FA8525-R-0003 0001.pdf
PDF 369 KB Posted
- Attached to
- C-5M SUPPLEMENTAL DEPOT CAPABILITY (SDC) Federal contract opportunity
- Solicitation number
- FA8525-22-R-0003
About this file
This request for proposal solicits bids for a five-year indefinite delivery, indefinite quantity contract to provide supplemental depot capability services for the C-5M aircraft. The selected contractor will be responsible for programmed depot maintenance, unscheduled depot level maintenance, inspections, modifications and repairs on up to 16 C-5M aircraft. Services include PDM, overfly inspections, lavatory modifications, dorsal complex repairs, crown skin replacements, pylon-wing interface crack repairs and potential future maintenance and modifications. Proposals are due in accordance with instructions in attachments to the RFP. The Air Force will evaluate bids and make award using trade-off procedures outlined in attachment 25, considering factors such as price, past performance and technical approach.
View the file
Other files for this federal contract opportunity
Show all 36
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
JLSU
2. AMENDMENT/MODIFICATION NO.
FA8525-22-R-0003-0001
3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO.
FD20602133081
5. PROJECT NO (If applicable)
6. ISSUED BY CODE
C-5 GALAXY, AFLCMC/WLSKA
235 BYRON ST STE 19A
BLDG 300 CML PHN 478 926 7686
ROBINS AFB GA 31098-1670
BUYER: Aliscia L. Pitts/WLSKA aliscia.pitts@us.af.mil Phone: (478) 926- 3230
7. ADMINISTERED BY (If other than item 6) CODEFA8525
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
CODE
X
9A. AMENDMENT OF SOLICITATION NO.
FA852522R0003
9B. DATED (SEE ITEM 11)
3-MAY-2022
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, is not extended. Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods. ( a ) By completing Items 8 and 15, and returning copies of the amendment; ( b ) By acknowledging receipt of this amendment on each copy of the offer submitted; or ( c ) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return 1 copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
ROUTINE
Offerors: See RFP provisions, "Instruction to Offerors" and "Evaluation Basis for Award" for information relative to proposal preparation and the Government's evaluation methodology.
15A. NAME AND TITLE OF SIGNER (Type or print)
15B. CONTRACTOR/OFFEROR
BY ________________________________________________________
(Signature of person authorized to sign)
15C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16B. UNITED STATES OF AMERICA
BY ____________________________________________________
(Signature of Contracting Officer)
16C. DATE SIGNED
FACILITY CODE
NSN 7540-01-152-8070
PREVIOUS EDITION UNUSABLE
30-105 STANDARD FORM 30 (REV. 10-83)
PRESCRIBED BY GSA
FAR (48 CFR) 53.243
X
X
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
FA8525-22-R-0003-0001
Continuation of block 14. DESCRIPTION OF AMENDMENT/MODIFICATION
The purpose of this Amendment is to compete the following:
1. Add the updated Wage Determinations for the following:
State of Ohio; Counties Greene, Miami & Montgomery
2. Add the Wage Determinations for the following States and Counties:
GA; Counties Houston, Peach & Pulaski NY; Counties Herkimer & Oneida Florida; Counties Manatee & Sarasota
3. All other terms and conditions shall remain the same for FA852522R0003.
FA852522R00030001
PART I THE SCHEDULE
SECTION B
SUPPLIES OR SERVICES AND PRICES/COSTS
Note 1: Overview: This Request For Proposal is issued with the intent to establish a single award Indefinite Delivery, Indefinite Quantity (IDIQ) contract to provide supplemental depot capability (SDC) for the C-5M. This requirement includes Programmed Depot Maintenance (PDM), Unscheduled Depot Level Maintenance (UDLM), repairs and modifications.
Note 2: Contract Type: This will be a single award Indefinite-Delivery Indefinite-Quantity, “D” type contract in accordance with FAR 16.504. The CLIN structure incorporated in the RFP includes CLINS X001 through X008. This buying instrument will utilize a mix of contract types, Fixed Price Incentive Firm(FPIF), Firm-Fixed Price (FFP), Cost-Plus-Fixed-Fee (CPFF), Cost-Reimbursement (CR), and Not Separately Priced (NSP).
Each Contract Line Item Number (CLIN) below indicates the contract type used for each particular requirement. The Basic Period and the Option Periods will be priced separately and the Attachment 01, SDC Pricing Model spreadsheet will be incorporated as part of the contract at time of award.
a. The IDIQ contract will consist of a three (3) year basic period with two (2) one (1) year option periods.
b. Pricing arrangements for the CLINs are as follows:
Fixed Price Incentive Fee (FPIF) 0001-2001, 0002-2002 Firm Fixed Price (FFP), 0003-2003 & 0004-2004 Cost Plus Fixed Fee (CPFF): 0005-2005 Cost Reimbursement with No Fee (CR-NF): 0006-2006 & 0007-2007 Not Separately Priced (NSP): 0008-2008
c. All work tasked prior to expiration of the Contract shall be completed under the terms of the Contract through final delivery.
d. CDRLs shall be provided in accordance with the CDRL listing attached herein. All CDRLs required will be listed in each individual task order.
e. SUBCLINS may be established on individual task order for funding purposes only.
f. The Government reserves the right to place individual orders, from time to time, within any contract period up to the maximum. The maximum quantity of PDM inductions that can be ordered under this contract across all contract periods is 16 EA.
Note 3: The contractor shall furnish and deliver to the Government the required services and materials to support this requirement IAW the PWS, applicable CDRLs, and attachments.
