Drawings_Part_9_2018_06-01.pdf
PDF 6 MB Posted
- Attached to
- INRC - Phase III
- Solicitation number
- 12034318R0017
About this file
This set of construction documents provides details for a federal construction project. The project involves construction of Phase III of the Interagency Natural Resource Center in Coeur d'Alene, Idaho, which will include a 29,000 square foot main office building to support 173 employees from the U.S. Forest Service, Fish & Wildlife Service, and Bureau of Land Management. The project value is estimated between $5 million and $10 million. Drawings include foundation plans, main floor framing plans, elevations, sections, and details for items such as windows, storefronts, and precast concrete. Furniture plans and details are also included. A related federal contract opportunity notice indicates that the solicitation for construction is expected to be posted on or around June 5, 2018, with responses due 30 days after posting.
19 - J-3 Drawings Part 9
View the file
Other files
Show all 40
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1/
2" 1/
4"
INT. WOODTRIM
NATURAL STONE (NS)
REF. 11/A5.2
BLOCKING BEHIND PRECAST AS
REQ. FOR PROPER ALIGNMENT
PRECAST STONE HEADER SLOPED TO
DRAIN ATTACHED WITH PINSTRAPS
EITHER SIDE REF. FIG. 1/A9.12
MORTAR JOINT BETWEEN STONE
VENEER AND PRECAST HEADER,
SEALING METAL FLASHING INTO
MORTAR JOINT ALLOW "WEEP- GAP" @
EVERY 48"
3/4" X 3/4" X 1/8" STEEL ANGLE. WELDED
TO LEDGER ANGLE, ALIGN WITH KEY-
SLOT IN BOTTOM OF PRE-CAST HEADER.
LEAVE A "WEEP-GAP" EVERY 48".
COMPOSITE SHIM, AS REQUIRED FOR
PROPER ALIGNMENT
3" x 4" x 1/4" STEEL LEDGER ANGLE
3/8" LAG SCREW & FLAT WASHER, FASTEN TO
STUD WALL, SPACE @ EVERY-OTHER STUD.
PRE-DRILL EACH SCREW.
KEY-SLOT, TO ACCEPT VERTICAL
LEG OF ANGLE. WIDTH OF SLOT TO
BE 1/8" WIDER THAN LEG OF
ANGLE. CHAMFER @ MOUTH OF
OPENING TO EASE INSTALLATION.
SLOP HORIZ. FACE,
TO DRAIN AWAY
FROM BUILDING
M
IN
1"
2" 3"
6"
3/4" 4 1/4"
1/ 4"
MIN.
1"
1"
1/
4"
3 1/2"
1/
2"
HEAVY DUTY, CORROSION
RESISTANT "PIN STRAP",
EPOXY ANCHOR INTO EITHER
SIDE OF PRECAST HEADER
1/ 4"
FIG. 1
B
ALIGN EDGE OF STONE VENEER
W/ OUTSIDE EDGE OF FRAMING
ALUM. CLAD FIXED WINDOW
BACKER ROD & SEALANT
SELF-ADHERED FLEXIBLE
FLASHING OVER NAILER FIN, 3"
OF OVERLAP MIN. ON TO
WEATHER BARRIER
2 X WOOD BLOCKING
AIR BARRIER WRAPPED
TO INTERIOR
NATURAL STONE (NS)
REF. 11/A5.2
INT. WOOD TRIM
3 1/2" 1/4"
ALUM. CLAD FIXED WINDOW
BACKER ROD & SEALANT
INT. WOOD TRIM
1/
2"
3/4"
AIR BARRIER WRAPPED
TO INTERIOR
PRECAST STONE HEADER SLOPED TO
DRAIN ATTACHED WITH PINSTRAPS
EITHER SIDE REF. FIG. 2 /A9.12
3/4" X 3/4" X 1/8" STEEL ANGLE. WELDED
TO LEDGER ANGLE, ALIGN WITH KEY-
SLOT IN BOTTOM OF PRE-CAST HEADER.
LEAVE A "WEEP-GAP" EVERY 48".
