This document contains construction drawings and specifications for a federal office building project. The drawings detail framing plans, foundation plans, and shear wall layouts for the main building, smoking structure, and pavilion. Key details include specifications for 16" I-joists, beam and header schedules, column schedules, and notes on roof framing, sheathing attachment, and allowable wall penetrations. The project involves construction of Phase III of the Interagency Natural Resource Center in Coeur d'Alene, Idaho, estimated between $5-10 million. The pre-solicitation notice states that the solicitation for proposals will be posted on June 5, 2018 with responses due 30 days after. The project will support 173 employees from the U.S. Forest Service, Fish & Wildlife Service, and Bureau of Land Management.
20 - J-3 Drawings Part 10
View the file
Other files
Show all 40
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
16" I-JOIST @ 16" OC
16" I-JOIST @ 16" OC
16" I-JOIST @ 16" OC
16" I-JOIST @ 16" OC
16" I-JOIST @ 16" OC
16" I-JOIST @ 16" OC
16" I-JOIST @ 16" OC
16" I-JOIST @ 16" OC
TAPERED 2x10 @ 24" OC
11 7/8" I-JOIST @ 16" OC
4x14 @ 24" OC
2x8 @ 16" OC
/4 x L
V L
O C
3/
4x
L V L
4" O
C
T A
P E
R E
D x
O C
TAPERED 2x10 AWNING
JOIST @ 16" OC, LAP STUDS
HSS 4x4x3/16 @
3'-3" OC
A A
E E
D D
B B
B
B
B
B5 B5
B
B1 B3
B1 B3
B
B 5 C4
ABVB
LOW ROOF FRAMING
C4
C4
ABV
ABV
C4
ABV
C4
C4
ABV
ABV
B
B
C4
C4
ABV
ABV
B12
B
B2
B2
S9.2
S9.2
S9.2
S9.2
B9
WALL ABOVE
S9.2
S9.2
C5
C5
1 1/8" -2/4/1- T&G OSB
TO SUBFLOOR 113' - 6"
C C
TYP
C4
ABV
C4
TYP
ABV
B2
B
S9.3
WOOD FRAMED STAIRS,
SEE DETAILS
B3
B6
S9.3
S9.3
10x16 & TRIPLE 1 3/4x16
LVL CANTILEVERED
ALONG WALL
S9.3
STAIRS,
SEE
NOT TO
LEFT
METAL
FASCIA
HATCHING INDICATES EXTENDED 2ND
FLOOR
B3 B3
C4
BLW
S9.3
S9.3
SIM
B12
B
HATCHING
INDICATES
LOW ROOF
FRAMING
B
B
C4
C4
C4
BLW
BLW
BLW
C4 BLW
2' - 8 1/2" 22' - 7 3/8" 2' - 8 1/8"
TAPERED 2x10
AWNING JOIST
@ 16" OC, LAP
STUDS
S2.1
S E
E A
R C
H
D B
L
D B
L
MECH OPENING TBD
1/2" OSB 'FLOOR'
SEE 15/S2.2
FOR ROOF
FRAMING
ABOVE
B7
( 112' - 2 5/8" )
B7
( 112' - 2 5/8" )
B7
( 112' - 2 5/8" )
C4
BLW
B
/8
S2.1
S2.1
3 1/2x16
LVL RIM
HATCH
INDICATES
'APPLIED'
TAPERED
FRAME
DBL
DBL
S9.3
3 1/2x16
LVL RIM
HATCH INDICATES
'APPLIED' TAPERED
FRAME
1 3/4x16 LVL AWNING
FRAMING @ 24" OC,
SEE 16/S9.3
B
B1
B
B
B9
S9.4
CLOSED RISER
WOOD FRAMED
STAIR ASSEMBLY,
SEE A8.1 & SEE 9/S9.1
FOR STRINGER TO
SLAB, USE SHAPED 1
3/4x11 7/8 LVL
STRINGERS (SINGLE
EDGE / DBL CENTER) -
1 1/8" OSB TREADS.
