This document contains a government file related to a federal construction contract opportunity and questions and answers about the opportunity.

The federal contract opportunity is for construction of Phase III of the Interagency Natural Resource Center in Coeur d'Alene, Idaho. The project scope includes a 29,000 square foot main office building to support 173 employees from the U.S. Fish & Wildlife Service, Bureau of Land Management, and U.S. Forest Service. The estimated value of the contract is between $5 million and $10 million. The solicitation was expected to be posted on June 5, 2018 with responses due 30 days later.

The government file also includes questions and answers from potential offerors relating to specifications, drawings, and requirements for the construction project. Areas of clarification included contract clauses, testing responsibilities, management software, approved manufacturers, site features, structural and civil details, systems furniture, window treatments, flooring materials and landscaping requirements.

Questions & Answers 12 Jul 18

View the file

Other files

File Type Posted
INRC_Second_Floor.dwg DWG drawing
INRC_First_Floor.dwg DWG drawing
Amendment_0002.pdf PDF
Revised_B-1.pdf PDF
Questions_and_Answers_062918.pdf PDF
Amendment_0001.pdf PDF
CV_(rev1).pdf PDF
L1.5_(rev1).pdf PDF
125900_SF_-_SYSTEMS_FURNITURE.pdf PDF
S0.1_(rev1).pdf PDF
C1.3_(rev1).PDF PDF
Prebid_Notes_6-19-18.pdf PDF
Prebid_Attendance.pdf PDF
Questions_and_Answers_061818.pdf PDF
Part_5_Project_Manual_2018_06_01.pdf PDF
Part_6_Project_Manual_2018_06_01.pdf PDF
Drawings_Part_8_2018_06-01.pdf PDF
J-1_Wage_Rate_Decision_ID180031_Mod_3_Dated_05112018.pdf PDF
Drawings_Part_10_2018_06-01.pdf PDF
Drawings_Part_14_2018_06-01.pdf PDF
Part_2_Project_Manual_2018_06_01.pdf PDF
Drawings_Part_1_2018_06-01.pdf PDF
Drawings_Part_13_2018_06-01.pdf PDF
Drawings_Part_6_2018_06-01.pdf PDF
Drawings_Part_9_2018_06-01.pdf PDF
Drawings_Part_3_2018_06-01.pdf PDF
Drawings_Part_12_2018_06-01.pdf PDF
J-5_Past_Performance_Questionnaire.pdf PDF
Part_4_Project_Manual_2018_06_01.pdf PDF
Drawings_Part_4_2018_06-01.pdf PDF
Drawings_Part_5_2018_06-01.pdf PDF
Drawings_Part_2_2018_06-01.pdf PDF
Drawings_Part_11_2018_06-01.pdf PDF
Short_Set_Solicitation_12034318R0017_Final_06072018.pdf PDF
J-4_State_of_Idaho_Workers'_Insurance.pdf PDF
Part_3_Project_Manual_2018_06_01.pdf PDF
Drawings_Part_7_2018_06-01.pdf PDF
Solicitation_12034318R0017_Final_06072018.pdf PDF
Part_7_Project_Manual_2018_06_01.pdf PDF
Part_1_Project_Manual_2018_06_01.pdf PDF
Show all 40

