Part_4_Project_Manual_2018_06_01.pdf

PDF 2 MB Posted

Attached to
INRC - Phase III
Solicitation number
12034318R0017
Issued by

About this file

This is a pre-solicitation notice for construction of the Interagency Natural Resource Center - Phase III project in Coeur d'Alene, Idaho. The Forest Service anticipates awarding a contract between $5 million and $10 million to support 173 employees from the Fish & Wildlife Service, Bureau of Land Management, and Forest Service in a new 29,000 square foot main office building. Interested parties should monitor the site for a formal solicitation and request for proposals expected to be posted on or around June 5, 2018, with responses due 30 days thereafter. The project will complete a multi-phased facility to house interagency natural resource personnel.

07 - J-2 Project Manual Part 4

View the file

Other files

File Type Posted
INRC_Second_Floor.dwg DWG drawing
INRC_First_Floor.dwg DWG drawing
7-12-18_Q&A.XLSX XLSX spreadsheet
Amendment_0002.pdf PDF
Revised_B-1.pdf PDF
Questions_and_Answers_062918.pdf PDF
L1.5_(rev1).pdf PDF
125900_SF_-_SYSTEMS_FURNITURE.pdf PDF
Amendment_0001.pdf PDF
CV_(rev1).pdf PDF
S0.1_(rev1).pdf PDF
C1.3_(rev1).PDF PDF
Prebid_Notes_6-19-18.pdf PDF
Prebid_Attendance.pdf PDF
Questions_and_Answers_061818.pdf PDF
Part_2_Project_Manual_2018_06_01.pdf PDF
Drawings_Part_1_2018_06-01.pdf PDF
Drawings_Part_13_2018_06-01.pdf PDF
Drawings_Part_6_2018_06-01.pdf PDF
Drawings_Part_9_2018_06-01.pdf PDF
Drawings_Part_3_2018_06-01.pdf PDF
Drawings_Part_12_2018_06-01.pdf PDF
J-5_Past_Performance_Questionnaire.pdf PDF
Drawings_Part_4_2018_06-01.pdf PDF
Drawings_Part_5_2018_06-01.pdf PDF
Drawings_Part_2_2018_06-01.pdf PDF
Drawings_Part_11_2018_06-01.pdf PDF
Part_5_Project_Manual_2018_06_01.pdf PDF
Part_6_Project_Manual_2018_06_01.pdf PDF
Drawings_Part_8_2018_06-01.pdf PDF
J-1_Wage_Rate_Decision_ID180031_Mod_3_Dated_05112018.pdf PDF
Drawings_Part_10_2018_06-01.pdf PDF
Drawings_Part_14_2018_06-01.pdf PDF
Short_Set_Solicitation_12034318R0017_Final_06072018.pdf PDF
J-4_State_of_Idaho_Workers'_Insurance.pdf PDF
Part_3_Project_Manual_2018_06_01.pdf PDF
Drawings_Part_7_2018_06-01.pdf PDF
Solicitation_12034318R0017_Final_06072018.pdf PDF
Part_7_Project_Manual_2018_06_01.pdf PDF
Part_1_Project_Manual_2018_06_01.pdf PDF
Show all 40

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

A&E ARCHITECTS P.C. US DEPARTMENT OF AGRICULTURE

IDAHO PANHANDLE NATIONAL FOREST

INRC OFFICE BUILDING – PHASE 3

COEUR D’ALENE, IDAHO

ROOM-IDENTIFICATION SIGNAGE 101423.13 - 3

2.4 ACCESSORIES

A. Adhesive: As recommended by sign manufacturer.

B. Two-Face Tape: Manufacturer's standard high-bond, foam-core tape, 0.045 inch thick, with adhesive on both sides.

2.5 FABRICATION

A. General: Provide manufacturer's standard sign assemblies according to requirements indicated.

1. Mill joints to a tight, hairline fit. Form assemblies and joints exposed to weather to resist water penetration and retention.

B. Subsurface-Applied Graphics: Apply graphics to back face of clear face-sheet material to produce precisely formed image. Image shall be free of rough edges.

C. Subsurface-Etched Graphics: Reverse etch back face of clear face-sheet material. Fill resulting copy with manufacturer's standard enamel. Apply opaque manufacturer's standard background color coating over enamel-filled copy.

PART 3 - EXECUTION

3.1 INSTALLATION

A. General: Install signs using mounting methods indicated and according to manufacturer's written instructions.

1. Install signs level, plumb, true to line, and at locations and heights indicated, with sign surfaces free of distortion and other defects in appearance.

2. Install signs so they do not protrude or obstruct according to the accessibility standard.

3. Before installation, verify that sign surfaces are clean and free of materials or debris that would impair installation.

B. Mounting Methods - Options:

1. Adhesive: Clean bond-breaking materials from substrate surface and remove loose debris. Apply linear beads or spots of adhesive symmetrically to back of sign and of suitable quantity to support weight of sign after cure without slippage. Keep adhesive away from edges to prevent adhesive extrusion as sign is applied and to prevent visibility of cured adhesive at sign edges. Place sign in position, and push to engage adhesive. Temporarily support sign in position until adhesive fully sets.

INRC OFFICE BUILDING – PHASE 3

COEUR D’ALENE, IDAHO

ROOM-IDENTIFICATION SIGNAGE 101423.13 - 4

2. Two-Face Tape: Clean bond-breaking materials from substrate surface and remove loose debris.

Apply tape strips symmetrically to back of sign and of suitable quantity to support weight of sign without slippage. Keep strips away from edges to prevent visibility at sign edges. Place sign in position, and push to engage tape adhesive.

END OF SECTION 101423.13

INRC OFFICE BUILDING – PHASE 3

COEUR D’ALENE, IDAHO

METAL TOILET COMPARTMENTS 102113.13 - 1

SECTION 102113.13 - METAL TOILET COMPARTMENTS

PART 1 - GENERAL

1.1 SUMMARY

A. Section includes painted steel toilet compartments configured as toilet enclosures and urinal screens.

1.2 ACTION SUBMITTALS

A. Product Data: For each type of product.

B. Sustainable Design Submittals:

1. Product Data: For recycled content, indicating postconsumer and preconsumer recycled content and cost.

C. Shop Drawings: For toilet compartments. Include plans, elevations, sections, and attachment details.

D. Samples for each type of toilet compartment material indicated.

1.3 INFORMATIONAL SUBMITTALS

A. Product certificates.

1.4 CLOSEOUT SUBMITTALS

A. Maintenance data.

PART 2 - PRODUCTS

2.1 PERFORMANCE REQUIREMENTS

A. Recycled Content of Steel Products: Postconsumer recycled content plus one-half of preconsumer recycled content not less than 25 percent.

http://www.arcomnet.com/sustainable_design.aspx?topic=7 http://www.arcomnet.com/sustainable_design.aspx?topic=31

INRC OFFICE BUILDING – PHASE 3

COEUR D’ALENE, IDAHO

METAL TOILET COMPARTMENTS 102113.13 - 2

B. Accessibility Requirements: Where indicated to comply with accessibility requirements, comply with the U.S. Architectural & Transportation Barriers Compliance Board's "Americans with Disabilities Act (ADA), Accessibility Guidelines for Buildings and Facilities (ADAAG),” and ICC/ANSI A117.1.