USE 2x8 @ 16" OC @
LANDING
SEE A7.1 FOR EXTENT
OF TIMBER JOIST
3-1 3/4x16 LVL
ALONG WALL
W/ BACKSPAN
B11
S9.3
FLOOR JOIST
I-JOIST SHALL BE ENGINEERED WOOD JOIST
WITH THE FOLLOWING REQUIREMENTS:
MIN FLANGE WIDTH:
0'-20' - 2 1/4" FLANGE
20'-25' - 3 1/2" FLANGE
DEFLECTION
LL = L/480
TL = L/360
C
HSS 4x4x3/16
HSS 4x4x1/2
HSS 4x4x1/2
1 1/2x22GA 'B'
DECKING
CEILING FRAMING BELOW
S9.3
S9.3
S9.3
TOP 116' - 1"
TOP 116' - 1"
(V)
(V)
TOS = 115'-2"± (V)
© Copyright D'Amato Conversano Inc. All Rights Reserved This document, and the ideas and designs may not be reused, in whole or in part, without written permission from D'Amato Conversano Inc.
D'Amato Conversano Inc. disclaims any responsibility for its unauthorized use.
www.dci-engineers.com
CIVIL / STRUCTURAL
BILLINGS | BOZEMAN | MISSOULA
0 1 2 3 4 5 6 7 8 9 1 inches
DRAWING NO.
PKG
NO.
SHEET
OF
PROJECT NO.:
REVISIONS:
DESIGNED
TECH. REVIEW
CADD
DESIGNED SUB SHEET NO. TITLE OF SHEET
05/2018
5/
/2
2:
:1
P
M
S2.2
06.01.18C O
N S
T R
U C
T
IO
N D
O C
U M
E N
T S
UPPER FLOOR PLAN
13083
INRC OFFICE BUILDING - PHASE 3
USDA FOREST SERVICE
TRB
JRM
TRB
: 1/8" = 1'-0"S2.2
11 UPPER FLOOR FRAMING PLAN
BEAM / HEADER SCHEDULE
Type Mark Type
B2 2-1 3/4x11 7/8 LVL
B3 3-1 3/4x11 7/8 LVL
B5 3-1 3/4x16 LVL
B6 W14X38
B7 W24X68
B9 10x16 DF
B10 W10X33
B11 5 1/8x18 GL
B12 W14X26
COLUMN SCHEDULE
TYPE MARK TYPE BASE PLATE
C3 3-2x6 STUD PACK
C4 4-2x6 STUD PACK
C5 HSS4X4X3/8
C6 10x10
NOTE:
ALL HEADERS NOT DESIGNATED SHALL BE
CONSIDERED 'B1'
B1 2-2x10
: 1/8" = 1'-0"S2.2
15 ROOF FRAMING PLAN
MAIN STAIR ASSEMBLY
-CLOSED RISER / WOOD
FRAMED STAIRS FROM MAIN
TO MASEMENT, SEE NOTES AT
FAR RIGHT OF SHEET.
-C10x20 STRINGERS & 3 1/8x12
GL TREADS FROM MAIN TO
UPPER LEVEL, SEE A8.1 & A9.0
& 3/S2.1.