COMPOSITE SHIM, AS REQUIRED FOR
PROPER ALIGNMENT
3" x 4" x 1/4" STEEL LEDGER ANGLE
3/8" LAG SCREW & FLAT WASHER, FASTEN
TO STUD WALL, SPACE @ EVERY-OTHER
STUD. PRE-DRILL EACH SCREW. FLEXIBLE
FLASHING OVER LAG.
NATURAL STONE (NS)
REF. 11/A5.2
KEY-SLOT, TO ACCEPT VERTICAL
LEG OF ANGLE. WIDTH OF SLOT TO
BE 1/8" WIDER THAN LEG OF
ANGLE. CHAMFER @ MOUTH OF
OPENING TO EASE INSTALLATION.
SLOP HORIZ. FACE,
TO DRAIN AWAY
FROM BUILDING
M
IN
1"
3" 3"
6"
1" 6"
1/ 2"
1"
1/ 4"
2"1"
3"
3 1/2"
1/
2"
HEAVY DUTY, CORROSION
RESISTANT "PIN STRAP",
EPOXY ANCHOR INTO EITHER
SIDE OF PRECAST HEADER
1/
4"
FIG. 2
NAILING FIN OF WINDOW
AIR BARRIER LAP OVER
FLASHING
2 X BLOCKING
ALUM. CLAD FIXED WINDOW
1-1/2" FIBER CEMENT TRIM
SELF-ADHERED FLEXIBLE
FLASHING EXTEND 3" PAST
METAL FLASHING
5/8" FIBER CEMENT FRAMING
FIBERS CEMENT STARTER TYP.
INT. WD TRIM
BACKER ROD & SEALANT TYP.
FIBER CEMENT LAP SIDING (FS 1)
REF.
1/
2"
1/
4" NAILING FIN TYP.
SPRAY FOAM INSULATION @
JAMBS AND HEAD TYP.
/12 A5.2
1/
2"
2"
HEADER, SEE STRUCTURAL
A
1/ 4"
INT. WD TRIM
AIR BARRIER WRAPPED
TO INTERIOR
1-1/2" FIBER CEMENT TRIM
2X WOOD BLOCKING
BACKER ROD & SEALANT
EITHER SIDE
1/4"
3 1/2"
3 1/2" 1/4"
1/ 4"
SELF-ADHERED FLEXIBLE
FLASHING OVER NAILER FIN, 3" OF
OVERLAP MIN. ON TO WEATHER
BARRIER
3/4" FIBER CEMENT FRAMING
FIBERS CEMENT LAP SIDING (FS-1)
REF. /12 A5.2
AIR BARRIER WRAPPED
TO INTERIOR
1-1/2" FIBER CEMENT TRIM
2X BLOCKING, SILL SUPPORT
BACKER ROD AND SEALANT
3 1/2"
FIBER CEMENT LAP SIDING (FS1)
REF.
1/
2"
3/4"
INT. WOODTRIM
/12 A5.2
C
ALUM. CLAD WINDOW
BACKER ROD & SEALANT
T.O. BANDING
116' - 3"
WINDOW SILL, TYP.
116' - 4"
AIR BARRIER WRAP
TO INTERIOR, UNDER
SILL FLASHING
FLASHING, TO MATCH
FIBER CEMENT TRIM.
OVERLAP AIR BARRIER
PRE-CAST WALL
BANDING, REF.
3/4" THICK FIBER CEMENT TRIM
/14 A5.5
2x BLOCKING, SILL SUPPORT
3 1/2"
1-1/4" INT. WOODTRIM
1/
2"
3/4"
D
1/
2"
1/ 4"
3 1/2"
5"
3/4"
VARIES
3/4"
WP-4
TYP.
WD TRIM PAINT
GRADE PINE TYP.
1/
2"
3 1/2"
2 1/4"
REF. WINDOW TYPES
2 1/4"
5"
FS3-1 TYP ALL ALL
WINDOW TRIM
TRIM @ HEADER HEAD IS
+0.25" PROUD OF SIDE
TRIM
REF. WINDOW TYPES
6"
4 1/2"
4 1/2"
6"
PRECAST
PRECAST
0 1 2 3 4 5 6 7 8 9 10 inches
DRAWING NO.
PKG
NO.