2.2 PAINTED STEEL TOILET COMPARTMENTS

A. Manufacturers: Subject to compliance with requirements, provide products by one of the following:

1. All American Metal Corp.

2. Ampco Products, LLC.

3. Bradley Corporation.

4. Global Partitions; ASI Group.

5. Marlite.

6. Metpar Corp.

B. Toilet-Enclosure Style: Overhead braced, floor anchored.

C. Urinal-Screen Style: Wall hung, flat panel, floor anchored.

D. Door, Panel, and Pilaster Construction: Seamless, metal facing sheets pressure laminated to core material; with continuous, interlocking molding strip or lapped-and-formed edge closures; corners secured by welding or clips and exposed welds ground smooth. Provide with no-sightline system.

Exposed surfaces shall be free of pitting, seam marks, roller marks, stains, discolorations, telegraphing of core material, or other imperfections.

1. Core Material: Manufacturer's standard sound-deadening honeycomb of resin-impregnated kraft paper in thickness required to provide finished thickness of 1 inch for doors and panels and 1-1/4 inches for pilasters.

2. Grab-Bar Reinforcement: Provide concealed internal reinforcement for grab bars mounted on units of size and material adequate for panel to withstand applied downward load on grab bar of at least 250 lbf, when tested according to ASTM F 446, without deformation of panel.

3. Tapping Reinforcement: Provide concealed reinforcement for tapping (threading) at locations where machine screws are used for attaching items to units.

E. Urinal-Screen Construction:

1. Integral-Flange, Wall-Hung Urinal Screen: Similar to panel construction, with integral full-height flanges for wall attachment, and maximum 1-1/4 inches thick.

F. Facing Sheets and Closures: Electrolytically coated steel or hot-dip galvanized-steel sheet with nominal base-metal (uncoated) thicknesses as follows:

1. Pilasters, Braced at Both Ends: Manufacturer's standard thickness, but not less than 0.036 inch.

2. Pilasters, Unbraced at One End: Manufacturer's standard thickness, but not less than 0.048 inch.

3. Panels: Manufacturer's standard thickness, but not less than 0.030 inch.

4. Doors: Manufacturer's standard thickness, but not less than 0.030 inch.

5. Flat-Panel Urinal Screens: Thickness matching the panels.

http://www.specagent.com/Lookup?ulid=9482 http://www.specagent.com/Lookup?uid=123457011083 http://www.specagent.com/Lookup?uid=123457011085 http://www.specagent.com/Lookup?uid=123457011086 http://www.specagent.com/Lookup?uid=123457011094 http://www.specagent.com/Lookup?uid=123457011091 http://www.specagent.com/Lookup?uid=123457011092

INRC OFFICE BUILDING – PHASE 3

COEUR D’ALENE, IDAHO

METAL TOILET COMPARTMENTS 102113.13 - 3

G. Pilaster Shoes and Sleeves (Caps): Stainless-steel sheet, not less than 0.031-inch nominal thickness and 3 inches high, finished to match hardware.

H. Urinal-Screen Post: Manufacturer's standard post design of 1-3/4-inch-square, aluminum tube with satin finish; with shoe and sleeve (cap) matching that on the pilaster.

I. Brackets (Fittings):

1. Full-Height (Continuous) Type: Manufacturer's standard design; stainless steel.

J. Steel Sheet Finish: Manufacturer's standard baked-on finish.

1. Color: As indicated by manufacturer's designations or if not indicated as selected by Contracting Officer from manufacturer's full range.

2.3 HARDWARE AND ACCESSORIES

A. Hardware and Accessories: Manufacturer's standard operating hardware and accessories.

1. Material: Chrome-plated zamac.

2. Provide units that comply with regulatory requirements for accessibility at compartments designated as accessible.

B. Hardware and Accessories: Manufacturer's heavy-duty stainless-steel operating hardware and accessories.

1. Provide units that comply with regulatory requirements for accessibility at compartments designated as accessible.

C. Overhead Bracing: Manufacturer's standard continuous, extruded-aluminum head rail with antigrip profile and in manufacturer's standard finish.

D. Anchorages and Fasteners: Manufacturer's standard exposed fasteners of stainless steel, finished to match the items they are securing, with theft-resistant-type heads. Provide sex-type bolts for through-bolt applications. For concealed anchors, use stainless steel, hot-dip galvanized steel, or other rust-resistant, protective-coated steel compatible with related materials.

2.4 FABRICATION

A. Fabrication, General: Fabricate toilet compartment components to sizes indicated. Coordinate requirements and provide cutouts for through-partition toilet accessories, and solid blocking within panel where required for attachment of toilet accessories.

INRC OFFICE BUILDING – PHASE 3

COEUR D’ALENE, IDAHO

METAL TOILET COMPARTMENTS 102113.13 - 4

B. Overhead-Braced Units: Provide manufacturer's standard corrosion-resistant supports, leveling mechanism, and anchors at pilasters to suit floor conditions. Provide shoes at pilasters to conceal supports and leveling mechanism.

C. Floor-Anchored Units: Provide manufacturer's standard corrosion-resistant anchoring assemblies with leveling adjustment nuts at pilasters for structural connection to floor. Provide shoes at pilasters to conceal anchorage.

D. Urinal-Screen Posts: Provide manufacturer's standard corrosion-resistant anchoring assemblies with leveling adjustment at bottoms of posts. Provide shoes and sleeves (caps) at posts to conceal anchorage.

E. Door Size and Swings: Unless otherwise indicated, provide 24-inch-wide, in-swinging doors for standard toilet compartments and 36-inch-wide, out-swinging doors with a minimum 32-inch-wide, clear opening for compartments designated as accessible.

PART 3 - EXECUTION

3.1 INSTALLATION

A. General: Comply with manufacturer's written installation instructions. Install units rigid, straight, level, and plumb. Secure units in position indicated with manufacturer's recommended anchoring devices.

1. Maximum Clearances:

a. Pilasters and Panels: 1/2 inch.

b. Panels and Walls: 1 inch.

2. Stirrup Brackets: Secure panels to walls and to pilasters with no fewer than three brackets attached at midpoint and near top and bottom of panel.

a. Locate wall brackets so holes for wall anchors occur in masonry or tile joints.

b. Align brackets at pilasters with brackets at walls.

3. Full-Height (Continuous) Brackets: Secure panels to walls and to pilasters with full-height brackets.

a. Locate bracket fasteners so holes for wall anchors occur in masonry or tile joints.

b. Align brackets at pilasters with brackets at walls.