-CONNECTION TREADS TO
STRINGERS W/ L2x2x1/4x0'-7"
ANGLE, WELD TO STRINGERS,
3-3/8"Øx2 1/2" LAGS TO
TREADS
-SEE DETAILS 9/S9.1 & 3/S2.1
FOR REFERENCE FRAMING
CONDITIONS
-PROVIDE 1 3/4x9 1/4 LVL'S @
16" OC @ CANTILEVERED
INTERMEDIATE LANDING
(TRIPLE @ STRINGERS) W/ 3/4"
T&G OSB SHEATHING
S2.2
A A
E E
D D
B B
B
B
6:12
:1
:1
:1
:1
4:12
:1
RIDGE
R
ID
G E
SKYLIGHT
B
B
C4
C4
C4 C4
C4
C4
S9.2
S9.4
STRUCTURAL FASCIA
STRUCTURAL FASCIA
:1
6:12 :1
:1
:1
:1
R
ID
G E
C C
:1
5/8" -32/16- OSB,
SEE GENERAL
NOTES
TB 124' - 0"
TB 124' - 0"
B11
B11
S9.4
WS WS
MT
MT
G
IR
S9.4
TB 124' - 0"
G T
S H
T
JT
SHGT
TB 124' - 0"
GT
SHT
A T
SHGT
S9.4
S9.4
TB 124' - 0"
JT
SHGT
S H T
S H T
S9.4
S9.4
J T
S H
G T
S H
T
G
IR
M T
M T
A T
A T
M T
SHT
SHT
M T
G
IR G
IR
GIR
GIR
SHGT
JT
4' - 0" 4' - 0"
4' - 0"
4' - 0"
4' - 0"
4' - 0" 4' - 0"
6:12
6:12
TB 123' - 0"
TB 123' - 0"
RIDGE
S9.4
S9.4
S9.4
S9.4
S9.4
S9.4
6:12
6:12
JT
A T
GIR
GIR
GIR
S9.4
S9.4
MIN
8' - 4"
TYP OVERHANG,
COORDIANTE WITH
ARCH SECTIONS
B2
B2
TRUSS BEARING ELEVATION
INDICATES AREA OF ROOF OVERFRAMING
ROOF FRAMING NOTES:
XX'-XX"TB
TOP OF WALL ELEVATION
XX'-XX"TOW
- ALL TRUSSES @ 24" UNO
-USE 2-2x8 BOX HEADER, TYP UNO ON THIS PLAN
WS STEP IN WALL PLATE HEIGHT
INDICATES ATTIC SPACE BELOW
TRUSS REFERENCE SCHEDULE
GT
MARK TRUSS TYPE
GABLE TRUSS
MT MONO TRUSS
AT ATTIC TRUSS
JT JACK TRUSS
SHT STEPPED HIP TRUSS
SHGT STEPPED HIP GIRDER TRUSS
GIR GIRDER TRUSS
HT HIP TRUSS
ALL TRUSSES @ 24" OC, UNO
© Copyright D'Amato Conversano Inc. All Rights Reserved This document, and the ideas and designs may not be reused, in whole or in part, without written permission from D'Amato Conversano Inc.
D'Amato Conversano Inc. disclaims any responsibility for its unauthorized use.
www.dci-engineers.com
CIVIL / STRUCTURAL
BILLINGS | BOZEMAN | MISSOULA
0 1 2 3 4 5 6 7 8 9 1 inches
DRAWING NO.
PKG
NO.
SHEET
OF
PROJECT NO.:
REVISIONS:
DESIGNED
TECH. REVIEW
CADD
DESIGNED SUB SHEET NO. TITLE OF SHEET
05/2018
5/
/2
2:
:1
P
M
S2.3
06.01.18C O
N S
T R
U C
T
IO
N D
O C
U M
E N
T S
ROOF FRAMING PLAN
13083
INRC OFFICE BUILDING - PHASE 3
USDA FOREST SERVICE
TRB
JRM
TRB
: 1/8" = 1'-0"S2.3
11 ROOF FRAMING PLAN
COLUMN SCHEDULE
TYPE MARK TYPE BASE PLATE
C3 3-2x6 STUD PACK
C4 4-2x6 STUD PACK
C5 HSS4X4X3/8
C6 10x10