SHEET
OF
PROJECT NO.:
REVISIONS:
DESIGNED
TECH. REVIEW
CADD
DESIGNED SUB SHEET NO. TITLE OF SHEET
06.01.2018
5/
/2
:1 5:
P
M
A9.12
06.01.18C O
N S
T R
U C
T
IO
N D
O C
U M
E N
T S
DETAILS - WINDOW
13083
INRC OFFICE BUILDING - PHASE 3
USDA FOREST SERVICE
JB
AN
AN
: 3" = 1'-0"A9.12
3 WINDOW DETAIL_PRECAST @ HEAD
: 3" = 1'-0"A9.12
7 WINDOW DETAIL__STONE @ JAMB
: 3" = 1'-0"A9.12
11 WINDOW DETAIL_PRECAST @ SILL
: 3" = 1'-0"A9.12
2 WINDOW DETAIL_FIBER CEMENT @ HEAD
: 3" = 1'-0"A9.12
6 WINDOW DETAIL_FIBER CEMENT @ JAMB
: 3" = 1'-0"A9.12
10 WINDOW DETAIL_FIBER CEMENT @ SILL
: 3" = 1'-0"A9.12A5.5
14 WINDOW DTL. _FIBER CEMENT SILL @ WALL BANDING
: 1/2" = 1'-0"A9.12
8 INTERIOR WINDOW TRIM DETAIL TYPICAL
: 1/2" = 1'-0"A9.12
5 EXTERIOR WINDOW TRIM @ FS-1 TYPICAL
: 1/2" = 1'-0"A9.12
9 EXTERIOR WINDOW TRIM @ SW-1 TYPICAL
BACKER ROD & SEALANT,
EACH SIDE
PRECAST CONCRETE COLUMN
SPACER NON-STRUCTURAL,
ALIGNED WITH EDGES OF
STOREFRONT
VENTILATED METAL "J"
TERMINATION PLATE
AIR BARRIER WRAPPED TO
INTERIOR
SIM. NATURAL STONE (NS)
REF. 11/A5.2
2 1/2"
SEALANT
BACKER ROD & SEALANT,
EACH SIDE
AIR BARRIER WRAPPED TO
INTERIOR
2X WD BLOCKING AS REQ.
NATURAL STONE (NS)
REF. 11/A5.2
ALUM. STOREFRONT
ALIGN CORNERING STONE
VENEER, WITH LEADING EDGE
OF STOREFRONT
SEALANT EITHER SIDE
3"
ALUM. STOREFRONT
BACKER ROD &
SEALANT, EACH SIDE
NATURAL STONE (NS)
REF. 11/A5.2
SELF-ADHERED FLEXIBLE
FLASHING 3" MIN OVERLAP
OVER AIR BARRIER
MORTAR JOINT BETWEEN STONE
VENEER AND BREAK METAL, WRAP
BREAK METAL UP WALL TO ACT AS
FLASHING, ALLOW "WEEP- GAP" @
EVERY 48" IN THE MORTAR JOINT
WRAP AIR BARRIER TO
INTERIOR
WOOD FRAMED W/ 2X FRAMING,
BRACE AS REQ.
3/4" LAG SCREW & FLAT WASHER,
FASTEN TO STUD WALL, SPACE @
EVERY OTHER STUD. PREDRILL
EACH SCREW
SPRAY FOAM INSULATION
1/2" CDX PLYWOOD
CONCEALED FASTENER, AND CLIP
FASTENED THROUGH PREVIOUSLY
APPLIED PIECE OF BREAK METAL.