Note 4: The mechanics of this contract will involve the issuance of separate task orders specifying the CLINs in the applicable contract period. It is anticipated that each PDM requirement will be awarded under a separate task order. The Government may wish to execute multiple task orders in any given period. The Government has the unilateral right to issue task orders on any priced CLIN/SUBCLIN and this right will not be rescinded or waived. Any CLIN/SUBCLIN that is required to be negotiated separately shall be awarded bilaterally. Failure of the Government to order the maximum quantity will not entitle the contractor to an equitable adjustment in price under the contract.
Note 5: MINIMUM/MAXIMUM VALUE: The contractor shall furnish to the Government, when and if ordered, the items or services specified in this Schedule up to and including the “Maximum” amount of $ TBD for all orders issued hereunder. The Government shall order at least the “Minimum” amount of $500K in conjunction with award of the basic contract. The quantities of supplies or services specified in this Schedule are estimates only and are not purchased by this contract. Except as this contract may otherwise provide, if the Government’s requirements do not result in orders in the quantities described as “estimated” or “maximum” in the schedule, that fact shall not constitute the basis for an equitable price adjustment.
Note 6: Misc. Information: All references to days are hereby defined as calendar days.
Note 7: Incorporation of Subcontract Plan IAW FAR 19.705-5(a)(5) is required at award of basic contract.
Note 8: Funding: Accounting and appropriation funds citation to be provided on each order issued under this IDIQ.
Note 9: The AFLCMC/WLSK Procuring Contracting Officer (PCO) shall be solely responsible for the issuance of modifications; however, the PCO may delegate the activities IAW FAR 42.203 to the Administrative Contracting Officer (ACO). DD Form
1155 will be utilized by the Government to issue delivery and/or tasks orders. Standard Form 30 will be utilized to modify the IDIQ Contract and any orders issued thereto.
Note 10: Early deliveries for CLINs X003X008 may be acceptable if they can be provided at no additional costs to theGovernment.
Note 11: All unit prices shall be expressed in whole dollars.
Note 12: ALL PROPOSALS SUBMITTED SHALL HAVE A VALIDITY THROUGH 21 April 2023
Note 13: CLIN 0001 is for a quantity of 2 EA PDM inductions that will be priced separately.
Offerors will provide pricing for each PDM induction on Attachment 01, SDC Pricing Model.
Note 14: For CLIN X002, Offerors may either (1) propose only to a single quantity range, or, (2) if more advantageous to the Government and/or Offeror, establish quantity/price ranges up to the maximum quantity for the CLIN. Proposed ranges shall cover all quantities from 1 EA through the maximum quantity of the CLIN. Offerors will provide pricing on Attachment 01, SDC Pricing Model.
Note 15: Offerors will propose fully burdened labor rates for CLIN X003. Government Estimate budgetary hours will be used for evaluation purposes only to calculate the Total Evaluated Price (TEP). In execution, the PCO will request a proposal for each UDLM requirement. The Contractor will propose hours and material costs associated with each UDLM occurrence up to the maximum quantity identified for CLIN X003 in The Schedule. These costs will be evaluated and negotiated at the time of occurrence. The contractor shall utilize the Fully Burdened FFP Labor Rates and Material Addon Factor included in Attachment 01, SDC Pricing Model in the development of all UDLM task order proposals.
Note 16: Notice to Offeror(s)/Supplier(s): Funds are not presently available for this effort. No award will be made under this solicitation until funds are available. The Government reserves the right to cancel this solicitation either before or after the closing date. In the event the Government cancels this solicitation, the Government has no obligation to reimburse an offeror for any costs.
Note 17: Offerors are to propose costs for defueling, filtering and labor associated with refueling under CLINs 0001, 0002, 1002, and 2002 Programmed Depot Maintenance (PDM) target cost per unit, to be input on Attachment 01, SDC Pricing Model.
Note 18: Note to Offerors: The C-5 System Program Office (SPO) has been put on notice that additional Government Furnished Equipment (GFE) may be available for the C-5 SDC effort. The C-5 SPO is currently working to verify the availability and condition of this GFE. A current listing, as well as recent pictures of this equipment will be available 11 May 2022 (est) as part of the C-5 SDC
Bidder’s Library, files “Potential GFE, other locations” and “Potential GFE-Pictures”. Additional information will be released via the Government Point of Entry (GPE) (www.sam.gov) for an in-person visit for interested parties to obtain visuals and ascertain condition of this equipment. In the event there are substantial changes to GFE available, an RFP amendment will be issued and Offerors will be afforded the opportunity to update their respective proposals to account for any additional GFE that can be provided to the SDC Contractor.
The potential additional GFE is as follows:
P/N Description TBD Wing Stand
BASIC Contract Period: The prices in the Basic Contract period shall be in effect from the effective date of the contract for a period of 36 months. Specific dates will be established upon award of the contract.
BASIC PERIOD
PDM Inductions 12 w/ Schedule Incentive Item No.
Incentive Firm Target Estimated Quantity
U/I Unit Price Target Cost Target Profit Target price
2 EA
Minimum Quantity
1 EA
Maximum Quantity
2 EA
PSC: J015
Ceiling Percentage: 130% Overrun Share Ratio: 50/50 (Gov/Ktr) Underrun Share Ratio: 50/50 (Gov/Ktr)
PDM Inductions 12 w/ Schedule Incentive In accordance with the PWS & applicable attachments. See C5 Cross Reference Matrix See Attachment 01, SDC Pricing Model
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: WIDE AREA WORKFLOW Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 90012008 2008
AS9100 9100
NATO AQAP AQAP 2070
Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder
_ Req No / Pri
Required Period of Performance
2 EA TBC
Proposed Period of Performance
2 EA
IAW H-001 Clause. TBC on individual orders issues hereunder.