BEAM / HEADER SCHEDULE
Type Mark Type
B2 2-1 3/4x11 7/8 LVL
B3 3-1 3/4x11 7/8 LVL
B5 3-1 3/4x16 LVL
B6 W14X38
B7 W24X68
B9 10x16 DF
B10 W10X33
B11 5 1/8x18 GL
B12 W14X26
NOTE:
ALL HEADERS NOT DESIGNATED SHALL BE
CONSIDERED 'B1'
B1 2-2x10
S2.3
1S
1S
AS AS
BS BS
TOP 100' - 11 1/2" TOF 97' - 0"
12"x20" CONC PIER
(2 PLACES)
3'-0" SQ x 12" DEEP
FOOTING W/ 5-#5 EA
WAY (2 PLACES)
100'-0"
REF GRADE
2-8x TAPERED COLUMNS
(2 PLACES)
S2.5
1S
1S
AS AS
BS BS
16' - 8 1/2"
"6x12 TAPERED
BEAMS
(2 PLACES)
SEE ARCH
FOR ROOF
TRRUSS
OVERFRAMIN
G
/2
/2
S2.6
S2.6
FULL LENGTH DF
2x6 T&G 'LID'
TO DECKING
108'-6 1/2"
SEE PLAN
TOP
2 1/2"
TIGHT 3/4"x4"
KERF COL
BASE
HSS
4x4x3/8x1'-0" W/
1/4" CAP
SEE PLAN
TOP
TAPERED 8x
COLUMNS
2-1"Ø THRU
BOLTS W/
BRIDGE
WASHERS
BASE PL 3/4x6x1'-2" W/ 6-3/4"Øx6" HAS (3"x5 1/2" GA)
HSS
4x4x3/8x1'-0" W/
1/4" CAP
SEE PLAN
TOP
SEE PLAN
TOF
2 1/2"
SEE PLAN
DBL 8x
TAPERED DF
COL
3/4" CHAMFER
#3 TIES @ 10" OC,
3 @ 4" OC @ TOP
6-#5 VERTS
S2.5
A A
B B
TYP PIER
GRID
GRID
1' - 10"
2" CLR, TYP
SECTION B-B - BASE PL
GRID
GRID
BASE PL 3/4x6x1'-2" W/ 6-3/4"Øx6" HAS (3"x5 1/2" GA)
HSS
4x4x3/8x1'-0" W/
1/4" CAP
1/412x20 PIER
SECTION A-A - COLUMN BASE
GRID
GRID
7 1/2" 2 1/2"
/2
2-1"Ø THRU BOLTS
W/ BRIDGE
WASHERS
TIGHT 3/4"x4" KERF
AROUND COL
6-#5 VERTS
#3 TIES @ 10" OC,
3 @ 4" OC @ TOP
12x20
PIER
SEE ARCH FOR
HANDSCAPE
© Copyright D'Amato Conversano Inc. All Rights Reserved This document, and the ideas and designs may not be reused, in whole or in part, without written permission from D'Amato Conversano Inc.
D'Amato Conversano Inc. disclaims any responsibility for its unauthorized use.
www.dci-engineers.com
CIVIL / STRUCTURAL
BILLINGS | BOZEMAN | MISSOULA
0 1 2 3 4 5 6 7 8 9 1 inches
DRAWING NO.
PKG
NO.
SHEET
OF
PROJECT NO.:
REVISIONS:
DESIGNED
TECH. REVIEW
CADD
DESIGNED SUB SHEET NO. TITLE OF SHEET
05/2018
5/
/2
3:
:1
P
M
S2.5
06.01.18C O
N S
T R
U C
T
IO
N D
O C
U M
E N
T S
SMOKING STRUCTURE PLANS - ALT
#2
13083
INRC OFFICE BUILDING - PHASE 3
USDA FOREST SERVICE
Checker
Author
Designer
: 1/4" = 1'-0"S2.5
5 FOUNDATION PLAN - SMOKING STRUCTURE
: 1/4" = 1'-0"S2.5
7 ROOF FRAMING PLAN - SMOKING STRUCTURE
: 3/4" = 1'-0"S2.5
11 BASE DETAIL
: 1" = 1'-0"S2.5S2.5
13 TYPICAL PIER
AP
AP
BP
BP
1P 1P
2P 2P
12"x20" CONC PIER
(4 PLACES)