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

RFI#RFI ItemResponse
11Please reference Solicitation 12034318R0017_Final_06072018 Part II Contract Clauses (Section I- 3 FAR 52.222-62 Paid Sick Leave Under Executive Order 13706 (JAN 2017). Is this clause would also be applicable to employees of Subcontractors?Yes, this clause is applicable to all subcontractors.Amendment 003
12The under slab vapor barrier requirements are conflicting.Delete Cast In Place Concrete Note 19 on Sheet S0.1 regarding underslab vapor barrier.Amendment 003
13Is the GC required to add $3000 to the bid for CDA irrigation capitalization fees per L1.4?Yes. See note on L1.4 and Section C-5 of the Solicitation.Amendment 003
14Section 086200 calls for a Basis of Design of a Velux glass skylight but approves CPI, Kalwall and Wasco. That is quite a range of possible materials. All of these materials have different performance characteristics. There is nothing in the specification about light transmission, U-Value, OSHA compliance or Solar Heat Gain. Would you be amenable to using the same specification as used for Phase 1 and Phase 2, Section 084523? This would also allow the skylights to match the translucent wall panels being installed on Phase 2.We would prefer a clear-glazed skylight unit, and not a insulated translucent sandwich panel system (as in Phase 2).Amendment 003
15The specification calls for a 3’-0” x 5’-0” standard skylight size but A2.4 appears to show two 5’-0” x 8’-0”. Is the larger size correct?Please ignore spec, drawings are correct. 5x8 please.Amendment 003
16The specification calls for an integral curb but detail 14/A2.6 calls for a steel tube per structural. Which is accurate?Please provide steel tube as curb.Amendment 003
17Detail 14/A2.6 calls for a “continuous steel tube, Ref. structural “ but sheet S2.3 does not show any steel tubes at the skylight areas.Provide an HSS 8 x 2 x 3/8 tube steel frame around skylight opening as shown. Provide 3/16" x 3" sq. flanges (2 per corner) at base at all 4 corners for 1/2" diameter x 4" lags to solid 6x blocking below.Amendment 003
18Is there a need for two skylights requiring two separate curbs? Would you be open to a single, one panel skylight, 5’-0” x 18’-0” on a single steel tube curb per structural? Less framing inside, less finish work inside and less labor to frame and install.Please provide custom skylight as designed, with two separate openings for two skylights.Amendment 003
19Velux does not offer a standard 5’-0” x 8’-0” Fixed Curb Mounted Commercial Skylight.Please provide custom skylight as designed at 5'x8'.Amendment 003
20The Velux “integral curb” is not actually integral. It is a factory fabricated curb that mounts to the roof and then the skylight is mounted to the curb. Basically like all the other skylights offered. This is a moot point anyway if the curb is actually the structural steel tube as noted on 14/A2.6.Acknowledged.Amendment 003
21Side Walk detail: please reference S9.1/10 and detail C-5 on C9.1. 59.1/10 shows a rebar thicken edge detail for sidewalk/apron, but no reference to that detail is found on the Structural drawings. C9.1 shows detail for typical side walk. Which detail is to be used for new side walks and aprons for this project?Please refer to Civil drawings and details for all exterior concrete curbs, sidewalks, etc. Sidewalk shall be per the Detail on sheet C9.1. Aprons shall be per city standard details for any HS-20 loading locations.Amendment 003
22Elevator Sump Pump Pit: There is no structural detail (rebar, size of walls/foundation) for the sump pit. Can you please provide a structural detail for the elevator sump pump pit? There is a cut section shown on the Plumbing drawings, but no details on rebar, and wall sizes, foundation, etc.Provide a cast concrete sump with min. 6" walls and base with #4 @ 12" o/c each way for walls and base slab. Dirt form exterior wall face per contractor option. Sump dimensions and depth to be coordinated with pump specifications. Provide cover grating with bearing ledge.Amendment 003
23Rigid Foundation Insulation: can you please confirm extent of under slab rigid insulation at perimeter of foundation walls? Architectural drawings do not show horizontal foundation insulation, but specs calls for 36” of 3” thick. Can you please verify extent of horizontal insulation and thickness?No underslab insulation is required. Please ignore spec. No horizontal insulation under slab is required, because of our continuous insulation at the building envelope.Amendment 003
24If horizontal insulation under slab is required, are we to install vertical insulation on the inside of the foundation walls? Currently the architectural drawings is showing to install vertical foundation rigid insulation on the outside of foundation walls.Vertical insulation at all perimeter stem walls is required on outside of foundation walls (per 13/A5.5), but not the inside of the foundation walls. No horizontal insulation under slab is required, because of our continuous insulation at the building envelope.Amendment 003
