CV_(rev1).pdf
PDF 3 MB Posted
- Attached to
- INRC - Phase III
- Solicitation number
- 12034318R0017
About this file
This document package includes construction documents for the Interagency Natural Resource Center Office Building - Phase III project along with a related federal contract opportunity notice.
The construction documents detail plans for a new 29,000 square foot office building to support 173 employees from the U.S. Forest Service, Fish & Wildlife Service, and Bureau of Land Management. The project will include a wood-framed structure with fiber cement siding and stone cladding, as well as meeting rooms, conference rooms, private offices, and open office space. Construction is scheduled to occur from 2018-2019.
The federal contract opportunity notice indicates the USDA Forest Service Northern Region intends to award a contract for construction of Phase III of the Interagency Natural Resource Center in Coeur d'Alene, Idaho. The project magnitude is estimated between $5-10 million. A request for proposals will be posted on June 5, 2018 with responses due 30 days after.
Drawing cover page
View the file
Other files
Show all 40
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT SUMMARY
PROJECT NAME:
PROJECT ADDRESS:
PROJECT SUMMARY / SCOPE OF WORK:
INTERAGENCY NATURAL RESOURCE CENTER (INRC) OFFICE BUILDING - PHASE 3
47°43'01.4"N 116°48'55.7"W
3600 W. NURSERY RD, COEUR D'ALENE, ID, KOOTENAI COUNTY, 83815 - CLIMATE ZONE B5
PROJECT INCLUDES A ENTIRELY NEW OFFICE BUILDING STRUCTURE THAT WILL BE WOOD FRAMED. MATERIALS TO INCLUDE: FIBER-CEMENT SIDING, STONE CLADDING, TIMBER-FRAMED ENTRYWAY, ETC. SPACES WILL INCLUDE:
MEETING ROOMS, CONFERENCE ROOMS, PRIVATE OFFICES AND OPEN OFFICE SPACE.
IDAHO STATE MAP VICINITY MAP
Image Courtesy of Google Earth
PROJECT LOCATION
COEUR D'ALENE
IDAHO FALLSBOISE
TWIN FALLS
POCATELLO
SPOKANE
LEWISTON
MISSOULA
I90
N . R
A M
S E
Y R
D
W. KATHLEEN AVE.
L
IN
C O
L N
W A
Y
MT
WA
NOTE: SEE A0.3 FOR ACTUAL AREAS AS
THEY RELATE TO THE BUILDING CODE
DRAWING INDEXPROJECT TEAM
OWNER
US DEPARTMENT OF AGRICULTURE - USDA
IDAHO PANHANDLE NATIONAL FORESTS
3815 SCHREIBER WAY
COEUR D'ALENE, ID 83815
(208) 765-7204 office
MIKE SHOUP, CONTRACTING OFFICER REPRESENTATIVE
ARCHITECT
A&E ARCHITECTS
222 NORTH HIGGINS
MISSOULA, MT 59802
406.721.5643 office
CHRIS MARTISON, AIA, PRINCIPAL-IN-CHARGE
BRANDON PRINZING, ARCHITECT
CIVIL ENGINEER
MORRISON-MAIERLE, INC.
3011 PALMER ST
MISSOULA, MT 59808
406.542.8880 office
TOBY MCCLUE, CIVIL ENGINEER
STRUCTURAL ENGINEER
DCI ENGINEERS
131 W. MAIN ST
MISSOULA, MT 59802
406.721.7315 office
TOM BEAUDETTE, STRUCTURAL ENGINEER
M/P/E ENGINEER
MORRISON-MAIERLE, INC.
3011 PALMER ST
MISSOULA, MT 59808
406.542.8880 office
ARIAN BLOOMFIELD, ELECTRICAL ENGINEER
JODY WAVEREK, MECHANICAL / PLUMBING ENGINEER
LANDSCAPE ARCHITECT
KENT WATSON & ASSOCIATES
225 BLACK PINE TRAIL
MISSOULA, MT 59803
406.721.3500 office
KENT WATSON, LANDSCAPE ARCHITECT
SYSTEMS FURNITURE DESIGNER
INSITE INC.