2-8x TAPERED
COLUMNS (4
PLACES)
3'-6"x4'-6"x12" DEEP
COOTING W/ 5-#5 EA
WAY (4 PLACES)
100'-0"
REF GRADE
TOF 97' - 0"
TOP 100' - 11 1/2"
TYP
TYP
S2.5
AP
AP
BP
BP
1P 1P
2P 2P
/2
/2
(TOJ 109'-0")
1' - 1 1/2" 28' - 10" 1' - 1 1/2"
8' - 4 1/4" 14' - 5" 8' - 3 3/4"
31' - 1"
/2
/2
13A
S2.6
13B
S2.6
6x12 TAPERED BEAMS
(TOB = 8'-4 1/2")
SEE ARCH FOR ROOF
TRUSS OVERFRAMING
S2.6
S2.6
FULL LENGTH DF
2x6 T&G 'LID'
TO DECKING
108'-6 1/2"
GRID
/4
SEE ARCH
3' - 9"
PREFAB TRUSS
OVERFRAMING
NOTCHED & TAPERED
3x12, SEE PLAN FOR
SPACING
2-8" TIMBERLOK
TOE SCREWS,
EA SIDE
6x12
INSTALL FINAL
SOFFIT BOARDS
AFTER
TRUSSES
INSTALLED
SEE ARCH
PREFAB TRUSS
OVERFRAMING
3x12
2-8" TIMBERLOK
TOE SCREWS,
EA SIDE,
RECESS & PLUG
1' - 1 1/2" SEE PLAN
SEE ARCH
TAPERED 6x12
2x6 T&G
6x12, SEE ARCH
FOR END TAPER
2-1"Ø THRU BOLTS,
EA COL W/ BRIDGE
WASHERS
TAPERED 8x
COL (8 1/2 BASE
TO 13 1/2)
3x12 JOIST @ PAVILION, SEE 11/S2.6 FOR CONN
5 1/2" 8"
/2
/2
2 1/2"
A B
FULL LENGTH
2x6 T&G
/4
SEE ARCH FOR ROOF
TRUSSES ATOP
© Copyright D'Amato Conversano Inc. All Rights Reserved This document, and the ideas and designs may not be reused, in whole or in part, without written permission from D'Amato Conversano Inc.
D'Amato Conversano Inc. disclaims any responsibility for its unauthorized use.
www.dci-engineers.com
CIVIL / STRUCTURAL
BILLINGS | BOZEMAN | MISSOULA
0 1 2 3 4 5 6 7 8 9 1 inches
DRAWING NO.
PKG
NO.
SHEET
OF
PROJECT NO.:
REVISIONS:
DESIGNED
TECH. REVIEW
CADD
DESIGNED SUB SHEET NO. TITLE OF SHEET
05/2018
5/
/2
3:
:5
P
M
S2.6
06.01.18C O
N S
T R
U C
T
IO
N D
O C
U M
E N
T S
PAVILION PLANS - ALT #1
13083
INRC OFFICE BUILDING - PHASE 3
USDA FOREST SERVICE
TRB
JRM
TRB
: 1/4" = 1'-0"S2.6
5 FOUNDATION PLAN - PAVILION
: 1/4" = 1'-0"S2.6
7 ROOF FRAMING PLAN - PAVILION
: 3/4" = 1'-0"S2.6S2.6
11 EAVE DETAIL
: 3/4" = 1'-0"S2.6S2.6
15 EAVE DETAIL
: 3/4" = 1'-0"S2.6S2.5
13 TYP TOP CONNECTION
A A
E E
D D
B B
C C
A
TYP @ PERIMETER
A
A
A
B
B B
B
B B
B
B
B
A
SHEAR WALL SCHEDULE
MARK
ADDITIONAL REMARKS:
WALL
SHEATHING
EDGE
NAILING
FIELD
NAILING
FND ANCHOR REMARKS
BOT PL TO RIM
(SOLE NAILING)
1/2" SHTHG,
ONE SIDE OF
WALL
8d @ 6" OC
10d COOLER
NAILS @ 4" OC
8d @ 12" OC -
5/8" DIA AR @ 48" OC
7" EMBED
5/8" GYP BOARD
EA SIDE
16d @ 6" OC
16d @ 4" OC
(1,2,3,4,5)