22 GA. BREAK METAL ASSEMBLY
COLOR TO MATCH STOREFRONT
1/ 2"
1/
2"
1/ 2"
1' - 0" 1"
1/4"- 1' SLOPE
WD BLOCKING UNDER BREAK METAL,
SLOPED TO DRAIN
NOTE: ALL BREAK METAL SHALL BE
SECURED IN SUCH A WAY THAT THE
METAL LAYS FLUSH AND TIGHT WITH
THE SUBSTRATE MATERIAL, USE
BLOCKING AND/OR COUNTER SINK
FASTENERS AS NECESSARY
SELF-ADHERED FLEXIBLE
FLASHING 3" MIN OVERLAP
OVER AIR BARRIER
D
USE BLOCKING IN WALL ATTACHED TO W FLANGE
WHERE REQUIRED TO CREATE FLUSH SURFACE TO
ATTACH BREAK METAL ASSEMBLY
HEADER VARIES REF. STRUCT
NATURAL STONE (NS)
REF. 11/A5.2
INT. WDTRIM
BACKER ROD & SEALANT
AIR BARRIER WRAPPED TO
INTERIOR
PRECAST STONE HEADER
SLOPED TO DRAIN ATTACHED
WITH PINSTRAPS EITHER SIDE
REF. FIG 2 / A9.12
3/4" X 3/4" X 1/8" STEEL ANGLE. WELDED
TO LEDGER ANGLE, ALIGN WITH KEY-
SLOT IN BOTTOM OF PRE-CAST HEADER.
LEAVE A "WEEP-GAP" EVERY 48".
COMPOSITE SHIM, AS REQUIRED FOR
PROPER ALIGNMENT
3" x 4" x 1/4" STEEL LEDGER ANGLE
3/8" LAG SCREW & FLAT WASHER, FASTEN
TO STUD WALL, SPACE @ EVERY-OTHER
STUD. PRE-DRILL EACH SCREW. FLEXIBLE
FLASHING OVER LAG.
3/4"
1/
2"
1/ 4"
AIR BARRIER WRAPPED TO
INTERIOR
2X BLOCKING AS REQ
ALUM. STOREFRONT
5/8" FIBER CEMENT TRIM
BACKER ROD & SEALANT,
EACH SIDE
3 1/2"
FIBER CEMENT LAP SIDING (FS 1)
REF.
1/4"
1-1/2" FIBER CEMENT TRIM BOARD
/12 A5.2
1/ 2"
2"
AIR BARRIER WRAPPED TO
INTERIOR
1 X WD BLOCKING AS REQ.
ALIGN FACE STOREFRONT
WITH OUTSIDE FACE OF
PLYWOOD SHEATHING TYP.
FIBER CEMENT STARTER BLOCK
BACKER ROD & SEALANT
EITHER SIDE
FIBER CEMENT LAP SIDING (FS 1)
REF.
1-1/2" FIBER CEMENT TRIM
5/8" FIBER CEMENT TRIM
SPRAY FOAM INSULATION @
JAMBS AND HEAD TYP.
WRAP GWB BEHIND
STOREFRONT, SEALANT
@TRANSITION TYP.
/12 A5.2
GWB
1/
2"
2"
1/ 4"
A
GLULAM HEADER
REF. STRUCT.
ALUM. STOREFRONT
FIBROUS EXPANSION JOINT
FILLER
RIGID INSULATION @
PERIMETER TYP.
BACKER ROD & SEALANT,
EACH SIDE
LEADING EDGE OF
STOREFRONT EXTENDS
BEYOND FOUNDATION TO
ALIGN VERT. W/ PLYWOOD
SHEATHING
FOUNDATION VARIES
REF. STRUCT.
FLOORING MATERIAL
VARIES REF. FIRST FLOOR
FINISH PLAN 9/A2.1F
1/
2"
BEVEL SLAB AND INSULATION
1/2"
SEALANT
ALIGN EDGE OF STORE
FRONT WITH OUTSIDE EDGE
OF GWB
BACKER ROD & SEALANT
EACH SIDE
STONE VENEER WALL (###)
REF. ##/A##
TERMINATE GWB BEHIND
STOREFRONT
HEADER REF STRUCT.
0 1 2 3 4 5 6 7 8 9 10 inches
DRAWING NO.
PKG
NO.