3.2 ADJUSTING

A. Hardware Adjustment: Adjust and lubricate hardware according to hardware manufacturer's written instructions for proper operation. Set hinges on in-swinging doors to hold doors open approximately 30 degrees from closed position when unlatched. Set hinges on out-swinging doors to return doors to fully closed position.

INRC OFFICE BUILDING – PHASE 3

COEUR D’ALENE, IDAHO

METAL TOILET COMPARTMENTS 102113.13 - 5

END OF SECTION 102113.13

INRC OFFICE BUILDING – PHASE 3

COEUR D’ALENE, IDAHO

FOLDING PANEL PARTITIONS 102239 - 1

SECTION 102239 - FOLDING PANEL PARTITIONS

PART 1 - GENERAL

1.1 SUMMARY

A. Section Includes:

1. Manually operated, acoustical panel partitions.

1.2 PREINSTALLATION MEETINGS

A. Preinstallation Conference: Conduct conference at Project site.

1.3 ACTION SUBMITTALS

A. Product Data: For each type of product.

B. Sustainable Design Submittals:

1. Product Data: For recycled content, indicating postconsumer and preconsumer recycled content and cost.

2. Chain-of-Custody Certificates: For certified wood products. Include statement of costs.

C. Shop Drawings: For operable panel partitions.

1. Include plans, elevations, sections, attachment details, and numbered panel installation sequence.

2. Indicate stacking and operating clearances. Indicate location and installation requirements for hardware and track, blocking, and direction of travel.

3. Include diagrams for power, signal, and control wiring.

D. Samples: For each exposed product and for each color and texture specified.

E. Delegated-Design Submittal: For operable panel partitions.

1. Include design calculations for seismic restraints that brace tracks to structure above.

1.4 INFORMATIONAL SUBMITTALS

A. Coordination Drawings: Reflected ceiling plans, drawn to scale and coordinated with each other, using input from installers of the items involved.

B. Setting Drawings: For embedded items and cutouts required in other work, including support-beam, mounting-hole template.

http://www.arcomnet.com/sustainable_design.aspx?topic=146

INRC OFFICE BUILDING – PHASE 3

COEUR D’ALENE, IDAHO

FOLDING PANEL PARTITIONS 102239 - 2

C. Seismic Qualification Certificates: For operable panel partitions, tracks, accessories, and components, from manufacturer.

D. Product Certificates: For each type of operable panel partition.

E. Product test reports.

F. Sample warranty.

1.5 CLOSEOUT SUBMITTALS

A. Operation and maintenance data.

1.6 QUALITY ASSURANCE

A. Installer Qualifications: An entity that employs installers and supervisors who are trained and approved by manufacturer.

1.7 WARRANTY

A. Special Warranty: Manufacturer agrees to repair or replace components of operable panel partitions that fail in materials or workmanship within specified warranty period.

1. Warranty Period: Five years from date of Substantial Completion.

PART 2 - PRODUCTS

2.1 PERFORMANCE REQUIREMENTS

A. Delegated Design: Engage a qualified professional engineer, as defined in Section 014000 "Quality Requirements," to design seismic bracing of tracks to structure above.

B. Seismic Performance: Operable panel partitions shall withstand the effects of earthquake motions determined according to ASCE/SEI 7.

1. The term "withstand" means "the partition panels will remain in place without separation of any parts when subjected to the seismic forces specified."

C. Acoustical Performance: Provide operable panel partitions tested by a qualified testing agency for the following acoustical properties according to test methods indicated:

1. Sound-Transmission Requirements: Operable panel partition assembly tested for laboratory sound-transmission loss performance according to ASTM E 90, determined by ASTM E 413, and rated for not less than the STC indicated.

2. Noise-Reduction Requirements: Operable panel partition assembly, identical to partition tested for STC, tested for sound-absorption performance according to ASTM C 423, and rated for not less than the NRC indicated.

INRC OFFICE BUILDING – PHASE 3

COEUR D’ALENE, IDAHO

FOLDING PANEL PARTITIONS 102239 - 3

D. Fire-Test-Response Characteristics: Provide panels with finishes complying with one of the following as determined by testing identical products by a testing and inspecting agency acceptable to authorities having jurisdiction:

1. Surface-Burning Characteristics: Comply with ASTM E 84; testing by a qualified testing agency.

a. Flame-Spread Index: 25 or less.

b. Smoke-Developed Index: 450 or less.

2. Fire Growth Contribution: Complying with acceptance criteria of local code and authorities having jurisdiction when tested according to NFPA 265 Method B Protocol or NFPA 286.

2.2 OPERABLE ACOUSTICAL PANELS

A. Operable Acoustical Panels: Partition system, including panels, seals, finish facing, suspension system, operators, and accessories.

1. Basis-of-Design Product: Subject to compliance with requirements, provide Hufcor, Inc., Series 642 Paired Panels or comparable product by one of the following:

a. Modernfold, Inc.

b. Panelfold Inc.

B. Panel Operation: Manually operated, paired panels.

C. Panel Construction: As required to support panel from suspension components and with reinforcement for hardware attachment. Fabricate panels with tight hairline joints and concealed fasteners. Fabricate panels so finished in-place partition is rigid; level; plumb; aligned, with tight joints and uniform appearance; and free of bow, warp, twist, deformation, and surface and finish irregularities.

D. Dimensions: Fabricate operable acoustical panel partitions to form an assembled system of dimensions indicated and verified by field measurements.

E. STC: Not less than 50.

F. NRC: Not less than 0.65.

G. Panel Materials:

1. Recycled Content: Postconsumer recycled content plus one-half of preconsumer recycled content not less than 25 percent.

2. Certified Wood: Wood products shall be certified according to the American Tree Farm System's "AFF Standard," the AF&PA's Sustainable Forestry Initiative, FSC STD-01-001 and FSC STD-40- 004, or the standards of the Programme for Endorsement of Forest Certification.

3. Steel Frame: Steel sheet, manufacturer's standard thickness.

4. Steel Face/Liner Sheets: Tension-leveled steel sheet, manufacturer's standard thickness.

5. Aluminum: Alloy and temper recommended by aluminum producer and finisher for type of use, corrosion resistance, and finish indicated; manufacturer's standard strengths and thicknesses for type of use.

6. Gypsum Board: ASTM C 1396/C 1396M.

7. Cement Board: ASTM C 1288.

8. Particleboard: ANSI A208.1.

http://www.specagent.com/Lookup?ulid=7619 http://www.specagent.com/Lookup?uid=123457064729 http://www.specagent.com/Lookup?uid=123457064730 http://www.arcomnet.com/sustainable_design.aspx?topic=196 http://www.arcomnet.com/sustainable_design.aspx?topic=175

INRC OFFICE BUILDING – PHASE 3

COEUR D’ALENE, IDAHO

FOLDING PANEL PARTITIONS 102239 - 4

9. Medium-Density Fiberboard: ANSI A208.2.

10. Plywood: DOC PS 1.

H. Panel Closure: Manufacturer's standard.

I. Hardware: Manufacturer's standard as required to operate operable panel partition and accessories;

with decorative, protective finish.

