L1.5_(rev1).pdf

PDF 556 KB Posted

Attached to
INRC - Phase III
Solicitation number
12034318R0017
Issued by

About this file

This pre-solicitation notice provides details for an upcoming federal contract opportunity with the US Forest Service Northern Region. The solicitation will be posted on or around June 5, 2018 and will include construction of Phase III of the Interagency Natural Resource Center in Coeur d'Alene, Idaho. Phase III comprises the construction of a 29,000 square foot main office building to support 173 employees from the US Fish and Wildlife Service, Bureau of Land Management, and US Forest Service. The estimated value of the construction project is between $5 million and $10 million. Responses to the solicitation will be due 30 days after it is posted to the federal contracting website. The awarded firm will be constructing office space to support interagency natural resource operations in northern Idaho.

Revised drawing L1.5

View the file

Other files

File Type Posted
7-12-18_Q&A.XLSX XLSX spreadsheet
INRC_Second_Floor.dwg DWG drawing
INRC_First_Floor.dwg DWG drawing
Amendment_0002.pdf PDF
Revised_B-1.pdf PDF
Questions_and_Answers_062918.pdf PDF
Amendment_0001.pdf PDF
CV_(rev1).pdf PDF
125900_SF_-_SYSTEMS_FURNITURE.pdf PDF
S0.1_(rev1).pdf PDF
C1.3_(rev1).PDF PDF
Prebid_Notes_6-19-18.pdf PDF
Prebid_Attendance.pdf PDF
Questions_and_Answers_061818.pdf PDF
Part_5_Project_Manual_2018_06_01.pdf PDF
Part_6_Project_Manual_2018_06_01.pdf PDF
Drawings_Part_8_2018_06-01.pdf PDF
J-1_Wage_Rate_Decision_ID180031_Mod_3_Dated_05112018.pdf PDF
Drawings_Part_10_2018_06-01.pdf PDF
Drawings_Part_14_2018_06-01.pdf PDF
Part_2_Project_Manual_2018_06_01.pdf PDF
Drawings_Part_1_2018_06-01.pdf PDF
Drawings_Part_13_2018_06-01.pdf PDF
Drawings_Part_6_2018_06-01.pdf PDF
Drawings_Part_9_2018_06-01.pdf PDF
Drawings_Part_3_2018_06-01.pdf PDF
Drawings_Part_12_2018_06-01.pdf PDF
J-5_Past_Performance_Questionnaire.pdf PDF
Part_4_Project_Manual_2018_06_01.pdf PDF
Drawings_Part_4_2018_06-01.pdf PDF
Drawings_Part_5_2018_06-01.pdf PDF
Drawings_Part_2_2018_06-01.pdf PDF
Drawings_Part_11_2018_06-01.pdf PDF
Short_Set_Solicitation_12034318R0017_Final_06072018.pdf PDF
J-4_State_of_Idaho_Workers'_Insurance.pdf PDF
Part_3_Project_Manual_2018_06_01.pdf PDF
Drawings_Part_7_2018_06-01.pdf PDF
Solicitation_12034318R0017_Final_06072018.pdf PDF
Part_7_Project_Manual_2018_06_01.pdf PDF
Part_1_Project_Manual_2018_06_01.pdf PDF
Show all 40

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(10) BOULDERS, PER DETAIL 7/L0.1.

ALL BOULDERS SHOULD HAVE SEMI-

FLAT AREA CONDUCIVE FOR SITTING.

NATIVE GRASS THROUGHOUT

ALR

GENERAL NOTE: SEE L1.2 FOR PLANT SCHEDULE

PHASE 3 - OFFICE BUILDING

EDGE OF CONCRETE WALK

DARK LINE INDICATES NEW GRADE

DAHSED LINE INDICATES BASE BID GRADE

0 1 2 3 4 5 6 7 8 9 10 inches

DRAWING NO.

PKG

NO.

SHEET

OF

PROJECT NO.:

REVISIONS:

DESIGNED

TECH. REVIEW

CADD

DESIGNED SUB SHEET NO. TITLE OF SHEET

06.01.2018

6/

/2

5:

:3

P

M

06.28.181

L1.5

06.01.18C O

N S

T R

U C

T

IO

N D

O C

U M

E N

T S

AMPHITHEATER

13083

INRC OFFICE BUILDING - PHASE 3

USDA FOREST SERVICE

BP

BP

BP

: 1" = 20'-0"L1.5

10 AMPHITHEATER

File details come from the government source that posted it. Updated .