SHEET
OF
PROJECT NO.:
REVISIONS:
DESIGNED
TECH. REVIEW
CADD
DESIGNED SUB SHEET NO. TITLE OF SHEET
06.01.2018
5/
/2
:1 5:
P
M
A9.13
06.01.18C O
N S
T R
U C
T
IO
N D
O C
U M
E N
T S
DETAILS - STOREFRONT
13083
INRC OFFICE BUILDING - PHASE 3
USDA FOREST SERVICE
JB
AN
AN
: 3" = 1'-0"A9.13A6.1
11 STOREFRONT DETAIL _ INT STONE @ JAMB
: 3" = 1'-0"A9.13A6.1
14 STOREFRONT DETAIL _STONE @ JAMB
: 6" = 1'-0"A9.13A4.1
6 STOREFRONT DETAIL_STONE @ HEAD
: 3" = 1'-0"A9.13A6.3
10 STOREFRONT DETAIL_STONE @ SILL
: 3" = 1'-0"A9.13A6.2
13 STOREFRONT DETAIL_FIBER CEMENT @ JAMB
: 3" = 1'-0"A9.13A6.1
5 STOREFRONT DETAIL_FIBER CEMENT @ HEAD
: 3" = 1'-0"A9.13A6.1
9 STOREFRONT DETAIL_FOUNDATION @ SILL
: 3" = 1'-0"A9.13A6.1
1 STOREFRONT DETAIL W/ ACT INT - HEADER
0 1 2 3 4 5 6 7 8 9 10 inches
DRAWING NO.
PKG
NO.
SHEET
OF
PROJECT NO.:
REVISIONS:
DESIGNED
TECH. REVIEW
CADD
DESIGNED SUB SHEET NO. TITLE OF SHEET
06.01.2018
5/
/2
:1 5:
P
M
F2.1
06.01.18C O
N S
T R
U C
T
IO
N D
O C
U M
E N
T S
FIRST/GROUND LEVEL FURNITURE
PLAN
13083
INRC OFFICE BUILDING - PHASE 3
USDA FOREST SERVICE
MG
MG
PKG
NO.
SHEET
OF
PROJECT NO.:
REVISIONS:
DESIGNED
TECH. REVIEW
CADD
DESIGNED SUB SHEET NO. TITLE OF SHEET
06.01.2018
5/
/2
:1 5:
P
M
F2.2
06.01.18C O
N S
T R
U C
T
IO
N D
O C
U M
E N
T S
SECOND LEVEL FURNITURE PLAN
13083
INRC OFFICE BUILDING - PHASE 3
USDA FOREST SERVICE
MG
PKG
NO.
SHEET
OF
PROJECT NO.:
REVISIONS:
DESIGNED
TECH. REVIEW
CADD
DESIGNED SUB SHEET NO. TITLE OF SHEET
06.01.2018
5/
/2
:1 5:
P
M
F9.1
06.01.18C O
N S
T R
U C
T
IO
N D
O C
U M
E N
T S
FURNITURE - DETAILS
13083
INRC OFFICE BUILDING - PHASE 3
USDA FOREST SERVICE
MG
A A
E E
D D
B B
TOC 90' - 0"
TOC 100' - 0"
F2
F1
F2
F4
HSS 4x4x1/4
F2
4" CONC SLAB ON
GRADE W/ FIBERMESH
F2
F2
F3F2
F2
S J
S J
3' - 0" 1' - 2"
/4
/4
F2
S J S
J
S J
4" CONC SLAB
ON GRADE W/
FIBERMESH
F2
F2
TO PIT 86' - 0"
F2
F1
F1F1
F1
F1
F1
F1
F1
F1
F1
F1
F1
180' - 0"
4'
1/
2" 8'
0"
8'
0"
F2
F2
/2
14' - 3 1/2"
1'-5" WIDE x 12'-5" LONG CONC
WALLS W/ 2'-0" WIDE PRECAST
CONC CAP (3 PLACES)
S9.2
S9.2
S9.2
S9.2
S9.1
S9.2
S9.1
S9.2
S9.1
S9.2
S9.2
C C
36' - 0" 16' - 0" 92' - 0" 36' - 0"
F1
5' - 0"
/4
/2
C5
C5
C4
C4
C5
C4
C5
F4
F4
F4
F4F4
F4
16' - 0" 36' - 0" 12' - 0" 28' - 0" 52' - 0" 36' - 0"
F1
8' - 0 3/16"
16' - 0"