25Please reference Note 5 on A1.0. Note 5 is not shown in the drawings, and no reference to Civil drawings. Can you please clarify?Please ignore keynote 5. It is not applicable.Amendment 003
26How thick is the site concrete at the amphitheater and front of the building? Civil drawing C9.1 has two details with two different thicknesses. Please see C9.1 details 2 and C-5.Utilize Detail C-5 for concrete thickness at the amphitheater and city standard details for vehicular traffic.Amendment 003
27Fire Sprinkler Question from Subcontractor: We need to know if the underside of all trusses and floor joist will receive drywall. We have only been able to see the third floor receiving drywall, but no other details for the other floors and ceiling. Can you please confirm?No horizontal fire-rated assemblies are required between floor or between spaces. At a minimum, acoustical batt insulation is required per the contract documents .Amendment 003
28City of Coeur d’ Alene has a 60 lb ground snow code requirement. Structural general notes indicate 40 lb roof snow load but no indication of ground snow load. Please confirm if design meets snow load code standards for City of Coeur d’ Alene.Ground snow load 60 psf and roof snow load 40 psf updated on S0.1 per addendum. Structural design meets 60 psf ground/40 psf roof criteria.Amendment 003
29Systems Furniture-If at all possible, can you please provide us with an AutoCAD file of both floors?Attached are DWG files of 1st and 2nd floors.Amendment 003
30Systems Furniture-The typical show positions A-H2. However, we did not find any locations labeled “B” on either floor. Can you please verify this is true?This is possible. The A-H2 designations are meant to give bidders approximations. The bidder/supplier is ultimately responsible for all parts, pieces, quantities to install as shown on the plans and also to field verify dimensions before ordering. There may be some variations to the standards based on building dimensions in certain areas.Amendment 003
31Systems Furniture-c. Are you able to provide quantities of each typical?Supplier is responsible for all quantities.Amendment 003
32Systems Furniture-Do we have to include cost for chairs as well for each position?In the KEY it is noted that chairs are not included in contract.Amendment 003
33Systems Furniture-Areas such as “F106” and “F109”, etc. appear to show just a work surface. Is this to be included as part of the systems furniture package?Yes, there are shared work surfaces such as these shown that are to be included as part of the systems product. Again, the bidder/supplier is responsible for all parts needed to install their particular product according to the drawings.Amendment 003
34Question in regards to Roller Shades: Addenda 1 states to use Hunter Douglas Green Screen Evolve 1% fabric. This fabric is not available to MechoShade which is the balance of the specification. Are we to bid Hunter Douglas roller shades? If so, Hunter Douglas Roller Shades FR or Hunter Douglas RB500 roller shades? RB500 is close to MechoShade in quality and function. In addition, as the fabric is now a sunscreen and not blackout, are side and sill channels still required?Basis of Design for Typical Roller Shades shall be: Single Manual Roller Shade, Hunter Douglas, Green Screen, Evolve HD 3501, Rain 1% openness, fascia top/back cover, R16 clutch. Blackout shades are required in room Large Meeting Room 105. Basis of Design for Blackout Shades shall be: Single Manual Roller Shade, Hunter Douglas, Blockout Fabric with room darkening side and sill channels, manual drive with fascias, Morocco, R16 clutch.Amendment 003
35Reference stone called out as "Daltile Basalt 12x24 Natural Mica". Need to get more information. Basalts come from different countries, and has different finishes, most popular being honed. Usually gray or black. Appreciate any feedback you can give or reply with images front and back from samples you may have.Amended Basis of Design: American Olean, Concrete Chic Collection, Color: Stylish Charcoal CC68.Amendment 003
36What is the setback for landscaping trees and the Avista gas line?The minimum setback from the Avista gas line is 5 ft for landscaping trees. Prior to landscaping; the contractor shall call for an Avista Gas Line locate for the gas line between the Phase 3 building and the Phase 1 & 2 buildings.Amendment 003
37Please review the hoist way dimension. It appears incorrect.Architect spoke with Randy from NW Elevator on 07.06.18. We agreed that a 2500 lb. elevator (as specified) is the basis of designAmendment 003