631 PARK LANE
BILLINGS, MT 59102
(406) 256-6232 office
MARY SUE GUNNIFSON, INTERIOR DESIGNER
1. EVERY ATTEMPT HAS BEEN MADE TO ASSURE THE ACCURACY OF THE DRAWINGS. NOTIFY ARCHITECT IMMEDIATELY FOR WRITTEN CLARIFICATION IF ANY DISCREPANCY
EXISTS.
2. DRAWINGS CONTAINED WITHIN THESE DOCUMENTS ARE ABBREVIATED IN NATURE. THE CONTRACTOR IS EXPECTED TO USE QUALITY, ACCEPTABLE, CONSTRUCTION
PRACTICES & TECHNIQUES FOR THE EXTENT & TYPE OF WORK DESCRIBED HEREIN.
3. ALL CONSTRUCTION SHALL CONFORM TO ALL APPLICABLE STANDARDS & REGULATIONS AS PRESCRIBED BY THE INTERNATIONAL EXISTING BUILDING CODE, UNIFORM MECHANICAL CODE, UNIFORM PLUMBING CODE, UNIFORM FIRE CODE, AMERICAN NATIONAL STANDARDS, NFPA, THE AMERICANS WITH DISABILITIES ACT, & ANY APPLICABLE LOCAL CODES & REGULATIONS AND ALL WORK SHALL BE PREFORMED IN ACCORDANCE WITH ALL REQUIREMENTS OF THE LOCAL AUTHORITY OF JURISDICTION
4. DO NOT SCALE DRAWINGS. IF A DIMENSION DOES NOT EXIST OR IS IN ERROR, CONTACT THE ARCHITECT IMMEDIATELY FOR WRITTEN CLARIFICATION.
5. CONTRACTOR(S) SHALL GUARANTEE THEIR WORK FOR A PERIOD OF NO LESS THAN ONE YEAR FROM THE DATE OF SUBSTANTIAL COMPLETION. CONTRACTOR(S) SHALL
REPLACE ALL DEFECTIVE PARTS & SUPPLIES AT THEIR COST.
6. CONTRACTOR SHALL SUPPLY ALL PARTS, MATERIALS, & LABOR REQUIRED TO COMPLETE THE WORK INDICATED INCLUDING ALL ACCESSORIES, FINISHES, & SYSTEMS NECESSARY OR APPLICABLE TO ENSURE A COMPLETE & FUNCTIONAL PROJECT UPON COMPLETION.
7. ANY ITEM SHOWN OR REFERENCED IN ONE INSTANCE SHALL BE AS IF SHOWN IN ALL INSTANCES.
8. CONTRACTOR TO REFER TO ALL DRAWINGS INCLUDED IN THIS SET FOR DESCRIPTION OF WORK. CONTRACTOR IS RESPONSIBLE FOR COORDINATION OF ALL REQUIREMENTS BETWEEN THE DRAWINGS & THE WORK OF ANY & ALL EMPLOYEES, SUB-CONTRACTORS, SUB-SUB-CONTRACTORS OR ANY PERSON OR TRADE PARTICIPATING
IN ANY ASPECT OF THE WORK OUTLINED.
9. PROVIDE & MAINTAIN ALL NECESSARY BARRICADES, FLAGMEN, SIGNAGE, & TEMPORARY STRUCTURES NECESSARY TO FACILITATE SAFE ACCESS & TRAVEL TO THE
GENERAL PUBLIC.
10. ALL FINISHES SHALL BE SCRIBED TO ADJACENT SURFACES TO ENSURE COVERAGE OF ANY GAPS OR SPACES NOT INTENDED TO BE EXPOSED.