J. Finish Facing: Woven Fabric wall covering

2.3 SEALS

A. Description: Seals that produce operable panel partitions complying with performance requirements and the following:

1. Seals made from materials and in profiles that minimize sound leakage.

2. Seals fitting tight at contact surfaces and sealing continuously between adjacent panels and between operable panel partition perimeter and adjacent surfaces, when operable panel partition is extended and closed.

B. Horizontal Bottom Seals: Resilient, mechanical, retractable, constant-force-contact seal exerting uniform constant pressure on floor when extended, ensuring horizontal and vertical sealing and resisting panel movement.

1. Automatically Operated for Acoustical Panels: Extension and retraction of bottom seal automatically operated by movement of partition, with operating range not less than 2 inches between retracted seal and floor finish.

2.4 PANEL FINISH FACINGS

A. Description: Finish facings for panels that comply with indicated fire-test-response characteristics and that are factory applied to operable panel partitions with appropriate backing, using mildew-resistant nonstaining adhesive as recommended by facing manufacturer's written instructions.

B. Fabric Wall Covering: Hufcor Status Series High-Performance Woven Fabric, from same dye lot, treated to resist stains.

1. Color/Pattern: Hufcor Casarina 39-26.

C. Trimless Edges: Fabricate exposed panel edges so finish facing wraps uninterrupted around panel, covering edge and resulting in an installed partition with facing visible on vertical panel edges, without trim, for minimal sightlines at panel-to-panel joints.

2.5 SUSPENSION SYSTEMS

A. Tracks: Steel or aluminum with adjustable steel hanger rods for overhead support, designed for operation, size, and weight of operable panel partition indicated. Size track to support partition operation and storage without damage to suspension system, operable panel partitions, or adjacent construction.

Limit track deflection to no more than 0.10 inch between bracket supports. Provide a continuous system

INRC OFFICE BUILDING – PHASE 3

COEUR D’ALENE, IDAHO

FOLDING PANEL PARTITIONS 102239 - 5

of track sections and accessories to accommodate configuration and layout indicated for partition operation and storage.

B. Carriers: Trolley system as required for configuration type, size, and weight of partition and for easy operation; with ball-bearing wheels.

C. Track Intersections, Switches, and Accessories: As required for operation, storage, track configuration, and layout indicated for operable panel partitions, and compatible with partition assembly specified.

Fabricate track intersections and switches from steel or aluminum.

PART 3 - EXECUTION

3.1 INSTALLATION

A. Install operable panel partitions and accessories after other finishing operations, including painting, have been completed in area of partition installation.

B. Broken, cracked, chipped, deformed, or unmatched panels are not acceptable.

C. Broken, cracked, deformed, or unmatched gasketing or gasketing with gaps at butted ends is not acceptable.

D. Light-Leakage Test: Illuminate one side of partition installation and observe vertical joints and top and bottom seals for voids. Adjust partitions for alignment and full closure of vertical joints and full closure along top and bottom seals.

3.2 ADJUSTING

A. Verify that safety devices are properly functioning.

3.3 DEMONSTRATION

A. Engage a factory-authorized service representative to train Owner's maintenance personnel to adjust, operate, and maintain operable panel partitions.

END OF SECTION 102239

INRC OFFICE BUILDING – PHASE 3

COEUR D’ALENE, IDAHO

WALL AND DOOR PROTECTION 102600 - 1

SECTION 102600 - WALL AND DOOR PROTECTION

PART 1 - GENERAL

1.1 SUMMARY

A. Section Includes:

1. Corner guards.

1.2 ACTION SUBMITTALS

A. Product Data: For each type of product.

B. Sustainable Design Submittals:

1. Product Data: For adhesives, indicating VOC content.

2. Laboratory Test Reports: For adhesives, indicating compliance with requirements for low-emitting materials.

C. Shop Drawings: For each type of wall and door protection showing locations and extent.

1. Include plans, elevations, sections, and attachment details.

D. Samples: For each exposed product and for each color and texture specified, 12 inches long.

1.3 INFORMATIONAL SUBMITTALS

A. Product certificates.

B. Material certificates.

C. Sample warranty.

1.4 CLOSEOUT SUBMITTALS

A. Maintenance data.

1.5 PREINSTALLATION MEETINGS

A. Preinstallation Conference: Conduct conference at Project site.

http://www.arcomnet.com/sustainable_design.aspx?topic=11

INRC OFFICE BUILDING – PHASE 3

COEUR D’ALENE, IDAHO

WALL AND DOOR PROTECTION 102600 - 2

1.6 WARRANTY

A. Special Warranty: Manufacturer agrees to repair or replace components of wall- and door-protection units that fail in materials or workmanship within specified warranty period.

1. Warranty Period: Five years from date of Substantial Completion.

PART 2 - PRODUCTS

2.1 CORNER GUARDS

A. Basis-of-Design Product: Subject to compliance with requirements, provide J Sheet Metal Series 400 Surface Corner Guards or comparable product.

1. Type 430 Stainless Steel Corner Guards, 18-gauge.

2. 90° stainless steel corner guard with 1 1/2" legs.

3. Mounted with construction adhesive.

2.2 MATERIALS

A. Adhesive: As recommended by protection product manufacturer.

1. Adhesives shall have a VOC content of 70 g/L or less.

PART 3 - EXECUTION

3.1 INSTALLATION

A. Installation Quality: Install wall and door protection according to manufacturer's written instructions, level, plumb, and true to line without distortions. Do not use materials with chips, cracks, voids, stains, or other defects that might be visible in the finished Work.

1. Install corner guard units in locations and at mounting heights indicated on Drawings.

B. Immediately after completion of installation, clean accessories using manufacturer recommended cleaning agent.

C. Remove excess adhesive using methods and materials recommended in writing by manufacturer.

END OF SECTION 102600

http://www.specagent.com/Lookup?ulid=9192 http://www.arcomnet.com/sustainable_design.aspx?topic=143

INRC OFFICE BUILDING – PHASE 3

COEUR D’ALENE, IDAHO

TOILET, BATH, AND LAUNDRY ACCESSORIES 102800 - 1

SECTION 102800 - TOILET, BATH, AND LAUNDRY ACCESSORIES

PART 1 - GENERAL

1.1 SUMMARY

A. Section Includes:

1. Public-use washroom accessories.

2. Warm-air dryers.

3. Childcare accessories.

4. Underlavatory guards.

5. Custodial accessories.

1.2 ACTION SUBMITTALS

A. Product Data: For each type of product.

B. Product Schedule: Indicating types, quantities, sizes, and installation locations by room of each accessory required.

1. Identify locations using room designations indicated.

2. Identify products using designations indicated.

1.3 INFORMATIONAL SUBMITTALS

A. Sample warranty.

1.4 CLOSEOUT SUBMITTALS

A. Maintenance data.

1.5 WARRANTY

A. Manufacturer's Special Warranty for Mirrors: Manufacturer agrees to repair or replace mirrors that fail in materials or workmanship within specified warranty period.

