10) Attachment G - SOLAR XRIS GFP.pdf

PDF 313 KB Posted

Attached to
Space weather Observations at L1 to Advance Readiness (SOLAR) Series X-ray Irradiance Sensor (XRIS)
Solicitation number
80GSFC26R0006
Issued by

About this file

This is a Government Furnished Property (GFP) list document for the Space Weather Next (SW Next) Program, specifically for the X-Ray Irradiance Sensor (XRIS) component of the Space weather Observations at L1 to Advance Readiness (SOLAR) Project under NASA's Goddard Space Flight Center (Code 493).

The document is a configuration management-controlled listing that is effective from March 13, 2026, through March 13, 2031. It represents Revision B, updated following approval of Configuration Change Request SOLAR-CCR-0186. The document explicitly states that at the current time, there is no anticipated Government-Furnished Equipment (GFE) or property for the SOLAR XRIS Project, with a single line item listed as "TBD" (To Be Determined) for Quantity, Type, Equipment Control Number (ECN), Acquisition Value, and Date of Delivery to Contractor. The document will be updated as needed when GFP items are identified. The effort involves coordination between the U.S. Department of Commerce (National Oceanic and Atmospheric Administration/NESDIS) and NASA, with configuration management oversight by GSFC's SOLAR CMO. Changes to this document require prior approval through the SOLAR project Technical Data Management System via Configuration Control Request (CCR) or Signature Control Request (SCoRe).

View the file

Other files

File Type Posted
Update 02_Questions and Answers.pdf PDF
Amendment 01_XRIS RFP 80GSFC26R0006 (duly executed).pdf PDF
Update 01_Question and Answer.pdf PDF
4) Attachment A - SOLAR XRIS SOW.pdf PDF
11) Attachment J - Requirements Statements List.pdf PDF
17) Attachment N - 3. DRD CPIC.pdf PDF
18) Attachment N - 3a. DRD CPIC Template for IT Portfolio PPM Data Collection.pdf PDF
2) 80GSFC26R0006 XRIS SF33.pdf PDF
6) Attachment C - SOLAR XRIS CDRL.pdf PDF
8) Attachment E - SOLAR XRIS RHARD.pdf PDF
13) Attachment L - Time-and-Materials Rates.pdf PDF
14) Attachment M - Performance Based Milestone Payment.pdf PDF
21) Attachment O - Organizational Conflicts of Interest (OCI) Plan.pdf PDF
25) Enclosure 2 - Financial Capability Disclosure.pdf PDF
5) Attachment B - SOLAR XRIS SPEC.pdf PDF
7) Attachment D - SOLAR XRIS MAR.pdf PDF
12) Attachment K - Small Business Subcontracting Plan.pdf PDF
15) Attachment N - 1. Non-Technical Contract Data Requirements List.pdf PDF
20) Attachment N - 4a. DRD CITAR Report Template.pdf PDF
22) Attachment P - Contractor Proposed Enhancements.pdf PDF
27) Exhibits 1 - 3.pdf PDF
1) XRIS Final RFP 80GSFC26R0006 Cover Letter.pdf PDF
3) XRIS RFP 80GSFC26R0006.pdf PDF
9) Attachment F - Funding Profile.pdf PDF
16) Attachment N - 2. DRD-2 Security Requirements for Unclassified IT Resources.pdf PDF
19) Attachment N - 4. DRD CITAR.pdf PDF
23) Attachment Q - Quality Assurance Plan.pdf PDF
24) Enclosure 1 - Past Performance Questionnaire.pdf PDF
26) Enclosure 3 - Quality Assurance Surveillance Plan.pdf PDF
Show all 29

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Effective Date: March 13, 2026

Expiration Date: March 13, 2031

Check the SOLAR CM tool Server at https://ipdtdms.gsfc.nasa.gov/frontmenu dsp.cfm to verify that this is the correct version prior to use.

SOLAR-XRIS-LIST-0008, Revision B

Space Weather Next (SW Next) Program

Space weather Observations at L1 to Advance Readiness Project

Code 493

SOLAR

X-Ray Irradiance Sensor (XRIS)

Government Furnished Property (GFP)

U.S. Department of Commerce (DOC)

National Oceanic and Atmospheric Administration (NOAA)

NOAA Satellite and Information Service (NESDIS)

National Aeronautics and Space Administration (NASA)

GSFC SOLAR CMO

March 13, 2026

Released

SWO Reviewed – Not Subject to Export Control

SOLAR XRIS GFP SOLAR-XRIS-LIST-0008, Revision B ii Check the SOLAR CM tool Server at https://ipdtdms.gsfc.nasa.gov/frontmenu dsp.cfm to verify that this is the correct version prior to use.

SOLAR X-Ray Irradiance Sensor (XRIS)

Government Furnished Property (GFP)

Signature/Approval Page

Prepared By:

Paul Markie

Reviewed By:

Charles DeLee

Stephen Husty

John Panek

Yaireska Collado Vega

Thomas Haas

Edward Glanfield

John Vollmer

Ashley Greeley

Approved By:

James (Jim) Morrissey iii Check the SOLAR CM tool Server at https://ipdtdms.gsfc.nasa.gov/frontmenu dsp.cfm to verify that this is the correct version prior to use.

Preface

This document is under Space weather Observations at L1 to Advance Readiness (SOLAR) configuration management (CM)-controlled document. Changes to this document require prior approval and shall be submitted in the SOLAR project Technical Data Management System

(TDMS) via a Configuration Control Request (CCR) or Signature Control Request (SCoRe), along with supportive material justifying the proposed change. Changes to this document will be made via complete revision.

All of the requirements within this document assume the use of the work “shall” unless otherwise stated.

Questions or comments concerning this document should be addressed to:

SOLAR Project Configuration Management Office

Goddard Space Flight Center

Code 493

Greenbelt, MD 20771 iv Check the SOLAR CM tool Server at https://ipdtdms.gsfc.nasa.gov/frontmenu dsp.cfm to verify that this is the correct version prior to use.

Change History Log

Revision Effective Date Description of Changes

(Reference the CCR & CCB/ERB Approval Date)

Revision - 07/11/2024 Baseline Release following the approval of SOLAR-CCR-

Revision A 08/21/2025 Update following the approval of SOLAR-CCR-0144

Revision B 03/13/2026 Update following the approval of SOLAR-CCR-0186

Check the SOLAR CM tool Server at https://ipdtdms.gsfc.nasa.gov/frontmenu dsp.cfm to verify that this is the correct version prior to use.

Appendix A. Abbreviations and Acronyms

CCB Configuration Control Board

CCR Configuration Change Request

CM Configuration Management

CMO CM Office

DO Delivery Order

ECN Equipment Control Number

GFE Government-Furnished Equipment

GFP Government-Furnished Property

GSFC Goddard Space Flight Center

I&T Integration and Test

L1 Lagrange-1

MAG Magnetometer

NASA National Aeronautics and Space Administration

Rev Revision

S/C or SC Spacecraft

SOLAR Space weather Observations at L1 to Advance Readiness

SOS Spacecraft/Observatory Simulator

XRIS X-Ray Irradiance Sensor