CLIN 0002: Individual Orders may be placed under this CLIN after the USG has awarded the task orders for the PDM Inductions 1-2.
BASIC PERIOD
PDM Inductions w/Schedule Incentive Item No.
Incentive Firm Target Estimated Quantity
U/I Target Cost Target Profit Target Price
7 EA
Minimum Quantity
1 EA
Maximum Quantity
7 EA
PSC: J015
Ceiling Percentage: 120% Overrun Share Ratio: 50/50 (Gov/Ktr) Underrun Share Ratio: 50/50 (Gov/Ktr)
PDM Inductions w/ Schedule Incentive In accordance with the PWS and applicable attachments. See C5 Cross Reference Matrix See RFP Attachment 01, SDC Pricing Model
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: WIDE AREA WORKFLOW Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 90012008 2008
AS9100 9100
NATO AQAP AQAP 2070
Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder
_ Req No / Pri
Required Period of Performance
+ TBC 7 EA TBC
Proposed Period of Performance
+ TBC 7 EA
IAW H001 and H002 Clause. TBC on individual orders issued hereunder.
Unprogrammed Depot Level Maintenance (UDLM)
Item No.
Firm Fixed Price Estimated Quantity
U/I Unit Price
12 EA
Minimum Quantity
1 EA
Maximum Quantity
12 EA
PSC: J015
Unprogrammed Depot Level Maintenance (UDLM) In accordance with the PWS and applicable attachments. See C5 Cross Reference Matrix See Attachment 01, SDC Pricing Model.
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: WIDE AREA WORKFLOW Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
ISO 90012008 2008
AS9100 9100
NATO AQAP AQAP 2070
Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder
_ Req No / Pri
Required Period of Performance
+ TBC 12 EA TBC
Proposed Period of Performance
+ TBC 12 EA
AFTO Form 103 Additional Workload Tasks
Item No.
Firm Fixed Price Quantity U/I Unit Price Total Price
1 EA
PSC: J015
AFTO Form 103 Additional Workload Tasks In accordance with the PWS & applicable attachments. See C5 Cross Reference Matrix See Attachment 01, SDC Pricing Model.
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: WIDE AREA WORKFLOW Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 90012008 2008
AS9100 9100
NATO AQAP AQAP 2070
Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder
_ Req No / Pri
Required Period of Performance
+ TBC 1 EA TBC
Proposed Period of Performance
+ TBC 1 EA
Any task order placed under the contract including CLIN X005 will include both the estimated hours and rate(s) for CLIN X005. Upon close out of the task order, the fixed fee amount will be adjusted by multiplying the negotiated fee dollars/hour by the actual number of hours incurred.
Over and Above
Item No.
Cost Plus Fixed Fee Quantity U/I Estimated Cost Fixed Fee Est Total Cost
1 LO
PSC: J015
Over and Above In accordance with the PWS & applicable attachments. See C5 Cross Reference Matrix See Attachment 01, SDC Pricing Model.
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: WIDE AREA WORKFLOW Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 90012008 2008
AS9100 9100
NATO AQAP AQAP 2070
Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder
_ Req No / Pri
Required Period of Performance
+ TBC 1 LO TBC
Proposed Period of
+ TBC 1 LO
Offerors are to propose an Addon Factor, and show the breakdown of how the addon factor is calculated, for CLIN X006 on Attachment 01, SDC Pricing Model. While Attachment 01, SDC Pricing Model includes Government estimated costs for CLIN X006, and Offerors are not required to propose an estimated cost, Offerors are cautioned that only storage and fuel costs are associated with CLIN X006 in execution of these requirements.
Fuel
Item No.
Cost Reimbursement No Fee Quantity U/I Est Unit Cost Total Estimated Cost
1 LO
Fuel In accordance with the PWS & applicable attachments. See C5 Cross Reference Matrix See Attachment 01, SDC Pricing Model
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: WIDE AREA WORKFLOW Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 90012008
AS9100 9100
NATO AQAP AQAP 2070
Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder
_ Req No / Pri
Required Period of Performance
+ TBC 1 LO TBC
Proposed Period of Performance
+ TBC 1 LO
Offerors are to propose an Addon Factor, and show the breakdown of how the addon factor is calculated, for CLIN X007 on Attachment 01, SDC Pricing Model. Attachment 01, SDC Pricing Model includes Government estimated costs for CLIN X007. Offerors are not required to propose an estimated cost for this CLIN.
Travel
Item No.
Cost Reimbursement No Fee Quantity U/I Est Unit Cost Total Estimated Cost
1 LO
Travel as approved in advance by Contracting Officer. Travel reimbursed IAW FAR 31.2. See C5 Cross Reference Matrix.
In accordance with the PWS & applicable attachments.See C5 Cross Reference Matrix See Attachment 01, SDC Pricing Model
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: WIDE AREA WORKFLOW Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 90012008 2008
AS9100 9100
NATO AQAP AQAP 2070
Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder
_ Req No / Pri
Required Period of Performance
+ TBC 1 LO TBC
Proposed Period of Performance
+ TBC 1 LO
Data
Item No.
Not Separately Priced Quantity U/I Unit Price
1 LO NSP
Data in accordance with DD Form 14231, Exhibits A001 A0034.
In accordance with the PWS, DD Form 1423s, and applicable attachments. Required delivery IAW specific CDRLs.
