J-1_Wage_Rate_Decision_ID180031_Mod_3_Dated_05112018.pdf

PDF 31 KB Posted

Attached to
INRC - Phase III
Solicitation number
12034318R0017
Issued by

About this file

This document provides a federal wage determination for a construction project in Coeur d'Alene, Idaho. The wage determination outlines prevailing wage rates for various crafts involved in building construction in Kootenai County, Idaho, such as carpenters, painters, plumbers, laborers, and operating engineers. The rates are effective until a future modification is issued. The related federal contract opportunity is a pre-solicitation notice for construction of Phase III of the Interagency Natural Resource Center in Coeur d'Alene, Idaho. The project involves construction of a 29,000 square foot office building to support 173 employees from the U.S. Fish and Wildlife Service, Bureau of Land Management, and U.S. Forest Service. The contract value is estimated between $5 million and $10 million. The solicitation for proposals is expected to be issued on or around June 5, 2018 with responses due 30 days after posting. The construction will be awarded by the Northern Region of the U.S. Forest Service.

03 - J-1 Wage Rate Decision ID180031 Mod 3

View the file

Other files

File Type Posted
INRC_First_Floor.dwg DWG drawing
INRC_Second_Floor.dwg DWG drawing
7-12-18_Q&A.XLSX XLSX spreadsheet
Amendment_0002.pdf PDF
Revised_B-1.pdf PDF
Questions_and_Answers_062918.pdf PDF
125900_SF_-_SYSTEMS_FURNITURE.pdf PDF
S0.1_(rev1).pdf PDF
Amendment_0001.pdf PDF
CV_(rev1).pdf PDF
C1.3_(rev1).PDF PDF
L1.5_(rev1).pdf PDF
Prebid_Notes_6-19-18.pdf PDF
Prebid_Attendance.pdf PDF
Questions_and_Answers_061818.pdf PDF
Drawings_Part_14_2018_06-01.pdf PDF
Drawings_Part_3_2018_06-01.pdf PDF
Drawings_Part_11_2018_06-01.pdf PDF
Short_Set_Solicitation_12034318R0017_Final_06072018.pdf PDF
Part_5_Project_Manual_2018_06_01.pdf PDF
Part_6_Project_Manual_2018_06_01.pdf PDF
Drawings_Part_1_2018_06-01.pdf PDF
Drawings_Part_13_2018_06-01.pdf PDF
Part_2_Project_Manual_2018_06_01.pdf PDF
Drawings_Part_6_2018_06-01.pdf PDF
J-4_State_of_Idaho_Workers'_Insurance.pdf PDF
Part_3_Project_Manual_2018_06_01.pdf PDF
Drawings_Part_8_2018_06-01.pdf PDF
Drawings_Part_9_2018_06-01.pdf PDF
Drawings_Part_10_2018_06-01.pdf PDF
Drawings_Part_7_2018_06-01.pdf PDF
Part_1_Project_Manual_2018_06_01.pdf PDF
Part_7_Project_Manual_2018_06_01.pdf PDF
Solicitation_12034318R0017_Final_06072018.pdf PDF
J-5_Past_Performance_Questionnaire.pdf PDF
Drawings_Part_5_2018_06-01.pdf PDF
Part_4_Project_Manual_2018_06_01.pdf PDF
Drawings_Part_4_2018_06-01.pdf PDF
Drawings_Part_12_2018_06-01.pdf PDF
Drawings_Part_2_2018_06-01.pdf PDF
Show all 40

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation No. 12034318R0017 INRC-Phase III/Coeur d’Alene, ID Wage Rate Decision ID180031, Page 1 of 7

General Decision Number: ID180031 05/11/2018 ID31

Superseded General Decision Number: ID20170031

State: Idaho

Construction Type: Building

County: Kootenai County in Idaho.

Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.35 for calendar year 2018 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.35 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2018. The EO minimum wage rate will be adjusted annually.