S J
S J
TOW 99' - 9 3/8"
TOW 99' - 9 3/8"
S9.2
S9.1
TOF 89' - 8"
TOF 89' - 8"
C3 F3
TOW 100' - 0"
TOF 96' - 0"
TOF 96' - 0"
TOF 96' - 0"
TOW 100' - 0"
TOW 100' - 0"
TOF 96' - 0"
TOW 100' - 0"
C4
TOW 100' - 0"
TOW 100' - 0"
TOF 96' - 0"
S9.1
S9.2
S9.2
S J
S J
S J
S J
S J
S J
S J
S J
S9.1
C4
S J
S J
S J
S J
S J
S J
S J
S J
S J
S J
S J
S J
S J
S J
S J
TOF 96' - 0"
TOW 100' - 0"
S9.3
F3
C4
C4
F3
S J
S J
S J
S J S J
S J S J
S J
S J
S J
S J
S J
S J
S J
/2
F1 F1
S J
S J S J
S J
S J
F4
S J
S9.3
C3
F4
TOW 100' - 0"
18' - 0" 18' - 0"
/4
S J
/4
/2
/4
S J
S J
F5
S9.1
S9.4
/4
8' - 1 1/4"
/2
F6
C6 C6 C6
C6
(2 PLACES)(2 PLACES)
(2 PLACES)
(2 PLACES)
1'-5" WIDE x 5'-0" LONG
CONC WALL W/ 2'-0"
WIDE PRECAST CONC
CAP
S9.4
C4
TRUSS BEARING ELEVATION
INDICATES AREA OF ROOF OVERFRAMING
ROOF FRAMING NOTES:
XX'-XX"TB
TOP OF WALL ELEVATION
XX'-XX"TOW
- ALL TRUSSES @ 24" UNO
-USE 2-2x8 BOX HEADER, TYP UNO ON THIS PLAN
WS STEP IN WALL PLATE HEIGHT
INDICATES ATTIC SPACE BELOW
© Copyright D'Amato Conversano Inc. All Rights Reserved This document, and the ideas and designs may not be reused, in whole or in part, without written permission from D'Amato Conversano Inc.
D'Amato Conversano Inc. disclaims any responsibility for its unauthorized use.
www.dci-engineers.com
CIVIL / STRUCTURAL
BILLINGS | BOZEMAN | MISSOULA
0 1 2 3 4 5 6 7 8 9 1 inches
DRAWING NO.
PKG
NO.
SHEET
OF
PROJECT NO.:
REVISIONS:
DESIGNED
TECH. REVIEW
CADD
DESIGNED SUB SHEET NO. TITLE OF SHEET
05/2018
5/
/2
2:
:1
P
M
S1.1
06.01.18C O
N S
T R
U C
T
IO
N D
O C
U M
E N
T S
FOUNDATION PLAN
13083
INRC OFFICE BUILDING - PHASE 3
USDA FOREST SERVICE
Checker
Author
Designer
: 1/8" = 1'-0"S1.1
16 FOUNDATION PLAN
FOOTING SCHEDULE
TYPE
MARK WIDTH LENGTH THICKNESS FOOTING REINF COMMENTS
F1 1' - 8" CONT 10" 2-#4
F2 2' - 0" CONT 10" 3-#4 & #4 @ 18" OC,
SHORT
F3 3' - 0" 3'-0" 10" 5-#4 EA WAY
F4 4' - 0" 4'-0" 10" 6-#4 EA WAY
F5 3' - 0" 14'-0" 10" 5-#4 LONG, 13-#4 SHORT
F6 3' - 0" 7'-0" 10" 5-#4 LONG, 7-#4 SHORT
COLUMN SCHEDULE
TYPE MARK TYPE BASE PLATE
C3 3-2x6 STUD PACK
C4 4-2x6 STUD PACK
C5 HSS4X4X3/8
C6 10x10
S1.1
1 3/4x11 7/8 LVL @ 16" OC
1 3/4x11 7/8 LVL @ 16" OC
59' - 11"
8' - 8" 12' - 0" 28' - 0" 11' - 3"
39' - 3"
B6
S9.2
S9.2
S9.2
S9.2
C C
B12
/4
/4
S9.1
B
B
B
B
C4
C4