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: WIDE AREA WORKFLOW Exhibit: A Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Data
Title Number Date Tailoring
ISO 90012008 2008
AS9100 9100
NATO AQAP AQAP 2070
Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder
_ Req No / Pri
Required Period of Performance
+ IAW1423 1 LO TBC
Proposed Period of Performance
+ IAW1423 1 LO
OPTION I
PDM Inductions w/Schedule Incentive Item No.
Incentive Firm Target Estimated Quantity
U/I Target Cost Target Profit Target Price
4 EA
Minimum Quantity
1 EA
Maximum Quantity
4 EA
PSC: J015
Ceiling Percentage: 120% Overrun Share Ratio: 50/50 (Gov/Ktr) Underrun Share Ratio: 50/50 (Gov/Ktr)
PDM Inductions w/ Schedule Incentive In accordance with the PWS and applicable attachments. See C5 Cross Reference Matrix See RFP Attachment 01, SDC Pricing Model
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: WIDE AREA WORKFLOW
The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 90012008 2008
AS9100 9100
NATO AQAP AQAP 2070
Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder
_ Req No / Pri
Required Period of Performance
+ TBC 4 EA TBC
Proposed Period of Performance
+ TBC 4 EA
IAW H001 and H002 Clause. TBC on individual orders issued hereunder.
Unprogrammed Depot Level Maintenance (UDLM)
Item No.
Firm Fixed Price Estimated Quantity
U/I Unit Price
4 EA
Minimum Quantity
1 EA
Maximum Quantity
4 EA
PSC: J015
Unprogrammed Depot Level Maintenance (UDLM) In accordance with the PWS and applicable attachments. See C5 Cross Reference Matrix See Attachment 01, SDC Pricing Model.
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: WIDE AREA WORKFLOW Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
ISO 90012008 2008
AS9100 9100
NATO AQAP AQAP 2070
Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder
_ Req No / Pri
Required Period of Performance
+ TBC 4 EA TBC
Proposed Period of Performance
+ TBC 4 EA
AFTO Form 103 Additional Workload Tasks
Item No.
Firm Fixed Price Quantity U/I Unit Price Total Price
1 EA
PSC: J015
AFTO Form 103 Additional Workload Tasks In accordance with the PWS & applicable attachments. See C5 Cross Reference Matrix See Attachment 01, SDC Pricing Model.
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: WIDE AREA WORKFLOW Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 90012008 2008
AS9100 9100
NATO AQAP AQAP 2070
Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder
_ Req No / Pri
Required Period of
+ TBC 1 EA TBC
Proposed Period of Performance
+ TBC 1 EA
Any task order placed under the contract including CLIN 1005 will include both the estimated hours and rate(s) for CLIN 1005. Upon close out of the task order, the fixed fee amount will be adjusted by multiplying the negotiated fee dollars/hour by the actual number of hours incurred.
Over and Above
Item No.
Cost Plus Fixed Fee Quantity U/I Estimated Cost Fixed Fee Est Total Cost
1 LO
PSC: J015
Over and Above In accordance with the PWS & applicable attachments. See C5 Cross Reference Matrix See Attachment 01, SDC Pricing Model.
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: WIDE AREA WORKFLOW Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 90012008 2008
AS9100 9100
NATO AQAP AQAP 2070
Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder
_ Req No / Pri
Required Period of Performance
+ TBC 1 LO TBC
Proposed Period of
Offerors are to propose an Addon Factor, and show the breakdown of how the addon factor is calculated, for CLIN 1006 on Attachment 01, SDC Pricing Model. While Attachment 01, SDC Pricing Model includes Government estimated costs for CLIN 1006, and Offerors are not required to propose an estimated cost, Offerors are cautioned that only storage and fuel costs are associated with CLIN 1006 in execution of these requirements.
Fuel
Item No.
Cost Reimbursement No Fee Quantity U/I Est Unit Cost Total Estimated Cost
1 LO
Fuel In accordance with the PWS & applicable attachments. See C5 Cross Reference Matrix See Attachment 01, SDC Pricing Model
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: WIDE AREA WORKFLOW Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 90012008
AS9100 9100
NATO AQAP AQAP 2070
Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder
_ Req No / Pri
Required Period of Performance
+ TBC 1 LO TBC
Proposed Period of Performance
+ TBC 1 LO
Offerors are to propose an Addon Factor, and show the breakdown of how the addon factor is calculated, for CLIN 1007 on Attachment 01, SDC Pricing Model. Attachment 01, SDC Pricing Model includes Government estimated costs for CLIN 1007. Offerors are not required to propose an estimated cost for this CLIN.
Travel
Item No.
Cost Reimbursement No Fee Quantity U/I Est Unit Cost Total Estimated Cost
1 LO
Travel as approved in advance by Contracting Officer. Travel reimbursed IAW FAR 31.2. See C5 Cross Reference Matrix.
In accordance with the PWS & applicable attachments.See C5 Cross Reference Matrix See Attachment 01, SDC Pricing Model
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: WIDE AREA WORKFLOW Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 90012008 2008
AS9100 9100
NATO AQAP AQAP 2070
Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder
_ Req No / Pri
Required Period of Performance
+ TBC 1 LO TBC
Proposed Period of Performance
+ TBC 1 LO
Data
Item No.
Not Separately Priced Quantity U/I Unit Price
1 LO NSP
Data in accordance with DD Form 14231, Exhibits B001 B034.
In accordance with the PWS, DD Form 1423s, and applicable attachments. Required delivery IAW specific CDRLs.
