

OC

UM

EN

TS

1" = 50'

13 COORDINATE LAYOUT PLAN

C1.6

P

R

O

F

E

S

S

I

O

N

AL

E

G

I

N

E

E

R

R

E

G

I

S T E

R

E

D

S

T

A

T

O F

I

D

A

H

O

D

E

B

O

R

A

H

J

O

H

N

S

T

O

N

COORDINATE LAYOUT PLAN

5/1 6/2

8 6

:11 P

M

TBM

CRH

DAJ

ABBREVIATIONS

SW SIDEWALK

TBC TOP BACK OF CURB

PC POINT OF CURVATURE

PT POINT OF TANGENCY

PCC POINT OF COMPOUND CURVATURE

PRC POINT OF REVERSE CURVATURE

INRC OFFICE BUILDING - PHASE 3

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

O

H

P

O

H

P

O

H

P

O

H

P

O

H

P

O

H

P

O

H

P

O

H

P

O

H

P

O

H

P

O

H

P

O

H

P

OHP

OHP

OHP

OHP

OHP

OHP

OHP

OHP

OHP

OHP

OHP

OHP

OHP

OHP

OHP

OHP

O

O

O

O

O

O

O

O

E

E

E

E

E

E

E E

E E

E E

E E

E E

E E

E E

E E

E E

E

FL

FL

FL

WS

WS

WS

E

E

E

E

E

E

E

E

E

F

F

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E

E E

E E

E E

E

E

E

S S

S S

S S

S

S

S

S

S

S

F F

F F

F

E

E

E

E

E

E

E

E

E

E

E E

E

E

F F

E

E

E E

E E

E

E

E E

E E

E

E

G

G

E

E

E

E

E

E

D

Y H

D

Y

H D

Y

H

D

Y

H

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

WS

W

W

W

W

W

W

W

W

W

W

W

W

F

M

F

M

F

M

F

M

F

M

F M

F M

F M

F M

F M

F M

FM

C.O.

SS SS

W W W

E E E

F F F

6S 6S

8S 8S

SCALE

50 25 0 100

IN FEET

KEY NOTES

SANITARY SEWER SERVICE CONNECTION, SEE PLUMBING SHEETS.

DOMESTIC 2" WATER & 4" FIRE SERVICE STUBS. SEE PLUMBING

SHEETS FOR CONNECTION TO OFFICE BUILDING.

SEE ELECTRICAL SHEETS FOR CONNECTION TO OFFICE BUILDING.

NATURAL GAS SERVICE, SEE PLUMBING SHEETS FOR FURTHER

INFORMATION. UTILITY TO ROUTE NATURAL GAS SERVICE AND

COORDINATE PIPE BURIAL DEPTH. PROVIDE ADEQUATE SIZE TO

ACCOMODATE WAREHOUSE, WAREHOUSE EXPANSION, AND FUTURE

OFFICE BUILDING.

PARKING AREA LIGHTING (TYPICAL). SEE ELECTRICAL SHEETS.

INSTALL POST INDICATOR VALVE ADJACENT TO SIDEWALK.

FIRE DEPARTMENT CONNECTION. SEE MECHANICAL SHEETS.

TBM/PEB

CRH/NCK

DAJ13 PROPOSED UTILITY PLAN

4" SANITARY SEWER SERVICE

8" WATER MAIN

BURIED POWER

BURIED FIBER

1" = 50'

C1.7

P

R

O

F

E

S

S

I

O

G

I

N

E

E

R

R

E

G

I

S T E

R

E

D

S

T

A

A

H

O

D

E

B

O

R

J

O

H

N

S

T

O

N

PROPOSED UTILITY PLAN

5/1 6/2

8 6

:11 P

M

6" SANITARY SEWER

8" SANITARY SEWER

LEGEND

BILLINGS | BOZEMAN | MISSOULA

0 1 2 3 4 5 6 7 8 9 10 inches

DRAWING NO.

PKG

NO.