Sheet3

RFI#Action PersonRFI ItemResponseRequestor
1ShoupRFI ClarificationChange 013100-1.6-A to "Procedure: Immediately on discover of the need for interpretation of the Contract Documents, submit an RFI in the form specified.Mike ShoupAmendment 001
2ShoupQuality Control tests clarification.All tests and Quality Control tests shall be completed by the contractor using an independent, certified, third party testing agency. Forward all test results to the contracting officer upon contractor receipt of the test results.Mike ShoupAmendment 001
3ShoupProcore Construction Management software clarification.The contractor shall use Procore Construction Management software for contract administration functions; RFIs, Submittals, Testing, Correspondence, etc. Delete section 0133000-2.1-A.Mike ShoupAmendment 001
4ShoupApproved Equal clarificationChange all specification sections that refer to specific manufacturers to include language that confirms that acceptable manufacturers are not limited to the listed manufacturers. Equivalent products and manufacturers that meet all of the performance requirements in the specifications are acceptable. Reference section I-2 clause FAR 52.236-5 Material and Workmanship. "The Contractor may, at its option, use any equipment, material, article, or process that, in the judgment of the Contracting Officer, is equal to that named in the specifications,Mike ShoupAmendment 001
5ShoupAre the two inch irrigation conduits already installed for the 1 inch irrigation lines on Sheet L1.4.Sheet L1.4 - Two inch conduit sleeves were installed under the asphalt as part of the Phase 1 project to accommodate the Phase 3 irrigation lines.Mike ShoupAmendment 001
6ShoupWhat are the asphalt restoration requirements for the Phase 3 contractor?Add note to detail 13/C1.3: "The Phase 3 Contractor shall include the following: 1) At the end of Phase 3 construction install a fog seal for all existing asphalt pavement east of the pavilion including: roads, front office parking, east parking, etc. 2) Repaint all asphalt pavement markings shown on detail 13/C1.3 east of the warehouse, . The seal coat shall use .08 to .1 G/S.Y. for CSS-1 diluted 50/50; prior to seal coat application, the asphalt surface shall be thoroughly cleaned removing all dirt and debris by broom, air, and sweeping.Mike ShoupAmendment 001
7ShoupDetail 1/C1.3 ClarificationAdd Note "Remove the existing large Ponderosa Pine tree and roots next to the retaining wall and replace it with a 7'-10' Douglas Fir Tree. The retaining wall was constructed as part of Phase 1."Mike ShoupAmendment 001
10PrinzingRegarding section 122124, Roller Window Shades, the spec calls for Mecho Shade in 0% open/blackout, 0700 series. Sheet A9.0 calls for Hunter Douglas, 1% Green Screen. Should the shade cloth be 0700 black out (aka SB9000 by Hunter) or 1% open Green Screen?Use Sheet A9.0 Hunter Douglas Greenscreen Evolve HD 3501, Rain 1% OpennessTom Rice-Blind SourceAmendment 001
11ReckleyPlease reference Solicitation 12034318R0017_Final_06072018 Part II Contract Clauses (Section I- 3 FAR 52.222-62 Paid Sick Leave Under Executive Order 13706 (JAN 2017). Is this clause would also be applicable to employees of Subcontractors?Yes, this clause is applicable to all subcontractors.NNAC-C. Trucco (208-714-5401)Amendment 002
12ShoupThe under slab vapor barrier requirements are conflicting.Delete Cast In Place Concrete Note 19 on Sheet S0.1 regarding underslab vapor barrier.ShoupAmendment 002
13ShoupIs the GC required to add $3000 to the bid for CDA irrigation capitalization fees per L1.4?Yes. See note on L1.4 and Section C-5 of the Solicitation.NNAC-C. Trucco (208-714-5401)Amendment 002
14PrinzingSection 086200 calls for a Basis of Design of a Velux glass skylight but approves CPI, Kalwall and Wasco. That is quite a range of possible materials. All of these materials have different performance characteristics. There is nothing in the specification about light transmission, U-Value, OSHA compliance or Solar Heat Gain. Would you be amenable to using the same specification as used for Phase 1 and Phase 2, Section 084523? This would also allow the skylights to match the translucent wall panels being installed on Phase 2.K. Walker-Kilgore (509-893-0750)
15PrinzingThe specification calls for a 3’-0” x 5’-0” standard skylight size but A2.4 appears to show two 5’-0” x 8’-0”. Is the larger size correct?K. Walker-Kilgore (509-893-0750)
16PrinzingThe specification calls for an integral curb but detail 14/A2.6 calls for a steel tube per structural. Which is accurate?K. Walker-Kilgore (509-893-0750)
17PrinzingDetail 14/A2.6 calls for a “continuous steel tube, Ref. structural “ but sheet S2.3 does not show any steel tubes at the skylight areas.K. Walker-Kilgore (509-893-0750)