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: WIDE AREA WORKFLOW Exhibit: B
The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Data
Title Number Date Tailoring
ISO 90012008 2008
AS9100 9100
NATO AQAP AQAP 2070
Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder
_ Req No / Pri
Required Period of Performance
+ IAW1423 1 LO TBC
Proposed Period of Performance
+ IAW1423 1 LO
OPTION II
PDM Inductions w/Schedule Incentive Item No.
Incentive Firm Target Estimated Quantity
U/I Target Cost Target Profit Target Price
4 EA
Minimum Quantity
1 EA
Maximum Quantity
4 EA
PSC: J015
Ceiling Percentage: 120% Overrun Share Ratio: 50/50 (Gov/Ktr) Underrun Share Ratio: 50/50 (Gov/Ktr)
PDM Inductions w/ Schedule Incentive In accordance with the PWS and applicable attachments. See C5 Cross Reference Matrix See RFP Attachment 01, SDC Pricing Model
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: WIDE AREA WORKFLOW
Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 90012008 2008
AS9100 9100
NATO AQAP AQAP 2070
Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder
_ Req No / Pri
Required Period of Performance
+ TBC 4 EA TBC
Proposed Period of Performance
+ TBC 4 EA
IAW H001 and H002 Clause. TBC on individual orders issued hereunder.
Unprogrammed Depot Level Maintenance (UDLM)
Item No.
Firm Fixed Price Estimated Quantity
U/I Unit Price
4 EA
Minimum Quantity
1 EA
Maximum Quantity
4 EA
PSC: J015
Unprogrammed Depot Level Maintenance (UDLM) In accordance with the PWS and applicable attachments. See C5 Cross Reference Matrix See Attachment 01, SDC Pricing Model.
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: WIDE AREA WORKFLOW
Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 90012008 2008
AS9100 9100
NATO AQAP AQAP 2070
Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder
_ Req No / Pri
Required Period of Performance
+ TBC 12 EA TBC
Proposed Period of Performance
+ TBC 12 EA
AFTO Form 103 Additional Workload Tasks
Item No.
Firm Fixed Price Quantity U/I Unit Price Total Price
1 EA
PSC: J015
AFTO Form 103 Additional Workload Tasks In accordance with the PWS & applicable attachments. See C5 Cross Reference Matrix See Attachment 01, SDC Pricing Model.
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: WIDE AREA WORKFLOW Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 90012008 2008
AS9100 9100
NATO AQAP AQAP 2070
Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder
_ Req No / Pri
Required Period of Performance
+ TBC 1 EA TBC
Proposed Period of Performance
+ TBC 1 EA
Any task order placed under the contract including CLIN 2005 will include both the estimated hours and rate(s) for CLIN 2005. Upon close out of the task order, the fixed fee amount will be adjusted by multiplying the negotiated fee dollars/hour by the actual number of hours incurred.
Over and Above
Item No.
Cost Plus Fixed Fee Quantity U/I Estimated Cost Fixed Fee Est Total Cost
1 LO
PSC: J015
Over and Above In accordance with the PWS & applicable attachments. See C5 Cross Reference Matrix See Attachment 01, SDC Pricing Model.
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: WIDE AREA WORKFLOW Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 90012008 2008
AS9100 9100
NATO AQAP AQAP 2070
Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder
_ Req No / Pri
Required Period of Performance
+ TBC 1 LO TBC
Proposed Period of
Offerors are to propose an Addon Factor, and show the breakdown of how the addon factor is calculated, for CLIN 2006 on Attachment 01, SDC Pricing Model. While Attachment 01, SDC Pricing Model includes Government estimated costs for CLIN 2006, and Offerors are not required to propose an estimated cost, Offerors are cautioned that only storage and fuel costs are associated with CLIN 2006 in execution of these requirements.
Fuel
Item No.
Cost Reimbursement No Fee Quantity U/I Est Unit Cost Total Estimated Cost
1 LO
Fuel In accordance with the PWS & applicable attachments. See C5 Cross Reference Matrix See Attachment 01, SDC Pricing Model
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: WIDE AREA WORKFLOW Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 90012008
AS9100 9100
NATO AQAP AQAP 2070
Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder
_ Req No / Pri
Required Period of Performance
+ TBC 1 LO TBC
Proposed Period of
Offerors are to propose an Addon Factor, and show the breakdown of how the addon factor is calculated, for CLIN 2007 on Attachment 01, SDC Pricing Model. Attachment 01, SDC Pricing Model includes Government estimated costs for CLIN 2007. Offerors are not required to propose an estimated cost for this CLIN.
Travel
Item No.
Cost Reimbursement No Fee Quantity U/I Est Unit Cost Total Estimated Cost
1 LO
Travel as approved in advance by Contracting Officer. Travel reimbursed IAW FAR 31.2. See C5 Cross Reference Matrix.
In accordance with the PWS & applicable attachments.See C5 Cross Reference Matrix See Attachment 01, SDC Pricing Model
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: WIDE AREA WORKFLOW Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 90012008 2008
AS9100 9100
NATO AQAP AQAP 2070
Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder
_ Req No / Pri
Required Period of Performance
+ TBC 1 LO TBC
Proposed Period of Performance
+ TBC 1 LO
Data
Item No.
Not Separately Priced Quantity U/I Unit Price
1 LO NSP
Data in accordance with DD Form 14231, Exhibits C001 C034.
In accordance with the PWS, DD Form 1423s, and applicable attachments. Required delivery IAW specific CDRLs.