SHEET

OF

PROJECT NO.:

REVISIONS:

DESIGNED

TECH. REVIEW

CADD

DESIGNED SUB SHEET NO. TITLE OF SHEET

INRC OFFICE BUILDING

- PHASE 3

13083

IPNF - IDAHO PANHANDLE NATIONAL FOREST

COPYRIGHT © MORRISON-MAIERLE, INC., 2018

engineers surveyors planners scientists

Morrison

Maierle

06.01.18CO

NS

TR

UC

TI

ON

D

OC

UM

EN

TS

** STRIPE WIDTH

MINIMUM=24"

SPECIAL=36"

WIDTH OF SYMBOL

MINIMUM=24"

SPECIAL=36"

HEIGHT OF SYMBOL

MINIMUM=28"

SPECIAL=41"

RESERVED

PARKING

VAN

ACCESSIBLE

$100 FINE

PERMIT REQUIRED

RESERVED

PARKING

$100 FINE

PERMIT REQUIRED

2"

0"

18"

4"

12"

0"1 4"

0"1 4"

STANDARD

ACCESSIBLE PARKING

SPACE SIGN ASSEMBLY

VAN

ACCESSIBLE PARKING

SPACE SIGN ASSEMBLY

18"

12"

$100 FINE

PERMIT REQUIRED

1.5"

0.5" 0"

1.5"

1.5"

12"

$100 FINE PLAQUE DETAIL

NOTES:

1. SIGNS MAY ALSO BE MOUNTED ON BUILDING FACE AS APPLICABLE AND APPROVED BY OWNER.

2. SIGNS SHALL BE MOUNTED TO POST OR BUILDING USING NEOPRENE, FIBROUS, OR OTHER

APPROVED NON-METALLIC WASHERS.

R7-8NA

(NO ARROW)

12" x 18"

R7-8NA

(NO ARROW)

12" x 18"

"$100 FINE"

PLAQUE

12" x 6"

R7-8A 12" x 6"

"$100 FINE"

PLAQUE

12" x 6"

2" SQUARE

PERFORATED

GRADE 50

STEEL POST

FINISHED

GROUND

SURFACE

WHITE

BACKGROUND SIGN BLANK & BORDER

SAME AS R7-8A

1.5" GREEN

SERIES D

LETTERS

1" GREEN SERIES

D LETTERS

SIGN POST FOUNDATION

PER DETAIL 3 THIS SHEET

NATIVE GROUND

BILLINGS | BOZEMAN | MISSOULA

0 1 2 3 4 5 6 7 8 9 10 inches

DRAWING NO.

PKG

NO.

SHEET

OF

PROJECT NO.:

REVISIONS:

DESIGNED

TECH. REVIEW

CADD

DESIGNED SUB SHEET NO. TITLE OF SHEET

INRC OFFICE BUILDING

- PHASE 3

13083

IPNF - IDAHO PANHANDLE NATIONAL FOREST

COPYRIGHT © MORRISON-MAIERLE, INC., 2018

engineers surveyors planners scientists

Morrison

Maierle

06.01.18CO

NS

TR

UC

TI

ON

D

OC

UM

EN

TS

C9.1

P

R

O

F

E

S

S

I

O

G

I

N

E

E

R

R

E

G

I

S T E

R

E

D

S

T

A

A

H

O

D

E

B

O

R

J

O

H

N

S

T

O

N

CIVIL DETAILS

5/1 6/2

8 6

:11 P

M

TBM

CRH

DAJ

NOT TO SCALE

2 TYPICAL CONCRETE SECTION

NOT TO SCALE

1 TYPICAL ASPHALT SECTION

6" CONCRETE

4" OF

" MINUS

CRUSHED BASE

SUBGRADE,

TOP 8" 95%

PROCTOR DENISITY

3" ASPHALT CONCRETE

SURFACING

8" OF

" OR 1

" MINUS

CRUSHED AGGREGATE BASE

COURSE

SUBGRADE, TOP 8"

95% ASTM D698

PROCTOR DENSITY

SEPARATION FABRIC

SEPARATION FABRIC

NOTE:

REFER TO GEOTECHNICAL REPORT AS GOVERNING DOCUMENT

NOTE:

REFER TO GEOTECHNICAL REPORT AS GOVERNING DOCUMENT

NOT TO SCALE

5 HANDICAP PAVEMENT MARKING

NOT TO SCALE

8 ACCESSIBLE PARKING SIGN INSTALLATION DETAIL

1. BALES SHALL BE PLACED AT THE TOE OF A SLOPE OR ON THE CONTOUR AND IN A ROW WITH ENDS TIGHTLY

ABUTTING THE ADJACENT BALES.