1. Warranty Period: 15 years from date of Substantial Completion.

INRC OFFICE BUILDING – PHASE 3

COEUR D’ALENE, IDAHO

TOILET, BATH, AND LAUNDRY ACCESSORIES 102800 - 2

1.6 PREINSTALLATION MEETINGS

A. Preinstallation Conference: Conduct conference at Project site.

PART 2 - PRODUCTS

2.1 PERFORMANCE REQUIREMENTS

A. Electrical Components, Devices, and Accessories: Listed and labeled as defined in NFPA 70, by a qualified testing agency, and marked for intended location and application.

B. Recycling content of steel products: Post-consumer recycling content plus one-half of preconsumer recycling content not less than 25 percent.

2.2 PUBLIC-USE WASHROOM ACCESSORIES

A. Paper Towel (Roll) Dispenser, TA-1:

1. Bobrick TrimLine Series, semi-recessed paper towel dispenser and waste receptacle, Model No.

B-38032.

2. Mounting: Semi-recessed.

3. Minimum Capacity: 600 C-fold, 800 Multi-fold, 1100 single-fold

4. Material and Finish: Stainless steel, Type 304 finish (satin).

5. Lockset: Tumbler type.

B. Automatic Hand Dryer, TA-2

1. Bobrick, TrimLine Series, recessed, Model No. B3725.

2. Description: Recessed automatic hand dryer, with infrared activation sensor.

3. Mounting: Recessed.

4. Operation: Electronic-sensor activated with operation time of 10 to 20 seconds.

5. Cover Material and Finish: Stainless steel, No. 4 finish (satin).

6. Electrical Requirements: See electrical drawings.

C. Foaming-Soap Dispenser, TA-3:

1. Sloan manual, wall-mount, foaming Soap Push Dispenser, Model No. SJS-1100.

2. Description: Designed for dispensing soap in lather form from a bag-type refill.

3. Mounting: Vertically oriented, surface mounted.

4. Materials: Chrome.

5. Capacity: 1200 applications.

6. Refill Indicator: Window type.

D. Toilet Tissue (Jumbo-Roll) Dispenser, TA-4:

INRC OFFICE BUILDING – PHASE 3

COEUR D’ALENE, IDAHO

TOILET, BATH, AND LAUNDRY ACCESSORIES 102800 - 3

1. Bobrick, Surface-Mounted single jumbo-roll, Model No. B-2890.

2. Description: One-roll unit.

3. Mounting: Surface mounted.

4. Capacity: 10-inch-diameter rolls.

5. Material and Finish: Stainless steel, No. 4 finish (satin).

6. Lockset: Tumbler type.

7. Refill Indicator: Viewing slot at front.

8. Materials: 22 guage stainless steel, satin.

9. Refill Indicator: Window type.

E. Sanitary-Napkin Disposal Unit, TA-5:

1. Bobrick, Contura Series, surface-mounted, Model No. B-270.

2. Mounting: Surface mounted.

3. Door or Cover: Disposal-opening cover.

4. Receptacle: Removable.

5. Material and Finish: Stainless steel, No. 4 finish (satin).

F. Horizontal Grab Bar, TA-6:

1. Bobrick, 1-1/4 inch OD Heavy Duty Stainless Steel Grab Bar with Snap Flange, Concealed Mounting, Model No. B-5806.

2. Mounting: Flanges with concealed fasteners.

3. Material: Stainless steel, 0.05 inch thick.

a. Finish: Smooth, No. 4 finish (satin).

4. Outside Diameter: 1-1/4 inches.

5. Length: As indicated on Drawings

a. TA-6 x 36 inches long.

b. TA-6 x 42 inches long.

G. Vertical Grab Bar, TA-7:

1. Bobrick, 1-1/4 inch OD Heavy Duty Stainless Steel Grab Bar with Snap Flange, Concealed Mounting, Model No. B-5806.

2. Mounting: Flanges with concealed fasteners.

3. Material: Stainless steel, 0.05 inch thick.

a. Finish: Smooth, No. 4 finish (satin).

4. Outside Diameter: 1-1/4 inches.

5. Configuration and Length: 18”

H. Seat-Cover Dispenser, TA-8:

1. Bobrick, Contura Series, Surface-Mounted, Model No. B-4221.

2. Minimum Capacity: 250 seat covers.

INRC OFFICE BUILDING – PHASE 3

COEUR D’ALENE, IDAHO

TOILET, BATH, AND LAUNDRY ACCESSORIES 102800 - 4

3. Exposed Material and Finish: Stainless steel, No. 4 finish (satin).

I. Mirror Unit, TA-9:

1. Bobrick, Tilt mirror with Stainless Steel Frame, Model No. B-293.

2. Frame: Stainless-steel channel.

a. Size: 24 x 36.

b. Corners: welded and ground smooth.

3. Hangers: Produce rigid, tamper- and theft-resistant installation, using method indicated below.

a. One-piece, galvanized-steel, wall-hanger device with spring-action locking mechanism to hold mirror unit in position with no exposed screws or bolts.

J. Baby Changing Station, TA-10:

1. Koala Kare Products, Horizontal Wall-Mounted Stainless Steel, Model No. KB110-SSWM

2. Exposed Material and Finish: 18-guage, stainless steel, No. 4 finish (satin).

K. Sanitary Napkin Dispenser, TA-12:

1. Bobrick, TrimLine Series, recessed, napkin/tampon vendor, Model No. B-37063 50

a. Basis-of Design: Bobrick TrimLine Series, recessed, automatic, Model No. B-3725.

b. Capacity: 30 tampons, 20 napkins.

c. Coin operated with free option.

d. Cover Material and Finish: Stainless steel, No. 4 finish (satin).

L. Coat Hook with Bumper, TA-13:

1. Bobrick, Model No. B-212.

2. Solid cast aluminum with matte finish.

3. Equip end with hard rubber bumper.

M. Mop and Broom Holder, TA-14:

1. Bobrick, Model No. B-223 x 36” long.

2. Cover Material and Finish: Stainless steel, No. 4 finish (satin).

3. Spring-loaded rubber cam holders with anti-slip coating.

2.3 WARM-AIR DRYERS

2.4 UNDERLAVATORY GUARDS

A. Underlavatory Guard, TA-11:

1. Plumberex specialty Products Inc., Pro-Extreme, ADA Compliant Under-Lav Cover, Model No.

X4444.

INRC OFFICE BUILDING – PHASE 3

COEUR D’ALENE, IDAHO

TOILET, BATH, AND LAUNDRY ACCESSORIES 102800 - 5

2. Description: Insulating pipe covering for supply and drain piping assemblies that prevent direct contact with and burns from piping; allow service access without removing coverings.

3. Material and Finish: Antimicrobial, molded plastic, white.

2.5 FABRICATION

A. Keys: Provide universal keys for internal access to accessories for servicing and resupplying. Provide minimum of six keys to Contracting Officer.