Limitations of Liability: Other Than High Value Item
Data
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: WIDE AREA WORKFLOW Exhibit: C Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 90012008 2008
AS9100 9100
NATO AQAP AQAP 2070
Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder
_ Req No / Pri
Required Period of Performance
+ IAW1423 1 LO TBC
Proposed Period of Performance
+ IAW1423 1 LO
SHIP TO / PLACE OF PERFORMANCE
TYPE/CODE: + IAW1423
MARK FOR: (See Individual Line Item) REQUISITION NUMBER: (See Individual Line Item) REQUISITION PRIORITY: (See Individual Line Item)
AWARD NUMBER:
TYPE/CODE: + TBC
MARK FOR: (See Individual Line Item) REQUISITION NUMBER: (See Individual Line Item) REQUISITION PRIORITY: (See Individual Line Item)
AWARD NUMBER:
PART I THE SCHEDULE
SECTION E
INSPECTION AND ACCEPTANCE
52.246-2 INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)
(IAW FAR 46.302)
52.246-3 INSPECTION OF SUPPLIES--COST-REIMBURSEMENT (MAY 2001)
(IAW FAR 46.303)
52.246-4 INSPECTION OF SERVICES--FIXED-PRICE (AUG 1996)
(IAW FAR 46.304)
52.246-5 INSPECTION OF SERVICES--COST-REIMBURSEMENT (APR 1984)
(IAW FAR 46.305)
PART I THE SCHEDULE
SECTION F
DELIVERIES OR PERFORMANCE
52.247-29 F.O.B. ORIGIN (FEB 2006)
(IAW FAR 47.303-1(c))
52.247-34 F.O.B. DESTINATION (NOV 1991)
(IAW FAR 47.303-6(c))
PART I THE SCHEDULE
SECTION G
CONTRACT ADMINISTRATION DATA
252.232-7006 WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (DEC 2018)
(IAW DFARS 232.7004(b), PGI 232.7004(b)(1), DFARS 212.301(f)(liii))
(a) Definitions. As used in this clause— “Department of Defense Activity Address Code (DoDAAC)” is a six position code that uniquely identifies a unit, activity, or organization.
“Document type” means the type of payment request or receiving report available for creation in Wide Area WorkFlow
(WAWF).
“Local processing office (LPO)” is the office responsible for payment certification when payment certification is done external to the entitlement system.
“Payment request” and “receiving report” are defined in the clause at 252.2327003, Electronic Submission of Payment Requests and Receiving Reports.
(b) Electronic invoicing. The WAWF system provides the method to electronically process vendor payment requests and receiving reports, as authorized by Defense Federal Acquisition Regulation Supplement (DFARS) 252.2327003, Electronic Submission of Payment Requests and Receiving Reports.
(c) WAWF access. To access WAWF, the Contractor shall—
(1) Have a designated electronic business point of contact in the System for Award Management at https://www.sam.gov; and
(2) Be registered to use WAWF at https://wawf.eb.mil/ following the stepbystep procedures for selfregistration available at this web site.
(d) WAWF training. The Contractor should follow the training instructions of the WAWF WebBased Training Course and use the Practice Training Site before submitting payment requests through WAWF. Both can be accessed by selecting the “Web Based Training” link on the WAWF home page at https://wawf.eb.mil/ .
(e) WAWF methods of document submission. Document submissions may be via web entry, Electronic Data Interchange, or File Transfer Protocol.
(f) WAWF payment instructions. The Contractor shall use the following information when submitting payment requests and receiving reports in WAWF for this contract or task or delivery order:
(1) Document type. The Contractor shall submit payment requests using the following document type(s):
(i) For costtype line items, including laborhour or timeandmaterials, submit a cost voucher.
(ii) For fixed price line items—
(A) That require shipment of a deliverable, submit the invoice and receiving report specified by the Contracting Officer.
(Contracting Officer: Insert applicable invoice and receiving report document type(s) for fixed price line items that require shipment of a deliverable.)
(B) For services that do not require shipment of a deliverable, submit either the Invoice 2in1, which meets the requirements for the invoice and receiving report, or the applicable invoice and receiving report, as specified by the Contracting Officer.
(Contracting Officer: Insert either “Invoice 2in1” or the applicable invoice and receiving report document type(s) for fixed price line items for services.)
(iii) For customary progress payments based on costs incurred, submit a progress payment request.
(iv) For performance based payments, submit a performance based payment request.
(v) For commercial item financing, submit a commercial item financing request.
(2) Fast Pay requests are only permitted when Federal Acquisition Regulation (FAR) 52.2131 is included in the contract.
(f) [Note: The Contractor may use a WAWF “combo” document type to create some combinations of invoice and receiving report in one step.]
(3) Document routing. The Contractor shall use the information in the Routing Data Table below only to fill in applicable fields in WAWF when creating payment requests and receiving reports in the system.
Routing Data Table* Field Name in WAWF Data to be entered in WAWF Pay Official DoDAAC Issue By DoDAAC Admin DoDAAC Inspect By DoDAAC Ship To Code Ship From Code Will be completed at contract award Mark For Code Service Approver (DoDAAC) Service Acceptor (DoDAAC) Accept at Other DoDAAC LPO DoDAAC DCAA Auditor DoDAAC Other DoDAAC(s) (*Contracting Officer: Insert applicable DoDAAC information or “See schedule” if multiple ship to/acceptance locations apply, or “Not applicable.”)
(**Contracting Officer: If the contract provides for progress payments or performancebased payments, insert the DoDAAC for the contract administration office assigned the functions under FAR 42.302(a)(13).)
(4) Payment request. The Contractor shall ensure a payment request includes documentation appropriate to the type of payment request in accordance with the payment clause, contract financing clause, or Federal Acquisition Regulation 52.2167, Allowable Cost and Payment, as applicable.