2. EACH BALE SHALL BE EMBEDDED IN THE SOIL A MINIMUM OF 4 INCHES (4") AND PLACED SO THE BINDINGS ARE

HORIZONTAL.

3. BALES SHALL BE SECURELY ANCHORED IN PLACE BY EITHER TWO (2) STAKES OR REBARS DRIVEN THROUGH THE

BALE. THE FIRST STAKE IN EACH BALE SHALL BE DRIVEN TOWARD THE PREVIOUSLY LAID BALE AT AN ANGLE TO

FORCE THE BALES TOGETHER. STAKES SHALL BE DRIVEN FLUSH WITH THE BALE.

4. INSPECTION SHALL BE FREQUENT AND REPAIR REPLACEMENT SHALL BE MADE PROMPTLY AS NEEDED.

5. BALES SHALL BE REMOVED WHEN THEY HAVE SERVED THEIR USEFULNESS SO AS NOT TO BLOCK OR IMPEDE

STORM FLOW OR DAMAGE.

CONSTRUCTION SPECIFICATIONS

1. LAY ONE BLOCK ON EACH SIDE OF THE STRUCTURE ON ITS SIDE ON THE BOTTOM ROW TO

ALLOW POOL DRAINAGE. THE FOUNDATION SHOULD BE EXCAVATED AT LEAST 2 INCHES

BELOW THE CREST OF THE STORM DRAIN. PLACE THE BOTTOM ROW OF THE BLOCK

AGAINST THE EDGE OF THE STORM DRAIN FOR LATERAL SUPPORT AND TO AVOID

WASHOUTS WHEN OVERFLOW OCCURS. IF NEEDED, GIVE LATERAL SUPPORT TO

SUBSEQUENT ROWS BY PLACING 2x4 WOOD STUDS THROUGH BLOCK OPENINGS.

2. CAREFULLY FIT HARDWARE CLOTH OR COMPARABLE WIRE MESH WITH 1/2-INCH OPENING

OVER ALL BLOCK OPENING TO HOLD GRAVEL IN PLACE.

3. USE CLEAN GRAVEL, 3/4-INCH WASHED STONE, PLACED 2 INCHES BELOW THE TOP OF THE

BLOCK ON A 2:1 SLOPE OR FLATTER AND SMOOTH IT TO AN EVEN GRADE.

NOTES:

1. TWO CONCRETE BLOCKS SHALL BE PLACED ON THEIR SIDES ABUTTING

THE CURB AT THEIR SIDE OF THE INLET OPENING. A 2-INCH X 4-INCH STUD

SHALL BE CUT AND PLACED THROUGH THE OUTER HOLES OF THE SPACER

BLOCKS TO BRACE THE FRONT BLOCKS. FRONT BLOCKS ARE PLACED ON

THEIR SIDES ACROSS THE INLET AND ABUTTING THE SPACER BLOCKS.

2. HARDWARE CLOTH OR COMPARABLE WIRE MESH WITH 1/2-INCH

OPENINGS SHALL BE PLACED OVER THE OUTSIDE VERTICAL FACE

(WEBBING) OF THE BLOCKS TO PREVENT FILTER STONE FROM BEING

WASHED THROUGH HOLES IN THE BLOCK.

3. 3/4-INCH WASHED STONE SHALL BE PILED AGAINST THE WIRE TO THE TOP

OF THE BLOCK.

4. CHECK DEVICE AFTER EACH RAIN. REPLACE WASHED STONE IF IT CLOGS

WITH SEDIMENT.

5. APPLICABLE AT CURB INLETS WHERE AN OVERFLOW CAPABILITY IS

NECESSARY TO PREVENT EXCESSIVE PONDING IN FRONT OF THE INLET

6"

1. PREPARE SOIL BEFORE INSTALLING BLANKETS, INCLUDING ANY NECESSARY APPLICATION OF LIME, FERTILIZER, AND SEED. NOTE: WHEN USING CELL-O-SEED DO NOT SEED PREPARED AREA. CELL-O-SEED

MUST BE INSTALLED WITH PAPER SIDE DOWN.

