12_C-5 Cross Reference Matrix.pdf

PDF 171 KB Posted

Attached to
C-5M SUPPLEMENTAL DEPOT CAPABILITY (SDC) Federal contract opportunity
Solicitation number
FA8525-22-R-0003
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center

About this file

This cross reference matrix and solicitation identify requirements for a five-year indefinite delivery, indefinite quantity contract to provide supplemental depot capability services for the C-5M aircraft. The contractor shall perform up to 16 programmed or unscheduled depot maintenance events including program depot maintenance, inspections, and modifications. Services include maintenance inductions, unscheduled depot level maintenance, fuel storage and refueling, travel, and data deliverables. The solicitation was issued by the Air Force Materiel Command Lifecycle Management Center to establish a single-award contract with one basic period of 36 months and two annual option periods. Proposals are due in accordance with instructions in the request for proposal and will be evaluated using trade-off procedures defined in Section M to make award.

View the file

Other files for this federal contract opportunity

Other files attached to C-5M SUPPLEMENTAL DEPOT CAPABILITY (SDC), newest first.
File Type Posted
FA8525-22-R-0003 0005.pdf PDF
FA8525-22-R-0003 0004.pdf PDF
2nd Post RFP Release QA_C-5 Supplemental Depot Capability_round 2.pdf PDF
FA8525-22-R-0003 0003.pdf PDF
Post RFP Release QA_ C-5 SDC Solicitation FA8525-22-R-0003.pdf PDF
FA8525-22-R-0003 0002.pdf PDF
24_C-5 SDC Section L updated.pdf PDF
11_C-5 FPIF Application.xlsx XLSX spreadsheet
13 -2 Wage Determination Additional locations Houston_Peach_ Palaski_ GA_Herkimer_Oneida_NY_ Manatee_Sarasota_FL.pdf PDF
13-1_ Updated Wage Determination_ update 1.pdf PDF
FA8525-R-0003 0001.pdf PDF
25_C-5 SDC Section M.pdf PDF
23_C-5 Pre-award Survey Checklist (1).pdf PDF
17_C-5 Client Authorization Letter.pdf PDF
02_C-5 Supplemental Depot Capability (SDC) PWS.pdf PDF
20 C-5 Present_Past Performance Relevancy Table.pdf PDF
13 C-5 SDC Consolidated Wage Determination 11 April 2022.pdf PDF
09 C-5 SDC Packaging Requirements.pdf PDF
08_C-5 SDC Transportation Requirements.pdf PDF
18 C-5 Consent Form.pdf PDF
11 C-5 FPIF Application.pdf PDF
03_C-5M Programmed Depot Maintenance (PDM) Work Specification-Appendix A.pdf PDF
FA8525-22-R-0003.pdf PDF
24_C-5 SDC Section L.pdf PDF
22_C-5 Pricing Model_Pricing Example.xlsx XLSX spreadsheet
21 C-5 PPI Tool Instructions.pdf PDF
19_C-5 Transmittal Letter.pdf PDF
16_C-5 Past Performance Questionaire.pdf PDF
15 C-5 Bidders Library DD Form 2345 Militarily Critical Technical Data Agreement March 2016.pdf PDF
14_C-5 SDC QASP.pdf PDF
10_C-5 GFP Attachment.pdf PDF
07_C-5 SDC Contract Security Classification Specifications.pdf PDF
06_C-5 SDC CDRL A001 thru A034.pdf PDF
05 C-5 SDC Sources of Supply Flow Chart- Appendix C.pdf PDF
04_C-5 AFTO Form 103_Catalog M Tasks-Appendix B.pdf PDF
01_SDC Pricing Model.xlsx XLSX spreadsheet
Show all 36

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

C-5M Supplemental Depot Capability Cross Reference Matrix

RFP FA8525-22-R-0003

Attachment 12 As of 7 April 2022

Cross Reference Matrix: The cross reference matrix will be utilized as a tool to show critical interrelationships and dependencies among the technical requirements documents including the Performance Work Statement (PWS), the Work Specification, the Contract Data Requirements List (CDRL), Section L (Instructions to Offerors) and Section M (Evaluation Basis for Award). The cross reference matrix will help offerors ensure they have responded to all the evaluation criteria and proposal submittal requirements identified in the solicitation. If the matrix conflicts with any other requirement, direction, or provision of this solicitation, the other reference shall take precedence over this matrix. Section M references in the matrix are for informational purposes only, and the Government shall be obligated to evaluate proposals solely in conformance with the provisions of Section M of the solicitation.