(5) Receiving report. The Contractor shall ensure a receiving report meets the requirements of DFARS Appendix F.
(g) WAWF point of contact.
(1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activity’s WAWF point of contact.
(Contracting Officer: Insert applicable information or “Not applicable.”)
(2) Contact the WAWF helpdesk at 8666185988, if assistance is needed
(The above Clause/Provision has been modified.)
PAYMENT INSTRUCTIONS:
In accordance with DFARS PGI 204.7108 Payment Instructions and OUSD(AT&L)/DPAP Memo dated 08 Mar 18 the following link shall be inserted when payment instructions are required.
https://www.acq.osd.mil/dpap/dars/pgi/pgi_htm/PGI204_71.htm#payment_instructions
ACCOUNTING AND APPROPRIATION DATA (AUG 1998)
Accounting and Appropriation Chargeable ACRN Funds Citation Amount Chargeable
ACRN TOTAL $ 0.00
PART I THE SCHEDULE
SECTION H
SPECIAL CONTRACT REQUIREMENTS
H001 C5 SDC PDM Flow Day Requirements
Aircraft Flow Day Metrics
1 830*
2 476
3 428
4 390
5 359
6 330
7 307
8 285
916 265
* The initial flow day total requirement is 830 days. This timeframe is comprised of both preinduction activities and PDM activities. Preinduction activities are limited to no more than 270 days and the PDM flow day requirement is 560 days.
Flow Day requirements are identified in the table above. These flow day requirements are meant to be sequential in nature, span the entirety of the contract period of performance, and not restart with each Option period. Each induction will be executed via a separate task order, and will have its’ own corresponding flow day requirement, identified in the table above, based on the sequential PDM induction executed against this contract. For example, PDM induction #1 (CLIN 0001) above coordinates with the first aircraft induction, PDM induction #2 (CLIN 0001) above coordinates with the second aircraft induction, and so forth. PDM inductions 316 will be ordered under CLINs X002. Flowing this example out, the 6th PDM induction will coordinate to aircraft 6 above and have a flow day requirement of 330 days, regardless of the contract period during which the PDM induction was awarded. Flow day requirements will not be repeated other than when the standard 265 flow day requirement is reached at PDM induction #9. In execution, PDM induction #9 through PDM induction # 16, the flow day requirement will remain constant at 265 days.
H002 FPIF Cost and Delivery Incentives A. The Government recognizes a derived benefit from Contractor Performance above the target flow days established in Section 2.0 of the Performance Based Work Statement (PWS). Conversely, performance below the established target flow days will have a disadvantageous effect on C5 Mission Capability. To promote continued high levels of Contractor performance, the Government will utilize incentives and disincentives in regards to flow days achieved.
B. The Target Flow Days for each induction is as follows:
Induction Target Flow Days 1 830* 2 476 3 428 4 290 5 359 6 330 7 307 8 285 9+ 265
* The initial flow day total requirement is 830 days. This timeframe is comprised of both preinduction activities and PDM activities. Preinduction activities are limited to no more than 270 days and the PDM flow day requirement is 560 days.
C. The FPIF CLINs under this contract shall utilize underrun and overrun shares of 50/50. For FPIF CLIN 0001, the Ceiling Price shall be 130%. For FPIF CLINs 0002, 1002, and 2002, the Ceiling Price shall be 120%. The Target Fee percentage will be included as proposed by the successful offeror.
D. For FPIF CLINs 0001, 0002, 1002, and 2002, the Government shall split the Target Incentive Fee Dollars into buckets of 30% for the Cost Incentive and 70% for the Delivery Incentive. An example of the breakout can be found in Attachment 11 C5 FPIF Application. Any Contractor cost overrun or underrun share will be reflected with the 30% Cost Incentive portion of the Target Incentive Fee Dollars. To calculate the Delivery Incentive, the number of flow days either under or over target will be multiplied by the delivery percentage factor. The resulting number will be multiplied by the Delivery portion (70%) of the Target Incentive Fee Dollars. The resulting amount will be the added back to the Target Incentive Fee Dollars. This will result in an increase or decrease depending on if the delivery days are under or over the Target Flow Days. The formula is as follows: Delivery Incentive = 70% of Target Incentive Fee Dollars + [70% of Target Incentive Fee Dollars* (Flow Day number over or under target * delivery percentage factor)]. The Government’s delivery percentage factors per PDM Induction can be found in Attachment 11 C5 FPIF Application, tab 2 “Schedule Flow Days by Induction”. The final calculations on the Cost Incentive (30%) and the Delivery Incentive (70%) will be added together to form the Total Incentive Fee on each FPIF CLIN.
E. The incentives, or disincentives, will be calculated within 90 days after PDM aircraft delivery with a modification issued thereafter to capture the net effect. These modifications will be issued on a unilateral basis. Such unilateral adjustment shall be subject to the “Disputes” clause set forth in Section I.
PART II CONTRACT CLAUSES
SECTION I
CONTRACT CLAUSES
5352.201-9101 OMBUDSMAN (OCT 2019)
(IAW AFFARS 5301.9103)
(c) If resolution cannot be made by the contracting officer, the interested party may contact the ombudsman, Thomas (Tom) Eller, D.B.A. at 478 222 1088 , FAX 000 000 0000 , email thomas.eller.1@us.af.mil . Concerns, issues, disagreements, and recommendations that cannot be resolved at the Center/MAJCOM/DRU/SMC ombudsman level, may be brought by the interested party for further consideration to the Air Force ombudsman, Associate Deputy Assistant Secretary (ADAS) (Contracting), SAF/AQC, 1060 Air Force Pentagon, Washington DC 203301060, phone number (571) 2562395, facsimile number (571) 2562431.