GENERAL NOTES
PHASING PLAN
PHASE 1 - 2017, 2018
SITE WORK, UTILITIES AND WAREHOUSE (NORTH END)
PHASE 2 - 2017, 2018
WAREHOUSE (SOUTH END)
PHASE 3 - 2018, 2019
OFFICE BUILDING, SITEWORK & LANDSCAPING
(DESCRIBED IN THESE DOCUMENTS)
REFER TO C1.2 FOR SITE WORK PHASING INFORMATION
PHASE 1
PHASE 1 SITEWORK
P H
A S
E
PHASE 3
PHASE 3 SCOPE OF WORK
PHASE 1 (NOT IN SCOPE OF WORK)
NOTE: REFER TO CIVIL DRAWINGS
FOR SITEWORK PHASING
PHASE 1
PHASE 2
SITEWORK BOUNDRY (REFERENCE C1.2)
PHASE 2 (NOT IN SCOPE OF WORK)
PHASE 1
FOREST SUPERVISOR
DATETECHNICAL SERVICES OFFICER
DATE
REGIONAL ENGINEER DATE
SIGNATURES
REGIONAL FACILITIES PROGRAM MANAGER DATE
1.1 SYSTEMS FURNITURE - F2.1, F2.2 125900
OPTION ITEMS
OPTION ITEM #1
OPTION ITEM #2
2.1 INFORMATION PAVILION - A1.1 -
2.2 SMOKING STRUCTURE - A1.2 -
2.3 ADHERED STONE MASONRY NS A4.1 044313.16
2.4 FIBER-CEMENT SIDING FS-1, FS-2 A4.1 074646
2.5 ACOUSTICAL PANEL CEILINGS ACT-1, ACT-2 A7.1, A7.2 095113
2.6 CARPET TILE CPT-1,2,3 A2.1F, A2.2F 096813
2.7 PAINTING, INTERIOR GWB - A9.0 099123
2.8 PAINTING, EXTERIOR - A4.1, A4.2, A4.3 099113
2.9 FOLDING PANEL PARTITIONS AC-2 A2.1 102239
2.10 ROLLER SHADES AC-1 A2.1, A2.2, A9.0 122124
2.11 AMPHITHEATER - L1.5 -
# ITEM SHEET PROJECT MANUAL
# ITEM SHEET PROJECT MANUALTAG
TAG
CONTRACTOR TO BID OPTION ITEMS LISTED IN THEIR ENTIRETY. TAG, SHEET, AND
SPEC REFERENCE FOR CONVENIENCE ONLY.
A MINIMUM TWO GREEN GLOBES CERTIFICATION IS REQUIRED WITH THIS PROJECT. REFER TO
PROJECT MANUAL FOR SPECIFICS. CONTRACTOR TO USE GREEN GLOBE SURVEY (INCLUDED IN
PROJECT MANUAL) AS A GUIDING DOCUMENTS TO ACHIEVE GREEN GLOBES CERTIFICATION.
GREEN GLOBES
0 1 2 3 4 5 6 7 8 9 10 inches
DRAWING NO.
PKG
NO.
SHEET
OF
PROJECT NO.:
REVISIONS:
DESIGNED
TECH. REVIEW
CADD
DESIGNED SUB SHEET NO. TITLE OF SHEET
06.01.2018
6/
/2
3:
:0
P
M
06.28.181
CV
06.01.18C O
N S
T R
U C
T
IO
N D
O C
U M
E N
T S
COVERSHEET
13083
INRC OFFICE BUILDING - PHASE 3
USDA FOREST SERVICE
INRC OFFICE BUILDING - PHASE 3
GENERAL INFORMATION
1 CV COVERSHEET
ARCHITECTURAL DRAWINGS
55 A6.10 INTERIOR ELEVATIONS
56 A6.11 INTERIOR ELEVATIONS
57 A6.12 INTERIOR ELEVATIONS
58 A7.0 RCP - LOWER LEVEL
59 A7.1 RCP - FIRST/GROUND LEVEL
60 A7.2 RCP - SECOND LEVEL
61 A8.0 VERTICAL CIRCULATION - STAIR 1