Please note that this EO applies to the above-mentioned types of contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but it does not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)-(60). Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Modification Number Publication Date

0 01/05/2018 1 01/19/2018 2 04/06/2018 3 05/11/2018

* BOIL0242-002 10/01/2017

Rates Fringes

BOILERMAKER (Industrial Work).... $ 38.69 28.41

BRID0003-001 06/01/2017

Rates Fringes

BRICKLAYER..................................... $ 29.79 17.73

Wage Rate Decision ID180031, Page 2 of 7

CARP0001-047 06/01/2017

Rates Fringes

CARPENTER (Drywall Hanging and Metal Stud Installation Only)...................................................... $ 27.76 16.14

ELEV0038-001 01/01/2018

Rates Fringes

ELEVATOR MECHANIC..................... $ 42.74 32.645

ENGI0370-030 06/01/2016

Rates Fringes

POWER EQUIPMENT OPERATOR:

Rollers (all types)................................ $ 26.66 14.35

ZONE PAY:

Zone Centers: Spokane, Pasco, Lewiston ZONE 1: 0-45 Miles: Free ZONE 2: 45 Miles & Over: $2.00

IRON0014-019 07/01/2017

Rates Fringes

IRONWORKER, STRUCTURAL........... $ 32.64 26.56

LABO0238-027 06/01/2017

Rates Fringes

LABORER (MASON TENDER

(Cement/Concrete, Brick)........................ $ 26.01 12.15

Wage Rate Decision ID180031, Page 3 of 7

* PAIN0005-009 07/01/2017

PAINTER (Includes Brush, Roller and Spray)..................................... $ 22.30 11.00

*$.70 shall be paid over and above the basic wage rates listed for work on swing stages and high work over 30 feet

PAIN0054-005 07/01/2017

BENEWAH, BONNER, BOUNDARY, CLEARWATER, IDAHO (NORTH OF THE 46TH

PARALLEL), KOOTENAI, LATAH, LEWIS, NEX PERCE AND SHOSHONE COUNTIES

DRYWALL FINISHER/TAPER........... $ 26.00 12.36

PLAS0072-002 06/01/2017

ZONE 1:

CEMENT MASON/CONCRETE FINISHER... $ 28.23 13.77

Zone Differential (Add to Zone 1 rate): Zone 2 - $2.00

BASE POINTS: Spokane, Pasco, Lewiston, Wenatchee

Zone 1: 0-45 radius miles from the main post office

Zone 2: Over 45 radius miles from the main post office

* PLUM0044-014 06/01/2017

Rates Fringes

PLUMBER/PIPEFITTER

Zone 1................................................. $ 38.46 17.74

Wage Rate Decision ID180031, Page 4 of 7

SHEE0055-002 06/01/2017

SHEET METAL WORKER (Includes HVAC Duct Installation).......................... $ 29.42 20.99

SUID2010-024 08/08/2012

Rates Fringes

CARPENTER, Includes Acoustical Ceiling Installation, and Form Work...................... $ 22.40 6.17

ELECTRICIAN.......................................... $ 24.72 6.43

INDUSTRIAL: MILLWRIGHT................ $ 28.00 0.00

INSULATOR - MECHANICAL

(Duct, Pipe & Mechanical System Insulation)....................................... $ 19.68 3.78

IRONWORKER, REINFORCING............. $ 24.74 16.01

LABORER: Common or General............... $ 14.94 0.00

OPERATOR: Backhoe/Excavator.............. $ 21.96 0.00

OPERATOR: Bobcat/Skid Steer/Skid Loader......................................... $ 17.36 0.00

OPERATOR: Bulldozer.............................. $ 24.52 7.87

OPERATOR: Forklift.................................. $ 18.27 1.10

OPERATOR: Loader (Front End)............... $ 21.27 5.54

ROOFER...................................................... $ 18.00 0.00

TRUCK DRIVER: Dump Truck................. $ 21.55 0.00

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any

Wage Rate Decision ID180031, Page 5 of 7 solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year. Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR

5.5 (a) (1) (ii)).

The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).

Union Rate Identifiers

A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than "SU" or "UAVG" denotes that the union classification and rate were prevailing for that classification in the survey. Example: PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.

Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.

Survey Rate Identifiers

Classifications listed under the "SU" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates.

Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.

Wage Rate Decision ID180031, Page 6 of 7

Survey wage rates are not updated and remain in effect until a new survey is conducted.

Union Average Rate Identifiers

Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.

A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage Rate Decision ID180031, Page 7 of 7

Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION

File details come from the government source that posted it. Updated .