2. BEGIN AT THE TOP OF THE SLOPE BY ANCHORING THE BLANKET IN A 6-INCH WIDE TRENCH WITH

APPROXIMATELY 12 INCHES OF BLANKET EXTENDED BEYOND THE UP-SLOPE PORTION OF THE TRENCH.

ANCHOR THE BLANKET WITH A ROW OF STAPLES/STAKES APPROXIMATELY 12 INCHES APART IN THE

BOTTOM OF THE TRENCH. BACKFILL AND COMPACT THE TRENCH AFTER STAPLING. APPLY SEED TO

COMPACTED SOIL AND FOLD REMAINING 12-INCH PORTION OF THE BLANKET BACK OVER SEED AND

COMPACTED SOIL. SECURE BLANKET OVER COMPACTED SOIL WITH A ROW OF STAPLES/STAKES SPACED

APPROXIMATELY 12 INCHES APART ACROSS THE WIDTH OF THE BLANKET.

3. ROLL THE BLANKETS (A.) DOWN OR (B.) HORIZONTALLY ACROSS THE SLOPE. BLANKETS WILL UNROLL WITH

THE APPROPRIATE SIDE AGAINST THE SOIL SURFACE. ALL BLANKETS MUST BE SECURELY FASTENED TO

SOIL SURFACE BY PLACING STAPLES/STAKES IN APPROPRIATE LOCATIONS AS SHOWN IN THE STAPLE

PATTERN GUIDE. WHEN USING OPTIONAL DOT SYSTEM, STAPLES/STAKES SHOULD BE PLACED THROUGH

EACH OF THE COLORED DOTS CORRESPONDING TO THE APPROPRIATE STAPLE PATTERN.

4. 4THE EDGES OF PARALLEL BLANKETS MUST BE STAPLED WITH APPROXIMATELY 2-5 INCHES OVERLAP

DEPENDING ON BLANKET TYPE. TO ENSURE PROPER SEAM ALIGNMENT, PLACE THE EDGE OF THE

OVERLAPPING BLANKET (BLANKET BEING INSTALLED ON TOP) EVEN WITH THE COLORED SEAM STITCH ON

THE PREVIOUSLY INSTALLED BLANKET.

5. CONSECUTIVE BLANKETS SPLICED DOWN THE SLOPE MUST BE PLACED END OVER END (SHINGLE STYLE)

WITH AN APPROXIMATE 3-INCH OVERLAP. STAPLE THROUGH OVERLAPPED AREA, APPROXIMATELY 12

INCHES APART ACROSS ENTIRE BLANKET WIDTH.

NOTE: IN LOOSE SOIL CONDITIONS, THE USE OF STAPLE OR STAKE LENGTHS GREATER THAN 6

INCHES MAY BE NECESSARY TO PROPERLY ANCHOR THE BLANKETS.

3B

3A

3"

2"-5"

12"

6"

BILLINGS | BOZEMAN | MISSOULA

0 1 2 3 4 5 6 7 8 9 10 inches

DRAWING NO.

PKG

NO.

SHEET

OF

PROJECT NO.:

REVISIONS:

DESIGNED

TECH. REVIEW

CADD

DESIGNED SUB SHEET NO. TITLE OF SHEET

INRC OFFICE BUILDING

- PHASE 3

13083

IPNF - IDAHO PANHANDLE NATIONAL FOREST

COPYRIGHT © MORRISON-MAIERLE, INC., 2018

engineers surveyors planners scientists

Morrison

Maierle

06.01.18CO

NS

TR

UC

TI

ON

D

OC

UM

EN

TS

C9.2

P

R

O

F

E

S

S

I

O

G

I

N

E

E

R

R

E

G

I

S T E

R

E

D

S

T

A

A

H

O

D

E

B

O

R

J

O

H

N

S

T

O

N

CIVIL DETAILS

5/1 6/2

8 6

:11 P

M

TBM

CRH

DAJ

NOT TO SCALE

9 EROSION CONTROL BLANKET DETAIL

FOR SLOPE INSTALLATION

NOT TO SCALE

6 BLOCK AND GRAVEL CURB INLET PROTECTION DETAIL

NOT TO SCALE

7 BLOCK AND GRAVEL DROP INLET PROTECTION DETAIL

File details come from the government source that posted it. Updated .