INDICATES SPECIAL SHEAR WALL TYPE, ALL EXT WALLS ARE TO BE 2x6 @ 16" OC (UNO) W/ 8d NAILS @ 6" OC, EDGE NAILING AND 12" OC, FIELD
NAILING, W/ 5/8" DIA AR @ 48" OC, UNLESS DESIGNATED SPECIAL,
'SIMPSON' MASAPZ ANCHORS MAY BE USED IN LIEU OF 5/8" DIA AR AT
CONTR OPTION WITH EQUIVALENT SPACING
1. ALL WD SHEATHED WALLS SHALL BE BLOCKED AT ALL SHTHG EDGES,
EDGE NAILING APPLIED TO ALL T&B PLS, VERT JOINTS, HORIZ BLOCKED
JOINTS, WALL CORNERS AND HOLDOWN ANCHOR STUDS
2. PROVIDE 3x3x1/4 PL WASHERS AT ALL ANCHOR RODS
3. EMBED ALL ANCHOR RODS 7" MIN, UNO
4. ANCHOR RODS & WASHERS IN CONTACT W/ PT PLS SHALL BE
GALVANIZED OR STAINLESS STEEL
5. PROVIDE PT 3x SILL PLATES WHERE INDICATED
6. STUD LAYOUT SHALL MATCH FRAMING MEMBER LAYOUT ABOVE WHERE
APPLICABLE
7. DBL TOP PLS SHALL BE ATTACHED PER 'TYP MIN DOUBLE PLATE LAP & MIN
NAILING'
8. SEE 'ALLOWABLE PENETRATIONS FOR LIGHT FRAMED LUMBER 2x
LUMBER' FOR ALLOWABLE FRAMING PENETRATIONS
9. SEE 'TYPICAL FLOOR & ROOF SHEATHING ATTACHMENT' FOR HORIZ
DIAPHRAGM NAILING, BLOCKING AT UNSUPPORTED PANEL EDGES NOT
REQUIRED UNLESS SPECIFICALLY INDICATED ON PLAN
10. SEE 'TYP WALL SHTHG ATTACHMENT' FOR SHEAR WALL NAILING,
BLOCKING, & FOUNDATION ANCHOR SPACING
11. RIM / BLOCKING TO TOP PL ATTACHMENT SHALL BE BASED ON SHEAR
WALL TYPE BELOW
5/8" DIA AR @ 48" OC
7" EMBED
10d COOLER
NAILS @ 12" OC
A A
E E
D D
B B
C C
A
A
A
B
B
B
B
A
B
TYP @ PERIMETER
© Copyright D'Amato Conversano Inc. All Rights Reserved This document, and the ideas and designs may not be reused, in whole or in part, without written permission from D'Amato Conversano Inc.
D'Amato Conversano Inc. disclaims any responsibility for its unauthorized use.
www.dci-engineers.com
CIVIL / STRUCTURAL
BILLINGS | BOZEMAN | MISSOULA
0 1 2 3 4 5 6 7 8 9 1 inches
DRAWING NO.
PKG
NO.
SHEET
OF
PROJECT NO.:
REVISIONS:
DESIGNED
TECH. REVIEW
CADD
DESIGNED SUB SHEET NO. TITLE OF SHEET
05/2018
5/
/2
2:
:1
P
M
S3.1
06.01.18C O
N S
T R
U C
T
IO
N D
O C
U M
E N
T S
SHEAR WALL PLANS
13083
INRC OFFICE BUILDING - PHASE 3
USDA FOREST SERVICE
Checker
Author
Designer
: 1/16" = 1'-0"S3.1
5 MAIN FLOOR SHEAR WALL PLAN
: 12" = 1'-0"S3.1
7 SHEARWALL SCHEDULE
: 1/16" = 1'-0"S3.1
13 UPPER FLOOR SHEAR WALL PLAN
File details come from the government source that posted it. Updated .