52.203-14 DISPLAY OF HOTLINE POSTER(S) (NOV 2021)
(IAW FAR 3.1004(b), DFARS 203.1004(b)(2)(ii))
(3) Any required posters may be obtained as follows:
Poster(s) Obtain from [For DoD:] DoD Inspector General, ATTN: Defense Hotline, 400 Army Navy Drive Washington, DC 222022884
52.203-17 CONTRACTOR EMPLOYEE WHISTLEBLOWER RIGHTS AND REQUIREMENT TO
INFORM EMPLOYEES OF WHISTLEBLOWER RIGHTS (JUN 2020)
(IAW FAR 3.908-9)
52.204-10 REPORTING EXECUTIVE COMPENSATION AND FIRST-TIER SUBCONTRACT
AWARDS (JUN 2020)
(IAW FAR 4.1403(a))
252.211-7008 USE OF GOVERNMENT-ASSIGNED SERIAL NUMBERS (SEP 2010)
(IAW DFARS 211.274-6(c), DFARS 212.301(f)(xv))
52.215-10 PRICE REDUCTION FOR DEFECTIVE CERTIFIED COST OR PRICING DATA
(AUG 2011)
(IAW FAR 15.408(b))
52.215-12 SUBCONTRACTOR CERTIFIED COST OR PRICING DATA (JUN 2020)
(IAW FAR 15.408(d)(1))
52.215-15 PENSION ADJUSTMENTS AND ASSET REVERSIONS (OCT 2010)
(IAW FAR 15.408(g))
52.215-18 REVERSION OR ADJUSTMENT OF PLANS FOR POSTRETIREMENT BENEFITS (PRB)
OTHER THAN PENSIONS (JUL 2005)
(IAW FAR 15.408(j))
52.215-19 NOTIFICATION OF OWNERSHIP CHANGES (OCT 1997)
(IAW FAR 15.408(k))
52.215-23 LIMITATIONS ON PASS-THROUGH CHARGES (JUN 2020)
(IAW FAR 15.408(n)(2))
252.215-7002 COST ESTIMATING SYSTEM REQUIREMENTS (DEC 2012)
(IAW DFARS 215.408(1))
252.217-7028 OVER AND ABOVE WORK (DEC 1991)
(IAW DFARS 217.7702)
52.222-49 SERVICE CONTRACT LABOR STANDARDS--PLACE OF PERFORMANCE UNKNOWN
(MAY 2014)
(IAW FAR 22.1006(f))
(a) In addition to places or areas identified in wage determinations, if any, attached to the solicitation, wage determinations have also been requested for the following: TBC . The Contracting Officer will request wage determinations for additional places or areas of performance if asked to do so in writing by 00 :00 15 , 00 5 0000 .
52.223-11 OZONE-DEPLETING SUBSTANCES AND HIGH GLOBAL WARMING POTENTIAL
HYDROFLUOROCARBONS (JUN 2016)
(IAW FAR 23.804(a)(1))
(a) Definitions. As used in this clause “Global warming potential” means how much a given mass of a chemical contributes to global warming over a given time period compared to the same mass of carbon dioxide. Carbon Dioxide’s global warming potential is defined as 1.0.
“High global warming potential hydrofluorocarbons” means any hydrofluorocarbons in a particular end use for which EPA’s Significant New Alternatives Policy (SNAP) program has identified other acceptable alternatives that have lower global warming potential. The SNAP list of alternatives is found at 40 CFR part 82, subpart G, with supplemental tables of alternatives available at (http://www.epa.gov/snap/ ).
“Hydrofluorocarbons” means compounds that only contain hydrogen, fluorine, and carbon.
“Ozonedepleting substance” means any substance the Environmental Protection Agency designates in 40 CFR Part 82 as
(1) Class I, including, but not limited to, chlorofluorocarbons, halons, carbon tetrachloride, and methyl chloroform; or
(2) Class II including, but not limited to hydrochlorofluorocarbons.
(b) The Contractor shall label products which contain or are manufactured with ozonedepleting substances in the manner and to the extent required by 42 U.S.C. 7671j (b), (c), (d), and (e) and 40 CFR Part 82, Subpart E, as follows:
Warning Contains (or manufactured with, if applicable) *_______, a substance(s) which harm(s) public health and environment by destroying ozone in the upper atmosphere.
* The Contractor shall insert the name of the substance(s).
(c) Reporting. For equipment and appliances that normally each contain 50 or more pounds of hydrofluorocarbons or refrigerant blends containing hydrofluorocarbons, the Contractor shall—
(1) Track on an annual basis, between October 1 and September 30, the amount in pounds of hydrofluorocarbons or refrigerant blends containing hydrofluorocarbons contained in the equipment and appliances delivered to the Government under this contract by—
(i) Type of hydrofluorocarbon (e.g., HFC134a, HFC125, R410A, R404A, etc.);
(ii) Contract number; and
(iii) Equipment/appliance;
(2) Report that information to the Contracting Officer for FY16 and to www.sam.gov, for FY17 and after00
(i) Annually by November 30 of each year during contract performance; and
(ii) At the end of contract performance.
(d) The Contractor shall refer to EPA’s SNAP program (available at http://www.epa.gov/snap ) to identify alternatives.
This is the start of the file's text. The full file is on GovTribe.