18PrinzingIs there a need for two skylights requiring two separate curbs? Would you be open to a single, one panel skylight, 5’-0” x 18’-0” on a single steel tube curb per structural? Less framing inside, less finish work inside and less labor to frame and install.K. Walker-Kilgore (509-893-0750)
19PrinzingVelux does not offer a standard 5’-0” x 8’-0” Fixed Curb Mounted Commercial Skylight.K. Walker-Kilgore (509-893-0750)
20PrinzingThe Velux “integral curb” is not actually integral. It is a factory fabricated curb that mounts to the roof and then the skylight is mounted to the curb. Basically like all the other skylights offered. This is a moot point anyway if the curb is actually the structural steel tube as noted on 14/A2.6.K. Walker-Kilgore (509-893-0750)
21PrinzingSide Walk detail: please reference S9.1/10 and detail C-5 on C9.1. 59.1/10 shows a rebar thicken edge detail for sidewalk/apron, but no reference to that detail is found on the Structural drawings. C9.1 shows detail for typical side walk. Which detail is to be used for new side walks and aprons for this project?NNAC-C. Trucco (208-714-5401)
22PrinzingElevator Sump Pump Pit: There is no structural detail (rebar, size of walls/foundation) for the sump pit. Can you please provide a structural detail for the elevator sump pump pit? There is a cut section shown on the Plumbing drawings, but no details on rebar, and wall sizes, foundation, etc.NNAC-C. Trucco (208-714-5401)
23PrinzingRigid Foundation Insulation: can you please confirm extent of under slab rigid insulation at perimeter of foundation walls? Architectural drawings do not show horizontal foundation insulation, but specs calls for 36” of 3” thick. Can you please verify extent of horizontal insulation and thickness?NNAC-C. Trucco (208-714-5401)
24PrinzingIf horizontal insulation under slab is required, are we to install vertical insulation on the inside of the foundation walls? Currently the architectural drawings is showing to install vertical foundation rigid insulation on the outside of foundation walls.NNAC-C. Trucco (208-714-5401)
25PrinzingPlease reference Note 5 on A1.0. Note 5 is not shown in the drawings, and no reference to Civil drawings. Can you please clarify?NNAC-C. Trucco (208-714-5401)
26PrinzingHow thick is the site concrete at the amphitheater and front of the building? Civil drawing C9.1 has two details with two different thicknesses. Please see C9.1 details 2 and C-5.NNAC-C. Trucco (208-714-5401)
27PrinzingFire Sprinkler Question from Subcontractor: We need to know if the underside of all trusses and floor joist will receive drywall. We have only been able to see the third floor receiving drywall, but no other details for the other floors and ceiling. Can you please confirm?NNAC-C. Trucco (208-714-5401)
28PrinzingCity of Coeur d’ Alene has a 60 lb ground snow code requirement. Structural general notes indicate 40 lb roof snow load but no indication of ground snow load. Please confirm if design meets snow load code standards for City of Coeur d’ Alene.NNAC-C. Trucco (208-714-5401)
29PrinzingSystems Furniture-If at all possible, can you please provide us with an AutoCAD file of both floors?NNAC-C. Trucco (208-714-5401)
30PrinzingSystems Furniture-The typical show positions A-H2. However, we did not find any locations labeled “B” on either floor. Can you please verify this is true?NNAC-C. Trucco (208-714-5401)
31PrinzingSystems Furniture-c. Are you able to provide quantities of each typical?NNAC-C. Trucco (208-714-5401)
32PrinzingSystems Furniture-Do we have to include cost for chairs as well for each position?NNAC-C. Trucco (208-714-5401)
33PrinzingSystems Furniture-Areas such as “F106” and “F109”, etc. appear to show just a work surface. Is this to be included as part of the systems furniture package?NNAC-C. Trucco (208-714-5401)
34PrinzingQuestion in regards to Roller Shades: Addenda 1 states to use Hunter Douglas Green Screen Evolve 1% fabric. This fabric is not available to MechoShade which is the balance of the specification. Are we to bid Hunter Douglas roller shades? If so, Hunter Douglas Roller Shades FR or Hunter Douglas RB500 roller shades? RB500 is close to MechoShade in quality and function. In addition, as the fabric is now a sunscreen and not blackout, are side and sill channels still required?NNAC-C. Trucco (208-714-5401)
35PrinzingReference stone called out as "Daltile Basalt 12x24 Natural Mica". Need to get more information. Basalts come from different countries, and has different finishes, most popular being honed. Usually gray or black. Appreciate any feedback you can give or reply with images front and back from samples you may have.C. Hill-Arch Sales-(206-999-6890)
36PrinzingPlease show the Avista Gas Line route with coordinates on the utility or landscaping sheet. It is not permissible to install landscaping within 5 ft of the gas line.Shoup