62 A8.1 VERTICAL CIRCULATION - STAIR 2
63 A8.2 VERT. CIRC. - ELEVATOR
64 A9.0 SCHEDULES - ROOM FINISHES
65 A9.1 SCHEDULES - DOOR & WINDOW
66 A9.2 DOOR AND WINDOW TYPES
67 A9.3 DETAILS - CANOPIES
68 A9.4 DETAILS - CASEWORK
69 A9.5 DETAILS - CASEWORK
70 A9.6 DETAILS - CEILINGS / FLOORS
71 A9.7 DETAILS - INTERIOR
72 A9.8 DETAILS - SCREEN & MURAL
73 A9.9 DETAILS - PAINT & SIGNAGE
74 A9.10 DETAILS - STAIR
75 A9.11 DETAILS - DOOR
76 A9.12 DETAILS - WINDOW
77 A9.13 DETAILS - STOREFRONT
ARCHITECTURAL DRAWINGS
18 A0.1 GENERAL INFORMATION
19 A0.2 INTERIOR WALL ASSEMBLIES
20 A0.3 CODE ANALYSIS / LIFE SAFETY
21 A1.0 ARCHITECTURAL SITE PLAN
22 A1.1 INFORMATIONAL PAVILION
23 A1.2 SMOKING STRUCTURE
24 A2.0 LOWER LEVEL PLAN
25 A2.0C LOWER LEVEL CONSTRUCTION PLAN
26 A2.1 FIRST/GROUND LEVEL PLAN
27 A2.1C FIRST/GROUND LEVEL CONSTRUCTION PLAN
28 A2.1F FIRST/GROUND LEVEL FLOOR FINISH PLAN
29 A2.2 SECOND LEVEL PLAN
30 A2.2C SECOND LEVEL CONSTRUCTION PLAN
31 A2.2F SECOND LEVEL FLOOR FINISH PLAN
32 A2.3 ATTIC LEVEL PLAN
33 A2.4 ROOF PLAN - MAIN
34 A2.5 ROOF PLAN - CANOPIES
35 A2.6 ROOF DETAILS
36 A3.0 ENLARGED FLOOR PLANS
37 A4.1 EXTERIOR ELEVATIONS
38 A4.2 EXTERIOR ELEVATIONS
39 A4.3 EXTERIOR ELEVATIONS
40 A5.0 BUILDING SECTIONS
41 A5.1 BUILDING SECTIONS
42 A5.2 WALL SECTIONS
43 A5.3 WALL SECTIONS
44 A5.4 WALL SECTIONS
45 A5.5 EXTERIOR DETAILS
46 A6.1 INTERIOR ELEVATIONS
47 A6.2 INTERIOR ELEVATIONS
48 A6.3 INTERIOR ELEVATIONS
49 A6.4 INTERIOR ELEVATIONS
50 A6.5 INTERIOR ELEVATIONS
51 A6.6 INTERIOR ELEVATIONS
52 A6.7 INTERIOR ELEVATIONS
53 A6.8 INTERIOR ELEVATIONS
54 A6.9 INTERIOR ELEVATIONS
MECHANICAL DRAWINGS
93 M0.1 HVAC NOTES AND LEGENDS
94 M0.2 HVAC SCHEDULES
95 M0.3 HVAC SCHEDULES
96 M0.4 HVAC SCHEDULES
97 M0.5 MEP COORDINATION
98 M2.0 LOWER LEVEL HVAC PLAN
99 M2.1 FIRST/GROUND LEVEL HVAC PLAN
100 M2.2 SECOND LEVEL HVAC PLAN
101 M2.3 ATTIC HVAC PLAN
102 M2.4 FIRST/GROUND LEVEL HVAC PIPING PLAN
103 M2.5 SECOND LEVEL HVAC PIPING PLAN
104 M5.0 HVAC SECTIONS
105 M9.1 HVAC DETAILS
106 M9.2 REFRIGERANT PIPING SCHEMATICS
PLUMBING DRAWINGS
107 P0.1 PLUMBING SCHEDULES AND LEGENDS
108 P2.0 LOWER LEVEL PLUMBING PLAN
109 P2.1 FIRST/GROUND LEVEL UNDERFLOOR PLUMBING PLAN
110 P2.2 FIRST/GROUND LEVEL PLUMBING PLAN