C4
C4
B
HATCHED WALLS
INDICATED 2x6 BEARING
WALLS ABOVE
HATCHED WALLS
INDICATED 2x6 BEARING
WALLS ABOVE
B
C4
ABV
S9.1
FLOOR JOIST
I-JOIST SHALL BE ENGINEERED WOOD JOIST
WITH THE FOLLOWING REQUIREMENTS:
MIN FLANGE WIDTH:
0'-16' - 2 1/4" FLANGE
16'-24' - 3 1/2" FLANGE
DEFLECTION
LL = L/480
TL = L/360
1/4
11 7/8" RAFTERS
@ 16" OC W/ TYP
FACE HANGER
2x12 LEDGER W/ 3-# 12x3 1/2" SCREWS
@ 16" OC
8d @ 4" OC
2x6 @ 16" OC
W/ 1/2" OSB
TO PARA
SEE PLAN
2x6 @ 16" OC
W/ 1/2" OSB
TO PARA
SEE PLAN
4x10 @
24" OC
1x T&G W/
5/8" OSB
10d @ 6" OC
8d @ 4" OC
TAPERED 2x10
@ 16" OC
SEAT TIGHT
BLOCKING
8d @ 3" OC
/2
/4
TYP 2-2x10
HEADER
LAP EA STUD
& SCREW W/
4-#12x3", TOP
& BOTTOM
S E
E A
R C
H
C10x20
STRINGER
3 1/8x12 GL
TREAD, TYP
3/8"x4" BASE PLATE W/ 3-5/8"Øx4" LAGS TO
BLOCKING BEAMS
BLW
1/4" END
CAP PL
(V)
4" 4"
SEE A8.0 FOR
RAILING
1" 2 1/2"
BEAM,
SEE PLAN
L2x2x1/4x0'-7" W/ 3- 3/8"Øx2 1/2"
LAGS TO TREAD
1/4" TOP &
BOTTOM PLATE'S
& REQUIRED
3/16
FACE PLATE 3/8"x4"
W/ 3-5/8"Ø THRU
BOLTS
© Copyright D'Amato Conversano Inc. All Rights Reserved This document, and the ideas and designs may not be reused, in whole or in part, without written permission from D'Amato Conversano Inc.
D'Amato Conversano Inc. disclaims any responsibility for its unauthorized use.
www.dci-engineers.com
CIVIL / STRUCTURAL
BILLINGS | BOZEMAN | MISSOULA
0 1 2 3 4 5 6 7 8 9 1 inches
DRAWING NO.
PKG
NO.
SHEET
OF
PROJECT NO.:
REVISIONS:
DESIGNED
TECH. REVIEW
CADD
DESIGNED SUB SHEET NO. TITLE OF SHEET
05/2018
5/
/2
2:
:1
P
M
S2.1
06.01.18C O
N S
T R
U C
T
IO
N D
O C
U M
E N
T S
MAIN FLOOR PLAN
13083
INRC OFFICE BUILDING - PHASE 3
USDA FOREST SERVICE
TRB
JRM
TRB
: 1/8" = 1'-0"S2.1
11 MAIN FLOOR FRAMING PLAN
BEAM / HEADER SCHEDULE
Type Mark Type
B2 2-1 3/4x11 7/8 LVL
B3 3-1 3/4x11 7/8 LVL
B5 3-1 3/4x16 LVL
B6 W14X38
B7 W24X68
B9 10x16 DF
B10 W10X33
B11 5 1/8x18 GL
B12 W14X26
COLUMN SCHEDULE
TYPE MARK TYPE BASE PLATE
C3 3-2x6 STUD PACK
C4 4-2x6 STUD PACK
C5 HSS4X4X3/8
C6 10x10
NOTE:
ALL HEADERS NOT DESIGNATED SHALL BE
CONSIDERED 'B1'
B1 2-2x10
: 3/4" = 1'-0"S2.1
5 DETAIL
: 3/4" = 1'-0"S2.1
10 DETAIL
: 3/4" = 1'-0"S2.1
15 DETAIL
S2.1
S2.1
S2.2S1.0
: 3/4" = 1'-0"S2.1
3 DETAIL
S2.2
File details come from the government source that posted it. Updated .