RFP FA8525-22-R-0003

Attachment 12 As of 7 April 2022

Technical Requirements Document

CLIN

Section L Section M CDRL Proposal (Offeror Completes)

4.0-4.5

4.24.3 and 4.24.15 (defueling-full requirement, fuel filtering, refueling-labor only), 0001 - PDM -

Inductions 1-2 FPIF w/ Schedule Incentive

0002 PDM -

Inductions 3-16 FPIF w/ Schedule Incentive

Vol. I, Vol II.3, II.4. and II.5 and Attachments, Vol III, IV, V

Vol II, Vol III, IV, V

N/A

4.2.5 , 4.2.7, 4.5,

4.24.3 and 4.24.15 (defueling-full requirement, fuel filtering, refueling-labor only), 4.26.1, 4.26.8, and 4.26.9, 0001 - PDM -

Inductions 1-2 FPIF w/ Schedule Incentive

0002 PDM -

Inductions 3-16 FPIF w/ Schedule Incentive

Vol. I, Vol II.3, II.4. and II.5 and Attachments, Vol III, IV, V

A003/ A004/ A007/ A008

4.5, 4.10.2, 4.14.7, 4.16, 4.16.3,

4.24.3 and 4.24.15 (defueling-full requirement, fuel filtering, refueling-labor only), 4.26.1, 4.26.2, 4.26.6, 4.26.8 4.26.9,and 4.31

0001 - PDM -

Inductions 1-2 FPIF w/ Schedule Incentive

0002 PDM -

Inductions 3-16 FPIF w/ Schedule Incentive Schedule Incentive

Vol. I, Vol II.3, II.4. and II.5 and Attachments, Vol III, IV, V

A009/ A010/ A018/ A019/

RFP FA8525-22-R-0003

Attachment 12 As of 7 April 2022

3.2.4, 4.24.3 and 4.24.15 (defueling-full requirement, fuel filtering, refueling-labor only)

0001 - PDM -

Inductions 1-2 FPIF w/ Schedule Incentive

0002 PDM -

Inductions 3-16 FPIF w/ Schedule Incentive

Vol. I, Vol II.3, II.4. and II.5 and Attachments, Vol III, IV, V

A020/ A021

4.19, 4.24.3 and 4.24.15 (defueling-full requirement, fuel filtering, refueling-labor only), and 4.24.14.1

0001 - PDM -

Inductions 1-2 FPIF w/ Schedule Incentive

0002 PDM -

Inductions 3-16 FPIF w/ Schedule Incentive

Vol. I, Vol II.3, II.4. and II.5 and Attachments, Vol III, IV, V

A022/ A024

4.6.5, 4.7.3, 4.23.3, and 4.23.4.1, 4.24.3 and 4.24.15 (defueling-full requirement, fuel filtering, refueling-labor only)

0001 - PDM -

Inductions 1-2 FPIF w/ Schedule Incentive

0002 PDM -

Inductions 3-16 FPIF w/ Schedule Incentive

Vol. I, Vol II.3, II.4. and II.5 and Attachments, Vol III, IV, V

A029/ A031/

4.2.7 , 4.5, 4.8.1, 4.13, 4.26.1, 4.26.8, and 4.26.9

0003 - UDLM-

FFP (Fixed Price Labor Rates)

Vol. I, Vol II.3, II.4. and II.5 and Attachments, Vol III, IV, V

A006/ A007/ A008/ A009

4.2.7 , 4.5, 4.26.1, 4.26.8, and 4.26.9

0004 - AFTO

Form 103 Workload Tasks -

FFP

Vol. I, Vol II.3, II.4. and II.5 and Attachments, Vol III, IV, V

A007/ A008/ A009

4.2.7, 4.5, 4.26.1, 4.26.8, and 4.26.9, and 5.13

0005 - O&A-

CPFF

Vol. I, Vol II.3, II.4. and II.5 and

Vol II, Vol III, IV, V

A007/ A009/A030/

RFP FA8525-22-R-0003

Attachment 12 As of 7 April 2022

Attachments, Vol III, IV, V

4.24.3 and 4.24.15 (storage and refueling-fuel only)

0006 – Fuel -

CRNF

Vol. I, Vol II.3, II.4. and II.5 and Attachments, Vol III, IV, V

N/A

4.14.2, 4.21 0007-Travel -

CFNF

Vol. I, Vol II.3, II.4. and II.5 and Attachments, Vol III, IV, V

A023

3.1.1, 3.2.4, 3.2.12, 3.2.13, 3.3.2.1, 4.5, 4.7.3, 4.8.1, 4.10.2, 4.12.1, 4.12.2, 4.13, 4.14.7, 4.15, 4.16, 4.26.1, 4.26.2, 4.26.3, 4.26.4, 4.26.5, 4.26.6, 4.26.7, 4.26.8, 4.26.9, 4.27, 4.28, 4.30, 4.31, 5.5.3, 5.6, and 5.13

0008 – Data NSP Vol. I, Vol II.3, II.4. and II.5 and Attachments, Vol III, IV, V

A001/A002/ A005/ A006/ A008/ A009/ A011/ A012/ A013/ A014/ A015/ A016/ A017/ A025/ A026/ A027/ A028/ A030/ A032/ A033/ A034

File details come from the government source that posted it. Updated .