PART 3 - EXECUTION

3.1 INSTALLATION

A. Install accessories according to manufacturers' written instructions, using fasteners appropriate to substrate indicated and recommended by unit manufacturer. Install units level, plumb, and firmly anchored in locations and at heights indicated.

B. Grab Bars: Install to withstand a downward load of at least 250 lbf, when tested according to

ASTM F 446.

END OF SECTION 102800

INRC OFFICE BUILDING – PHASE 3

COEUR D’ALENE, IDAHO

FIRE PROTECTION CABINETS 104413 - 1

SECTION 104413 - FIRE PROTECTION CABINETS

PART 1 - GENERAL

1.1 SUMMARY

A. Section includes fire-protection cabinets for portable fire extinguishers.

1.2 ACTION SUBMITTALS

A. Product Data: For each type of product.

B. Shop Drawings: For fire-protection cabinets.

1.3 CLOSEOUT SUBMITTALS

A. Maintenance data.

1.4 COORDINATION

A. Coordinate size of fire-protection cabinets to ensure that type and capacity of fire extinguishers indicated are accommodated.

B. Coordinate sizes and locations of fire-protection cabinets with wall depths.

1.5 SEQUENCING

A. Apply vinyl lettering on field-painted fire-protection cabinets after painting is complete.

PART 2 - PRODUCTS

2.1 PERFORMANCE REQUIREMENTS

A. Fire-Rated Fire-Protection Cabinets: Listed and labeled to comply with requirements in ASTM E 814 for fire-resistance rating of walls where they are installed.

2.2 FIRE-PROTECTION CABINET

A. Cabinet Type: Suitable for fire extinguisher.

1. Manufacturers: Subject to compliance with requirements, provide products by one of the following:

http://www.specagent.com/Lookup?ulid=699

INRC OFFICE BUILDING – PHASE 3

COEUR D’ALENE, IDAHO

FIRE PROTECTION CABINETS 104413 - 2

a. American Specialties, Inc.

b. Guardian Fire Equipment, Inc.

c. JL Industries, Inc.; a division of the Activar Construction Products Group.

d. Kidde Residential and Commercial Division.

e. Larsens Manufacturing Company.

B. Cabinet Construction: As required by location.

1. Fire-Rated Cabinets: Construct fire-rated cabinets with double walls fabricated from 0.043-inch-thick cold-rolled steel sheet lined with minimum 5/8-inch-thick fire-barrier material. Provide factory-drilled mounting holes.

C. Cabinet Material: Stainless-steel sheet.

D. Semirecessed Cabinet: One-piece combination trim and perimeter door frame overlapping surrounding wall surface with exposed trim face and wall return at outer edge (backbend).

1. Square-Edge Trim: 1-1/4- to 1-1/2-inch backbend depth.

E. Cabinet Trim Material: Stainless-steel sheet.

F. Door Material: Stainless-steel sheet.

G. Door Style: Fully glazed panel with frame.

H. Door Glazing: Tempered break glass.

I. Door Hardware: Manufacturer's standard door-operating hardware of proper type for cabinet type, trim style, and door material and style indicated.

J. Accessories:

1. Break-Glass Strike: Manufacturer's standard metal strike, complete with chain and mounting clip, secured to cabinet.

2. Door Lock: Cam lock that allows door to be opened during emergency by pulling sharply on door handle.

3. Identification: Lettering complying with authorities having jurisdiction for letter style, size, spacing, and location. Locate as indicated.

a. Identify fire extinguisher in fire-protection cabinet with the words "FIRE

EXTINGUISHER."

1) Location: Applied to cabinet glazing.

2) Application Process: Pressure-sensitive vinyl letters.

3) Lettering Color: Black.

4) Orientation: Vertical.

K. Materials:

1. Stainless Steel: ASTM A 666, Type 304.

a. Finish: No. 4 directional satin finish.

http://www.specagent.com/Lookup?uid=123456993843 http://www.specagent.com/Lookup?uid=123456993840 http://www.specagent.com/Lookup?uid=123456993837 http://www.specagent.com/Lookup?uid=123456993844 http://www.specagent.com/Lookup?uid=123456993838

INRC OFFICE BUILDING – PHASE 3

COEUR D’ALENE, IDAHO

FIRE PROTECTION CABINETS 104413 - 3

2. Tempered Break Glass: ASTM C 1048, Kind FT, Condition A, Type I, Quality q3, 1.5 mm thick.

2.3 FABRICATION

A. Fire-Protection Cabinets: Provide manufacturer's standard box (tub) with trim, frame, door, and hardware to suit cabinet type, trim style, and door style indicated.

PART 3 - EXECUTION

3.1 INSTALLATION

A. Prepare recesses for semirecessed fire-protection cabinets as required by type and size of cabinet and trim style.

B. Install fire-protection cabinets in locations and at mounting heights indicated or, if not indicated, at heights acceptable to authorities having jurisdiction.

C. Fire-Protection Cabinets: Fasten cabinets to structure, square and plumb.

D. Identification: Apply vinyl lettering at locations indicated.

E. Adjust fire-protection cabinet doors to operate easily without binding. Verify that integral locking devices operate properly.

END OF SECTION 104413

INRC OFFICE BUILDING – PHASE 3

COEUR D’ALENE, IDAHO

FIRE EXTINGUISHERS 104416 - 1

SECTION 104416 - FIRE EXTINGUISHERS

PART 1 - GENERAL

1.1 SUMMARY

A. Section includes portable, hand-carried fire extinguishers.

1.2 ACTION SUBMITTALS

A. Product Data: For each type of product.

1.3 INFORMATIONAL SUBMITTALS

A. Warranty: Sample of special warranty.

1.4 CLOSEOUT SUBMITTALS

A. Operation and maintenance data.

1.5 COORDINATION

A. Coordinate type and capacity of fire extinguishers with fire-protection cabinets to ensure fit and function.

1.6 WARRANTY

A. Special Warranty: Manufacturer's standard form in which manufacturer agrees to repair or replace fire extinguishers that fail in materials or workmanship within specified warranty period.

1. Warranty Period: Six years from date of Substantial Completion.

PART 2 - PRODUCTS

2.1 PERFORMANCE REQUIREMENTS

A. NFPA Compliance: Fabricate and label fire extinguishers to comply with NFPA 10, "Portable Fire Extinguishers."

B. Fire Extinguishers: Listed and labeled for type, rating, and classification by an independent testing agency acceptable to authorities having jurisdiction.

INRC OFFICE BUILDING – PHASE 3

COEUR D’ALENE, IDAHO

FIRE EXTINGUISHERS 104416 - 2

2.2 PORTABLE, HAND-CARRIED FIRE EXTINGUISHERS

A. Fire Extinguishers: Type, size, and capacity for each fire-protection cabinet indicated.

1. Manufacturers: Subject to compliance with requirements, provide products by one of the following:

a. Ansul Incorporated; Tyco International.

b. Guardian Fire Equipment, Inc.

c. JL Industries, Inc.; a division of the Activar Construction Products Group.

d. Larsens Manufacturing Company.