111 P2.3 SECOND LEVEL UNDERFLOOR PLUMBING PLAN
112 P2.4 SECOND LEVEL PLUMBING PLAN
113 P9.1 PLUMBING DETAILS
LANDSCAPE DRAWINGS
12 L0.1 LANDSCAPE SCHEDULE
13 L1.1 LANDSCAPE SITE PLAN
14 L1.2 LANDSCAPE DETAILS
15 L1.3 IRRIGATION SCHEDULE
16 L1.4 IRRIGATION SITE PLAN
17 L1.5 AMPHITHEATER
ELECTRICAL DRAWINGS
114 E0.1 SYMBOLS AND ABBREVIATIONS
115 E1.1 ELECTRICAL SITE PLAN
116 E2.0 LOWER LEVEL POWER PLAN
117 E2.1 FIRST/GROUND LEVEL POWER PLAN
118 E2.2 SECOND LEVEL POWER PLAN
119 E2.3 ATTIC LEVEL POWER PLAN
120 E2.4 LOWER LEVEL SIGNAL PLAN
121 E2.5 FIRST/GROUND LEVEL SIGNAL PLAN
122 E2.6 SECOND LEVEL SIGNAL PLAN
123 E2.7 ATTIC LEVEL SIGNAL PLAN
124 E7.0 RCP LOWER LEVEL LIGHTING PLAN
125 E7.1 RCP FIRST/GROUND LEVEL LIGHTING PLAN
126 E7.2 RCP SECOND LEVEL LIGHTING PLAN
127 E7.3 ATTIC LIGHTING PLAN
128 E9.1 DETAILS
129 E9.2 DETAILS
130 E9.3 DETAILS
131 E9.4 DETAILS
132 E9.5 DETAILS
133 E9.6 DETAILS
134 E9.7 DETAILS
135 E9.8 SCHEDULES
136 E9.9 SCHEDULES
137 E9.10 SCHEDULES
138 E9.11 SCHEDULES
139 E9.12 SCHEDULES
140 E9.13 SCHEDULES
PERSPECTIVE SHOWN FOR REFERENCE ONLY
STRUCTURAL DRAWINGS
81 S0.1 GENERAL NOTES
82 S1.1 FOUNDATION PLAN
83 S2.1 MAIN FLOOR PLAN
84 S2.2 UPPER FLOOR PLAN
85 S2.3 ROOF FRAMING PLAN
86 S2.5 SMOKING STRUCTURE PLANS - OPTION ITEM #2
87 S2.6 PAVILION PLANS - OPTION #1
88 S3.1 SHEAR WALL PLANS
89 S9.1 DETAILS
90 S9.2 DETAILS
91 S9.3 DETAILS
92 S9.4 DETAILS
FIRE PROTECTION DRAWINGS
141 FP0.1 FIRE PROTECTION NOTES
142 FP2.1 FIRE PROTECTION PLANS
143 FP9.1 FIRE PROTECTION DETAILS
FURNITURE DRAWINGS
78 F2.1 FIRST/GROUND LEVEL FURNITURE PLAN
79 F2.2 SECOND LEVEL FURNITURE PLAN
80 F9.1 FURNITURE - DETAILS
CIVIL DRAWINGS
2 C1.1 2013 TOPOGRAPHIC SURVEY
3 CD1.1 DEMOLITION PLAN
4 C1.2 OVERALL PHASING PLAN
5 C1.3 PROPOSED SITE PLAN
6 C1.4 GRADING & DRAINAGE PLAN
7 C1.5 SIGNAGE PLAN
8 C1.6 COORDINATE LAYOUT PLAN
9 C1.7 PROPOSED UTILITY PLAN
10 C9.1 CIVIL DETAILS
11 C9.2 CIVIL DETAILS
BUILDING AREAS
Name Area (GSF)
1ST LEVEL GROSS 14607 SF
2ND LEVEL - GROSS 14324 SF
28931 SF
RUNNING SHEET COUNT
1. CONSTRUCTION DOCUMENTS, 06.01.18 TOTAL OF 142
2. REVISION #1, 06.28.18: ADDED (ONE) 1 SHEET TO SET TOTAL OF 143
File details come from the government source that posted it. Updated .