2. Instruction Labels: Include pictorial marking system complying with NFPA 10, Appendix B.

A. Multipurpose Dry-Chemical Type: UL-rated 10 lb. nominal capacity, with monoammonium phosphate-based dry chemical in manufacturer's standard enameled container.

PART 3 - EXECUTION

3.1 INSTALLATION

A. Examine fire extinguishers for proper charging and tagging.

1. Remove and replace damaged, defective, or undercharged fire extinguishers.

B. Install fire extinguishers in locations indicated and in compliance with requirements of authorities having jurisdiction.

END OF SECTION 104416

http://www.specagent.com/Lookup?ulid=703 http://www.specagent.com/Lookup?uid=123457012068 http://www.specagent.com/Lookup?uid=123457012070 http://www.specagent.com/Lookup?uid=123457012062 http://www.specagent.com/Lookup?uid=123457012064

INRC OFFICE BUILDING – PHASE 3

COEUR D’ALENE, IDAHO

BIRD NETTING 108113 - 1

SECTION 108113 – BIRD NETTING

PART 1 - GENERAL

1.1 SUMMARY

A. Section Includes:

1. Bird control netting.

1.2 ACTION SUBMITTALS

A. Product Data: For each type of product.

B. Sustainable Design Submittals:

1. Product Data: For recycled content, indicating postconsumer and preconsumer recycled content and cost.

C. Shop Drawings:

1. Include plans, elevations, sections, details, and attachments to other work.

D. Samples: For units with factory-applied color finishes.

1.3 INFORMATIONAL SUBMITTALS

A. Sample warranty.

1.4 CLOSEOUT SUBMITTALS

A. Maintenance data.

1.5 PREINSTALLATION MEETINGS

A. Preinstallation Conference: Conduct conference at Project site.

1.6 QUALITY ASSURANCE

A. Installer Qualifications: An entity that employs installers and supervisors who are trained and approved by manufacturer.

INRC OFFICE BUILDING – PHASE 3

COEUR D’ALENE, IDAHO

BIRD NETTING 108113 - 2

1.7 WARRANTY

A. Warranty: Manufacturer agrees to repair or replace components that fail in materials or workmanship within specified warranty period without monetary limitation.

1. Warranty Period: 10 years for bird netting from date of Substantial Completion.

PART 2 - PRODUCTS

2.1 MANUFACTURERS

A. Basis-of-Design Product: Subject to compliance with requirements, provide Bird-B-Gone Bird Net 2000 or comparable product.

1. Model Designation:

a. Size: 3/4” Heavy Duty 12/6

b. Color: Black.

2.2 MATERIALS

A. Recycled Content of Steel Products: Postconsumer recycled content plus one-half of preconsumer recycled content not less than 25 percent.

B. Netting: U.V. stabilized knotted polyethylene net. Flame resistant (270°F melting point). Rot-proof, non-conductive and stable in sub-zero temperatures.

C. Construction: 12/6 Bird Net 2000, comprised of 6 monofilaments, each 12/1000” thick with U.V.

stabilizers added. Monofilaments are twisted together to produce a strong twine with 160-200 twists per meter.

D. Break Strength: ISO 1806 protocol mesh tested in excess of 40 lbs. Proof of Test Certification Required.

1. Sizes: As required.

2. Hardware: All metal hardware or products are galvanized or stainless steel.

2.3 FABRICATION

A. General: Fabricate bird netting and items from components of sizes not less than those indicated or required by the manufacturer for the work indicated. Use larger-sized components as recommended by bird netting manufacturer. Furnish bolts, hardware, and accessories required for complete installation with manufacturer's standard finishes.

http://www.specagent.com/Lookup?ulid=631 http://www.specagent.com/Lookup?uid=123457011365 http://www.arcomnet.com/sustainable_design.aspx?topic=31

INRC OFFICE BUILDING – PHASE 3

COEUR D’ALENE, IDAHO

BIRD NETTING 108113 - 3

PART 3 - EXECUTION

3.1 BIRD NETTING PREPARATION

A. Examine the installation area and note any detrimental or hazardous work conditions. Notify Contractor of detrimental work conditions. Do not proceed with installation until conditions are corrected.

B. Surface should be thoroughly cleaned and free of bird droppings, nesting materials, rust peeling paint or other debris.

C. Remove or repair articles that may damage Bird Net 2000 after installation, including overhanging foliage, brush and loose parts on the structure.

3.2 INSTALLATION

A. Install in accordance with manufacturer’s recommendations for conditions indicated. Fit bird netting to the area to be protected perfectly so pest birds cannot enter the protected area, and so the netting blends with the architecture.

1. Installed tightly and securely to ensure a long lasting installation that is visually hard to see.

3.3 ADJUSTING AND CLEANING

A. Adjust to secure, tight position without binding or warping. Adjust to visually smooth surface.

B. Remove and replace loose screws, fasteners and attachments. Remove unnecessary debris.

END OF SECTION 108113

INRC OFFICE BUILDING – PHASE 3

COEUR D’ALENE, IDAHO

DPL PROJECTOR 115213 - 1

SECTION 115213 – DLP PROJECTOR

PART 1 - GENERAL

1.1 SUMMARY

A. Section Includes:

1. DLP Projector

2. Mounting bracket for ceiling installation.

1.2 ACTION SUBMITTALS

A. Product Data: For each type of product.

B. Equipment Specifications. Include the following:

1. Projector performance specifications and geometric correction range.

2. Projector size and weight.

3. Installation Terminals.

4. Ceiling bracket anchorage details, including connection to supporting structure for suspended units.

5. Location of wiring connections for electrically operated units.

6. Installation instructions.

1.3 CLOSEOUT SUBMITTALS

A. Operation and Maintenance Data.

1. Manufacturer’s instructions detailing maintenance requirements.

2. Parts catalog that includes complete list of repair and replacement parts, with cuts and identifying numbers.

PART 2 - PRODUCTS

2.1 PROJECTOR

A. Basis-of-Design: Panasonic 1-Chip DLP Projector, Model No. PT-RZ575 complete with power cord, remote control unit, software, mounting accessories, and other components necessary for a complete installation. Or approved equal.

INRC OFFICE BUILDING – PHASE 3

COEUR D’ALENE, IDAHO

DPL PROJECTOR 115213 - 2

B. Ceiling Bracket: Fully adjustable bracket for ceiling mounting with attachment clips to connect to structural elements above the lay-in ceilings.

PART 3 - EXECUTION

3.1 INSTALLATION

A. Install brackets and projectors at locations indicated to comply with manufacturer's written instructions.

1. Test electrically operated units to verify that screen controls, limit switches, closures, and other operating components are in optimum functioning condition.

END OF SECTION 115213

INRC OFFICE BUILDING – PHASE 3

COEUR D’ALENE, IDAHO

ROLLER WINDOW SHADES 122124 - 1

SECTION 122124 ROLLER WINDOW SHADES

PART 1 – GENERAL

1.1 SECTION INCLUDES

A. Provide manually operated, blackout roller shades.

1.2 SUBMITTALS

A. Product Data: Manufacturer’s data sheets on each product to be used, including:

1. Preparation instructions and recommendations.

2. Styles, material descriptions, dimensions of individual components, profiles, features, finishes and operating instructions.

3. Storage and handling requirements and recommendations.

4. Mounting details and installation methods.

B. Window Treatment Schedule: For all roller shades. Use same room designations as indicated on the Drawings and include opening sizes and key to typical mounting details.

C. Verification Samples: Shade cloth samples and aluminum finish sample as selected. Mark face of material to indicate interior faces.

D. Maintenance Data: Methods for maintaining roller shades, precautions regarding cleaning materials and methods, instructions for operating hardware and controls.

1.3 QUALITY ASSURANCE

A. Fire-Test-Response Characteristics: Passes NFPA 701-99 small and large-scale vertical burn.

Materials tested shall be identical to products proposed for use.

B. Shadecloth Anti-Microbial Characteristics: ‘No Growth’ per ASTM G 21 results for fungi ATCC9642, ATCC 9644, and ATCC9645.

1.4 DELIVERY, STORAGE, AND HANDLING

A. Deliver components in factory-labeled packages, marked with manufacturer and product name, fire-test-response characteristics, and location of installation using same room designations indicated on Drawings and in the Window Treatment Schedule.

1.5 PROJECT CONDITIONS

A. Environmental Limitations: Install roller shades after finish work including painting is complete and ambient temperature and humidity conditions are maintained at the levels indicated for Project when occupied for its intended use.

1.6 WARRANTY

A. Warranty: Provide manufacturer’s standard warranties, including the following:

INRC OFFICE BUILDING – PHASE 3

COEUR D’ALENE, IDAHO

ROLLER WINDOW SHADES 122124 - 2

1. Roller Shade Hardware, and Shadecloth: Manufacturer’s standard non-depreciating twenty-five year limited warranty.

2. Roller Shade Installation: One year from date of Substantial Completion.

PART 2 – PRODUCTS

2.1 MANUFACTURER

A. Basis of Design Manufacturer for Window Shade System: Products by MechoSystems; 42-03 35th Street, Long Island City, NY 11101. Tel: (718) 729-2020

a. Standard switch or IS may control an individual, sub-group or group of EDU’s in accordance with the address in each EDU.

2.2 SHADE BANDS

A. Shade Bands: Construction of shade band includes the fabric, the enclosed hem weight, shade roller tube, and the attachment of the shade band to the roller tube. Sewn hems and open hem pockets are not acceptable.

1. Concealed Hembar: Shall be continuous extruded aluminum for entire width of shade band and with the following characteristics:

a. Hembar shall be heat sealed on all sides.

b. Open ends shall not be accepted.

2. Shade Band and Shade Roller Attachment:

a. Use extruded aluminum shade roller tube of a diameter and wall thickness required to support shade fabric without excessive deflection.

b. Provide for positive mechanical attachment of shade band to roller tube; shade band shall be made removable / replaceable with a “snap-on” snap-off” spline mounting, without having to remove shade roller from shade brackets.

c. Mounting Spline shall not require use of adhesives, adhesive tapes, staples, and/or rivets.

d. Any method of attaching shade band to roller tube that requires the use of: adhesive, adhesive tapes, staples, and/or rivets, does not meet the performance requirements of this specification and shall not be accepted.

2.3 ROLLER SHADE FABRICATION

A. Fabricate shade cloth to hang flat without buckling or distortion. Fabricate with heat-sealed trimmed edges to hang straight without curling or raveling. Fabricate unguided shadecloth to roll true and straight without shifting sideways more than 1/8 inch (3.18 mm) in either direction per 8 feet (2438

mm) of shade height due to warp distortion or weave design.

B. Blackout shade bands, when used in side channels, shall have horizontally mounted, roll-formed stainless steel or tempered-steel battens not more than 3 feet (115 mm) on center extending fully into the side channels. Battens shall be concealed in an integrally colored fabric to match the inside and outside colors of the shade band, in accordance with manufacturer’s published standards for spacing and requirements.

1. Battens shall be roll formed of stainless steel or tempered steel and concave to match the contour of the roller tube.

2.4 ROLLER SHADE COMPONENTS

A. Access and Material Requirements:

1. Provide shade hardware allowing for the removal of shade roller tube from brackets without removing hardware from opening and without requiring end or center supports to be removed.

INRC OFFICE BUILDING – PHASE 3

COEUR D’ALENE, IDAHO

ROLLER WINDOW SHADES 122124 - 3

2. Provide shade hardware that allows for removal and re-mounting of the shade bands without having to remove the shade tube, drive or operating support brackets.

B. Manual Operated Chain Drive Hardware and Brackets:

1. Provide for universal, regular and offset drive capacity, allowing drive chain to fall at front, rear or non-offset for all shade drive end brackets. Universal offset shall be adjustable for future change.

2. Provide hardware capable for installation of a removable fascia, for both regular and/or reverse roll, which shall be installed without exposed fastening devices of any kind.

3. Provide shade hardware system that allows for removable regular and/or reverse roll fascias to be mounted continuously across two or more shade bands without requiring exposed fasteners of any kind.

4. Provide shade hardware system that allows for operation of multiple shade bands (multi-banded shades) by a single chain operator, subject to manufacturer’s design criteria.

Connectors shall be offset to assure alignment from the first to the last shade band.

5. Provide shade hardware system that allows multi-banded manually operated shades to be capable of smooth operation when the axis is offset a maximum of 6 degrees on each side of the plane perpendicular to the radial line of the curve, for a 12 degrees total offset.

6. Provide positive mechanical engagement of drive mechanism to shade roller tube. Friction fit connectors for drive mechanism connection to shade roller tube are not acceptable.

7. Provide shade hardware constructed of minimum 1/8-inch (3.18 mm) thick plated steel or heavier as required to support 150 percent of the full weight of each shade.

8. Drive Bracket / Brake Assembly:

a. MechoShade Drive Bracket model M5 shall be fully integrated with all MechoShade accessories, including, but not limited to: SnapLoc fascia, room darkening side / sill channels, center supports and connectors for multi-banded shades.

b. M5 drive sprocket and brake assembly shall rotate and be supported on a welded 3/8 inch (9.525 mm) steel pin.

c. The brake shall be an over running clutch design which disengages to 90 percent during the raising and lowering of a shade. The brake shall withstand a pull force of 50 lbs. (22

kg) in the stopped position.

d. The braking mechanism shall be applied to an oil-impregnated hub on to which the brake system is mounted. The oil impregnated hub design includes an articulated brake assembly, which assures a smooth, non-jerky operation in raising and lowering the shades. The assembly shall be permanently lubricated. Products that require externally applied lubrication and or not permanently lubricated are not acceptable.

e. The entire M5 assembly shall be…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .